Method and system for controlling drainage liquid level of nuclear power plant
By preparing compressed air supply and liquid level information control between the reactor pressure vessel and the regulator of the nuclear power plant, the problem of level gauge measurement error during the first circuit drainage of the nuclear power plant is solved, ensuring the safe operation in the reactor and the pressure vessel. Stress consistency.
Patent Information
- Application Number
- CN202411031483.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-30
- Publication Date
- 2024-11-15
AI Technical Summary
When draining water in the first circuit of a nuclear power plant, the level gauge measurement errors due to the pressure changes of the voltage regulator and reactor pressure vessel may cause abnormal water level of the reactor pressure vessel, increasing the risk of core fuel exposure.
By preparing compressed air supply between the reactor pressure vessel and the regulator, obtaining liquid level information, determining the drainage status, and controlling the compressed air supply based on the liquid level information to adjust the internal pressure, ensuring the accuracy of the level gauge measurement and avoiding water level abnormal.
The consistency between the reactor pressure vessel and the internal pressure regulator is achieved, the level gauge measurement error is reduced, the risk of core fuel is avoided, and the safe operation of the nuclear power plant is ensured.
Smart Images

Figure CN118969345A_ABST
Abstract
Description
Technical Field
[0001] The present application belongs to the field of nuclear power technology, and in particular, relates to a method and system for controlling the drainage level of a nuclear power plant. Background Art
[0002] A nuclear power plant is a power plant that uses the energy released by nuclear fission or nuclear fusion reactions to generate electricity. The reactor coolant enters the reactor driven by the main pump, flows through the core, and then flows out from the outlet pipe of the reactor vessel, enters the steam generator, and then returns to the main pump, forming a circulation process of the reactor coolant, also known as the primary circuit of the nuclear power plant. The primary circuit of a nuclear power plant is a closed circuit, which is formed by the reactor pressure vessel, the pressurizer and the steam generator. When the radiochemical conditions of the primary circuit of the nuclear power plant are met, the open end of the reactor pressure vessel is entered by directly opening the sealed top cover, while the manhole door of the pressurizer remains closed.
[0003] However, when the primary circuit of a nuclear power plant is drained, due to the changes in the pressure of the pressurizer and the reactor pressure vessel, the liquid level gauge of the reactor pressure vessel measures a false liquid level, resulting in a large error in the measurement of the liquid level gauge. When the measurement of the liquid level gauge of the reactor pressure vessel has a large error, it is easy to cause abnormal water level in the reactor pressure vessel when controlling the liquid level through the measurement error of the liquid level gauge, resulting in the risk of exposure of the reactor core fuel. Summary of the invention
[0004] The embodiments of the present application provide a method and system for controlling the drainage liquid level of a nuclear power plant, which can solve the problem of abnormal water level caused by the measurement error of the reactor pressure vessel liquid level gauge.
[0005] The present application provides a nuclear power plant drainage liquid level control method, which is applied to a circulation loop of a nuclear reactor coolant, wherein the circulation loop of the nuclear reactor coolant includes a reactor pressure vessel and a pressurizer, and the reactor pressure vessel is connected to the pressurizer. The method includes:
[0006] Under the condition of the reactor pressure vessel and the pressurizer being in a state of ready compressed air supply, obtaining first pressurizer liquid level information and first pressure vessel liquid level information;
[0007] determining a drainage state of the reactor pressure vessel according to the first pressurizer liquid level information and the first pressure vessel liquid level information;
[0008] supplying compressed air to the reactor pressure vessel according to the drainage status of the reactor pressure vessel;
[0009] When the reactor pressure vessel is operating in a compressed air supply state, obtaining second pressurizer liquid level information and second pressure vessel liquid level information;
[0010] The drainage of the reactor pressure vessel is controlled according to the second pressurizer liquid level information and the second pressure vessel liquid level information.
[0011] In one embodiment, the step of controlling the drainage of the reactor pressure vessel according to the second pressurizer liquid level information and the second pressure vessel liquid level information includes:
[0012] If the liquid level information of the second pressure vessel changes from a downward trend to a stable state and the compressed air supply flow rate shows a downward trend, the reactor pressure vessel is controlled to drain water.
[0013] In one embodiment, the step of controlling the drainage of the reactor pressure vessel according to the second pressurizer liquid level information and the second pressure vessel liquid level information includes:
[0014] If the liquid level difference between the second pressurizer liquid level information and the second pressure vessel liquid level information is greater than a first threshold, the reactor pressure vessel is controlled to stop draining water.
[0015] In one embodiment, the step of controlling the drainage of the reactor pressure vessel according to the second pressurizer liquid level information and the second pressure vessel liquid level information includes:
[0016] If the liquid level difference between the second pressurizer liquid level information and the second pressure vessel liquid level information is less than a second threshold, the reactor pressure vessel is controlled to continue draining water to a target value.
[0017] In one embodiment, the step of controlling the drainage of the reactor pressure vessel according to the second pressurizer liquid level information and the second pressure vessel liquid level information includes:
[0018] If the liquid level information of the second pressure vessel changes from an upward peak trend to a stable state, the compressed air supply to the pressurizer and the reactor pressure vessel is closed, and the external gas supply to the pressurizer and the reactor pressure vessel is opened.
[0019] In one embodiment, before the step of obtaining the first pressurizer liquid level information and the first pressure vessel liquid level information under the standby compressed air supply state of the reactor pressure vessel and the pressurizer, the method further comprises:
[0020] Opening the reserve compressed air supply to the pressurizer and the reactor pressure vessel according to the compressed air supply information to ensure that the reactor pressure vessel and the pressurizer are in a reserve compressed air supply state;
[0021] The external gas supply to the pressurizer and the reactor pressure vessel is closed.
[0022] In one embodiment, after the step of controlling the drainage of the reactor pressure vessel according to the second pressurizer liquid level information and the second pressure vessel liquid level information, the method further comprises:
[0023] closing the compressed air supply to the pressurizer and the reactor pressure vessel, and opening the external gas supply to the pressurizer and the reactor pressure vessel;
[0024] Under the external gas supply state of the pressurizer and the reactor pressure vessel, obtaining the third pressurizer liquid level information and the third pressure vessel liquid level information;
[0025] The reactor pressure vessel is controlled to drain water to a target value according to the third pressurizer liquid level information and the third pressure vessel liquid level information.
[0026] In one embodiment, after the step of controlling the reactor pressure vessel to drain water to a target value according to the third pressurizer liquid level information and the third pressure vessel liquid level information, the method further comprises:
[0027] The exhaust port of the pressure vessel liquid level detection module corresponding to the third pressure vessel liquid level information is opened to place the reactor pressure vessel in a pressure relief and cover opening mode.
[0028] In one embodiment, the step of opening the external gas supply to the pressurizer and the reactor pressure vessel includes:
[0029] In a first supply phase, a first opening parameter is set, and according to the first opening parameter, external gas supply to the pressurizer and the reactor pressure vessel is synchronously opened;
[0030] In a continuous second supply phase, a second opening parameter is set, and according to the second opening parameter, the external gas supply of the pressurizer and the reactor pressure vessel is synchronously opened; the second opening parameter is greater than the first opening parameter.
[0031] The present application provides a nuclear power plant drainage liquid level control system, comprising:
[0032] Reactor pressure vessel;
[0033] a pressurizer, in communication with the reactor pressure vessel;
[0034] A pressure vessel liquid level detection module, connected to the reactor pressure vessel, for detecting liquid level information of the first pressure vessel and liquid level information of the second pressure vessel;
[0035] A pressurizer liquid level detection module, connected to the pressurizer, for detecting the first pressurizer liquid level information and the second pressurizer liquid level information;
[0036] a control module connected to the pressure vessel liquid level detection module and the pressurizer liquid level detection module, and configured to determine a drainage state of the reactor pressure vessel according to the first pressurizer liquid level information and the first pressure vessel liquid level information;
[0037] a compressed air supply module connected to the reactor pressure vessel and the pressurizer, the compressed air supply module connected to the control module, and the compressed air supply module is used to supply compressed air to the reactor pressure vessel according to the drainage state of the reactor pressure vessel;
[0038] The control module is also used to control the drainage of the reactor pressure vessel according to the second pressurizer liquid level information and the second pressure vessel liquid level information.
[0039] Compared with the prior art, the embodiments of the present invention have the following beneficial effects:
[0040] When draining the primary circuit of a nuclear power plant by the nuclear power plant drainage level control method provided by the present application, it is determined whether the pressure in the reactor pressure vessel and the pressurizer has changed according to the first pressurizer level information and the first pressure vessel level information in the state of the prepared compressed air supply, and then the drainage state of the reactor pressure vessel is determined. Further, compressed air is supplied to the reactor pressure vessel according to the drainage state of the reactor pressure vessel to adjust the internal pressure of the reactor pressure vessel. In the state of compressed air supply of the reactor pressure vessel, the second pressurizer level information and the second pressure vessel level information are continued to be obtained, and the drainage of the reactor pressure vessel is controlled in real time according to the second pressurizer level information and the second pressure vessel level information.
[0041] By supplying compressed air to the reactor pressure vessel through the nuclear power plant drainage liquid level control method provided by the present application, the internal pressure of the reactor pressure vessel can be made consistent with the internal pressure of the pressurizer, solving the problem of errors in the pressure vessel liquid level information caused by the inconsistency between the internal pressures of the reactor pressure vessel and the pressurizer. Thus, the nuclear power plant drainage liquid level control method provided by the present application solves the problem of abnormal water level caused by the measurement error of the liquid level gauge of the reactor pressure vessel in the traditional method, avoids the risk of exposure of the core fuel of the reactor in the reactor pressure vessel, and ensures the safe operation of the nuclear power plant. BRIEF DESCRIPTION OF THE DRAWINGS
[0042] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.
[0043] Figure 1 It is a schematic diagram of the steps of the nuclear power plant drainage level control method provided by the present application;
[0044] Figure 2 It is a structural schematic diagram of the nuclear power plant drainage level control system provided in this application. DETAILED DESCRIPTION
[0045] In the following description, specific details such as specific system structures, technologies, etc. are provided for the purpose of illustration rather than limitation, so as to provide a thorough understanding of the embodiments of the present application. However, it should be clear to those skilled in the art that the present application may also be implemented in other embodiments without these specific details. In other cases, detailed descriptions of well-known systems, devices, circuits, and methods are omitted to prevent unnecessary details from obstructing the description of the present application.
[0046] It should be understood that when used in the present specification and the appended claims, the term "comprising" indicates the presence of described features, wholes, steps, operations, elements and / or components, but does not exclude the presence or addition of one or more other features, wholes, steps, operations, elements, components and / or combinations thereof.
[0047] It should also be understood that the term “and / or” used in the specification and appended claims refers to any and all possible combinations of one or more of the associated listed items, and includes these combinations.
[0048] As used in the specification and appended claims of this application, the term "if" can be interpreted as "when" or "uponce" or "in response to determining" or "in response to detecting", depending on the context. Similarly, the phrase "if it is determined" or "if [described condition or event] is detected" can be interpreted as meaning "uponce it is determined" or "in response to determining" or "uponce [described condition or event] is detected" or "in response to detecting [described condition or event]", depending on the context.
[0049] In addition, in the description of the present application specification and the appended claims, the terms "first", "second", "third", etc. are only used to distinguish the descriptions and cannot be understood as indicating or implying relative importance.
[0050] References to "one embodiment" or "some embodiments" etc. described in the specification of this application mean that one or more embodiments of the present application include specific features, structures or characteristics described in conjunction with the embodiment. Therefore, the statements "in one embodiment", "in some embodiments", "in some other embodiments", "in some other embodiments", etc. that appear in different places in this specification do not necessarily refer to the same embodiment, but mean "one or more but not all embodiments", unless otherwise specifically emphasized in other ways. The terms "including", "comprising", "having" and their variations all mean "including but not limited to", unless otherwise specifically emphasized in other ways.
[0051] See also Figure 1 and Figure 2 The present application provides a nuclear power plant drainage level control method, which is applied to a circulation loop of a nuclear reactor coolant, wherein the circulation loop of the nuclear reactor coolant includes a reactor pressure vessel 10 and a pressurizer 20. The reactor pressure vessel 10 is connected to the pressurizer 20. The nuclear power plant drainage level control method includes:
[0052] S10, obtaining first pressurizer liquid level information and first pressure vessel liquid level information in a state where the reactor pressure vessel 10 and the pressurizer 20 are in a prepared compressed air supply state;
[0053] S20, determining the drainage state of the reactor pressure vessel 10 according to the first pressurizer liquid level information and the first pressure vessel liquid level information;
[0054] S30, supplying compressed air to the reactor pressure vessel 10 according to the drainage state of the reactor pressure vessel 10;
[0055] S40, when the reactor pressure vessel 10 is operating in a compressed air supply state, obtaining second pressurizer liquid level information and second pressure vessel liquid level information;
[0056] S50, controlling the drainage of the reactor pressure vessel 10 according to the second pressurizer liquid level information and the second pressure vessel liquid level information.
[0057] In this embodiment, the prepared compressed air supply state of the reactor pressure vessel 10 and the pressurizer 20 can be understood as the compressed air supply module 30 being fully prepared in advance to supply compressed air to the reactor pressure vessel 10 and the pressurizer 20, which can ensure that the compressed air supply is provided in time when the primary circuit of the nuclear power plant is rapidly drained. The first pressure vessel liquid level information and the second pressure vessel liquid level information are the liquid level information in the reactor pressure vessel 10 detected by the pressure vessel liquid level detection module 110 (also referred to as RCP090 / 091MN). The first pressurizer liquid level information and the second pressurizer liquid level information are the liquid level information in the pressurizer 20 detected by the pressurizer liquid level detection module 210 (also referred to as RCP098MN). The first pressure vessel liquid level information and the first pressurizer liquid level information represent the liquid level information of the reactor pressure vessel 10 and the liquid level information of the pressurizer 20 obtained under the prepared compressed air supply state of the reactor pressure vessel 10 and the pressurizer 20. The second pressure vessel liquid level information and the second pressurizer liquid level information represent the liquid level information of the reactor pressure vessel 10 and the liquid level information of the pressurizer 20 obtained under the compressed air supply state of the reactor pressure vessel 10. The first and second word descriptions do not represent a specific data, but represent data obtained under different states.
[0058] During the continuous drainage process of a circuit in a nuclear power plant, the reactor pressure vessel 10 is connected to the pressurizer 20. When the first pressurizer liquid level information is different from the first pressure vessel liquid level information, it indicates that there is a liquid level difference between the liquid level information of the reactor pressure vessel 10 and the pressurizer 20, which further indicates that the pressures in the reactor pressure vessel 10 and the pressurizer 20 have changed, resulting in false liquid level information of the first pressure vessel. It is necessary to stop the drainage in time and adjust the pressures in the reactor pressure vessel 10 and the pressurizer 20. For example, when the liquid level height in the first pressurizer liquid level information is 12.8m, and the liquid level height in the first pressure vessel liquid level information is less than 12.8m, the drainage state of the reactor pressure vessel 10 is to stop drainage. 12.8m is greater than the target value for drainage, and the value can be set according to the actual application scenario. The specific value is not limited in this application and can be adjusted adaptively.
[0059] When the drainage state of the reactor pressure vessel 10 is the drainage stop state, compressed air is supplied to the reactor pressure vessel 10, specifically, compressed air is supplied to the top of the reactor pressure vessel 10, so that the internal pressure of the reactor pressure vessel 10 is consistent with the internal pressure of the pressurizer 20. Therefore, in the compressed air supply state of the reactor pressure vessel 10, the second pressurizer liquid level information and the second pressure vessel liquid level information are continuously obtained, and the drainage of the reactor pressure vessel 10 is controlled according to the second pressurizer liquid level information and the second pressure vessel liquid level information.
[0060] When draining the primary circuit of a nuclear power plant by the nuclear power plant drainage level control method provided by the present application, it is determined whether the pressure in the reactor pressure vessel 10 and the pressurizer 20 has changed according to the first pressurizer level information and the first pressure vessel level information in the state of the preliminary compressed air supply, and then the drainage state of the reactor pressure vessel 10 is determined. Further, compressed air is supplied to the reactor pressure vessel 10 according to the drainage state of the reactor pressure vessel 10 to adjust the internal pressure of the reactor pressure vessel 10. In the state of compressed air supply of the reactor pressure vessel 10, the second pressurizer level information and the second pressure vessel level information are continuously obtained, and the drainage of the reactor pressure vessel 10 is controlled in real time according to the second pressurizer level information and the second pressure vessel level information.
[0061] By supplying compressed air to the reactor pressure vessel 10 through the nuclear power plant drainage level control method provided by the present application, the internal pressure of the reactor pressure vessel 10 can be made consistent with the internal pressure of the pressurizer 20, solving the problem of errors in the pressure vessel liquid level information caused by the inconsistency between the internal pressures of the reactor pressure vessel 10 and the pressurizer 20. Thus, the nuclear power plant drainage level control method provided by the present application solves the problem of abnormal water level caused by the measurement error of the liquid level gauge of the reactor pressure vessel 10 in the traditional method, avoids the risk of exposure of the core fuel of the reactor in the reactor pressure vessel 10 due to excessive drainage, and ensures the safe operation of the nuclear power plant.
[0062] The nuclear power plant drainage level control method provided in this application has been applied in actual scenarios and has been verified to have great practical significance, which can avoid nuclear safety incidents caused by abnormal water level in the reactor pressure vessel 10. The nuclear power plant drainage level control method provided in this application is applicable to all pressurized water reactor nuclear power plants.
[0063] In one embodiment, S50, the step of controlling the drainage of the reactor pressure vessel according to the second pressurizer liquid level information and the second pressure vessel liquid level information includes:
[0064] S510: If the second pressure vessel liquid level information changes from a downward trend to a stable state and the compressed air supply flow rate shows a downward trend, the reactor pressure vessel 10 is controlled to drain water.
[0065] In this embodiment, when the top valve 120 (also referred to as RCP640VP) of the reactor pressure vessel 10 is opened, under the compressed air supply state of the reactor pressure vessel 10, the second pressure vessel liquid level information is obtained by the pressure vessel liquid level detection module 110 (also referred to as RCP090 / 091MN). When the second pressure vessel liquid level information fluctuates downward and shows a downward trend, the greater the fluctuation amplitude, the greater the pressure difference between the reactor pressure vessel 10 and the pressurizer 20, and the longer the time required to wait for the pressure in the reactor pressure vessel 10 to be consistent with the pressure in the pressurizer 20 before draining. Under the compressed air supply state of the reactor pressure vessel 10, the second pressure vessel liquid level information is tracked in real time. When the second pressure vessel liquid level information tends to be stable, the compressed air supply flow rate decreases, indicating that the pressure in the reactor pressure vessel 10 tends to be consistent with the pressure in the pressurizer 20, which solves the problem of error in the pressure vessel liquid level information caused by the inconsistency of the internal pressures of the reactor pressure vessel 10 and the pressurizer 20, and further based on the normal pressure vessel liquid level information, the primary circuit drainage is continued.
[0066] In one embodiment, S50, the step of controlling the drainage of the reactor pressure vessel according to the second pressurizer liquid level information and the second pressure vessel liquid level information includes:
[0067] S520: If the liquid level difference between the second pressurizer liquid level information and the second pressure vessel liquid level information is greater than a first threshold, control the reactor pressure vessel to stop draining water.
[0068] In this embodiment, in the state that the reactor pressure vessel continues to drain, the second pressurizer liquid level information and the second pressure vessel liquid level information are obtained in real time, and the liquid level difference between the second pressurizer liquid level information and the second pressure vessel liquid level information is calculated. When the liquid level difference between the second pressurizer liquid level information and the second pressure vessel liquid level information is greater than the first threshold, it indicates that the pressure in the pressurizer 20 and the pressure in the reactor pressure vessel 10 have changed. The first threshold is a value in the range of 75cm to 85cm, which can be set according to the actual application scenario. In one embodiment, the first threshold is 80cm. When the liquid level difference between the second pressurizer liquid level information and the second pressure vessel liquid level information is greater than the first threshold, it indicates that the pressure in the pressurizer 20 and the pressure in the reactor pressure vessel 10 have changed significantly, making the second pressure vessel liquid level information false, and it is necessary to stop draining in time to avoid the risk of exposing the core fuel of the reactor in the reactor pressure vessel 10 due to excessive drainage.
[0069] In one embodiment, S50, the step of controlling the drainage of the reactor pressure vessel according to the second pressurizer liquid level information and the second pressure vessel liquid level information includes:
[0070] S530: If the liquid level difference between the second pressurizer liquid level information and the second pressure vessel liquid level information is less than a second threshold, the reactor pressure vessel is controlled to continue draining water to a target value.
[0071] In this embodiment, the second threshold value is a value in the range of 25 cm to 35 cm, which can be set according to the actual application scenario. In one embodiment, the second threshold value is 30 cm. When the liquid level difference between the second pressurizer liquid level information and the second pressure vessel liquid level information is less than the second threshold value, it indicates that the pressure in the pressurizer 20 is not much different from the pressure in the reactor pressure vessel 10, and a slight change has occurred, so that the second pressure vessel liquid level information can be maintained within the normal range, and the drainage of the nuclear power plant's primary circuit can continue, and there will be no risk of excessive drainage due to false liquid level information, causing the core fuel of the reactor in the reactor pressure vessel 10 to be exposed.
[0072] In one embodiment, the present application provides a method for controlling the liquid level of drainage in a nuclear power plant, further comprising:
[0073] S520 to S530 are repeated until the reactor pressure vessel 10 is drained to a target value.
[0074] In this embodiment, the target value may be a value within a range of 10m to 11m, and the specific value may be set according to the actual application scenario. In one embodiment, the target value is 10.5m. S520 to S530 are repeated until the reactor pressure vessel 10 is drained to 10.5m, which may also be understood as draining the primary circuit of the nuclear power plant to 10.5m.
[0075] In one embodiment, S50, the step of controlling the drainage of the reactor pressure vessel according to the second pressurizer liquid level information and the second pressure vessel liquid level information includes:
[0076] S540, if the second pressure vessel liquid level information changes from an upward peak trend to a stable state, the compressed air supply to the pressurizer 20 and the reactor pressure vessel 10 is turned off, and the external gas supply to the pressurizer 20 and the reactor pressure vessel 10 is turned on, and step S60 is executed.
[0077] In this embodiment, the second pressure vessel liquid level information presents a trend of rising spike fluctuations to stability, which can be understood as a sudden and sharp rise in the second pressure vessel liquid level information over a period of time, forming a spike, and then quickly recovering to a stable trend. The second pressure vessel liquid level information presents a trend of rising spike fluctuations to stability, indicating that negative pressure has formed in the pressurizer 20, and the cause needs to be found out in time. The compressed air supply of the pressurizer 20 and the reactor pressure vessel 10 can be turned off, and the external gas supply of the pressurizer 20 and the reactor pressure vessel 10 can be turned on, that is, the step S60 is executed, and the drainage continues after the subsequent step S60 is executed.
[0078] In one embodiment, S10, before the step of obtaining the first pressurizer liquid level information and the first pressure vessel liquid level information in the reactor pressure vessel and the pressurizer in the standby compressed air supply state, the method includes:
[0079] S01, verifying compressed air supply information, and according to the compressed air supply information, starting the preparatory compressed air supply of the pressurizer 20 and the reactor pressure vessel 10 to ensure that the reactor pressure vessel 10 and the pressurizer 20 are in a preparatory compressed air supply state;
[0080] S02, closing the external gas supply between the pressurizer 20 and the reactor pressure vessel 10.
[0081] In this embodiment, the compressed air supply information includes the pressure information of the pressure gauge 310 downstream of the pressure reducing valve, the fixed value setting information of the compressed air pressure reducing valve 320, and the opening information of the first bypass flow control valve 330. By verifying the pressure gauge 310 downstream of the pressure reducing valve of the compressed air supply module 30 (also referred to as RAZ015LP), it is ensured that the fixed value of the compressed air pressure reducing valve 320 (also referred to as RAZ031VZ) of the compressed air supply module 30 is accurate. In one embodiment, the fixed value setting range of the compressed air pressure reducing valve 320 (also referred to as RAZ031VZ) is 200mbar.g to 300mbar.g. If the fixed value of the compressed air pressure reducing valve 320 (also referred to as RAZ031VZ) is not within the range of 200mbar.g to 300mbar.g, the compressed air pressure reducing valve 320 (also referred to as RAZ031VZ) is adjusted. The first bypass flow rate control valve 330 (also referred to as RAZ030VZ) of the compressed air pressure reducing valve 320 (also referred to as RAZ031VZ) is set to the maximum opening degree.
[0082] By checking the compressed air supply information in the compressed air supply circuit, it can be known whether the compressed air supply of the compressed air supply module 30 is fully prepared. Then, by opening the first compressed air supply pipeline valve 350 (also called RAZ049), the second compressed air supply pipeline valve 360 (also called 125VZ) and the third compressed air supply pipeline valve 370 (also called RCP644VP), the reserve compressed air supply of the pressurizer 20 is opened, and the compressed air supply is prepared in advance to ensure that the pressurizer 20 is in the reserve compressed air supply state, so as to avoid untimely compressed air supply when the primary circuit of the nuclear power plant is rapidly drained.
[0083] When draining the primary circuit of a nuclear power plant, when the compressed air flow meter 340 (also called SAR002LD) confirms that the flow is normal, it can ensure that the air intake of the pressurizer 20 is unobstructed. Further, confirm that the metal hose for air supply connected to the top of the reactor pressure vessel 10 is intact and has no bends. By opening the fourth compressed air supply pipeline valve 380 (also called RAZ126VZ), the reserve compressed air supply of the reactor pressure vessel 10 is turned on, and the metal hose for air supply at the top of the reactor pressure vessel 10 is pressurized, and the compressed air supply is prepared in advance to ensure that the reactor pressure vessel 10 is in a state of reserve compressed air supply, so as to avoid untimely compressed air supply when the primary circuit of the nuclear power plant is drained quickly.
[0084] Before a circuit of the nuclear power plant starts to drain water, the external gas supply to the pressurizer 20 and the reactor pressure vessel 10 is shut off by closing the first external gas supply pipeline valve 410 (also referred to as RPE068VP) and the second external gas supply pipeline valve 420 (also referred to as RPE110VP), so that external gas will not enter the pressurizer 20 and the reactor pressure vessel 10.
[0085] In one embodiment, the highest point of the compressed air supply pipeline of the pressurizer 20 is 26.7 meters, the pressure gauge 310 (also known as RAZ015LP) downstream of the pressure reducing valve is 5.35 meters, and the set value setting range of the compressed air pressure reducing valve 320 (also known as RAZ031VZ) is 200 mbar.g. 2.67-0.535+0.2=2.335. The pressure of the primary circuit of the nuclear power plant is lower than 2.335 bar.g, which will not cause water resistance in the rising section of the gas supply pipeline. When the pressure of the primary circuit of the nuclear power plant is reduced to below 2 bar.g, the third compressed air supply pipeline valve 330 (also known as RCP644VP, also known as the top compressed air supply isolation valve) is opened, which can effectively prevent the water in the reactor pressure vessel 10 from escaping into the gas supply metal hose connected at the top, and can supply compressed air to the pressurizer 20 more stably.
[0086] In one embodiment, compressed air or external atmosphere is provided to the top of the reactor pressure vessel 10 by opening the top valve 120 (also referred to as RCP640VP) of the reactor pressure vessel 10. The reactor pressure vessel 10 is connected to the compressed air supply module 30 through the top valve 120 (also referred to as RCP640VP), the fourth compressed air supply pipeline valve 380 (also referred to as RAZ126VZ) and the first compressed air supply pipeline valve 350 (also referred to as RAZ049). The reactor pressure vessel 10 is connected to the external gas supply module 40 through the top valve 120 (also referred to as RCP640VP) and the second external gas supply pipeline valve 420 (also referred to as RPE110VP).
[0087] The regulator 20 is connected to the compressed air supply module 30 through the third compressed air supply pipeline valve 370 (also known as RCP644VP), the second compressed air supply pipeline valve 360 (also known as 125VZ) and the first compressed air supply pipeline valve 350 (also known as RAZ049). The regulator 20 is connected to the external gas supply module 40 through the first external gas supply pipeline valve 410 (also known as RPE068VP).
[0088] In one embodiment, after the step of controlling the drainage of the reactor pressure vessel according to the second pressurizer liquid level information and the second pressure vessel liquid level information at S50, the method includes:
[0089] S60, closing the compressed air supply to the pressurizer 20 and the reactor pressure vessel 10, and opening the external gas supply to the pressurizer 20 and the reactor pressure vessel 10;
[0090] S70, obtaining third pressurizer liquid level information and third pressure vessel liquid level information under the external gas supply state of the pressurizer 20 and the reactor pressure vessel 10;
[0091] S80, controlling the reactor pressure vessel 10 to drain water to a target value according to the third pressurizer liquid level information and the third pressure vessel liquid level information.
[0092] In this embodiment, the compressed air supply of the compressed air supply module 30 is closed by closing the second bypass flow regulating valve 321 (also called RAZ032VZ) of the compressed air pressure reducing valve 320 (also called RAZ031VZ), thereby closing the compressed air supply of the pressurizer 20 and the reactor pressure vessel 10. The external gas blower 430 (also called EBA001ZV), the third external gas supply pipeline valve 440 (also called RPE779VA) and the fourth external gas supply pipeline valve 450 (also called RPE066VP) are opened to prepare in advance for providing the pressurizer 20 and the reactor pressure vessel 10 with air. Further, the external gas supply pipeline valve 410 (also called RPE068VP) and the second external gas supply pipeline valve 420 (also called RPE110VP) are opened to supply external gas to the pressurizer 20 and the reactor pressure vessel 10.
[0093] Since the external gas supply to the pressurizer 20 and the reactor pressure vessel 10 is turned on, the pressure inside the pressurizer 20 and the reactor pressure vessel 10 will drop, thereby discharging water from the primary side U-tube of the steam generator connected to the pressurizer 20 and the reactor pressure vessel 10, and the liquid level information of the third pressurizer and the liquid level information of the third pressure vessel will rise, thereby achieving adjustment of the pressure inside the pressurizer 20 and the reactor pressure vessel 10.
[0094] Furthermore, under the external gas supply state of the pressurizer 20 and the reactor pressure vessel 10, the third pressurizer liquid level information and the third pressure vessel liquid level information are obtained in real time. The third pressurizer liquid level information is the liquid level information in the pressurizer 20 detected by the pressurizer liquid level detection module 210 (also referred to as RCP098MN). The third pressure vessel liquid level information is the liquid level information in the reactor pressure vessel 10 detected by the pressure vessel liquid level detection module 110 (also referred to as RCP090 / 091MN). The first, second and third word descriptions do not represent a specific data, but represent data obtained under different states. The third pressurizer liquid level information and the third pressure vessel liquid level information characterize the liquid level information of the pressurizer 20 and the liquid level information of the reactor pressure vessel 10 obtained under the external gas supply state of the pressurizer 20 and the reactor pressure vessel 10.
[0095] When the third pressurizer liquid level information and the third pressure vessel liquid level information rise and tend to be stable, the reactor pressure vessel 10 is controlled to continue draining and drain to the target value. In one embodiment, the target value is a value in the range of 10.21m to 10.68m. The specific value can be set according to the actual application scenario, and the specific value is not limited in this application. In one embodiment, the target value is 10.5m. When the third pressurizer liquid level information and the third pressure vessel liquid level information are stable, it indicates that the liquid level difference between the two is small, the internal pressure is consistent, and the drainage of the first circuit of the nuclear power plant to the target value can continue.
[0096] By using the nuclear power plant drainage liquid level control method provided by the present application, the reactor pressure vessel 10 and the pressurizer 20 are supplied with external gas, so that the internal pressure of the reactor pressure vessel 10 can be consistent with the internal pressure of the pressurizer 20, and the problem of errors in the pressure vessel liquid level information caused by the inconsistency between the internal pressures of the reactor pressure vessel 10 and the pressurizer 20 is solved. Therefore, the nuclear power plant drainage liquid level control method provided by the present application solves the problem of abnormal water level caused by the measurement error of the liquid level gauge of the reactor pressure vessel 10 in the traditional method, avoids the risk of the core fuel of the reactor in the reactor pressure vessel 10 being exposed due to excessive drainage, and can ensure the safe operation of the nuclear power plant.
[0097] In one embodiment, S60, the step of starting the external gas supply to the pressurizer and the reactor pressure vessel includes:
[0098] S610, in the first supply stage, setting a first opening parameter, and synchronously opening the external gas supply of the pressurizer 20 and the reactor pressure vessel 10 according to the first opening parameter;
[0099] S620, in the continuous second supply stage, set a second opening parameter, and according to the second opening parameter, synchronously open the external gas supply of the pressurizer 20 and the reactor pressure vessel 10; the second opening parameter is greater than the first opening parameter.
[0100] In this embodiment, in the first supply stage, by setting the first opening parameter to be less than the second opening parameter, the first external gas supply pipeline valve 410 (also referred to as RPE068VP) and the second external gas supply pipeline valve 420 (also referred to as RPE110VP) are slightly opened to supply external gas to the pressurizer 20 and the reactor pressure vessel 10, thereby achieving pressure relief for the pressurizer 20 and the reactor pressure vessel 10. In one embodiment, the first opening parameter can be set within a range of 9% to 11%, and the specific value can be set according to the actual application scenario. In one embodiment, the first opening parameter can be set to 10%.
[0101] In the second supply stage which is continuous with the first supply stage, by setting the second opening parameter to be greater than the first opening parameter, the first external gas supply pipeline valve 410 (also referred to as RPE068VP) and the second external gas supply pipeline valve 420 (also referred to as RPE110VP) are synchronously fully opened to supply external gas to the pressurizer 20 and the reactor pressure vessel 10. The first external gas supply pipeline valve 410 (also referred to as RPE068VP) and the second external gas supply pipeline valve 420 (also referred to as RPE110VP) are synchronously operated to avoid a large pressure difference between the gas pressures of the pressurizer 20 and the reactor pressure vessel 10, which may cause the third pressurizer liquid level information and the third pressure vessel liquid level information to be false, thereby solving the problem of errors in the pressure vessel liquid level information caused by the inconsistency between the internal pressures of the reactor pressure vessel 10 and the pressurizer 20, and further based on the normal pressure vessel liquid level information, continue to drain the primary circuit.
[0102] In one embodiment, after the step of controlling the reactor pressure vessel 10 to drain water to a target value according to the third pressurizer liquid level information and the third pressure vessel liquid level information, S80, the method includes:
[0103] S90, opening the exhaust port of the pressure vessel liquid level detection module 110 (also referred to as RCP090 / 091MN) corresponding to the third pressure vessel liquid level information, so that the reactor pressure vessel 10 is in the pressure relief cover opening mode.
[0104] In this embodiment, the exhaust port of the pressure vessel liquid level detection module 110 (also referred to as RCP090 / 091MN) is opened, so that the pressure vessel liquid level detection module 110 (also referred to as RCP090 / 091MN) is connected to the external atmosphere, and then the reactor pressure vessel 10 is placed in the pressure relief cover opening mode, thereby safely and controllably completing the pre-cover drainage work of the primary circuit of the nuclear power plant. The nuclear power plant drainage liquid level control method provided by the present application can realize the pre-cover drainage work of the primary circuit of the nuclear power plant, and solve the problem of error in the pressure vessel liquid level information when the nuclear power plant drains water before the cover is opened.
[0105] See also Figure 2 The present application provides a nuclear power plant drainage level control system. The nuclear power plant drainage level control system includes a reactor pressure vessel 10, a pressurizer 20, a pressure vessel level detection module 110, a pressurizer level detection module 210, and a compressed air supply module 30. The pressurizer 20 is connected to the reactor pressure vessel 10. The pressure vessel level detection module 110 is connected to the reactor pressure vessel 10 and is used to detect the first pressure vessel level information and the second pressure vessel level information. The pressurizer level detection module 210 is connected to the pressurizer 20 and is used to detect the first pressurizer level information and the second pressurizer level information. The compressed air supply module 30 includes a pressure gauge 310 downstream of the pressure reducing valve (also known as RAZ015LP), a compressed air pressure reducing valve 320 (also known as RAZ031VZ), a first bypass flow regulating valve 330 (also known as RAZ030VZ), a compressed air flow meter 340 (also known as SAR002LD), a second bypass flow regulating valve 321 (also known as RAZ032VZ), etc.
[0106] The control module is connected to the pressure vessel liquid level detection module 110 and the pressurizer liquid level detection module 210, and is used to determine the drainage state of the reactor pressure vessel according to the first pressurizer liquid level information and the first pressure vessel liquid level information. The compressed air supply module 30 is connected to the reactor pressure vessel 10 and the pressurizer 20. The compressed air supply module 30 is connected to the control module. The compressed air supply module 30 is used to supply compressed air to the reactor pressure vessel 10 according to the drainage state of the reactor pressure vessel 10. The control module is also used to control the drainage of the reactor pressure vessel 10 according to the second pressurizer liquid level information and the second pressure vessel liquid level information.
[0107] In this embodiment, the pressurizer 20 is connected to the reactor pressure vessel 10 through a connecting pipeline. The pressure vessel liquid level detection module 110 includes RCP090 and 091MN liquid level gauges. The RCP090 and 091MN liquid level gauges are connected in parallel to the reactor pressure vessel 10, which can realize multiple monitoring of the liquid level and improve the reliability of the measurement. The pressurizer liquid level detection module 210 includes an RCP098MN liquid level gauge. The control module can be a microprocessor, which can realize functions such as data processing and calculation, control and coordination, and data storage. The compressed air supply module 30 is connected to the reactor pressure vessel 10 and the pressurizer 20 through the first compressed air supply pipeline valve 350 (also called RAZ049), the second compressed air supply pipeline valve 360 (also called 125VZ), the third compressed air supply pipeline valve 370 (also called RCP644VP), the top valve 120 (also called RCP640VP), and the fourth compressed air supply pipeline valve 380 (also called RAZ126VZ). The valves are connected by pipelines. For the relevant description in this embodiment, reference can be made to the relevant description of the method in the above embodiment.
[0108] By supplying compressed air to the reactor pressure vessel 10 through the nuclear power plant drainage level control system provided by the present application, the internal pressure of the reactor pressure vessel 10 can be made consistent with the internal pressure of the pressurizer 20, solving the problem of errors in the pressure vessel liquid level information caused by the inconsistency between the internal pressures of the reactor pressure vessel 10 and the pressurizer 20. Thus, the nuclear power plant drainage level control system provided by the present application solves the problem of abnormal water level caused by the measurement error of the liquid level gauge of the reactor pressure vessel 10 in the prior art, avoids the risk of exposure of the core fuel of the reactor in the reactor pressure vessel 10 due to excessive drainage, and ensures the safe operation of the nuclear power plant.
[0109] In one embodiment, the nuclear power plant drainage level control system further includes an external gas supply module 40. The external gas supply module 40 includes a first external gas supply pipeline valve 410 (also referred to as RPE068VP), a second external gas supply pipeline valve 420 (also referred to as RPE110VP), an external gas blower 430 (also referred to as EBA001ZV), etc. The external gas supply module 40 is connected to the reactor pressure vessel 10 and the pressurizer 20, and is used to supply external gas to the pressurizer 20 and the reactor pressure vessel 10. The external gas supply module 40 is connected to the reactor pressure vessel 10 and the pressurizer 20 through the first external gas supply pipeline valve 410 (also referred to as RPE068VP), the third compressed air supply pipeline valve 370 (also referred to as RCP644VP), the second external gas supply pipeline valve 420 (also referred to as RPE110VP) and the top valve 120 (also referred to as RCP640VP). The valves are connected by pipelines. For the relevant description in this embodiment, reference may be made to the relevant description of the method in the above embodiment.
[0110] Through the nuclear power plant drainage level control system provided by the present application, the reactor pressure vessel 10 and the pressurizer 20 are supplied with external gas, so that the internal pressure of the reactor pressure vessel 10 can be consistent with the internal pressure of the pressurizer 20, solving the problem of errors in the pressure vessel liquid level information caused by the inconsistency of the internal pressures of the reactor pressure vessel 10 and the pressurizer 20. Therefore, through the nuclear power plant drainage level control system provided by the present application, the problem of abnormal water level caused by the measurement error of the liquid level gauge of the reactor pressure vessel 10 in the prior art is solved, and the risk of the core fuel of the reactor in the reactor pressure vessel 10 being exposed due to excessive drainage is avoided, so as to ensure the safe operation of the nuclear power plant.
[0111] It should be noted that the information interaction, execution process, etc. between the above-mentioned devices / units are based on the same concept as the method embodiment of the present application. Their specific functions and technical effects can be found in the method embodiment part and will not be repeated here.
[0112] Those skilled in the art can clearly understand that, for the convenience and simplicity of description, only the division of the above-mentioned functional units and modules is used as an example for illustration. In practical applications, the above-mentioned function allocation can be completed by different functional units and modules as needed, that is, the internal structure of the module can be divided into different functional units or modules to complete all or part of the functions described above. The functional units and modules in the embodiment can be integrated in a processing unit, or each unit can exist physically separately, or two or more units can be integrated in one unit. The above-mentioned integrated unit can be implemented in the form of hardware or in the form of software functional units. In addition, the specific names of the functional units and modules are only for the convenience of distinguishing each other, and are not used to limit the scope of protection of this application. The specific working process of the units and modules in the above-mentioned system can refer to the corresponding process in the aforementioned method embodiment, which will not be repeated here.
[0113] In the above embodiments, the description of each embodiment has its own emphasis. For the part that is not described or recorded in detail in a certain embodiment, please refer to the relevant description of other embodiments. It can be appreciated by those of ordinary skill in the art that the units and algorithm steps of each example described in conjunction with the embodiments disclosed herein can be implemented with electronic hardware, or a combination of computer software and electronic hardware. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of this application.
[0114] In the embodiments provided in the present application, it should be understood that the disclosed methods and modules can be implemented in other ways. For example, the module embodiments described above are only schematic. For example, the division of the modules or units is only a logical function division. There may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of modules or units, which can be electrical, mechanical or other forms.
[0115] The embodiments described above are only used to illustrate the technical solutions of the present application, rather than to limit them. Although the present application has been described in detail with reference to the aforementioned embodiments, a person skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. Such modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present application, and should all be included in the protection scope of the present application.
Claims
1. A method for controlling the liquid level of drainage in a nuclear power plant, applied to a circulating loop of a nuclear reactor coolant, wherein the circulating loop of the nuclear reactor coolant comprises a reactor pressure vessel and a pressurizer, wherein the reactor pressure vessel is in communication with the pressurizer, It is characterized in that The method comprises: Under the condition of the reactor pressure vessel and the pressurizer being in a state of ready compressed air supply, obtaining first pressurizer liquid level information and first pressure vessel liquid level information; determining a drainage state of the reactor pressure vessel according to the first pressurizer liquid level information and the first pressure vessel liquid level information; supplying compressed air to the reactor pressure vessel according to the drainage status of the reactor pressure vessel; When the reactor pressure vessel is operating in a compressed air supply state, obtaining second pressurizer liquid level information and second pressure vessel liquid level information; The drainage of the reactor pressure vessel is controlled according to the second pressurizer liquid level information and the second pressure vessel liquid level information.
2. The nuclear power plant drainage level control method according to claim 1, It is characterized in that The step of controlling the drainage of the reactor pressure vessel according to the second pressurizer liquid level information and the second pressure vessel liquid level information comprises: If the liquid level information of the second pressure vessel changes from a downward trend to a stable state and the compressed air supply flow rate shows a downward trend, the reactor pressure vessel is controlled to drain water.
3. The nuclear power plant drainage level control method according to claim 2, It is characterized in that The step of controlling the drainage of the reactor pressure vessel according to the second pressurizer liquid level information and the second pressure vessel liquid level information includes: If the liquid level difference between the second pressurizer liquid level information and the second pressure vessel liquid level information is greater than a first threshold, the reactor pressure vessel is controlled to stop draining water.
4. The nuclear power plant drainage level control method according to claim 2, It is characterized in that The step of controlling the drainage of the reactor pressure vessel according to the second pressurizer liquid level information and the second pressure vessel liquid level information includes: If the liquid level difference between the second pressurizer liquid level information and the second pressure vessel liquid level information is less than a second threshold, the reactor pressure vessel is controlled to continue draining water to a target value.
5. The nuclear power plant drainage level control method according to claim 1, It is characterized in that The step of controlling the drainage of the reactor pressure vessel according to the second pressurizer liquid level information and the second pressure vessel liquid level information comprises: If the liquid level information of the second pressure vessel changes from an upward peak trend to a stable state, the compressed air supply to the pressurizer and the reactor pressure vessel is closed, and the external gas supply to the pressurizer and the reactor pressure vessel is opened.
6. The nuclear power plant drainage level control method according to claim 1, It is characterized in that Before the step of obtaining the first pressurizer liquid level information and the first pressure vessel liquid level information under the standby compressed air supply state of the reactor pressure vessel and the pressurizer, the method further comprises: starting the supply of reserve compressed air to the pressurizer and the reactor pressure vessel according to the compressed air supply information; The external gas supply to the pressurizer and the reactor pressure vessel is closed.
7. The method for controlling the liquid level of nuclear power plant drainage according to claim 1 or claim 5, It is characterized in that After the step of controlling the drainage of the reactor pressure vessel according to the second pressurizer liquid level information and the second pressure vessel liquid level information, the method further includes: closing the compressed air supply to the pressurizer and the reactor pressure vessel, and opening the external gas supply to the pressurizer and the reactor pressure vessel; Under the external gas supply state of the pressurizer and the reactor pressure vessel, obtaining the third pressurizer liquid level information and the third pressure vessel liquid level information; The reactor pressure vessel is controlled to drain water to a target value according to the third pressurizer liquid level information and the third pressure vessel liquid level information.
8. The nuclear power plant drainage liquid level control method according to claim 7, It is characterized in that After the step of controlling the reactor pressure vessel to drain water to a target value according to the third pressurizer liquid level information and the third pressure vessel liquid level information, the method further includes: The exhaust port of the pressure vessel liquid level detection module corresponding to the third pressure vessel liquid level information is opened.
9. The nuclear power plant drainage liquid level control method according to claim 7, It is characterized in that The step of opening the external gas supply of the pressurizer and the reactor pressure vessel includes: In a first supply phase, a first opening parameter is set, and according to the first opening parameter, external gas supply to the pressurizer and the reactor pressure vessel is synchronously opened; In a continuous second supply phase, a second opening parameter is set, and according to the second opening parameter, the external gas supply of the pressurizer and the reactor pressure vessel is synchronously opened; the second opening parameter is greater than the first opening parameter.
10. A nuclear power plant drainage level control system, It is characterized in that include: Reactor pressure vessel; a pressurizer, in communication with the reactor pressure vessel; A pressure vessel liquid level detection module, connected to the reactor pressure vessel, for detecting liquid level information of the first pressure vessel and liquid level information of the second pressure vessel; A pressurizer liquid level detection module, connected to the pressurizer, for detecting the first pressurizer liquid level information and the second pressurizer liquid level information; a control module connected to the pressure vessel liquid level detection module and the pressurizer liquid level detection module, and configured to determine a drainage state of the reactor pressure vessel according to the first pressurizer liquid level information and the first pressure vessel liquid level information; a compressed air supply module connected to the reactor pressure vessel and the pressurizer, the compressed air supply module connected to the control module, and the compressed air supply module is used to supply compressed air to the reactor pressure vessel according to the drainage state of the reactor pressure vessel; The control module is also used to control the drainage of the reactor pressure vessel according to the second pressurizer liquid level information and the second pressure vessel liquid level information.