Expansion type early-dismantling formwork system and construction method thereof
Through the extended early removal formwork system, the combined formwork, non-modular extended formwork and fixed formwork brackets, combined with the reverse tensioning device and early removal support device, the early removal function of cast-in-place concrete slab formwork is solved by the difficulty of realizing the early removal function of cast-in-place concrete slab formwork. The problem of this problem has achieved resource conservation and improved construction efficiency, and adapted to cast-in-place concrete structures of complex shapes.
Patent Information
- Application Number
- CN202411227305.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-03
- Publication Date
- 2024-11-22
AI Technical Summary
It is difficult to achieve early demolition function of cast-in-place concrete slab formwork during construction, resulting in large quantities of formwork, large resource utilization, low construction efficiency, and the design of existing formwork brackets has problems such as safety hazards and low economics.
The extended early disassembly formwork system is adopted, including a combined formwork, a non-modular extended formwork and a fixed formwork bracket. The formwork is reliable support and disassembly through reverse tensioning device and early disassembly support device to adapt to the shape of complex floor slabs. Reduce the cost of formwork and improve construction efficiency.
The early demolition function of the formwork is realized, the resource occupation is reduced, the construction efficiency and safety is improved, the cast-in-place concrete structures are adapted to complex shapes, and the construction cost and formwork price are reduced.
Smart Images

Figure CN118997456A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of civil engineering construction technology, and specifically relates to an extended early-disassembly formwork system and a construction method thereof. Background Art
[0002] The formwork configured for cast-in-place concrete slabs needs to support vertical loads. The cast-in-place concrete slabs need to reach a high proportion of the design strength value before the formwork can be removed. The formwork configured for cast-in-place concrete slabs requires a long cycle of recycling. Therefore, if no measures are taken, the number of formworks configured for cast-in-place concrete slabs in cast-in-place concrete structures will be large. How to use early dismantling devices in the formwork support system of cast-in-place concrete slabs to reduce the number of formworks invested, save engineering costs, and reduce resource usage is a key research direction of cast-in-place concrete slab formwork construction technology. The early dismantling device of the formwork support system should be set during the formwork configuration process. It is not allowed to partially support the concrete slab again after the concrete slab is poured and the concrete reaches the allowable early demolding strength and the formwork support is removed.
[0003] At present, the formwork used for cast-in-place concrete slabs in housing construction projects mainly includes two types: multi-layer bamboo plywood formwork and combined aluminum alloy formwork. Multi-layer bamboo plywood formwork is a formwork assembled from multi-layer bamboo plywood panels and panel support keels (the formwork assembled from multi-layer bamboo plywood panels and panel support keels is hereinafter referred to as plywood formwork, and the multi-layer bamboo plywood panel is hereinafter referred to as plywood). Plywood is cheap. Plywood can also be cut at will and can adapt to various complex plane shapes of cast-in-place concrete slabs. The ability to cut arbitrarily and the low cost after cutting are the core advantages of plywood formwork. In current construction projects, plywood formwork is widely used, accounting for the absolute majority of formwork configured for cast-in-place concrete slabs.
[0004] The socket-and-spigot type disc-and-hook steel pipe support is a standardized formwork support with a span that conforms to the building 3M module. It has a strong load-bearing capacity and high safety. The commonly used spans for formwork supports are 600mm, 900mm, 1200mm, and 1500mm. The socket-and-spigot type disc-and-hook steel pipe support is a formwork support system equipped with a standardized steel pipe support, a top support, and a bottom support.
[0005] When casting concrete slabs, plywood formwork is used with socket-type disc-type steel pipe brackets, which is the main development direction of this type of formwork at this stage. If the plywood formwork is to achieve the early disassembly function, the top support of the formwork bracket needs to be replaced with a special early disassembly device, and the formwork supported by the special early disassembly device needs to be configured as a rear disassembly belt. After part of the formwork bracket is removed, the span of the cast-in-place concrete slab supported by the rear disassembly belt shall not exceed 2M, so the panel support keel needs to be cut into lengths of 600mm, 900mm, 1200mm, 1500mm, and 1800mm, and the plywood needs to be cut into several special fixed sizes such as 600mm, 900mm, 1200mm, 1500mm, and 1800mm. This construction method is labor-intensive and material-intensive. Combined with the low labor efficiency of the loose assembly of plywood formwork, if the construction method of using plywood formwork with a special early disassembly device is adopted for ordinary projects, the cost-effectiveness is not high.
[0006] For large-span cast-in-place concrete slab structures, the concrete must reach 100% of the design strength before the formwork is allowed to be removed. The formwork takes a long time to occupy. If the ambient temperature is low, the concrete strength increases slowly. If the usual construction method is used, the formwork is difficult to recycle in the next construction stage. If the normal construction progress is to be achieved, the number of configured formworks will be large. In order to ensure the construction progress, the large-span cast-in-place concrete slab structure adopts a construction method of plywood formwork configured with a special early removal device, which is economical.
[0007] The engineering practice of configuring a special early dismantling device for plywood formwork has only been applied in a few special projects and is not universal. In projects using plywood formwork, the vertical poles of the formwork support and the cast-in-place columns, walls, and beams of the building need to be separated by a certain distance to facilitate the construction of cast-in-place columns, wall formworks, and beam side formworks of the building by operators. This distance is usually 200mm to 500mm. This section of the plywood formwork for the floor slab is not supported by the vertical poles of the formwork support and is a cantilevered section. This cantilevered section has the risk of overturning. In engineering practice, in order to avoid safety accidents, the cast-in-place column, wall formwork, and beam side formwork adjacent to this cantilevered section are often supported in advance, and this cantilevered section is improved to a simple support form. The steel bars in the columns and walls need to be manufactured and installed in advance before the formwork is supported, otherwise the steel bars cannot be manufactured and installed in the plywood formwork of the closed columns and walls.
[0008] When plywood formwork is used with socket-type disc-type steel pipe brackets, the main beam is placed on the top support of the socket-type disc-type steel pipe bracket, and the load borne by the plywood formwork is transferred to the steel pipe bracket through the main beam placed on the top support. In projects using plywood formwork, the main beam of the plywood formwork is usually rented. Common main beam materials are steel pipes and wooden I-beams. Wooden I-beams are used in thicker cast-in-place concrete slabs. The rental cost of wooden I-beams is high.
[0009] When the main beam of the plywood formwork is designed for force calculation, the main beam adopts a single-span simply supported beam, a second-span continuous beam, a third-span continuous beam, or a fourth-span continuous beam. The calculation model has a great influence on the calculation result. For the same material, the more spans the main beam is erected, the stronger its bearing capacity is. Construction sites vary greatly, and the span of the main beam is usually difficult to define specifically. Using the calculation results of the fourth-span continuous beam to guide the construction may bring huge safety risks. If the calculation results of the single-span simply supported beam are used to guide the construction, it may lead to material waste. The cross-sectional inertia moment and resistance moment of the wooden I-beam are large, and a single beam is usually used for calculation during design. The common specifications of wooden I-beams are H16, H20, and H24. The templates and components of the combined aluminum alloy formwork are connected to each other with pins, which can be easily detached from each other. With the special early disassembly device, the early disassembly function can be easily realized. The early disassembly function is the core advantage of the combined aluminum alloy formwork. The combined aluminum alloy formwork is usually equipped with standard templates of various sizes.
[0010] If the edge of the cast-in-place concrete slab is a curve or a broken line, or the plane shape of the cast-in-place concrete slab is an irregular polygon, etc., the standard formwork of the combined aluminum alloy formwork will be difficult to adapt to the above situation after splicing, and the non-compliant parts need to be specially customized. In addition, the beams, columns, and walls supporting the cast-in-place concrete slab have various sizes, and the nodes at the intersection of the cast-in-place concrete slab and these components are complex and changeable. Most of the nodes at the intersection need to be customized. Even in the construction of floors where the structural forms of each floor do not change much, only about 60-70% of the combined aluminum alloy formwork configuration can use standard formwork, and the rest need to be customized. The price of the combined aluminum alloy formwork is high, and the customized non-standard formwork is difficult to use in other engineering projects, and the amortization cost of the formwork is high. In engineering projects where the structural forms of various parts such as basements are basically different and a large number of customized non-standard formworks are required, it is even more difficult to apply the combined aluminum alloy formwork. The above reasons have greatly limited the scope of use of the combined aluminum alloy formwork.
[0011] In projects using composite aluminum alloy formwork, the composite aluminum alloy formwork at the column, wall, and beam position needs to be installed first to connect and support the horizontal plate formwork. The steel bars at the column and wall position need to be manufactured and installed before the composite aluminum alloy formwork at the column and wall position is installed, otherwise the steel bars cannot be manufactured and installed in the composite aluminum alloy formwork at the closed column and wall position. In the composite aluminum alloy formwork and plywood formwork, the manufacture and installation of beam steel bars are usually carried out after the plate formwork is supported. Due to the obstruction of the beam side formwork, the smooth placement of the steel bars in the beam is often affected, causing certain structural quality risks.
[0012] In the on-site construction of cast-in-place concrete structures, the labor consumption for the production and installation of beam reinforcement, the material consumption and labor consumption of beam formwork, and the quality problem of concrete not being vibrated and compacted well due to dense reinforcement during concrete pouring, all account for a large proportion of the beam. Whether the beam can use prefabricated assembled structures is of great significance for the industrialized manufacturing of construction projects and improving the quality of construction projects. In projects using combined aluminum alloy formwork and plywood formwork, the reinforcement of columns and walls must be completed in advance. If the beam adopts a prefabricated assembled structure in this project, the longitudinal force-bearing main reinforcement of the beam needs to be anchored into the column and wall. However, since the intersection of the beam and the column and wall is the core node area of the column and wall, there are a large number of core stirrups of the column and wall nodes. The stirrups will cross and block the longitudinal anchoring force-bearing main reinforcement of the prefabricated assembled beam that is lowered horizontally, and the prefabricated assembled beam is difficult to install smoothly.
[0013] There is a basic principle in the process of setting up and removing the formwork of cast-in-place concrete structures, namely: support first and then remove, and remove the last support first. According to this principle, the normal construction process should be: the floor slab is a horizontal component, and the formwork of the floor slab is the bottom formwork. The formwork of the floor slab needs to wait for a long time and can only be removed when the floor slab concrete reaches a higher strength, so the formwork of the floor slab can only be removed last and should be set up first. Columns and walls are vertical components, and the column and wall formworks are side formworks. They do not bear vertical loads. During construction, they only bear the lateral pressure of the flowing concrete during pouring. When the concrete reaches a lower strength in a shorter time, the column and wall formworks can be removed first and should be set up last.
[0014] In the above two formwork systems, some changes were made to the order of formwork installation for the convenience of construction, which violated the basic principles and brought some adverse effects to the project construction. Summary of the invention
[0015] The first object of the present invention is to provide an extended early dismantling formwork system, which has an early dismantling function, is highly adaptable to the complex plane shape of cast-in-place concrete slabs, and the formworks of columns, walls, beams, and slabs can be independently set up, and has low cost, convenient construction, high load-bearing capacity, and high safety.
[0016] The second purpose is to provide a construction method for an extended early-disassembly formwork system, which complies with the basic principles of formwork support and dismantling, and has no cross-influence between the various working procedures, which helps to improve the project quality and construction efficiency. At the same time, the downward pulling force of the reverse tensioning device and the upward pressing force of the early-disassembly support device form a force balance, ensuring the gap-free close connection between the early-disassembly support device and the extended early-disassembly formwork, so that the early-disassembly support device can reliably bear the floor load.
[0017] The object of the present invention is achieved by an expandable early disassembly formwork system, comprising:
[0018] A modular formwork, the modular formwork comprising a frame keel formwork and a plurality of pins connected to the frame keel formwork;
[0019] A non-modular expandable formwork, the non-modular expandable formwork comprising a plurality of extension strips, the plurality of extension strips being detachably connected at the periphery of the modular formwork in the horizontal direction through corresponding connection components;
[0020] A standardized formwork support, the standardized formwork support comprising a plurality of vertically arranged modular supports and a plurality of horizontally arranged rectangular steel pipe main beams, and
[0021] A plurality of the rectangular steel tube main beams are fixedly arranged at the lower end of the combined formwork, a plurality of the modular brackets are detachably arranged at the bottom of each rectangular steel tube main beam, the modular brackets are provided with early disassembly support devices, and a reverse tensioning device is arranged on the frame keel formwork.
[0022] Furthermore, the frame keel template includes a skeleton structure and a panel structure arranged on the skeleton structure, the skeleton structure is a rectangular frame formed by fixedly connecting rib tubes, the rib tubes are evenly provided with holes on the sides, and the frame keel template is connected by a plurality of pins to form the combined template.
[0023] Furthermore, the connecting assembly includes a main beam and a plurality of connecting strips evenly distributed along the length direction of the main beam, one end of the plurality of connecting strips is fixedly connected to the main beam; the extension strip is fixedly connected to the connecting strip by bolts.
[0024] Furthermore, the modular bracket is a socket-type disc-lock type, bowl-lock type or wheel-lock type modular steel pipe bracket.
[0025] Furthermore, the early disassembly support device includes a top support and a bottom support, the top support is a "U"-shaped part opening upward, the end of the rectangular steel pipe main beam is placed in the top support, the upper end of the modular support is fixedly connected to the lower end of the top support, and the bottom support is fixedly sleeved on the bottom of the modular support.
[0026] Furthermore, the reverse tensioning device includes a rope fixedly connected to the frame keel template and a basket bolt arranged at the other end of the rope.
[0027] Furthermore, a plywood is provided at the upper end of the non-modular expandable template, and the plywood is fixedly connected to the extension strip by rivets.
[0028] Furthermore, the dimensions of the frame keel template are: 300mm in width, and 600mm, 900mm, 1200mm or 1500mm in length.
[0029] A construction method of an extended early-disassembly formwork system comprises the following steps:
[0030] S1. Select a construction area, where the construction area is a rectangular area;
[0031] S2. Fix and install a plurality of modular brackets in the rectangular area in S1, and set a rectangular steel pipe main beam at the upper ends of the plurality of modular brackets;
[0032] S3, a plurality of horizontal frame keel templates are arranged on the plurality of rectangular steel tube main beams, the plurality of rectangular steel tube main beams and the corresponding modular brackets are relatively fixedly supported and installed through jacking, and the plurality of frame keel templates are relatively fixedly connected through the pins to form the combined template;
[0033] S4, evenly arranging a plurality of sets of reverse tensioning devices on the frame keel template, wherein the plurality of sets of reverse tensioning devices are symmetrically arranged on the frame keel template for providing stable support for the installation of the frame keel template;
[0034] S5. A non-modular expandable template is fixedly arranged on the periphery of the modular template, wherein the non-modular expandable template is provided with a plurality of extension bars, and the plurality of extension bars are fixedly arranged on the connection assembly to be fixedly connected with the modular template in a horizontal direction;
[0035] S6, arranging plywood on the upper end surfaces of the modular formwork and the non-modular expandable formwork installed in S5, and adaptively cutting the outer edges of the plywood;
[0036] S7, casting the combined formwork and the non-modular expandable formwork;
[0037] S8. When the strength of the cast-in-place concrete slab reaches a level that does not require support, adjust the top and bottom supports, remove the supporting device and loosen the frame keel formwork, and the remaining part of the formwork can be removed.
[0038] Furthermore, the rectangular steel tube main beam adopts a 80×80×3mm rectangular steel tube supported by a single single-span simply supported beam.
[0039] The beneficial effects of the present invention are embodied in:
[0040] 1. The present invention can reduce the occupation and usage of social resources.
[0041] 2. The present invention can promote the development of prefabricated structures;
[0042] 3. The present invention promotes the popularization and use of modular steel pipe supports such as socket-type disc-lock type, bowl-lock type, wheel-lock type, etc. BRIEF DESCRIPTION OF THE DRAWINGS
[0043] In order to more clearly illustrate the specific embodiments of the present invention or the technical solutions in the prior art, the following is a brief introduction to the drawings required for the specific embodiments or the description of the prior art. In all the drawings, similar elements or parts are generally identified by similar reference numerals. In the drawings, the elements or parts are not necessarily drawn according to the actual scale.
[0044] Figure 1 It is a schematic diagram of the overall structure of the expandable early disassembly formwork system of the present invention;
[0045] Figure 2 This is a schematic diagram of the frame keel template structure of the present invention;
[0046] Figure 3 It is a schematic diagram of the structure of the connection assembly of the present invention.
[0047] In the attached drawings, 1-combined formwork, 2-frame keel formwork, 3-frame keel formwork, 4-non-modular expandable formwork, 5-extension bar, 6-connecting assembly, 7-formed formwork bracket, 8-modular bracket, 9-rectangular steel pipe main, 10-early dismantling support device, 11-reverse tensioning device, 12-skeleton structure, 13-panel structure, 14-rib tube, 15-hole, 16-main beam, 17-connecting bar, 18-top support, 19-bottom support, 20-rope, 21-basket bolt, 22-plywood. DETAILED DESCRIPTION
[0048] The following embodiments of the technical solution of the present invention are described in detail in conjunction with the accompanying drawings. The following embodiments are only used to more clearly illustrate the technical solution of the present invention, and are therefore only used as examples, and cannot be used to limit the protection scope of the present invention.
[0049] It should be noted that, unless otherwise specified, the technical terms or scientific terms used in this application should have the common meanings understood by those skilled in the art to which the present invention belongs.
[0050] Reference Figure 1 An extended early dismantling formwork system, comprising:
[0051] A modular formwork 1, comprising a frame keel formwork 2 and a plurality of pins 3 connected to the frame keel formwork 2;
[0052] A non-modular expandable formwork 4, wherein the non-modular expandable formwork 4 comprises a plurality of extension bars 5, wherein the plurality of extension bars 5 are detachably connected to the periphery of the modular formwork 1 in a horizontal direction through corresponding connection components 6;
[0053] A standardized formwork support 7, wherein the standardized formwork support 7 comprises a plurality of vertically arranged modular supports 8 and a plurality of horizontally arranged rectangular steel pipe main beams 9, and
[0054] A plurality of the rectangular steel tube main beams 9 are fixedly arranged at the lower end of the combined formwork 1, and a plurality of the modular brackets 8 are detachably arranged at the bottom of each of the rectangular steel tube main beams 9. The modular brackets 8 are provided with early-disassembly support devices 10, and a reverse tensioning device 11 is provided on the frame keel formwork 2.
[0055] Preferably, the frame keel formwork 2 includes a skeleton structure 12 and a panel structure 13 arranged on the skeleton structure 12, the skeleton structure 12 is a rectangular frame formed by fixedly connecting rib tubes 14, the rib tubes 14 are provided with holes 15 evenly distributed on the sides, and the frame keel formwork 2 is connected by a plurality of the pins 3 to form the combined formwork 1.
[0056] It can be understood that the pin 3 referred to in the present invention is a pin specified in the industry standard of the People's Republic of China: JGJ 386-2016 Technical Specification for Combined Aluminum Alloy Formwork Engineering, which is a combination of a pin and a pin sheet. The pin 3 can also be a bolt pair.
[0057] As a preferred mode of this embodiment, the panel structure 13 and the rib tube 14 can be made of the same material or different materials. The panel structure 13 and the rib tube 14 can be separated and assembled or integrated.
[0058] As a preferred embodiment of this embodiment, the rectangular steel tube main beam is an 80×80 rectangular steel tube with a length of 600mm, 900mm, 1200mm or 1500mm.
[0059] Preferably, the connecting assembly 6 includes a main beam 16 and a plurality of connecting strips 17 evenly distributed along the length direction of the main beam 16, one end of the plurality of connecting strips 17 is fixedly connected to the main beam 16; the extension strip 5 is fixedly connected to the connecting strip 17 by bolts.
[0060] As a preferred embodiment of the present invention, the extension bar 5 is a strip-shaped profile with two holes at one end of the strip-shaped profile. The length of the extension bar 5 is 150 mm, 250 mm, 350 mm or 450 mm.
[0061] Preferably, the modular bracket 8 is a socket-type disc-lock type, bowl-lock type or wheel-lock type modular steel pipe bracket.
[0062] As a preferred embodiment of this embodiment, the modular bracket 8 is a steel pipe of Φ48.3×3.6 mm.
[0063] Preferably, the early dismantling support device 10 includes a top support 18 and a bottom support 19, the top support 18 is a "U"-shaped part opening upward, the end of the rectangular steel pipe main beam 9 is placed in the top support 18, the upper end of the modular bracket 8 is fixedly connected to the lower end of the top support 18, and the bottom support 19 is fixedly sleeved on the bottom of the modular bracket 8.
[0064] Preferably, the reverse tensioning device 11 comprises a rope 20 fixedly connected to the frame keel formwork 2 and a turnbuckle bolt 21 arranged at the other end of the rope 20 .
[0065] One end of the rope 20 is inserted into the hole on the side of the frame keel formwork 3 and is connected and fixed by tying a knot. The other end of the rope 20 is connected and fixed by tying a knot to one end of the basket bolt 21. The other end of the basket bolt 21 is hooked on the ground anchor. Adjust the basket bolt 21, tighten the rope 20, and the reverse tensioning device 11 produces a restraining effect, pressing the extended early-disassembly formwork against the top of the socket-type disc-type steel pipe support. Through the restraining effect of the reverse tensioning device 11, the overturning moment generated by the cantilevered non-modular extended formwork 4 when it is loaded is overcome.
[0066] The early dismantling support device 10 is placed at the lower part of the panel of the frame keel formwork 3, and the top support 18 and the bottom support 19 are adjusted, so that the early dismantling support device 10 presses the panel of the frame keel formwork 3. Due to the pre-tensioning effect of the reverse tensioning device 11, the early dismantling support device 10 will not push the expanded early dismantling formwork away from the top of the finalized formwork support 7.
[0067] The top support 18 and the bottom support 19 utilize the top support 18 and the bottom support 19 components of the socket-type disc-type steel pipe bracket, and the vertical steel pipe uses a Φ48.3×3.6mm steel pipe. All components of the early-dismantling support device 10 do not need to be specially made, which effectively reduces the purchase cost of the early-dismantling support.
[0068] When the extended early-dismantling formwork system is dismantled, the dismantling part and the retained part only need to remove the pins connecting each other, and the two parts can be separated. After removing a part of the formwork, the early-dismantling support device 10 supports part of the frame keel formwork 3 to continue to bear the load. When the strength of the cast-in-place concrete slab reaches a point where no support is required, the top support 18 and the bottom support 19 are adjusted, and the early-dismantling support device 10 loosens the frame keel formwork 3, and the retained part of the formwork can be removed.
[0069] As a preferred embodiment of the present invention, the rope 20 may also be replaced by a cargo strap with various rope tensioners.
[0070] Preferably, a plywood 22 is provided at the upper end of the non-modular expandable template 4, and the plywood 22 is fixedly connected to the extension strip 5 by rivets.
[0071] Preferably, the dimensions of the frame keel template 2 are: 300 mm in width, and 600 mm, 900 mm, 1200 mm or 1500 mm in length.
[0072] When the extended early-dismantling formwork system is dismantled, the dismantling part and the retained part only need to remove the pins connecting each other, and the two parts can be separated. After removing a part of the formwork, the early-dismantling support device 10 supports part of the frame keel formwork 3 to continue to bear the load. When the strength of the cast-in-place concrete slab reaches a point where no support is required, the top support 18 and the bottom support 19 are adjusted, and the early-dismantling support device 10 loosens the frame keel formwork 3, and the retained part of the formwork can be removed.
[0073] A construction method of an extended early-disassembly formwork system comprises the following steps:
[0074] S1. Select a construction area, where the construction area is a rectangular area;
[0075] S2. Fix and install a plurality of modular brackets in the rectangular area in S1, and set a rectangular steel pipe main beam at the upper ends of the plurality of modular brackets;
[0076] S3, a plurality of horizontal frame keel templates are arranged on the plurality of rectangular steel tube main beams, the plurality of rectangular steel tube main beams and the corresponding modular brackets are relatively fixedly supported and installed through jacking, and the plurality of frame keel templates are relatively fixedly connected through the pins to form the combined template;
[0077] S4, multiple sets of reverse tensioning devices are evenly arranged on the frame keel template, and multiple sets of reverse tensioning devices are symmetrically arranged on the frame keel template to provide stable support for the installation of the frame keel template; no matter what plane shape of the concrete slab, a rectangular area or a regular graphic area composed of several rectangles can always be marked out in the middle part of the concrete slab, and the length and width of the marked area are in accordance with the building 3M module, so as to be compatible with the modular bracket 8. This area is filled with frame keel templates 3 of various suitable sizes.
[0078] The area of the concrete slab formwork outside the above-mentioned rectangular area or regular pattern area is filled with a non-modular expandable formwork 4.
[0079] The formwork of the entire concrete slab is fully supported by the mutual complementation of the frame keel formwork 3 and the non-modular expansion formwork 4. The formwork of the entire concrete slab formed by the combination of the frame keel formwork 3 and the non-modular expansion formwork 4 is hereinafter referred to as the expansion early dismantling formwork.
[0080] The reverse tensioning device 11 is provided to add additional constraints to the extended early-disassembly formwork, so that the extended early-disassembly formwork can remain stable without the support of the column formwork, wall formwork, and beam side formwork, and the formworks of the column, wall, beam, and plate can form relatively independent parts without interfering with each other. After independence, the formworks of the column, wall, beam, and plate can also select different types of formwork systems respectively to better adapt to the special requirements of different structural components for the formwork system.
[0081] S5. A non-modular expandable template is fixedly arranged on the periphery of the modular template, wherein the non-modular expandable template is provided with a plurality of extension bars, and the plurality of extension bars are fixedly arranged on the connection assembly to be fixedly connected with the modular template in a horizontal direction;
[0082] S6. Plywood is set on the upper end surface of the combined formwork and non-modularized extended formwork installed in S5, and the outer edge of the plywood is adaptively cut; after the concrete slab formwork can be independently supported, the existing combined aluminum alloy formwork and plywood 22 formwork are reformed, and the construction method of first making and installing the steel bars of the column and wall parts is changed to first making and installing the beam steel bars or first placing the prefabricated assembled beams. At this time, due to the obstruction of the non-beam side formwork, the installation of the beam steel bars will be relatively smooth; at this time, due to the horizontal obstruction of the core stirrups of the column and wall nodes, the installation of the prefabricated assembled beams will also be very smooth. After the beam steel bars are installed or the prefabricated assembled beams are placed, the steel bars of the column and wall parts are installed. Since there is no obstruction of the column and wall formwork, the horizontal bars of the column and wall can be installed horizontally, and then the longitudinal force-bearing main bars of the column and wall are inserted from the upper part of the extended early dismantling formwork to the lower layer. After the installation of the column, wall and beam steel bars is completed, the column and wall formwork and the beam side formwork are installed. At this time, the column, wall formwork, and beam side formwork can be easily adjusted to the required vertical angle because there is no connection constraint of the plate formwork. After the improvement, it complies with the basic principles of formwork support and removal, and each process has no cross-influence, which helps to improve the project quality and construction efficiency.
[0083] At the same time, the downward pulling force of the reverse tensioning device 11 and the upward pushing force of the early dismantling support device 10 form a force balance, ensuring the seamless connection between the early dismantling support device 10 and the extended early dismantling formwork, so that the early dismantling support device 10 can reliably bear the floor load.
[0084] S7, casting the combined formwork and the non-modular expandable formwork;
[0085] S8. When the strength of the cast-in-place concrete slab reaches a level that does not require support, adjust the top and bottom supports, remove the supporting device and loosen the frame keel formwork, and the remaining part of the formwork can be removed.
[0086] Preferably, the rectangular steel tube main beam adopts a 80×80×3mm rectangular steel tube supported by a single single-span simply supported beam.
[0087] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some or all of the technical features therein by equivalents. These modifications or replacements do not make the essence of the corresponding technical solutions deviate from the scope of the technical solutions of the embodiments of the present invention, and they should all be included in the scope of the claims and specification of the present invention.
Claims
1. An expandable early dismantling formwork system, characterized in that: include: A modular formwork (1), the modular formwork (1) comprising a frame keel formwork (2) and a plurality of pins (3) connected to the frame keel formwork (2); A non-modular expandable formwork (4), the non-modular expandable formwork (4) comprising a plurality of extension strips (5), the plurality of extension strips (5) being detachably connected at the periphery of the modular formwork (1) in a horizontal direction via corresponding connection components (6); A standardized formwork support (7), the standardized formwork support (7) comprising a plurality of vertically arranged modular supports (8) and a plurality of horizontally arranged rectangular steel pipe main beams (9), and A plurality of the rectangular steel tube main beams (9) are fixedly arranged at the lower end of the combined formwork (1), and a plurality of the modular brackets (8) are detachably arranged at the bottom of each rectangular steel tube main beam (9), and the modular brackets (8) are provided with early disassembly support devices (10), and a reverse tensioning device (11) is provided on the frame keel formwork (2).
2. The expandable early dismantling formwork system according to claim 1 is characterized in that: The frame keel template (2) comprises a skeleton structure (12) and a panel structure (13) arranged on the skeleton structure (12); the skeleton structure (12) is a rectangular frame formed by fixedly connecting rib tubes (14); the rib tubes (14) are evenly provided with holes (15) on the sides; the frame keel template (2) is connected by a plurality of pins (3) to form the combined template (1).
3. The expandable early dismantling formwork system according to claim 2 is characterized in that: The connection assembly (6) comprises a main beam (16) and a plurality of connection strips (17) evenly distributed along the length direction of the main beam (16), one end of the plurality of connection strips (17) being fixedly connected to the main beam (16); and the extension strip (5) is fixedly connected to the connection strip (17) by bolts.
4. The expandable early dismantling formwork system according to claim 1, characterized in that: The modular support (8) is a socket-type disc-lock type, bowl-lock type or wheel-lock type modular steel pipe support.
5. The expandable early dismantling formwork system according to claim 1, characterized in that: The early dismantling support device (10) comprises a top support (18) and a bottom support (19); the top support (18) is a "U"-shaped member with an opening facing upward; the end of the rectangular steel pipe main beam (9) is placed in the top support (18); the upper end of the modular bracket (8) is fixedly connected to the lower end of the top support (18); and the bottom support (19) is fixedly sleeved on the bottom of the modular bracket (8).
6. The expandable early dismantling formwork system according to claim 1, characterized in that: The reverse tensioning device (11) comprises a rope (20) fixedly connected to the frame keel template (2) and a turnbuckle bolt (21) arranged at the other end of the rope (20).
7. The expandable early dismantling formwork system according to claim 1, characterized in that: A plywood (22) is provided at the upper end of the non-modular expandable template (4), and the plywood (22) is fixedly connected to the extension strip (5) via rivets.
8. The expandable early dismantling formwork system according to claim 1, characterized in that: The dimensions of the frame keel template (2) are: a width of 300 mm, and a length of 600 mm, 900 mm, 1200 mm or 1500 mm.
9. A construction method of an extended early dismantling formwork system, characterized in that: The method comprises the expandable early disassembly formwork system according to any one of claims 1 to 8, and further comprises the following steps: S1. Select a construction area, where the construction area is a rectangular area; S2. Fix and install a plurality of modular brackets in the rectangular area in S1, and set a rectangular steel pipe main beam at the upper ends of the plurality of modular brackets; S3, a plurality of horizontal frame keel templates are arranged on the plurality of rectangular steel tube main beams, the plurality of rectangular steel tube main beams and the corresponding modular brackets are relatively fixedly supported and installed through jacking, and the plurality of frame keel templates are relatively fixedly connected through the pins to form the combined template; S4, evenly arranging a plurality of sets of reverse tensioning devices on the frame keel template, wherein the plurality of sets of reverse tensioning devices are symmetrically arranged on the frame keel template for providing stable support for the installation of the frame keel template; S5. A non-modular expandable template is fixedly arranged on the periphery of the modular template, wherein the non-modular expandable template is provided with a plurality of extension bars, and the plurality of extension bars are fixedly arranged on the connection assembly to be fixedly connected with the modular template in a horizontal direction; S6, arranging plywood on the upper end surfaces of the modular formwork and the non-modular expandable formwork installed in S5, and adaptively cutting the outer edges of the plywood; S7, casting the combined formwork and the non-modular expandable formwork; S8. When the strength of the cast-in-place concrete slab reaches a level that does not require support, adjust the top and bottom supports, remove the supporting device and loosen the frame keel formwork, and the remaining part of the formwork can be removed.
10. The construction method of the expandable early dismantling formwork system according to claim 9, characterized in that: The rectangular steel tube main beam adopts a 80×80×3mm rectangular steel tube supported by a single single-span simply supported beam.
Citation Information
Patent Citations
Combined early-disassembly template device
CN102661040A
Temporary supporting device, temporary supporting structure and temporary supporting method for floor support plate
CN111456425A
Building template system
CN117071880A
Early support system that tears open of slab form
CN207513160U
Early-dismantling combined formwork structure
CN217079660U