Arrangement method and use method of old mine underground tunneling gangue filling system
By designing gangue crushing, pulping and filling systems underground in old mines, the problems of low gangue transportation efficiency and high production system transformation cost are solved, efficient gangue filling and transportation are achieved, and production costs are reduced.
Patent Information
- Application Number
- CN202411143259.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-20
- Publication Date
- 2024-11-22
AI Technical Summary
The transportation efficiency of underground gangue in old mines is low and the layout of filling systems requires the transformation of the production system, which leads to high costs.
A gangue filling system for underground excavation of old mines was designed, including working surface rubber transport trough, trough connection tunnel, gangue crushing and conveying unit, pulping unit and stirring pumping unit, through underground scraper, crusher, ball mill and Filling pumps and other equipment perform crushing, pulping and filling of gangue to form a continuous transportation and filling system.
Without changing the original production system, the efficiency of gangue transportation is improved, the cost of tunnel excavation support is reduced, the on-site filling of gangue is achieved, the ineffective transportation is reduced, and the overall benefits are significantly improved.
Smart Images

Figure CN118997839A_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of underground tunneling waste rock filling disposal, and specifically relates to a layout method of an underground tunneling waste rock filling system in an old mine, and also relates to a use method of the underground tunneling waste rock filling system in the old mine. Background Art
[0002] The annual gangue output in my country accounts for about 10-20% of coal output, and some coal mines even account for up to 25%. Large-scale gangue discharge not only occupies land resources, damages soil, water and atmospheric environment, but also poses safety hazards such as spontaneous combustion and landslides. Therefore, using gangue for underground filling is currently the most favorable measure for dealing with gangue, which can effectively control ground subsidence, damage to cultivated land, and reduce the discharge of coal gangue. In this regard, new mines plan to establish a gangue filling system in advance during the mine area design stage to facilitate later construction; for some old mines, facing the burden of gangue disposal, mine auxiliary transportation generally uses mine cars, and the material transportation system has a small transportation capacity, slow transportation speed and is discontinuous. The use of belts to transport coal and gangue synchronously can achieve continuous transportation, but it will increase the ineffective lifting of the system, and the transportation of gangue to the ground will add a burden to the washing system. The time-sharing and transportation of coal and gangue underground will also affect the transportation efficiency. At the same time, the available space underground in old mines is limited, making it difficult to arrange a waste rock filling system, and requiring partial transformation of the underground production system, which increases production costs. Summary of the invention
[0003] The purpose of the present invention is to provide a method for arranging a gangue filling system for underground excavation in old mines, so as to solve the problems of low efficiency of gangue transportation in existing old mines and high cost caused by the need to transform the production system when arranging the filling system.
[0004] Another object of the present invention is to provide a method for using the underground excavation waste rock filling system of an old mine.
[0005] The technical solution adopted by the present invention is a method for arranging a gangue filling system for underground excavation in an old mine, which includes a working face rubber transport chute, a chute connecting tunnel, and a working face rubber transport chute connecting tunnel. A gangue crushing and conveying unit is provided in the working face rubber transport chute connecting tunnel, a pulping unit is provided in the working face rubber transport chute, and a stirring and pumping unit is provided in the chute connecting tunnel. The gangue crushing and conveying unit is connected to the pulping unit at the end of the gangue transportation direction, and the pulping unit is connected to the stirring and pumping unit, thereby forming a filling system.
[0006] The present invention is also characterized in that:
[0007] The gangue crushing and conveying unit includes a gangue receiving pit arranged at the bottom of the working face rubber transport chute connecting tunnel, the gangue receiving pit is connected to the through-type crusher through an underground scraper, the through-type crusher is connected to the fine crusher through an underground scraper, the fine crusher is connected to one end of the feeding belt, the other end of the feeding belt is connected to the shuttle car group, and the shuttle car group is connected to a weighing belt.
[0008] The shuttle car group includes a plurality of shuttle cars connected in sequence.
[0009] The pulping unit comprises a wet ball mill, which is connected to a slurry pool through a chute, the slurry pool is connected to a slurry pump through a pipeline, the wet ball mill is connected to a water pipe, a water valve is arranged on the water pipe, and the wet ball mill is connected to a weighing belt.
[0010] The mixing and pumping unit comprises a mixer, the mixer is connected to a filling pump, the filling pump is connected to a filling pipeline, and the mixer is connected to a slurry pump.
[0011] Another technical solution adopted by the present invention is a method for using a gangue filling system for underground excavation in an old mine, wherein the filling system formed by the above arrangement method is implemented in accordance with the following steps:
[0012] Step 1: After the mining of the working face is completed, the closed wall is constructed, and the gangue in the mine is transported to the receiving pit by a number of side-discharging mine cars connected in series;
[0013] Step 2, filling the waste rock in the waste pit after processing it.
[0014] The present invention is also characterized in that:
[0015] The specific process of step 2 is: the gangue in the gangue pit is transported to the through-type crusher through the buried scraper for crushing, and then transported to the fine crusher for secondary crushing through the buried scraper, and then the crushed gangue is transported to the shuttle car through the feeding belt, and then transported to the wet ball mill after weighing through the weighing belt. The water valve is opened, and the underground fire sprinkler water is transported to the wet ball mill along the water pipe for grinding. After grinding to the designed slurry concentration, it flows into the slurry pool by gravity. The slurry pump then pumps the slurry to the mixer for stirring. The stirred slurry flows by gravity to the filling pump and is transported along the filling pipeline to the filling area for filling.
[0016] The beneficial effects of the present invention are:
[0017] (1) The arrangement method of the underground excavation waste rock filling system of the old mine of the present invention, without changing the original production system of the mine, utilizes the existing underground tunnel to arrange the filling unit to directly process and fill the waste rock, without re-excavating the tunnel, and accordingly does not affect the normal excavation and continuation of the old mine, saves the tunnel excavation support cost, fills and disposes the waste rock on site, reduces the ineffective lifting of waste rock, improves the transportation efficiency, and has significant comprehensive benefits;
[0018] (2) The method for using the old mine underground excavation waste rock filling system of the present invention utilizes the existing production system of the old mine to transport, crush, pulp and fill the waste rock. The process is simple, easy to operate and highly efficient. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 A schematic diagram of the structure of a filling system formed by the arrangement method of the present invention;
[0020] Figure 2 An enlarged view of the filling system formed by the arrangement method of the present invention.
[0021] In the figure, 1. West wing rail transport lane, 2. Yokogawa, 3. West wing belt transport lane, 4. West wing return air lane, 5. East wing return air lane, 6. Rail transport lane, 7. Belt transport lane, 8. Working face rubber transport chute connecting lane, 9. Rail, 10. Chute connecting lane, 11. Working face return air chute, 12. Working face rubber transport chute, 13. Return air connecting lane, 14. Enclosed wall, 15. Water valve, 16. Side discharge mine car, 17. Receiving pit, 18. Buried scraper, 19. Through crusher, 20. Fine crusher, 21. Feeding belt, 22. Shuttle car, 23. Weighing belt, 24. Wet ball mill, 25. Slurry tank, 26. Slurry pump, 27. Mixer, 28. Filling pump, 29. Filling pipe, 30. Water pipe. DETAILED DESCRIPTION
[0022] The present invention is described in detail below with reference to the accompanying drawings and specific embodiments.
[0023] Example 1
[0024] The arrangement method of the underground excavation gangue filling system of the old mine of the present invention adopts the existing underground tunnel of the old mine, such as Figure 1As shown, the underground tunnels of the old mine include the existing west wing return air tunnel 4, east wing return air tunnel 5, rail transport tunnel 6, and belt transport tunnel 7 of the old mine. The east wing return air tunnel 5 is connected to one end of the return air connecting tunnel 13, the belt transport tunnel 7 is connected to one end of the west wing belt transport tunnel 3, the rail transport tunnel 6 is connected to one end of the west wing rail transport tunnel 1, the west wing rail transport tunnel 1 and the west wing belt transport tunnel 3 are connected through the horizontal river 2, and the distance between the west wing rail transport tunnel 1 and the west wing belt transport tunnel 3 is 200m, the west wing belt transport lane 3 is connected to the west wing return air lane 4 through the return air connecting lane 13, the west wing rail transport lane 1 is provided with a track 9, the rail transport lane 6 is provided between the west wing rail transport lane 1 and the working face rubber transport chute connecting lane 8, the track 9 is used for the side unloading mine car 16 to run, the belt transport lane 7 is connected to one end of the working face rubber transport chute 12, the other end of the working face rubber transport chute 12 is provided with a closed wall 14, the working face rubber transport chute 12 is respectively connected to the return air connecting lane 13, and the west wing rail transport lane 1 is provided with a track 9 ... The connecting lane 13, the working face rubber transport chute connecting lane 8, and the chute connecting lane 10 are connected. The end of the working face rubber transport chute connecting lane 8 away from the working face rubber transport chute 12 is connected to the rail transport main lane 6. The end of the chute connecting lane 10 away from the working face rubber transport chute 12 is connected to the working face return air chute 11. One end of the working face return air chute 11 is connected to the west wing return air main lane 4. The other end of the working face return air chute 11 is provided with a closed wall 14. The working face rubber transport chute connecting lane 8 is provided with a track 9. The working face rubber transport chute A gangue crushing and conveying unit is provided in the trough tunnel 8, a pulping unit is provided in the working face rubber transport chute 12, and a stirring pumping unit is provided in the chute tunnel 10. The gangue crushing and conveying unit is connected to the pulping unit at the end of the gangue transportation direction, and the pulping unit is connected to the stirring pumping unit to form a filling system. The gangue crushing and conveying unit transports the crushed gangue to the pulping unit for ball milling pulping, and the pulping unit transports the slurry to the stirring pumping unit for uniform stirring and then fills the filling area.
[0025] Example 2
[0026] Based on Example 1, the structure is as follows Figure 2 As shown, the gangue crushing and conveying unit includes a gangue receiving pit 17 arranged at the inner bottom of one end of the working face rubber transport chute joint tunnel 8 close to the rail transport main tunnel 6, the gangue receiving pit 17 is used to hold the gangue, the gangue receiving pit 17 is connected to a through-type crusher 19 through an underground scraper 18, the through-type crusher 19 is connected to a fine crusher 20 through an underground scraper 18, the underground scraper 18 is used to transport the gangue, the fine crusher 20 is connected to one end of a feeding belt 21, the through-type crusher 19 is used to perform a primary crushing of the gangue, the fine crusher 20 is used to perform a secondary crushing of the gangue, the other end of the feeding belt 21 is connected to a shuttle car group, the shuttle car group includes a plurality of shuttle cars 22 connected in sequence, the shuttle car away from the feeding belt 21 is connected to a weighing belt 23, the shuttle car 22 has a buffering and transportation function, and the volume of each shuttle car is 20m 3, can cache 40t of materials.
[0027] The pulping unit includes a wet ball mill 24. The weighing belt 23 is connected to the wet ball mill 24 arranged in the working surface rubber transport chute 12. The wet ball mill 24 is used to pulp the gangue. The wet ball mill 24 is connected to the slurry pool 25 through a chute. The slurry pool 25 is connected to the slurry pump 26 through a pipeline. The wet ball mill 24 is connected to a water pipe 30. A water valve 15 is provided on the water pipe 30. The water pipe 30 is used to supply water to the wet ball mill 24 so as to ball-mill the gangue to form slurry.
[0028] The stirring and pumping unit includes a stirrer 27. The slurry pump 26 is connected to the stirrer 27 arranged in the chute connecting tunnel 10. The stirrer 27 is used to stir the slurry. The stirrer 27 is connected to the filling pump 28. The filling pump 28 is connected to the filling pipe 29. The filling pipe is laid along the existing tunnels underground to the filling area for filling.
[0029] Example 3
[0030] The method for using the gangue filling system for underground excavation in an old mine is a filling system formed by the above-mentioned arrangement method. In this embodiment, the production geological conditions of the old mine are as follows: the designed production capacity of an old mine is 1.5Mt / a. It adopts a vertical shaft and an inclined shaft joint development method, and a single horizontal development method. The main coal seam of the mine is No. 3 coal, with an average thickness of 3.0m and an inclination of 0-3°. It adopts a one-time full-height coal mining process, and the working system is a "38 system". The working face is arranged in two lanes. The No. 1 working face and the No. 2 working face have been mined. The closed wall 14 is constructed in the working face return air chute 11 and the working face rubber transport chute 12. The west wing tunnel of the mine field is now being excavated underground, with an annual production of 80,000 tons of gangue, a designed gangue filling capacity of 100,000 t / a, 330 working days per year, 10 hours of net filling time per day, a gangue processing capacity of 31t / h, and a slurry density of 1478kg / m 3 , mass concentration is 55%, slurry flow rate is 38.1m 3 / h, the pulping water consumption is 25.36m 3 / h, considering the wear and tear of the filling pipe 29 and economic safety, the outer diameter of the filling pipe 29 is 108mm and the wall thickness is 8mm;
[0031] Follow the steps below to implement it:
[0032] Step 1, after the working face is mined, the closed wall 14 is constructed, and the excavated gangue in the mine is transported to the gangue receiving pit 17 by a number of side-unloading mine cars 16 connected in series along the tracks 9 set in the west wing rail transport tunnel 1, the rail transport tunnel 6 and the working face rubber transport chute tunnel 8, without changing the old mine material transportation system, and the underground fresh air flow is supplied along the working face rubber transport chute tunnel 8, and the polluted air is sent to the west wing return air tunnel 4 along the working face return air chute 11, without changing the existing ventilation system of the old mine;
[0033] Specifically, the side-dumping mine car 16 has 10 sections, each with a capacity of 1.5t;
[0034] Step 2, filling the waste rock in the waste rock pit 17 after processing;
[0035] The specific process is:
[0036] The gangue in the receiving pit 17 is transported to the through crusher 19 through the buried scraper 18. After the gangue is crushed to a particle size of 80 mm, it is transported to the fine crusher 20 through the buried scraper 18 for secondary crushing to a particle size of 10 mm. The crushed gangue is then transported to the shuttle car 22 through the feeding belt 21, and then weighed by the weighing belt 23 and transported to the wet ball mill 24. The water valve 15 is opened, and the underground fire sprinkler water is transported to the wet ball mill 24 along the water pipe 30 for grinding. After grinding to the designed slurry concentration, it flows into the slurry pool 25 by gravity. The slurry pump 26 then pumps the slurry to the mixer 27 for stirring. The stirred slurry flows by gravity to the filling pump 28 and is transported to the filling area along the filling pipe 29 for filling.
[0037] Specifically, the shuttle car 22 has a buffering and transporting function, and the actual volume of each shuttle car is 20m 3 , can buffer 40t of gangue powder, and 4 shuttle cars can buffer 160t of gangue powder.
Claims
1. A method for arranging a gangue filling system for underground excavation in an old mine, comprising a working face rubber conveying chute (12), a chute connecting lane (10), and a working face rubber conveying chute connecting lane (8), characterized in that: A gangue crushing and conveying unit is arranged in the working face rubber transport chute (8), a pulping unit is arranged in the working face rubber transport chute (12), and a stirring and pumping unit is arranged in the chute joint tunnel (10). The gangue crushing and conveying unit is connected to the pulping unit at the end of the gangue transport direction, and the pulping unit is connected to the stirring and pumping unit, thereby forming a filling system.
2. The method for arranging the gangue filling system for underground excavation in an old mine according to claim 1 is characterized in that: The gangue crushing and conveying unit comprises a gangue receiving pit (17) provided at the inner bottom of the working face rubber transport chute connecting lane (8); the gangue receiving pit (17) is connected to a through-type crusher (19) via an underground scraper (18); the through-type crusher (19) is connected to a fine crusher (20) via an underground scraper (18); the fine crusher (20) is connected to one end of a feeding belt (21); the other end of the feeding belt (21) is connected to a shuttle car group; and the shuttle car group is connected to a weighing belt (23).
3. The method for arranging the gangue filling system for underground excavation in an old mine according to claim 2 is characterized in that: The shuttle car group comprises a plurality of shuttle cars (22) connected in sequence.
4. The method for arranging the gangue filling system for underground excavation in an old mine according to claim 2, characterized in that: The pulping unit comprises a wet ball mill (24), the wet ball mill (24) is connected to a slurry pool (25) via a chute, the slurry pool (25) is connected to a slurry pump (26) via a pipeline, the wet ball mill (24) is connected to a water pipe (30), a water valve (15) is provided on the water pipe (30), and the wet ball mill (24) is connected to a weighing belt (23).
5. The method for arranging the gangue filling system for underground excavation in an old mine according to claim 4, characterized in that: The stirring and pumping unit comprises a stirrer (27), the stirrer (27) is connected to a filling pump (28), the filling pump (28) is connected to a filling pipeline (29), and the stirrer (27) is connected to a slurry pump (26).
6. A method for using a gangue filling system for underground excavation in an old mine, wherein the filling system is constructed by the arrangement method according to any one of claims 1 to 5, and is specifically implemented according to the following steps: Step 1, after the mining of the working face is completed, a closed wall (14) is constructed, and the gangue excavated in the mine is transported to a receiving pit (17) by a plurality of side-discharging mine cars (16) connected in series; Step 2, filling the receiving pit (17) with waste rock after processing it.
7. The method for using the old mine underground excavation waste rock filling system according to claim 6, characterized in that: The specific process of step 2 is as follows: the gangue in the gangue pit (17) is transported to a through-type crusher (19) through an underground scraper (18) for crushing, and then transported to a fine crusher (20) through an underground scraper (18) for secondary crushing, and then the crushed gangue is transported to a shuttle car (22) through a feeding belt (21), and then transported to a wet ball mill (24) after being weighed by a weighing belt (23), and the water valve (15) is opened to transport underground fire sprinkler water along a water pipe (30) to the wet ball mill (24) for grinding, and after grinding to a designed slurry concentration, the water flows by gravity into a slurry pool (25), and the slurry pump (26) then pumps the slurry to a mixer (27) for stirring, and the stirred slurry flows by gravity to a filling pump (28) and is transported to a filling area along a filling pipeline (29) for filling.