Testing device for simulating cascade collapse of adjacent foundation pits caused by collapse of certain foundation pit
By simulating the test device caused by foundation pit collapse, the cascade collapse problem caused by the damage to the foundation pit support structure is solved, effective test data and protective measures are provided, and the safety of urban infrastructure is ensured.
Patent Information
- Application Number
- CN202411147431.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-21
- Publication Date
- 2024-11-26
AI Technical Summary
In the prior art, after the foundation pit support structure is damaged or collapsed, it is difficult to prevent cascade collapse, resulting in difficulty in ensuring the safety of urban infrastructure and lack of effective preventive measures.
Design a test device that simulates the collapse of foundation pits causing cascade collapse of adjacent foundation pits, including the continuous wall model of foundation pits and data monitoring system in the model box. By recording data through simulated foundation pit collapse process, it provides test technology for foundation pit protection and method.
Through the simulated test device, the mechanism data of foundation pit cascade failure is provided, effective testing technology is provided for foundation pit protection, and the safety of urban infrastructure is ensured.
Smart Images

Figure CN119021288A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of wall support foundation pit test, and in particular to a test device for simulating the collapse of a foundation pit and triggering the cascade collapse of adjacent foundation pits. Background Art
[0002] Urban foundation pits and underground projects are recognized as one of the construction fields with higher risks. They often face complex engineering geological and hydrogeological conditions, harsh surrounding environment, and extreme disaster risks such as heavy rain and floods. Due to the poor integrity of the foundation pit support structure, it is easy to have the risk of large-scale damage or even continuous collapse caused by local damage.
[0003] The foundation pit system constructed under the existing technology develops rapidly after damage or even collapse accidents occur, and it is difficult to carry out emergency rescue and disaster relief during the development process, and post-disaster repair and reconstruction are difficult. In particular, a large number of double foundation pit systems and foundation pit group systems have been formed in urban underground spaces. After one of the foundation pits is damaged, the soil constraint conditions around the adjacent foundation pits will change to varying degrees. In severe cases, it may cause excessive deformation or even collapse of the adjacent foundation pits, resulting in chain damage to the engineering system. However, under the current circumstances, there is a lack of effective knowledge and understanding of the evolution mechanism of cascading collapse caused by the damage or even collapse of the foundation pit support structure, and thus a lack of effective prevention of cascading collapse of foundation pits, which makes it impossible to effectively protect the safety of urban infrastructure and leads to large economic losses. Summary of the invention
[0004] The purpose of the present invention is to provide a test device for simulating the cascading collapse of adjacent foundation pits caused by the collapse of a certain foundation pit, so as to solve the problem in the prior art of lack of effective understanding of the evolution mechanism of cascading collapse caused by the destruction or even collapse of the foundation pit support structure and lack of corresponding preventive measures.
[0005] In order to solve the above technical problems, the present invention specifically provides the following technical solutions: A test device for simulating the collapse of a foundation pit causing cascading collapse of adjacent foundation pits, comprising a model box, the model box is filled with sand and a foundation pit continuous wall model for simulating multiple foundation pits is buried in the sand, multiple foundation pit support models are arranged on the foundation pit continuous wall model, and the multiple foundation pit support models are used to support the foundation pit continuous wall model, and a data monitoring system for monitoring the change information of each part of the foundation pit continuous wall model during the collapse process is arranged in the model box.
[0006] As a preferred solution of the present invention, the foundation pit continuous wall model includes multiple foundation pit models arranged in a model box and parallel to each other, each of the foundation pit models includes two ground-connected wall groups arranged in parallel in the model box, each of the ground-connected wall groups includes multiple ground-connected walls arranged in a straight line, and two adjacent ground-connected walls are connected by an H-shaped joint, each of the ground-connected walls includes two wall panels stacked in a vertical direction, a support belt is arranged between the corresponding two wall panels, and the support belt is used to bond the two wall panels, the stiffness of the support belt is less than the stiffness of the wall panel, and multiple foundation pit support models are respectively arranged in multiple foundation pit models.
[0007] As a preferred solution of the present invention, the thickness of the support belt is smaller than the thickness of the ground-connected wall.
[0008] As a preferred solution of the present invention, the foundation pit support model includes multiple fixed tubes, multiple connecting strips and multiple supporting tubes, and the multiple fixed tubes are respectively arranged on the opposite side walls of two ground-connected wall groups of the same foundation pit model, and are arranged at equal intervals in the vertical direction, and the multiple connecting strips are respectively arranged on the multiple fixed tubes, and both ends of each of the supporting tubes are connected to two fixed tubes at the same height and opposite to each other on the two ground-connected walls through corresponding connecting strips.
[0009] As a preferred solution of the present invention, the fixing tube is a hollow square tube, and the supporting tube is a hollow circular tube.
[0010] As a preferred solution of the present invention, the data monitoring system includes multiple strain gauges, multiple laser displacement sensors, a PIV industrial camera, multiple displacement meters and multiple earth pressure boxes. Multiple steel beams are arranged on the inner top of the model box. Multiple laser displacement sensors are arranged on the steel beams and are respectively located on both sides of multiple ground-connected wall groups. Multiple displacement meters are respectively arranged on the tops of multiple ground-connected walls. Multiple earth pressure boxes are respectively arranged on both sides of multiple ground-connected wall groups, and multiple earth pressure boxes located on the inner sides of the ground-connected wall groups are arranged below the excavation surface of the sand. Multiple strain gauges are respectively arranged on the side walls of multiple ground-connected walls away from the fixed pipes and at both ends of multiple support pipes. A transparent observation window is arranged on the model box, and the PIV industrial camera is arranged outside the model box and located at the observation window.
[0011] Compared with the prior art, the present invention has the following beneficial effects: The present invention simulates a group of foundation pits in actual engineering projects by setting a foundation pit continuous wall model in a model box, and causes foundation pit collapse by over-excavation in the foundation pit simulated by the foundation pit continuous wall model or loading outside the foundation pit, thereby triggering cascading damage to adjacent foundation pits. The data is recorded by a data monitoring system, which can effectively provide effective test data for the mechanism of cascading damage to foundation pits, provide test technology and methods for foundation pit protection, and lay a foundation for the safety of urban infrastructure. BRIEF DESCRIPTION OF THE DRAWINGS
[0012] In order to more clearly illustrate the implementation methods of the present invention or the technical solutions in the prior art, the following briefly introduces the drawings required for the implementation methods or the description of the prior art. Obviously, the drawings in the following description are only exemplary, and for ordinary technicians in this field, other implementation drawings can be derived from the provided drawings without creative work.
[0013] Figure 1 It is a schematic diagram of the three-dimensional structure of a test device for simulating the cascading collapse of adjacent foundation pits caused by the collapse of a foundation pit according to the present invention; Figure 2 It is a structural schematic diagram of the foundation pit continuous wall model of the present invention; Figure 3 The present invention is a front structural schematic diagram of a test device for simulating the cascading collapse of adjacent foundation pits caused by the collapse of a foundation pit.
[0014] The numbers in the figure represent the following: 1. Ground-connected wall; 2. Support belt; 3. H-type joint; 4. Fixed pipe; 5. Support pipe; 6. Connecting strip; 7. Laser displacement sensor; 8. Displacement meter; 9. Earth pressure box; 10. Strain gauge; 11. PIV industrial camera; 12. Model box; 13. Observation window. DETAILED DESCRIPTION
[0015] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0016] The following first describes the concepts involved in the present application in conjunction with the accompanying drawings. It should be noted that the following description of each concept is only to make the content of the present application easier to understand, and does not limit the scope of protection of the present application; at the same time, the embodiments and features in the embodiments of the present application can be combined with each other in the absence of conflict. The present application will be described in detail with reference to the accompanying drawings and in conjunction with the embodiments.
[0017] like Figures 1 to 3 As shown, the present invention provides a test device for simulating the cascading collapse of adjacent foundation pits caused by the collapse of a foundation pit, including a model box 12, the model box 12 is filled with sand and a foundation pit continuous wall model for simulating multiple foundation pits is buried in the sand, multiple foundation pit support models are arranged on the foundation pit continuous wall model, and the multiple foundation pit support models are used to support the foundation pit continuous wall model, and a data monitoring system for monitoring the change information of each part of the foundation pit continuous wall model during the collapse process is arranged in the model box 12.
[0018] When conducting the test, the model box 12 is placed in a designated position and fixed, then the foundation pit continuous wall model is placed in the model box 12, and sand is sprinkled into the model box 12 by the sand rain method to bury the foundation pit continuous wall model in the sand, and the foundation pit continuous wall model is stably supported by a plurality of foundation pit support models, and the weak parts of the foundation pit simulated by the foundation pit continuous wall model are supported, so that the foundation pit support model can stably fall off during the test to ensure that the foundation pit simulated by the foundation pit continuous wall model collapses, thereby simulating the phenomenon of cascading collapse of adjacent foundation pits caused by foundation pit collapse, providing a test device for research and analysis in this regard, and being able to provide effective test data to provide research support for subsequent protection against foundation pit collapse, and then provide research support for protecting urban infrastructure.
[0019] The data monitoring system is used to record data information and process image information throughout the entire process of foundation pit cascade collapse for subsequent analysis and research.
[0020] When conducting the test, two adjacent foundation pits can be excavated simultaneously or successively to study the influence of different excavation sequences on the deformation of the foundation pit and the subsequent continuous collapse process. After the excavation is completed, excavation can be continued in a single foundation pit (over-excavation), or weights can be added step by step outside a single foundation pit to induce continuous damage to a single foundation pit first, and then observe whether it will cause bending failure of the ground-connected wall 1 or tensile damage of the support in the adjacent foundation pit, leading to cascading collapse.
[0021] The spacing between multiple foundation pits simulated by the foundation pit continuous wall model can also be adjusted, as can the excavation depth and the number of supports for the foundation pit provided by the foundation pit support model. This can be used to analyze whether cascading collapse will occur in the foundation pit under different working conditions, and whether the catastrophic evolution process of cascading collapse of the foundation pit is different, so as to provide a reference for risk assessment and prevention and control of related projects.
[0022] When arranging the foundation pit continuous wall model, first fill the bottom of the model box 12 with sand so that the height of the sand is the same as the bottom height of the preset foundation pit continuous wall model. Then, the foundation pit continuous wall model is arranged, and the position of the foundation pit continuous wall model is positioned by setting a carpenter clamp on the top of the model box 12. The carpenter clamp can be set on the top of the model box 12 through a crossbeam to ensure the accurate layout of the position of the foundation pit continuous wall model. Then, the foundation pit support model and the data monitoring system are installed, and finally, sand is filled to the top of the foundation pit continuous wall model. A plurality of threaded holes at different positions can be arranged on the top of the model box 12, thereby adjusting the position of the crossbeam with the carpenter clamp, thereby adjusting the position between the plurality of foundation pits in the foundation pit continuous wall model, and realizing rapid and precise adjustment of the foundation pit position, thereby testing the foundation pits with different spacings.
[0023] During excavation, the sand and soil in the model box 12 are excavated step by step. For example, a gap is opened on one side of the model box 12, and the gap is closed by a plurality of baffles. The plurality of baffles are removed vertically downward in sequence, and the sand and soil are excavated when a single baffle is removed to achieve step-by-step excavation, thereby reducing interference with the test results. Interference can also be reduced by other means.
[0024] The foundation pit continuous wall model includes multiple foundation pit models arranged in a model box 12 and parallel to each other, each foundation pit model includes two ground-connected wall groups arranged in parallel in the model box 12, each ground-connected wall group includes multiple ground-connected walls 1 arranged in a straight line, and two adjacent ground-connected walls 1 are connected by an H-shaped joint 3, each ground-connected wall 1 includes two wall panels stacked in a vertical direction, a support belt 2 is arranged between the corresponding two wall panels, and the support belt 2 is used to bond the two wall panels, the stiffness of the support belt 2 is less than the stiffness of the wall panel, and multiple foundation pit support models are respectively arranged in multiple foundation pit models.
[0025] The multiple foundation pit models simulated by the foundation pit continuous wall model are all composed of two ground-connected wall groups, and each ground-connected wall group is composed of multiple ground-connected walls 1 connected in sequence through H-type joints 3, and a single ground-connected wall 1 is formed by bonding two upper and lower wall panels through support belts 2, so that the stiffness of the ground-connected wall 1 at the support belt 2 changes, and because the stiffness of the support belt 2 is less than the stiffness of the wall panel, the position of the support belt 2 is the weak point on the ground-connected wall 1. Secondly, according to engineering experience, the maximum bending moment of the ground-connected wall group after the foundation pit is excavated is located near the excavation surface. Therefore, when making the ground-connected wall group, the support belt 2 should be set at the maximum bending moment position of the ground-connected wall group to ensure that the ground-connected wall 1 can undergo continuous destruction.
[0026] In this embodiment, the wall panel is a plexiglass panel and the support belt 2 is gypsum, so that the formed ground-connected wall 1 can be designed equivalently to the actual engineering strength and stiffness, so that the test process fits the actual phenomenon and the data obtained from the test results have practical significance. The plexiglass panel can facilitate the observation of the displacement of sand in the foundation pit, but because its bending strength is too large, gypsum is set to bond the upper and lower plexiglass panels to ensure that the ground-connected wall 1 can undergo continuous destruction.
[0027] Furthermore, the ground-connected wall 1 and the supporting belt 2 may also be made of other materials, as long as the simulated ground-connected wall 1 can be designed to be equivalent to the actual engineering strength and stiffness.
[0028] The thickness of the supporting belt 2 is smaller than the thickness of the ground-connected wall 1 .
[0029] In this embodiment, the thickness of the ground-connected wall 1 and the support belt 2 refers to the thickness in the vertical direction, and the thickness of the support belt 2 is much smaller than the thickness of the ground-connected wall 1. For example, the thickness of the ground-connected wall 1 in the vertical direction is 1.2 meters, and the thickness of the support belt 2 is 2 centimeters, etc., or others are also acceptable. It is set according to the test requirements, so that the width of the support belt 2 should be as small as possible The thickness of the ground-connected wall 1 can ensure that the ground-connected wall group can undergo continuous destruction and avoid uneven local stiffness of the ground-connected wall 1.
[0030] The foundation pit support model includes multiple fixed pipes 4, multiple connecting strips 6 and multiple supporting pipes 5, and the multiple fixed pipes 4 are respectively arranged on the opposite side walls of two ground-connected wall groups of the same foundation pit model, and are arranged at equal intervals in the vertical direction. The multiple connecting strips 6 are respectively arranged on the multiple fixed pipes 4, and both ends of each supporting pipe 5 are connected to two fixed pipes 4 at the same height and opposite to each other on the two ground-connected wall groups through corresponding connecting strips 6.
[0031] The foundation pit support model is used to simulate the support system in the actual foundation pit, which is formed by multiple fixed pipes 4, multiple connecting strips 6 and multiple support pipes 5. The multiple fixed pipes 4 are respectively arranged on two ground-connected wall groups of a foundation pit model to install the connecting strips 6. The connecting strips 6 can be placed at both ends of the fixed pipes 4 or inserted into the fixed pipes 4. The number of connecting strips 6 is set according to the number of bolts of the support nodes in the actual project, and the strength of the connecting strips 6 is designed according to the tensile stiffness equivalent in the actual project.
[0032] The connecting strip 6 is used to simulate the joint between the support and the ground-connected wall group in the actual project, so that multiple support tubes 5 are installed on the corresponding two fixed tubes 4 to support the two ground-connected wall groups, so that the support tubes 5 can support the preset weak positions on the ground-connected wall groups, and can achieve the support tubes 5 falling off when the connecting strip 6 is pulled, thereby ensuring that the foundation pit collapse is triggered, so as to ensure the stable progress of the test process.
[0033] In this embodiment, the fixing pipe 4 and the supporting pipe 5 are both PVC pipes, and the connecting strip 6 is an aluminum strip, so that the simulated support can be equivalent to the actual project.
[0034] Furthermore, the fixing tube 4, the supporting tube 5 and the connecting strip 6 may also be made of other materials as long as they meet the test requirements.
[0035] The fixed tube 4 is a hollow square tube, and the supporting tube 5 is a hollow circular tube. To further ensure that the simulated support system is equivalent to the actual engineering design, the fixed pipe 4 is a hollow square pipe. Firstly, it is convenient to overlap with the corbel reserved on the ground-connected wall 1 (the corbel is not shown in the attached figure), and secondly, the side of the fixed pipe 4 is connected and fixed to the ground-connected wall assembly by glue.
[0036] The support tube 5 is a hollow circular tube because when the test is carried out indoors, the stress conditions on the same cross section of the hollow circular tube are the same, so when monitoring the axial force change of the support tube 5, it can be directly arranged at both ends of the support tube 5. If a tube body with a cross section of other shapes is used, the cross section will be unevenly stressed, affecting the accuracy of the measurement results of the data monitoring system.
[0037] The data monitoring system includes multiple strain gauges 10, multiple laser displacement sensors 7, a PIV industrial camera 11, multiple displacement meters 8 and multiple earth pressure boxes 9. Multiple steel beams are arranged on the inner top of the model box 12. Multiple laser displacement sensors 7 are arranged on the steel beams and are respectively located on both sides of multiple ground-connected wall groups. Multiple displacement meters 8 are respectively arranged on the tops of multiple ground-connected walls 1. Multiple earth pressure boxes 9 are respectively arranged on both sides of multiple ground-connected wall groups, and multiple earth pressure boxes 9 located on the inner side of the ground-connected wall group are arranged below the excavation surface of the sand. Multiple strain gauges 10 are respectively arranged on the side walls of multiple ground-connected walls 1 away from the fixed pipe 4 and at both ends of multiple support pipes 5. A transparent observation window 13 is arranged on the model box 12. The PIV industrial camera 11 is arranged outside the model box 12 and is located at the observation window 13.
[0038] When the data monitoring system is in use, the laser displacement sensor 7 monitors the formation of settlement troughs on the sandy surface soil during the foundation pit collapse process, the displacement meter 8 monitors the displacement changes at the top of the ground-connected wall 1, the soil pressure box 9 monitors the changes in soil pressure in the active and passive zones during the foundation pit excavation and collapse stages, the strain gauge 10 monitors the changes in the bending moment of the ground-connected wall 1 and the support axial force of the fixed pipe 4 during the foundation pit excavation and collapse stages, and the PIV industrial camera 11 observes the formation of sliding surfaces in the deep soil during the foundation pit collapse process.
[0039] And because the problem along the length direction of the foundation pit in the present invention is a two-dimensional plane strain problem, the strain gauge 10 used to measure the bending moment of the ground-connected wall 1 can be arranged only on the middle ground-connected wall 1, and the strain gauge 10 used to measure the axial force can be arranged only on partial support, that is, part of the foundation pit support model, for example, at both ends of the support pipe 5, and the setting position is close to the fixed pipe 4.
[0040] In this embodiment, the laser displacement sensor 7 is arranged along the length direction of the model box 12 .
[0041] The embodiments and / or implementation methods described above are only used to illustrate the preferred embodiments and / or implementation methods for realizing the technology of the present invention, and are not intended to limit the implementation methods of the technology of the present invention in any form. Any technical personnel in this field may make slight changes or modifications to other equivalent embodiments without departing from the scope of the technical means disclosed in the content of the present invention, but they should still be regarded as technologies or embodiments that are essentially the same as the present invention.
[0042] This article uses specific examples to illustrate the principles and implementation methods of this application. The description of the above embodiments is only used to help understand the method and its core ideas of this application. The above is only the preferred implementation method of this application. It should be pointed out that due to the limitations of textual expression and the objective existence of infinite specific structures, ordinary technicians in this technical field can make several improvements, modifications or changes without departing from the principles of this application, and can also combine the above technical features in an appropriate manner; these improvements, modifications, changes or combinations, or the direct application of the concept and technical solution of the invention to other occasions without improvement, should be regarded as the scope of protection of this application.
Claims
1. A test device for simulating the cascading collapse of adjacent foundation pits caused by the collapse of a foundation pit, characterized in that: The invention comprises a model box (12), wherein the model box (12) is filled with sand and a foundation pit continuous wall model for simulating a plurality of foundation pits is buried in the sand, a plurality of foundation pit support models are arranged on the foundation pit continuous wall model, and the plurality of foundation pit support models are used to support the foundation pit continuous wall model, and a data monitoring system for monitoring the change information of each part of the foundation pit continuous wall model during the collapse process is arranged in the model box (12).
2. The test device for simulating the collapse of a foundation pit and causing the cascading collapse of adjacent foundation pits according to claim 1, characterized in that: The foundation pit continuous wall model comprises a plurality of foundation pit models arranged in a model box (12) and parallel to each other, each of the foundation pit models comprising two ground-connected wall groups arranged in parallel in the model box (12), each of the ground-connected wall groups comprising a plurality of ground-connected walls (1) arranged in a straight line, and two adjacent ground-connected walls (1) are connected via an H-shaped joint (3), each of the ground-connected walls (1) comprises two wall panels stacked in a vertical direction, a support belt (2) is arranged between the two corresponding wall panels, and the support belt (2) is used to bond the two wall panels, the rigidity of the support belt (2) is less than the rigidity of the wall panel, and the plurality of foundation pit support models are respectively arranged in the plurality of foundation pit models.
3. The test device for simulating the collapse of a foundation pit and causing the cascading collapse of adjacent foundation pits according to claim 2, characterized in that: The thickness of the support belt (2) is smaller than the thickness of the ground-connected wall (1).
4. The test device for simulating the collapse of a foundation pit and causing the cascading collapse of adjacent foundation pits according to claim 1, characterized in that: The foundation pit support model comprises a plurality of fixed tubes (4), a plurality of connecting strips (6) and a plurality of supporting tubes (5), wherein the plurality of fixed tubes (4) are respectively arranged on opposite side walls of two ground-connected wall groups of the same foundation pit model and are arranged at equal intervals in the vertical direction, the plurality of connecting strips (6) are respectively arranged on the plurality of fixed tubes (4), and both ends of each supporting tube (5) are connected to two opposite fixed tubes (4) at the same height on the two ground-connected wall groups via corresponding connecting strips (6).
5. The test device for simulating the collapse of a foundation pit and causing the cascading collapse of adjacent foundation pits according to claim 4, characterized in that: The fixed tube (4) is a hollow square tube, and the support tube (5) is a hollow circular tube.
6. The test device for simulating the collapse of a foundation pit and causing the cascading collapse of adjacent foundation pits according to claim 4, characterized in that: The data monitoring system comprises a plurality of strain gauges (10), a plurality of laser displacement sensors (7), a PIV industrial camera (11), a plurality of displacement meters (8) and a plurality of earth pressure boxes (9); a plurality of steel beams are arranged on the inner top of the model box (12); a plurality of laser displacement sensors (7) are arranged on the steel beams and are respectively located on both sides of a plurality of ground-connected wall groups; a plurality of displacement meters (8) are respectively arranged on the tops of a plurality of ground-connected walls (1); a plurality of earth pressure boxes (9) are respectively arranged on both sides of a plurality of ground-connected wall groups, and a plurality of earth pressure boxes (9) located on the inner sides of the ground-connected wall groups are arranged below the excavation surface of the sand; a plurality of strain gauges (10) are respectively arranged on the side walls of a plurality of ground-connected walls away from the fixed pipe (4) and at both ends of a plurality of support pipes (5); a transparent observation window (13) is arranged on the model box (12); and the PIV industrial camera (11) is arranged outside the model box (12) and located at the observation window (13).