Goaf roadway driving surrounding rock control and gas pumping drainage method, device, equipment and medium

By using ball-and-stick shaped flexible mold bag grouting technology and a combination of positive and negative pressure in ventilation ducts, the problem of excessive gas levels during coal mine roadway excavation was solved, achieving efficient gas drainage and stable control of the surrounding rock, and reducing safety risks.

CN119021747APending Publication Date: 2024-11-26SHANXI ASIAN AMERICAN DANING ENERGY CO LTD +1
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411124900.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-15
Publication Date
2024-11-26

AI Technical Summary

Technical Problem

In coal mining, existing technologies are insufficient to effectively address the problem of excessive gas levels during tunnel excavation, especially in the lack of mature methods for gas control and surrounding rock management in goaf areas, leading to high safety risks.

Method used

The ball-and-stick flexible mold bag grouting technology is adopted. By determining the size information of the old working roadway, ball-and-stick flexible mold bags are made to form a filling retaining wall. Peripheral holes and central holes are constructed on both sides of the roadway. Combined with the positive pressure of the ventilation duct and the negative pressure of extraction, the pre-extraction and drainage of gas are realized.

Benefits of technology

It effectively solved the problem of excessive gas levels at the tunneling face, ensured the stability of the surrounding rock in the roadway, reduced safety risks, and achieved efficient gas drainage and safe passage through the goaf.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119021747A_ABST
    Figure CN119021747A_ABST
Patent Text Reader

Abstract

The invention provides a goaf roadway driving surrounding rock control and gas pumping drainage method, device, equipment and medium, and the method comprises the following steps: determining roadway size information of old goaf roadways on two sides of a goaf, manufacturing ball-stick-shaped flexible mold bags according to the roadway size information, and placing the ball-stick-shaped flexible mold bags into the corresponding old goaf roadways; grouting is conducted in the ball-stick-shaped flexible mold bags to form filling retaining walls, and after the filling retaining walls are solidified, the area, between the two retaining walls, of the gob roadway is filled; peripheral holes are constructed in the outer side of the roadway of the goaf to be excavated in the direction parallel to the excavation direction, grouting is conducted, and a center hole is constructed in the roadway of the goaf to be excavated after grouting; the center hole is expanded to the first preset size to serve as a gas pumping and discharging hole, and the gas pumping and discharging hole is connected into an extraction system on the opposite side of the goaf for pre-extraction before excavation; and in the tunneling process of the goaf roadway to be excavated, the head-on gas of the working face is introduced into the extraction system through the air duct positive pressure and the extraction negative pressure together. Therefore, the problem of gas overrun of the driving face can be effectively solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of coal mining, and in particular to a method, device, equipment and medium for controlling surrounding rock and extracting gas in goaf tunneling. Background Art

[0002] With the large-scale and high-intensity mining of coal resources, the existing coal resources with excellent coal quality, simple occurrence and superior mining technical conditions are gradually shrinking. The cases of residual mining, re-mining and mining in small kiln damaged areas in resource integration mines are increasing year by year. Some large mines need to arrange tunnels in the longwall working face that has been mined due to changes in mining deployment and succession plans, or transportation and production system transformation, horizontal extension, disaster management and other reasons. That is, it is necessary to span two old empty tunnels and the goaf in between. However, due to the collapse of overlying rock strata caused by mining, loose and broken rock masses about 3 to 5 times the mining height are accumulated in the goaf, and there are fracture zones more than 5 times the mining height in the upper layer. This kind of extremely unstable and incomplete rock mass poses a huge challenge to the safe excavation of the tunnel and the control of surrounding rock. At the same time, most of the goafs accumulate various toxic and harmful gases such as CH4, CO, and H2S, especially in high-gas and coal and gas outburst mines. The goaf and old empty tunnels have become interconnected "gas depots". If they cannot be scientifically and effectively managed, they will inevitably bring major safety risks to the tunnel excavation.

[0003] At present, there are few mature technical cases that can be used for reference in the control of surrounding rock and gas control in goaf excavation. There are even fewer reports on empirical methods for excessive gas in tunnels and goafs of longwall working faces of protruding coal seams. Therefore, developing a tunnel excavation method that can not only ensure the long-term stability of tunnel surrounding rock, but also effectively block and drain gas in goafs, and achieve safe passage through old empty tunnels and goafs has become a major technical challenge in the development of the coal industry. Summary of the invention

[0004] The present disclosure aims to solve one of the technical problems in the related art at least to some extent.

[0005] To this end, the purpose of the present disclosure is to propose a method, device, computer equipment and storage medium for surrounding rock control and gas extraction in goaf tunneling, which can effectively solve the problem of excessive gas in the excavation working face.

[0006] To achieve the above-mentioned purpose, the method for controlling surrounding rock and draining gas in goaf driving lanes proposed in the first embodiment of the present disclosure includes:

[0007] Determine the tunnel size information of the old empty tunnels on both sides of the goaf, and make a ball-stick-shaped flexible mold bag according to the tunnel size information, and place the ball-stick-shaped flexible mold bag into the corresponding old empty tunnel;

[0008] Injecting grout into the club-shaped flexible mold bag to form a filling retaining wall, and after the filling retaining wall is solidified, filling the area of ​​the old empty tunnel between the two retaining walls;

[0009] Construct peripheral holes parallel to the excavation direction on the outside of the tunnel in the goaf to be excavated and perform grouting, and after grouting, construct a central hole inside the tunnel in the goaf to be excavated;

[0010] Enlarging the central hole to a first preset size as a gas drainage hole, and connecting the gas drainage hole to the drainage system on the opposite side of the goaf for pre-drainage before excavation;

[0011] During the excavation process of the tunnel in the empty area to be excavated, the positive pressure of the wind tube and the negative pressure of the extraction are used together to introduce the gas at the working face into the extraction system.

[0012] To achieve the above-mentioned purpose, the goaf tunneling surrounding rock control and gas extraction device proposed in the second embodiment of the present disclosure includes:

[0013] A determination module is used to determine the tunnel size information of the old empty tunnels on both sides of the goaf, and to make a ball-stick-shaped flexible mold bag according to the tunnel size information, and to place the ball-stick-shaped flexible mold bag into the corresponding old empty tunnel;

[0014] The first processing module is used for injecting grout into the club-shaped flexible mold bag to form a filling retaining wall, and after the filling retaining wall is solidified, filling the area of ​​the old empty tunnel between the two retaining walls;

[0015] The second processing module is used to construct peripheral holes parallel to the excavation direction on the outer side of the tunnel in the goaf to be excavated and perform grouting, and after grouting, construct a central hole inside the tunnel in the goaf to be excavated;

[0016] A third processing module is used to expand the central hole to a first preset size as a gas extraction hole, and connect the gas extraction hole to the extraction system on the opposite side of the goaf for pre-excavation extraction;

[0017] The fourth processing module is used to introduce the gas at the head of the working face into the extraction system by the positive pressure of the wind tube and the negative pressure of extraction during the excavation process of the tunnel in the empty area to be excavated.

[0018] The computer device proposed in the third aspect embodiment of the present disclosure includes: a memory, a processor, and a computer program stored in the memory and executable on the processor. When the processor executes the program, the surrounding rock control and gas extraction method for goaf tunneling proposed in the first aspect embodiment of the present disclosure is implemented.

[0019] The fourth aspect embodiment of the present disclosure proposes a non-temporary computer-readable storage medium on which a computer program is stored. When the program is executed by a processor, the surrounding rock control and gas extraction method of goaf excavation tunneling proposed in the first aspect embodiment of the present disclosure is implemented.

[0020] The fifth embodiment of the present disclosure proposes a computer program product. When the instructions in the computer program product are executed by a processor, the method for controlling surrounding rock and gas extraction in goaf tunneling proposed in the first embodiment of the present disclosure is executed.

[0021] The method, device, computer equipment and storage medium for controlling surrounding rock and extracting gas in goaf tunnels provided by the present disclosure are as follows: by determining the tunnel size information of the old goaf tunnels on both sides of the goaf, and making a ball-stick-shaped flexible mold bag according to the tunnel size information, the ball-stick-shaped flexible mold bag is placed in the corresponding old goaf tunnel; grouting is injected into the ball-stick-shaped flexible mold bag to form a filling retaining wall, and after the filling retaining wall is consolidated, the area between the two retaining walls of the old goaf tunnel is filled; peripheral holes are constructed and grouting is performed on the outer side of the goaf tunnel parallel to the excavation direction, and after grouting, a central hole is constructed inside the goaf tunnel to be excavated; the central hole is enlarged to a first preset size as a gas extraction hole, and the gas extraction hole is connected to the extraction system on the opposite side of the goaf for pre-extraction before excavation; in the excavation process of the goaf tunnel to be excavated, the positive pressure of the wind tube and the negative pressure of the extraction jointly introduce the gas at the front of the working face into the extraction system. Thus, the problem of gas exceeding the limit in the excavation working face can be effectively solved.

[0022] Additional aspects and advantages of the present disclosure will be given in part in the following description and in part will be obvious from the following description or learned through practice of the present disclosure. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] The above and / or additional aspects and advantages of the present disclosure will become apparent and easily understood from the following description of the embodiments in conjunction with the accompanying drawings, in which:

[0024] Figure 1 It is a flow chart of a method for controlling surrounding rock and extracting gas in a goaf tunnel proposed in an embodiment of the present disclosure;

[0025] Figure 2 It is a schematic diagram of the arrangement of goaf tunnels proposed in the present disclosure;

[0026] Figure 3 is a schematic diagram of a first old empty laneway proposed according to the present disclosure;

[0027] Figure 4 is a schematic diagram of a club-shaped flexible mold bag according to the present disclosure;

[0028] Figure 5 It is a schematic diagram of the first old empty tunnel after filling according to the present disclosure;

[0029] Figure 6 It is the AA section after the first old empty tunnel is filled according to the present disclosure;

[0030] Figure 7 It is a schematic diagram of the arrangement of peripheral holes and central holes in goaf tunnels proposed in the present disclosure;

[0031] Figure 8 It is a schematic diagram of gas extraction during tunnel excavation in a goaf area proposed in the present disclosure;

[0032] Fig. 9 It is a structural schematic diagram of a surrounding rock control and gas extraction device for goaf tunneling proposed in an embodiment of the present disclosure;

[0033] Fig.10 A block diagram of an exemplary computer device suitable for implementing embodiments of the present disclosure is shown. DETAILED DESCRIPTION

[0034] Embodiments of the present disclosure are described in detail below, examples of which are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present disclosure, and are not to be construed as limitations of the present disclosure. On the contrary, the embodiments of the present disclosure include all changes, modifications, and equivalents that fall within the spirit and connotation of the appended claims.

[0035] Figure 1 It is a flow chart of a method for controlling surrounding rock and extracting gas in goaf tunneling proposed in one embodiment of the present disclosure.

[0036] Among them, it should be noted that the executor of the goaf excavation surrounding rock control and gas extraction method of this embodiment is the goaf excavation surrounding rock control and gas extraction device, which can be implemented by software and / or hardware. The device can be configured in a computer device, and the computer device may include but is not limited to a terminal, a server, etc.

[0037] like Figure 1 As shown in the figure, the surrounding rock control and gas extraction method of the goaf roadway includes:

[0038] S101: Determine the tunnel size information of the old empty tunnels on both sides of the goaf, and make a ball-stick-shaped flexible mold bag according to the tunnel size information, and place the ball-stick-shaped flexible mold bag into the corresponding old empty tunnel.

[0039] Among them, goaf refers to the cavity or space left after mining in coal mines or other mines.

[0040] Among them, old empty tunnels refer to tunnels that have stopped being used or have been mined out in the mine.

[0041] The tunnel size information may be used to describe the size of the old empty tunnel, for example, it may include shape information, length, maximum width, height, etc.

[0042] Among them, the ball-and-stick shaped flexible mold bag may refer to a flexible mold bag whose overall shape is composed of a sphere and a stick.

[0043] In the disclosed embodiment, when the tunnel size information of the old empty tunnels on both sides of the goaf is determined and a ball-stick-shaped flexible mold bag is made according to the tunnel size information, the applicability of the obtained ball-stick-shaped flexible mold bag to the old empty tunnels can be effectively improved.

[0044] In the disclosed embodiment, when the stick-shaped flexible mold bag is placed into the corresponding old empty tunnel, it can be used as a filling mold in the subsequent construction of the retaining wall, thereby ensuring the stability of the filling process.

[0045] S102: Inject grout into the ball-stick-shaped flexible mold bag to form a filling retaining wall, and after the filling retaining wall is consolidated, fill the area of ​​the old empty tunnel between the two retaining walls.

[0046] In the disclosed embodiment, the grouting material in the ball-and-stick shaped flexible mold bag and the filling material in the area between the two retaining walls can be flexibly configured according to the specific application scenario, and there is no limitation on this.

[0047] That is to say, in the embodiment of the present disclosure, filling retaining walls can be constructed at two locations of the old empty tunnel respectively, and then the area between the two retaining walls can be filled after the filling retaining walls are consolidated, so as to ensure the stability of the area during the excavation of the goaf tunnel.

[0048] S103: construct peripheral holes parallel to the excavation direction on the outer side of the tunnel in the goaf to be excavated and perform grouting. After grouting, construct a central hole inside the tunnel in the goaf to be excavated.

[0049] In the disclosed embodiment, when peripheral holes are constructed and grouting is performed on the outer side of the tunnel in the empty area to be mined parallel to the excavation direction, the stability of the corresponding area can be effectively improved, thereby ensuring that the subsequent center hole does not collapse during hole expansion and extraction.

[0050] S104: Enlarging the central hole to a first preset size as a gas extraction hole, and connecting the gas extraction hole to the extraction system on the opposite side of the goaf for pre-excavation extraction.

[0051] The first preset size may refer to a size to be expanded configured for the center hole.

[0052] It is understandable that after grouting, a center hole is constructed inside the tunnel in the goaf to be excavated. At this time, the size of the center hole obtained may be small and not suitable as a gas extraction hole. Therefore, in the embodiment of the present disclosure, the center hole can be enlarged to a first preset size as a gas extraction hole.

[0053] S105: During the excavation process of the tunnel in the empty area to be mined, the positive pressure of the wind tube and the negative pressure of the extraction are used together to introduce the gas at the working face into the extraction system.

[0054] That is to say, the present invention can introduce the gas at the working face into the extraction system by the positive pressure of the wind tube and the negative pressure of extraction during the excavation process of the tunnel in the empty area to be excavated, so as to effectively improve the gas extraction effect.

[0055] In this embodiment, by determining the tunnel size information of the old empty tunnels on both sides of the goaf, and making a ball-stick-shaped flexible mold bag according to the tunnel size information, the ball-stick-shaped flexible mold bag is placed in the corresponding old empty tunnel; grouting is injected into the ball-stick-shaped flexible mold bag to form a filling retaining wall, and after the filling retaining wall is consolidated, the area between the two retaining walls of the old empty tunnel is filled; peripheral holes are constructed and grouting is performed on the outer side of the goaf tunnel parallel to the excavation direction, and after grouting, a central hole is constructed inside the goaf tunnel to be excavated; the central hole is enlarged to a first preset size as a gas extraction hole, and the gas extraction hole is connected to the extraction system on the opposite side of the goaf for pre-extraction before excavation; during the excavation process of the goaf tunnel to be excavated, the positive pressure of the wind tube and the negative pressure of the extraction jointly introduce the gas at the head of the working face into the extraction system. In this way, the problem of excessive gas in the excavation working face can be effectively solved.

[0056] Optionally, the present disclosure also proposes a method for surrounding rock control and gas extraction in goaf excavation, wherein the goaf tunnel to be excavated is designed to open from the air inlet chute, and is excavated toward the other side of the goaf along a direction perpendicular to the air inlet chute, passing through the first section coal pillar, the first old goaf tunnel, the goaf, the second old goaf tunnel, the second section coal pillar in sequence, and is connected with the return air chute.

[0057] Optionally, the present disclosure also proposes a method for surrounding rock control and gas extraction in goaf tunneling, wherein the cross-section type of the goaf tunnel to be excavated is a straight wall three-center arch section, and the bottom plate of the goaf tunnel to be excavated is located below the bottom plate of the original longwall working face.

[0058] Optionally, the present disclosure further proposes a method for controlling surrounding rock and extracting gas in goaf, wherein a ball-and-stick shaped flexible mold bag is manufactured according to the tunnel size information, comprising:

[0059] Determine the layout position of the backfill retaining wall corresponding to the old empty tunnel, wherein the old empty tunnel includes the first old empty tunnel and the second old empty tunnel, and the layout position is on the left side and the right side of the tunnel in the empty area to be excavated;

[0060] Determine the maximum cross-sectional diameter of the old empty roadway at the layout position and the coal pillar width corresponding to the highest point of the roof of the old empty roadway at that position as roadway size information;

[0061] A ball-and-stick shaped flexible mold bag is manufactured according to the maximum diameter of the cross section and the width of the coal pillar, wherein the ball-and-stick shaped flexible mold bag is composed of a spherical flexible mold bag and a circular tubular flexible mold bag, the diameter of the spherical flexible mold bag is twice the maximum diameter of the cross section, the length of the circular tubular flexible mold bag is greater than the width of the coal pillar, the diameter of the circular tubular flexible mold bag is a second preset size, and there is a circular exhaust overflow hole with a diameter of a third preset size on the top of the ball-and-stick shaped flexible mold bag.

[0062] Optionally, the present disclosure further proposes a method for controlling surrounding rock and extracting gas in goaf tunnels, wherein a club-shaped flexible mold bag is placed in a corresponding old goaf tunnel, comprising:

[0063] The first borehole is drilled at the highest point of the roof of the old empty tunnel at the layout location, wherein a sealing pipe is installed at the hole mouth and the hole is sealed, and a valve and a gas extraction device are installed outside the hole;

[0064] Insert the grouting pipe from the opening of the club-shaped flexible mold bag to the bottom of the bag;

[0065] Push the grouting pipe together with the ball-and-stick shaped flexible mold bag along the first borehole to the bottom of the hole;

[0066] The grouting pipe and the push rod are pounded, and the spherical flexible mold bag is pushed into the old empty tunnel by spraying high-pressure gas or grouting into the ball-stick-shaped flexible mold bag or the first drill hole.

[0067] Optionally, the present disclosure further provides a method for controlling surrounding rock and extracting gas in a goaf, wherein grouting is injected into a club-shaped flexible mold bag to form a filling retaining wall, comprising:

[0068] Inject grout into the ball-and-stick shaped flexible mold bag through the grouting pipe;

[0069] During the grouting process, when the grouting volume reaches a preset multiple of the volume of the ball-and-stick shaped flexible mold bag, the grouting is stopped, the mouth is tied and fixed, and the hole is sealed with cement to form a filling retaining wall.

[0070] Optionally, the present disclosure further proposes a method for surrounding rock control and gas drainage in goaf, wherein the area between two retaining walls of the old goaf is filled, including:

[0071] Drill a second borehole at the highest point of the old empty tunnel between the two retaining walls;

[0072] Grouting is performed through the second borehole into the area between the two retaining walls of the old empty tunnel, wherein the grouting material is a mixed slurry of cement, fly ash and water glass;

[0073] During the grouting process, the grouting is stopped when the grouting pressure reaches the first preset pressure value and grouting returns to the orifice.

[0074] Optionally, the present disclosure also proposes a method for surrounding rock control and gas extraction in goaf tunneling, wherein the trajectory of each peripheral hole is parallel to the excavation direction of the goaf tunnel to be excavated, the peripheral holes are distributed on both sides of the tunnel and outside the top plate contour line and the vertical distances to the contour line are all target vertical distances, and the spacing between each peripheral hole is within a preset range.

[0075] Optionally, the present disclosure also proposes a method for surrounding rock control and gas extraction in goaf excavation, wherein peripheral holes are drilled in a sequence from bottom to top and alternating on both sides, and grouting is performed after each peripheral hole is completed, and each peripheral hole is stopped when it is drilled into the second section coal pillar.

[0076] Optionally, the present disclosure also proposes a method for controlling surrounding rock and gas drainage in goaf tunneling, wherein:

[0077] After the drilling of the peripheral holes stops, push the flower hole grouting pipe through the hollow drill rod to the bottom of the hole, and withdraw the drill rod for grouting;

[0078] During the grouting process, when the grouting pressure reaches the second preset pressure value and grouting returns to the orifice, grouting is stopped.

[0079] Optionally, the present disclosure further proposes a method for controlling surrounding rock and extracting gas in a goaf, wherein a center hole is constructed inside a goaf to be excavated, comprising:

[0080] In the air inlet chute, a center hole is drilled along the geometric center point of the tunnel section of the goaf to be excavated toward the return air chute, wherein the trajectory of the center hole is parallel to the tunnel excavation direction;

[0081] When the center hole is drilled through to the return air chute, cement slurry is used to seal the center hole on the return air chute side.

[0082] Optionally, the present disclosure further proposes a method for controlling surrounding rock and gas drainage in goaf tunneling, wherein the central hole is enlarged to a first preset size as a gas drainage hole, and the gas drainage hole is connected to a gas drainage system on the opposite side of the goaf for pre-drainage before excavation, including:

[0083] The center hole is expanded to a first preset size over its entire length, and during the expansion, a gas extraction pipeline is installed in the return air chute and connected to the extraction system;

[0084] When the hole expansion is completed, the gas extraction pipeline in the return air chute is connected to the central hole and the hole is sealed. At the same time, valves and extraction metering devices are installed at the hole mouth.

[0085] After the hole expansion is completed and the drill is withdrawn, the center hole on the air inlet chute side is sealed;

[0086] When the sealing slurry is completely solidified, open the gas extraction pipeline valve to pre-extract the gas in the tunnel to be excavated.

[0087] Optionally, the present disclosure further proposes a method for surrounding rock control and gas drainage in goaf driving, wherein:

[0088] When the extraction concentration of the pre-extraction is less than the preset concentration value, the tunnel in the empty area to be excavated is excavated, and the excavation working face is equipped with a wind tube for pressure-type local ventilation;

[0089] When the tunnel in the goaf to be excavated reaches the second section of the coal pillar, the gas extraction pipeline and related equipment at the orifice are removed to make the tunnel in the goaf to be excavated connected with the return air chute.

[0090] Based on the above embodiments, the method for controlling surrounding rock and gas extraction in goaf tunneling proposed in the present disclosure may include the following steps:

[0091] a. The goaf roadway (1) is designed to open from the air inlet chute (2) and to advance toward the other side of the goaf (3) of the longwall working face in a direction perpendicular to the air inlet chute (2), that is, it needs to pass through the first section coal pillar (4), the first old goaf roadway (5), the goaf (3) of the fully mechanized mining working face, the second old goaf roadway (6), the second section coal pillar (7), and be connected with the return air chute (8);

[0092] b. The cross-section type of the goaf tunnel (1) is a straight wall three-center arch cross-section. The floor of the goaf tunnel (1) extends below the bottom of the original longwall working face, and the distance from the bottom of the original longwall working face is h;

[0093] c. Use drilling peek, geological radar and other means to investigate the collapse of the first old empty tunnel (5) in the air intake chute (2), and choose to build the filling retaining wall (9) of the first old empty tunnel (5) at a position 3t to the left and 3t to the right of the goaf tunnel (1) (i.e., the layout position of the above-mentioned filling retaining wall).

[0094] d. Taking the left side 3t position as an example, first measure the maximum diameter r of the cross section of the old empty tunnel at this position, and the width s of the first coal pillar corresponding to the highest point of the roof of the old empty tunnel at this position. At the same time, combine drilling and coring methods to analyze the compaction of the caving rock mass in the goaf (3) of the longwall working face, including the average rock porosity and permeability coefficient of the goaf tunnel (1), and detect toxic and harmful gas components and gas concentration;

[0095] e. A spherical flexible mold bag (10) with a diameter of 2r and a circular tubular flexible mold bag (11) with a length of s+1m and a diameter of z (i.e., the second preset size) are manufactured, and the two are spliced ​​together to form a ball-stick-shaped flexible mold bag (12), and a circular exhaust and overflow hole (13) with a diameter of 30mm (i.e., the third preset size) is punched on the top of the ball-stick-shaped flexible mold bag (12);

[0096] f. According to the steps d to e, the same method is used to make a club-shaped flexible mold bag (12) at the right side of the goaf tunnel (1) 3t position;

[0097] g. In the air inlet chute (2), a ZYWL-4500D directional drill is used to drill holes at the highest point of the roof of the first old empty tunnel (5) at a position 3t away from the left side and 3t away from the right side of the goaf tunnel (1), respectively. The diameter of the hole is z (i.e., the second preset size mentioned above), a sealing pipe is installed at the hole mouth and the hole is sealed with two plugs and one injection bag, and a valve and a gas extraction device are installed outside the hole;

[0098] h. Insert the φ25mmPVC grouting pipe from the bag opening of the club-shaped flexible mold bag (12) to the bottom of the bag, and then push the φ25mmPVC grouting pipe together with the club-shaped flexible mold bag (12) along the borehole to the bottom of the hole, and push the spherical flexible mold bag (10) into the first old empty tunnel (5) by pounding the grouting pipe and the push rod, and spraying high-pressure gas into the club-shaped flexible mold bag (12) or the borehole (or grouting);

[0099] i. A 2ZBQ30 / 4 pneumatic grouting pump is used to inject grout into a ball-stick-shaped flexible mold bag (12) through a φ25mmPVC grouting pipe to form a retaining wall (9). The grouting material is a mixed slurry of P.O325 cement + grade II fly ash, the mass ratio of cement to fly ash is 1:0.35 to 1:0.4, and the water-binder ratio is 0.45:1 to 0.5:1. During the grouting process, when the grouting volume reaches 1.5 times (or the above-mentioned preset multiples, or any other multiples, without limitation) the volume of the ball-stick-shaped flexible mold bag (12), the grouting is stopped, the mouth is tied and fixed, and the hole is sealed with cement;

[0100] j. In the air inlet chute (2), a MSQ50 handheld air drill is used to drill a hole at the highest point of the old empty tunnel (5) between the two flexible mold bag retaining walls (9). The diameter of the hole is 42 mm. Grouting is performed into the first old empty tunnel (5) through a φ25 mm PVC grouting pipe. The grouting material is a mixed slurry of P.O325 cement + grade II fly ash + water glass. The concentration of water glass is 38-42 Be'. The mass ratio of cement, fly ash, water glass and water is 1:0.5:1:0.75. During the grouting process, the grouting pressure reaches 5 MPa (i.e., the example value of the first preset pressure value mentioned above) and the grouting returns to the hole mouth;

[0101] k. While drilling and grouting the first empty tunnel (5), perform drilling, exploration, flexible mold bag production and grouting on the second empty tunnel (6) in the same manner as in steps c to k;

[0102] 1. 3 days after the grouting is completed, a ZYWL-4500D directional drill with an openable and closable drill bit and a hollow drill rod is used in the air inlet chute (2) to drill n peripheral holes (14) in the direction of the second old empty tunnel (6), so that each peripheral hole (14) meets the following requirements within the goaf (3) of the comprehensive mining face: the trajectory of each peripheral hole (14) is parallel to the excavation direction of the goaf tunnel (1), the peripheral holes (14) are distributed on both sides of the tunnel and outside the top plate contour line and the vertical distance from the contour line is t (i.e. the above-mentioned target vertical distance), and the spacing between each peripheral hole (14) is 2 to 3m (i.e. the above-mentioned preset range). The method for determining the arrangement position of the peripheral holes (14) is as follows: first, a reference hole is determined at a position t above the center of the top plate of the goaf tunnel (1), and the remaining drill holes are distributed symmetrically on both sides as required.

[0103] m. The peripheral holes (14) are drilled in the order of bottom to top and alternating on both sides, and the grouting operation is carried out in a one-hole-drilling-one-hole manner, wherein each peripheral hole (14) is stopped when it reaches the second section coal pillar (7). After stopping, a φ25mm PVC flower hole grouting pipe is first pushed into the bottom of the hole through a hollow drill rod, and then the drill rod is withdrawn for grouting. The grouting material is ultrafine cement slurry, with a water-cement ratio of 0.4:1 to 0.45:1, and the grouting flow rate is controlled to q. During the grouting process, when the grouting pressure reaches 7MPa (i.e., the example value of the second preset pressure value mentioned above) and grouting returns to the hole mouth, the grouting is stopped;

[0104] n. 3 days after the grouting is completed, a center hole (15) is drilled in the air inlet chute (2) along the geometric center point of the cross section of the goaf tunnel (1) toward the return air chute (8) using a ZYWL-4500D directional drill. The hole diameter is 103 mm. The trajectory of the center hole (15) is parallel to the tunnel excavation direction. When the center hole (15) is drilled through to the return air chute (8), the center hole (15) is sealed with cement slurry on the return air chute (8) side in a timely manner. The sealing length is not less than 2 m.

[0105] o. After the hole is sealed, a Φ300mm (i.e., the first preset size) drill bit is used to expand the entire length of the 103mm center hole (15). During the expansion, a gas extraction pipeline is installed in the return air chute (8) and connected to the mine extraction system (16). When the hole is expanded, the extraction pipeline (16) in the return air chute (8) is connected to the Φ300mm center hole (15) and sealed with two plugging and one injection bag. The sealing length is not less than 20m. At the same time, valves, extraction metering devices, etc. are installed at the hole mouth;

[0106] p. After the hole expansion is completed and the drill is withdrawn, cement slurry is used to seal the Φ300mm center hole (15) on the side of the air inlet chute (2). The sealing length is not less than 5m. When the sealing slurry is completely solidified, the valve of the gas extraction pipeline (16) is opened to pre-extract the gas in the goaf tunnel (1) before excavation. The extraction negative pressure is 8000Pa.

[0107] q. When the extraction concentration of the pre-extraction is less than 10% (i.e., the example value of the above-mentioned preset concentration value), an EBZ160 type roadheader (17) is used to excavate the goaf tunnel (1), and a straight-leg three-section 29U type steel shed is used for support, with a shed distance of 600mm. A 1m diameter wind tube (18) is arranged on the excavation working face for pressurized local ventilation, and the wind tube air volume is f. During the excavation process, the extraction negative pressure is adjusted to 5000Pa;

[0108] r. Carry out secondary supplementary grouting of the excavated tunnel 40m ahead of the lagging excavation working face, with a row and spacing of 3m for grouting holes, and a drilling depth of 7m using a MQS-35 pneumatic handheld coal seam anchor drill. Grouting pipes are φ25mm PVC pipes, with a solid pipe at 5m near the hole mouth and a flower-hole pipe at 2m from the hole bottom. Grouting is stopped when the grouting pressure reaches 7MPa and grouting returns to the hole mouth;

[0109] s. When the goaf tunnel (1) is excavated to the second section coal pillar (7), the gas extraction pipeline and orifice-related equipment are removed to allow the goaf tunnel (1) to be connected with the return air chute (8).

[0110] Optionally, the present disclosure further proposes a method for surrounding rock control and gas drainage in goaf driving, wherein:

[0111] Investigate the caving patterns of old empty tunnels on both sides of the goaf to determine the compaction degree of the caving rock mass in the goaf;

[0112] Determine the demand information of the tunnels in the goaf to be excavated;

[0113] According to the compaction degree of the fallen rock mass and the demand information, the cross-sectional dimension information of the tunnel in the goaf to be excavated is determined.

[0114] Among them, demand information may include actual production needs and uses such as tunnel excavation, transportation, and ventilation.

[0115] That is to say, in the disclosed embodiment, the cross-sectional dimensions of the goaf tunnel are determined according to the degree of compaction of the rock mass falling from the goaf, as well as the actual production needs and uses of tunnel excavation, transportation, ventilation, etc.

[0116] Optionally, the present disclosure further proposes a method for surrounding rock control and gas drainage in goaf driving, wherein:

[0117] Determine the floor crushing condition of the goaf, the compaction degree of the fallen rock mass, the gas concentration and the drilling conditions of the holes around the tunnel;

[0118] The position of the bottom plate of the tunnel to be excavated in the goaf is determined based on the bottom plate crushing situation, the compaction degree of the fallen rock mass, the gas concentration and the drilling conditions of the holes around the tunnel.

[0119] That is to say, in the disclosed embodiment, the floor of the goaf tunnel (1) penetrates into the bottom of the original comprehensive mining face by a distance h=0-1.5 m, and the specific value needs to be determined comprehensively based on the crushing of the goaf floor, the compaction degree of the fallen rock mass, the gas concentration, and the drilling conditions of the holes around the tunnel.

[0120] Optionally, the present disclosure further proposes a method for surrounding rock control and gas extraction in goaf tunneling, wherein the diameter of the first borehole is determined by the size and material of the ball-and-stick shaped flexible mold bag and the stability of the borehole wall.

[0121] That is, in the disclosed embodiment, the drilling diameter z is closely related to the size and material of the ball-and-stick shaped flexible mold bag and the stability of the drilling hole wall.

[0122] Optionally, the present disclosure further proposes a method for surrounding rock control and gas drainage in goaf driving, wherein:

[0123] Determine the cross-sectional dimensions of the tunnel in the goaf to be excavated, the porosity and permeability of the rock mass in the goaf;

[0124] According to the cross-sectional dimension information, porosity and permeability coefficient, the number of peripheral holes, target vertical distance and grouting flow rate of the peripheral holes are determined.

[0125] That is, in the disclosed embodiment, the number of peripheral holes n, the vertical distance t between the peripheral holes and the contour line, and the grouting flow rate q are determined comprehensively based on the cross-sectional dimensions of the goaf tunneling tunnel, the porosity and permeability coefficient of the rock mass that has fallen from the goaf, etc.

[0126] Optionally, the present disclosure also proposes a method for controlling surrounding rock and extracting gas in goaf tunnels, wherein the air output of the air duct is related to the required air volume of the tunnel behind the excavation working face, the excavation cross-sectional area, the excavation rate and the gas concentration in the goaf.

[0127] That is to say, in the disclosed embodiment, the air output of the wind duct of the excavation working face is f, which is closely related to the air volume required in the tunnel behind the excavation working face, the excavation cross-sectional area, the excavation rate and the gas concentration in the goaf.

[0128] In combination with the content of the present invention, the specific implementation method is described as follows for the main transportation tunnel passing through the goaf of the 101 fully mechanized mining face:

[0129] 1. The main transport extension tunnel (1) is designed to be opened from the air intake chute (2) and excavated along the direction perpendicular to the air intake chute (2) to the other side of the goaf (3) of the 101 fully mechanized mining face, that is, it needs to pass through the first section coal pillar (4), the 101 return air chute old empty tunnel (5), the 101 fully mechanized mining face goaf (3), the 101 air intake chute old empty tunnel (6), the second section coal pillar (7), and connect with the return air chute (8), such as Figure 2 As shown, Figure 2 It is a schematic diagram of the arrangement of goaf tunnels proposed in the present disclosure;

[0130] 2. The cross-section type of the main transport extension tunnel (1) is a straight wall three-center arch cross-section, with a clear width of 4.3m, a clear height of 3.3m, and a straight wall height of 1.845m. The floor of the main transport extension tunnel (1) extends below the floor of the 101 fully mechanized mining face and is 1m away from the floor of the 101 fully mechanized mining face;

[0131] 3. Use drilling and geological radar to investigate the collapse of the old empty tunnel (5) of the 101 return air chute in the air intake chute (2), and select to build the filling retaining wall (9) of the old empty tunnel (5) of the 101 return air chute at the position of 9m on the left and 9m on the right of the main transport extension tunnel (1);

[0132] 4. Taking the 9m position on the left side as an example, the maximum diameter of the cross section of the old empty roadway in the 101 return air chute at this position is measured to be 2.3m, and the width of the first coal pillar corresponding to the highest point of the roof of the old empty roadway at this position is 10.7m. At the same time, combined with the drilling and coring methods, the average porosity of the caving rock mass in the area of ​​the roadway to be excavated is measured to be 0.21, the average permeability coefficient is 0.073m / d, and the CH4 concentration in the goaf is 5.3%. Figure 3 As shown, Figure 3 is a schematic diagram of a first old empty laneway proposed according to the present disclosure;

[0133] 5. A spherical flexible mold bag (10) with a diameter of 4.6 mm and a circular tubular flexible mold bag (11) with a length of 11.7 m and a diameter of 120 mm are made, and the two are spliced ​​together to form a ball-stick-shaped flexible mold bag (12). A circular exhaust and overflow hole (13) with a diameter of 30 mm is punched on the top of the ball-stick-shaped flexible mold bag (12). Figure 4 As shown, Figure 4 is a schematic diagram of a club-shaped flexible mold bag according to the present disclosure;

[0134] 6. According to steps 4 to 5, a ball-stick-shaped flexible mold bag (12) located 9 m away from the right side of the main transport extension lane (1) is manufactured in the same manner;

[0135] 7. In the air intake chute (2), a ZYWL-4500D directional drilling rig is used to drill holes at the highest point of the roof of the 101 return air chute old empty tunnel (5) at 9m away from the left side and 9m away from the right side of the main transport extension tunnel (1). The diameter of the holes is 120mm. Sealing pipes are installed at the hole mouths and sealed with two plugging and one injection bag. Valves and gas extraction devices are installed outside the holes.

[0136] 8. Insert the φ25mm PVC grouting pipe from the bag opening of the ball-stick-shaped flexible mold bag (12) to the bottom of the bag, and then push the φ25mm PVC grouting pipe together with the ball-stick-shaped flexible mold bag (12) along the borehole to the bottom of the hole, and push the grouting pipe and the push rod, and use the method of spraying high-pressure gas into the ball-stick-shaped flexible mold bag (12) or the borehole (or grouting) to push the spherical flexible mold bag (10) into the 101 return air chute old empty roadway (5);

[0137] 9. Use a 2ZBQ30 / 4 pneumatic grouting pump to inject grout into the ball-stick-shaped flexible mold bag (12) through a φ25mm PVC grouting pipe to form a retaining wall (9). The grouting material is a mixed slurry of P.O325 cement + grade II fly ash, the mass ratio of cement to fly ash is 1:0.35-1:0.4, and the water-binder ratio is 0.45:1-0.5:1. During the grouting process, when the grouting volume reaches 1.5 times the volume of the ball-stick-shaped flexible mold bag (12), stop grouting, tie the mouth to fix it, and use cement to seal the hole;

[0138] 10. In the air inlet chute (2), a MSQ50 handheld air drill is used to drill a hole at the highest point of the top plate of the 101 return air chute old empty tunnel (5) between the two soft mold bag retaining walls (9). The diameter of the hole is 42 mm. Grouting is injected into the 101 return air chute old empty tunnel (5) through a φ25 mm PVC grouting pipe. The grouting material is a mixed slurry of P.O325 cement + grade II fly ash + water glass. The concentration of water glass is 38-42 Be'. The mass ratio of cement, fly ash, water glass and water is 1:0.5:1:0.75. During the grouting process, when the grouting pressure reaches 5 MPa and the grouting returns to the hole mouth, the grouting is stopped. Figure 5 , 6 As shown, Figure 5 This is a schematic diagram of the first old empty tunnel after filling proposed in the present disclosure, Figure 6 It is the AA section after the first old empty tunnel is filled according to the present disclosure;

[0139] 11. While drilling and grouting the old empty tunnel (5) of the 101 return air chute, perform drilling, exploration, flexible mold bag making and grouting on the old empty tunnel (6) of the 101 intake air chute in the same manner according to steps 3 to 10;

[0140] 12. 3 days after the grouting is completed, 9 peripheral holes (14) are drilled in the air intake chute (2) in the direction of the old empty tunnel (6) of the 101 air intake chute using a ZYWL-4500D directional drilling rig equipped with an openable and closable drill bit and a hollow drill rod, so that each peripheral hole (14) meets the following requirements within the goaf (3) of the comprehensive mining face: the trajectory of each peripheral hole (14) is parallel to the excavation direction of the main transport extension tunnel (1), the peripheral holes (14) are distributed on both sides of the tunnel and outside the top plate contour line and the vertical distance from the contour line is 3m, and the spacing between each peripheral hole (14) is 2.5m. The method for determining the arrangement position of the peripheral holes (14) is as follows: first, determine the reference hole at a position 3m above the center of the top plate of the main transport extension tunnel (1), and the remaining drill holes are symmetrically distributed on both sides as required, such as Figure 7 As shown, Figure 7 It is a schematic diagram of the arrangement of peripheral holes and central holes in goaf tunnels proposed in the present disclosure;

[0141] 13. The peripheral holes (14) are drilled in the order of from bottom to top and alternating on both sides, and the grouting operation is carried out in the manner of drilling one hole and injecting one hole. Each peripheral hole (14) is stopped when it reaches the coal pillar (7) in the second section. After stopping, the φ25mm PVC flower hole grouting pipe is pushed into the bottom of the hole through the hollow drill rod, and then the drill rod is withdrawn for grouting. The grouting material is ultra-fine cement slurry, with a water-cement ratio of 0.4:1 to 0.45:1, and the grouting flow rate is controlled to q. During the grouting process, the grouting pressure reaches 7MPa and the grouting returns to the hole mouth;

[0142] 14. 3 days after the grouting is completed, a center hole (15) with a diameter of 103 mm is drilled in the air inlet chute (2) along the geometric center point of the cross section of the main transport extension tunnel (1) toward the return air chute (8) using a ZYWL-4500D directional drill. The center hole (15) is parallel to the tunneling direction. When the center hole (15) is drilled through to the return air chute (8), the center hole (15) is sealed with cement slurry on the return air chute (8) side in a timely manner. The sealing length is not less than 2 m. Figure 7 As shown, Figure 7 It is a schematic diagram of the arrangement of peripheral holes and central holes in goaf tunnels proposed in the present disclosure.

[0143] 15. After the hole is sealed, a Φ300mm drill bit is used to expand the entire length of the 103mm center hole (15). During the expansion, a gas extraction pipeline is installed in the return air chute (8) and connected to the mine extraction system (16). After the hole is expanded, the extraction pipeline (16) in the return air chute (8) is connected to the Φ300mm center hole (15) and sealed with two plugs and one injection bag. The sealing length is not less than 20m. At the same time, valves, extraction metering devices, etc. are installed at the hole mouth;

[0144] 16. After the hole expansion is completed and the drill is withdrawn, cement slurry is used to seal the Φ300mm center hole (15) on the side of the air inlet chute (2). The sealing length is not less than 5m. When the sealing slurry is completely solidified, the valve of the gas extraction pipeline (16) is opened to pre-excavate the gas in the main transportation extension tunnel (1). The extraction negative pressure is 8000Pa.

[0145] 17. When the extraction concentration of the pre-excavation is less than 10%, the main transport extension tunnel (1) is excavated by using an EBZ160 type tunnel boring machine (17), and a straight-leg three-section 29U type steel shed is used for support, with a shed distance of 600mm. A 1m diameter wind tube (18) is arranged on the excavation working face for pressure-type local ventilation, and the wind tube air volume is 800m3 / min. During the excavation process, the extraction negative pressure is adjusted to 5000Pa. Figure 8 As shown, Figure 8 It is a schematic diagram of gas extraction during tunnel excavation in a goaf area proposed in the present disclosure;

[0146] 18. At the front 40m of the lagging excavation working face, secondary supplementary grouting is carried out on the excavated tunnel. The grouting holes are arranged 3m apart and spaced 3m apart. The secondary supplementary grouting is carried out by drilling with an MQS-35 pneumatic handheld coal seam anchor drill. The drilling depth is 7m. The grouting pipe is a φ25mm PVC pipe. The 5m near the hole mouth is a solid pipe and the 2m at the bottom of the hole is a flower hole pipe. When the grouting pressure reaches 7MPa and grouting returns to the hole mouth, stop grouting;

[0147] 19. When the main transport extension tunnel (1) is excavated to the second section coal pillar (7), the gas extraction pipeline and orifice-related equipment are removed to connect the main transport extension tunnel (1) with the return air chute (8).

[0148] Based on the above embodiments, the beneficial effects of the present disclosure include at least: in view of the cross-over morphological characteristics of the two chute of the longwall working face after mining, a technical solution of long-distance grouting and blocking of coal pillars based on a ball-and-stick flexible mold bag is designed. The design of the exhaust and overflow holes of the ball-and-stick flexible mold bag can make the slurry flow out along the flexible mold bag to the bottom after the space inside the flexible mold bag is filled, and the remaining voids and cracks between the flexible mold bag and the bottom plate are filled densely. At the same time, the outflowing slurry can consolidate the flexible mold bag and the bottom plate to form a base, so as to better play the retaining wall role of the ball-and-stick flexible mold bag. In addition, the use of ball-and-stick flexible mold bags as retaining walls on both sides of the old empty tunnels can not only realize the dense filling of designated areas in tunnels with different slopes, but also avoid the loss and waste of slurry, and has good economy and applicability.

[0149] According to the structural characteristics of coal pillar-old empty tunnel-goaf-old empty tunnel-coal pillar formed after longwall working face mining, this paper adopts a 1,000-meter directional drilling rig with an openable and closable drill bit and a strong turning hollow drill rod to achieve accurate construction of parallel peripheral holes in the broken rock mass of the goaf and full-length grouting, recreating a closed stress arch structure, which, supplemented by a U-shaped steel shed and post-excavation injection, can effectively ensure the safety and stability of the tunnel surrounding rock. At the same time, the grouting reinforcement of the peripheral holes can prevent the central hole from collapsing during hole expansion and extraction. For gas (toxic and harmful gas) control, the closed stress arch structure can greatly block the connection and exchange of gas inside and outside the tunnel. By reasonably adjusting the extraction negative pressure, pre-extraction before excavation can dredge and release the free gas in the rock mass inside the tunnel. During the excavation process, the main function of the center hole is to use its extraction negative pressure and the positive pressure of the working face wind pipe to jointly guide and discharge the adsorbed gas released by the exfoliated rock mass and the gas infiltrating into the working face from the outside, and introduce them into the mine extraction system to avoid gas accumulation on the working face and flow along the tunnel to other work locations, thereby solving the problem of excessive gas in the excavation working face from the root and effectively utilizing the gas in the goaf.

[0150] The technology described in the present disclosure systematically solves a series of major technical problems in the goaf of longwall working faces, especially in the goaf of longwall working faces with excessive gas and protruding coal seams, and provides a new "digging, injection and pumping" technical model for the safe and rapid construction of tunnels in goafs and complex broken rock masses. It has great scientific and engineering significance and broad application prospects.

[0151] Fig. 9 It is a structural schematic diagram of a surrounding rock control and gas extraction device for goaf tunneling proposed in an embodiment of the present disclosure.

[0152] like Fig. 9 As shown, the goaf area tunneling surrounding rock control and gas extraction device 90 includes:

[0153] The determination module 901 is used to determine the tunnel size information of the old empty tunnels on both sides of the goaf, and to make a ball-stick-shaped flexible mold bag according to the tunnel size information, and to place the ball-stick-shaped flexible mold bag into the corresponding old empty tunnel;

[0154] The first processing module 902 is used to inject grout into the club-shaped flexible mold bag to form a filling retaining wall, and fill the area between the two retaining walls of the old empty tunnel after the filling retaining wall is consolidated;

[0155] The second processing module 903 is used to construct peripheral holes parallel to the excavation direction on the outside of the tunnel in the goaf to be excavated and perform grouting, and after grouting, construct a central hole inside the tunnel in the goaf to be excavated;

[0156] The third processing module 904 is used to expand the central hole to a first preset size as a gas drainage hole, and connect the gas drainage hole to the drainage system on the opposite side of the goaf for pre-drainage before excavation;

[0157] The fourth processing module 905 is used to introduce the gas at the working face into the extraction system by the positive pressure of the wind tube and the negative pressure of the extraction during the excavation process of the tunnel in the empty area to be excavated.

[0158] It should be noted that the aforementioned explanation of the method for controlling surrounding rock and gas extraction in goaf tunneling is also applicable to the device for controlling surrounding rock and gas extraction in goaf tunneling of the present embodiment, and will not be repeated here.

[0159] In this embodiment, by determining the tunnel size information of the old empty tunnels on both sides of the goaf, and making a ball-stick-shaped flexible mold bag according to the tunnel size information, the ball-stick-shaped flexible mold bag is placed in the corresponding old empty tunnel; grouting is injected into the ball-stick-shaped flexible mold bag to form a filling retaining wall, and after the filling retaining wall is consolidated, the area between the two retaining walls of the old empty tunnel is filled; peripheral holes are constructed and grouting is performed on the outer side of the goaf tunnel parallel to the excavation direction, and after grouting, a central hole is constructed inside the goaf tunnel to be excavated; the central hole is enlarged to a first preset size as a gas extraction hole, and the gas extraction hole is connected to the extraction system on the opposite side of the goaf for pre-extraction before excavation; during the excavation process of the goaf tunnel to be excavated, the positive pressure of the wind tube and the negative pressure of the extraction jointly introduce the gas at the head of the working face into the extraction system. In this way, the problem of excessive gas in the excavation working face can be effectively solved.

[0160] Fig.10 A block diagram of an exemplary computer device suitable for implementing embodiments of the present disclosure is shown. Fig.10 The computer device 12 shown is only an example and should not bring any limitation to the functions and scope of use of the embodiments of the present disclosure.

[0161] like Fig.10 As shown, the computer device 12 is in the form of a general-purpose computing device. The components of the computer device 12 may include, but are not limited to: one or more processors or processing units 16, a system memory 28, and a bus 18 that connects various system components (including the system memory 28 and the processing unit 16).

[0162] The bus 18 represents one or more of several types of bus structures, including a memory bus or memory controller, a peripheral bus, a graphics acceleration port, a processor or a local bus using any of a variety of bus structures. For example, these architectures include but are not limited to Industry Standard Architecture (ISA) bus, Micro Channel Architecture (MAC) bus, Enhanced ISA bus, Video Electronics Standards Association (VESA) local bus and Peripheral Component Interconnection (PCI) bus.

[0163] The computer device 12 typically includes a variety of computer system readable media. These media can be any available media that can be accessed by the computer device 12, including volatile and non-volatile media, removable and non-removable media.

[0164] The memory 28 may include computer system readable media in the form of volatile memory, such as random access memory (RAM) 30 and / or cache memory 32. The computer device 12 may further include other removable / non-removable, volatile / non-volatile computer system storage media. By way of example only, the storage system 34 may be used to read and write non-removable, non-volatile magnetic media ( Fig.10 Not shown, often called a "hard drive").

[0165] although Fig.10 Not shown in the figure, a disk drive for reading and writing a removable non-volatile disk (e.g., a "floppy disk"), and an optical disk drive for reading and writing a removable non-volatile optical disk (e.g., a compact disc read only memory (hereinafter referred to as: CD-ROM), a digital versatile disc read only memory (hereinafter referred to as: DVD-ROM) or other optical media) may be provided. In these cases, each drive may be connected to the bus 18 via one or more data medium interfaces. The memory 28 may include at least one program product having a set (e.g., at least one) of program modules that are configured to perform the functions of the various embodiments of the present disclosure.

[0166] A program / utility 40 having a set (at least one) of program modules 42 may be stored, for example, in the memory 28, such program modules 42 including but not limited to an operating system, one or more application programs, other program modules, and program data, each of which or some combination may include an implementation of a network environment. The program modules 42 generally perform the functions and / or methods of the embodiments described in the present disclosure.

[0167] The computer device 12 may also communicate with one or more external devices 14 (e.g., keyboard, pointing device, display 24, etc.), one or more devices that enable a human body to interact with the computer device 12, and / or any device that enables the computer device 12 to communicate with one or more other computing devices (e.g., network card, modem, etc.). Such communication may be performed via an input / output (I / O) interface 22. In addition, the computer device 12 may also communicate with one or more networks (e.g., a local area network (LAN), a wide area network (WAN), and / or a public network, such as the Internet) via a network adapter 20. As shown, the network adapter 20 communicates with other modules of the computer device 12 via a bus 18. It should be understood that, although not shown in the figure, other hardware and / or software modules may be used in conjunction with the computer device 12, including but not limited to: microcode, device drivers, redundant processing units, external disk drive arrays, RAID systems, tape drives, and data backup storage systems.

[0168] The processing unit 16 executes various functional applications and data processing by running the programs stored in the system memory 28, such as implementing the surrounding rock control and gas extraction method of goaf tunneling mentioned in the above-mentioned embodiment.

[0169] In order to implement the above embodiments, the present disclosure also proposes a non-temporary computer-readable storage medium on which a computer program is stored. When the program is executed by a processor, it implements the surrounding rock control and gas extraction method of goaf excavation proposed in the aforementioned embodiments of the present disclosure.

[0170] In order to implement the above embodiments, the present disclosure further proposes a computer program product. When the instruction processor in the computer program product is executed, the surrounding rock control and gas extraction method of goaf tunneling proposed in the aforementioned embodiments of the present disclosure is executed.

[0171] Those skilled in the art will readily appreciate other embodiments of the present disclosure after considering the specification and practicing the invention disclosed herein. The present disclosure is intended to cover any variations, uses, or adaptations of the present disclosure that follow the general principles of the present disclosure and include common knowledge or customary techniques in the art that are not disclosed in the present disclosure. The description and examples are to be considered exemplary only, and the true scope and spirit of the present disclosure are indicated by the following claims.

[0172] It should be understood that the present disclosure is not limited to the exact structures that have been described above and shown in the drawings, and that various modifications and changes may be made without departing from the scope thereof. The scope of the present disclosure is limited only by the appended claims.

[0173] It should be noted that, in the description of the present disclosure, the terms "first", "second", etc. are only used for descriptive purposes and cannot be understood as indicating or implying relative importance. In addition, in the description of the present disclosure, unless otherwise specified, the meaning of "plurality" is two or more.

[0174] Any process or method description in a flowchart or otherwise described herein may be understood to represent a module, segment or portion of code that includes one or more executable instructions for implementing the steps of a specific logical function or process, and the scope of the preferred embodiments of the present disclosure includes alternative implementations in which functions may not be performed in the order shown or discussed, including performing functions in a substantially simultaneous manner or in the reverse order depending on the functions involved, which should be understood by those skilled in the art to which the embodiments of the present disclosure belong.

[0175] It should be understood that the various parts of the present disclosure can be implemented in hardware, software, firmware or a combination thereof. In the above-mentioned embodiments, multiple steps or methods can be implemented in software or firmware stored in a memory and executed by a suitable instruction execution system. For example, if implemented in hardware, as in another embodiment, it can be implemented by any one of the following technologies known in the art or their combination: a discrete logic circuit having a logic gate circuit for implementing a logic function for a data signal, a dedicated integrated circuit having a suitable combination of logic gate circuits, a programmable gate array (PGA), a field programmable gate array (FPGA), etc.

[0176] A person skilled in the art may understand that all or part of the steps in the method for implementing the above-mentioned embodiment may be completed by instructing related hardware through a program, and the program may be stored in a computer-readable storage medium, which, when executed, includes one or a combination of the steps of the method embodiment.

[0177] In addition, each functional unit in each embodiment of the present disclosure may be integrated into a processing module, or each unit may exist physically separately, or two or more units may be integrated into one module. The above-mentioned integrated module may be implemented in the form of hardware or in the form of a software functional module. If the integrated module is implemented in the form of a software functional module and sold or used as an independent product, it may also be stored in a computer-readable storage medium.

[0178] The storage medium mentioned above can be a read-only memory, a magnetic disk or an optical disk, etc.

[0179] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present disclosure. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner.

[0180] Although the embodiments of the present disclosure have been shown and described above, it is to be understood that the above embodiments are exemplary and are not to be construed as limitations of the present disclosure. A person skilled in the art may change, modify, replace and vary the above embodiments within the scope of the present disclosure.

Claims

1. A method for surrounding rock control and gas extraction in goaf, characterized in that: include: Determine the tunnel size information of the old empty tunnels on both sides of the goaf, and make a ball-stick-shaped flexible mold bag according to the tunnel size information, and place the ball-stick-shaped flexible mold bag into the corresponding old empty tunnel; Injecting grout into the club-shaped flexible mold bag to form a filling retaining wall, and after the filling retaining wall is solidified, filling the area of ​​the old empty tunnel between the two retaining walls; Construct peripheral holes parallel to the excavation direction on the outside of the tunnel in the goaf to be excavated and perform grouting, and after grouting, construct a central hole inside the tunnel in the goaf to be excavated; Enlarging the central hole to a first preset size as a gas drainage hole, and connecting the gas drainage hole to the drainage system on the opposite side of the goaf for pre-drainage before excavation; During the excavation process of the tunnel in the empty area to be excavated, the positive pressure of the wind tube and the negative pressure of the extraction are used together to introduce the gas at the working face into the extraction system.

2. The method according to claim 1, characterized in that The tunnel in the goaf to be excavated is designed to open from the air inlet chute and excavate toward the other side of the goaf in a direction perpendicular to the air inlet chute, passing through the first section coal pillar, the first old goaf tunnel, the goaf, the second old goaf tunnel, the second section coal pillar in sequence, and connecting with the return air chute.

3. The method according to claim 2, characterized in that The cross-section type of the tunnel in the goaf to be excavated is a straight wall three-center arch section, and the bottom plate of the tunnel in the goaf to be excavated is located below the bottom plate of the original long wall working face.

4. The method according to claim 2, characterized in that The method of making a ball-and-stick shaped flexible mold bag according to the lane size information comprises: Determine the arrangement position of the old empty tunnel corresponding to the filling retaining wall, wherein the old empty tunnel includes a first old empty tunnel and a second old empty tunnel, and the arrangement position is on the left side and the right side of the tunnel in the empty area to be excavated; Determine the maximum cross-sectional diameter of the old empty roadway at the arrangement position and the coal pillar width corresponding to the highest point of the roof of the old empty roadway at the position as the roadway size information; The ball-and-stick shaped flexible mold bag is manufactured according to the maximum diameter of the cross section and the width of the coal pillar, wherein the ball-and-stick shaped flexible mold bag is composed of a spherical flexible mold bag and a circular tubular flexible mold bag, the diameter of the spherical flexible mold bag is twice the maximum diameter of the cross section, the length of the circular tubular flexible mold bag is greater than the width of the coal pillar, the diameter of the circular tubular flexible mold bag is a second preset size, and there is a circular exhaust overflow hole with a diameter of a third preset size on the top of the ball-and-stick shaped flexible mold bag.

5. The method according to claim 4, characterized in that The step of placing the club-shaped flexible mold bag into the corresponding old empty lane comprises: A first borehole is drilled at the highest point of the roof of the old empty tunnel at the arrangement position, wherein a sealing pipe is installed at the hole mouth and the hole is sealed, and a valve and a gas extraction device are installed outside the hole; Insert the grouting pipe from the bag opening of the club-shaped flexible mold bag to the bottom of the bag; Pushing the grouting pipe together with the ball-and-stick shaped flexible mold bag along the first borehole to the bottom of the hole; The grouting pipe and the push rod are pounded, and the spherical flexible mold bag is pushed into the old empty tunnel by spraying high-pressure gas or injecting grout into the ball-and-stick shaped flexible mold bag or the first borehole.

6. The method according to claim 5, characterized in that The step of injecting grout into the club-shaped flexible mold bag to form a filling retaining wall comprises: Injecting grout into the ball-and-stick shaped flexible mold bag through the grouting pipe; During the grouting process, when the grouting volume reaches a preset multiple of the volume of the ball-and-stick shaped flexible mold bag, the grouting is stopped, the opening is tied and fixed, and the hole is sealed with cement to form the filling retaining wall.

7. The method according to claim 1, characterized in that The filling of the area between the two retaining walls of the old empty tunnel comprises: Drilling a second borehole at the highest point of the old empty tunnel between the two retaining walls; Grouting is performed through the second borehole into the area of ​​the old empty tunnel between the two retaining walls, wherein the grouting material is a mixed slurry of cement, fly ash and water glass; During the grouting process, when the grouting pressure reaches the first preset pressure value and grouting returns to the orifice, grouting is stopped.

8. The method according to claim 1, characterized in that in, The trajectory of each of the peripheral holes is parallel to the excavation direction of the tunnel in the goaf to be excavated. The peripheral holes are distributed on the two sides of the tunnel and outside the top plate contour line, and the vertical distances to the contour line are all target vertical distances. The spacing between each of the peripheral holes is within a preset range.

9. The method according to claim 2, characterized in that The peripheral holes are drilled in an order from bottom to top and alternately on both sides, and grouting is performed after each peripheral hole is drilled. The drilling of each peripheral hole stops when it reaches the coal pillar in the second section.

10. The method according to claim 9, characterized in that Also includes: After the drilling of the peripheral holes stops, the flower hole grouting pipe is pushed into the bottom of the hole through the hollow drill rod, and the drill rod is withdrawn for grouting; During the grouting process, when the grouting pressure reaches the second preset pressure value and grouting returns to the orifice, grouting is stopped.

11. The method according to claim 2, characterized in that The construction of the center hole inside the tunnel in the goaf to be excavated includes: In the air inlet chute, the center hole is drilled along the geometric center point of the cross section of the tunnel in the gob to be excavated toward the return air chute, wherein the trajectory of the center hole is parallel to the tunnel excavation direction; After the central hole is drilled through to the return air chute, cement slurry is used to seal the central hole on the return air chute side.

12. The method according to claim 11, characterized in that The method of enlarging the central hole to a first preset size as a gas drainage hole, and connecting the gas drainage hole to a gas drainage system on the opposite side of the goaf for pre-drainage before excavation, includes: The central hole is expanded to the first preset size over its entire length, and during the expansion, a gas extraction pipeline is installed in the return air chute and connected to the extraction system; After the hole expansion is completed, the gas extraction pipeline in the return air chute is connected to the central hole and the hole is sealed, and a valve and an extraction metering device are installed at the hole mouth; After the hole expansion is completed and the drill is withdrawn, the center hole at the air inlet chute side is sealed; When the sealing slurry is completely solidified, the gas extraction pipeline valve is opened to pre-extract the gas in the tunnel of the gob to be excavated.

13. The method according to claim 11, characterized in that Also includes: When the extraction concentration of the pre-extraction is less than the preset concentration value, the tunnel in the empty area to be excavated is excavated, wherein the wind tube is arranged on the excavation working face for pressure-type local ventilation; When the tunnel in the goaf to be excavated reaches the coal pillar in the second section, the gas extraction pipeline and orifice-related equipment are removed to allow the tunnel in the goaf to be excavated to be connected with the return air chute.

14. The method according to claim 1, wherein: Also includes: Exploring the caving patterns of the old empty tunnels on both sides of the goaf to determine the compaction degree of the caving rock mass in the goaf; Determine the demand information of the tunnel in the goaf to be excavated; According to the compaction degree of the fallen rock mass and the demand information, the cross-sectional dimension information of the tunnel in the goaf to be excavated is determined.

15. The method according to claim 3, characterized in that Also includes: Determine the floor crushing condition of the goaf, the compaction degree of the rock mass, the gas concentration and the drilling conditions of the holes around the tunnel; The position of the bottom plate of the tunnel in the goaf to be excavated is determined based on the bottom plate crushing condition, the compaction degree of the fallen rock mass, the gas concentration and the drilling conditions of the holes around the tunnel.

16. The method according to claim 5, characterized in that The diameter of the first borehole is determined by the size and material of the ball-and-stick shaped flexible mold bag and the stability of the borehole wall.

17. The method according to claim 8, characterized in that Also includes: Determine the cross-sectional dimension information of the tunnel in the goaf to be excavated, the porosity and permeability coefficient of the rock mass in the goaf; The number of peripheral holes, the target vertical distance and the grouting flow rate of the peripheral holes are determined according to the cross-sectional dimension information, the porosity and the permeability coefficient.

18. The method of claim 1, wherein: The air output of the air duct is related to the air volume required in the tunnel behind the excavation working face, the excavation cross-sectional area, the excavation rate and the gas concentration in the goaf.

19. A device for controlling surrounding rock and extracting gas in goaf, characterized in that: include: A determination module is used to determine the tunnel size information of the old empty tunnels on both sides of the goaf, and to make a ball-stick-shaped flexible mold bag according to the tunnel size information, and to place the ball-stick-shaped flexible mold bag into the corresponding old empty tunnel; The first processing module is used for injecting grout into the club-shaped flexible mold bag to form a filling retaining wall, and filling the area of ​​the old empty tunnel between the two retaining walls after the filling retaining wall is solidified; The second processing module is used to construct peripheral holes parallel to the excavation direction on the outer side of the tunnel in the goaf to be excavated and perform grouting, and after grouting, construct a central hole inside the tunnel in the goaf to be excavated; A third processing module is used to expand the central hole to a first preset size as a gas extraction hole, and connect the gas extraction hole to the extraction system on the opposite side of the goaf for pre-excavation extraction; The fourth processing module is used to introduce the gas at the head of the working face into the extraction system by the positive pressure of the wind tube and the negative pressure of extraction during the excavation process of the tunnel in the empty area to be excavated.

20. A computer device, characterized in that: include: at least one processor; as well as a memory communicatively connected to the at least one processor; wherein, The memory stores instructions that can be executed by the at least one processor, and the instructions are executed by the at least one processor to enable the at least one processor to perform the method according to any one of claims 1 to 18.

21. A non-transitory computer-readable storage medium storing computer instructions, characterized in that: in, The computer instructions are used to cause the computer to execute the method according to any one of claims 1-18.

22. A computer program product, characterized in that It comprises a computer program which, when executed by a processor, implements the steps of the method according to any one of claims 1 to 18.

Citation Information

Cited By

  • Near-full-coal filling method and near-full-coal filling material for outburst mine fully mechanized caving face passing empty roadway

    CN119982060A