Multi-dimensional collaborative distribution network reliability guarantee method and device
Through a multi-dimensional collaborative distribution network reliability guarantee method, combined with physical, information and social system models, the problem of distribution network reliability guarantee during large-scale events is solved, more reliable failure rate and repair time is achieved, and the reliability of distribution network is improved. sex monitoring data.
Patent Information
- Application Number
- CN202410999534.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-24
- Publication Date
- 2024-11-29
- Estimated Expiration
- 2044-07-24
AI Technical Summary
During large-scale events, the distribution network faces multiple backgrounds such as 100% renewable energy access and extreme bad weather. How to achieve reliability guarantee of distribution networks has become a problem, and the existing technology is difficult to effectively solve this problem.
Using a multi-dimensional collaborative distribution network reliability guarantee method, the failure rate and repair time of physical components are comprehensively processed through the combination of physical system models, information system models and social system models, and the failure rate and repair time of physical components are updated using information physical coupling and social factors. , build more reliable distribution network reliability indicators.
It realizes the synergistic influence from the multi-dimensional perspectives of information, physics and society, provides better failure rate and repair time, improves the reliability monitoring data and reliability indicators of distribution networks, and solves the reliability guarantee of distribution network projects in large-scale events. need.
Smart Images

Figure CN119047730A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of smart grid technology, and in particular to a multi-dimensional coordinated distribution network reliability assurance method and device. Background Art
[0002] In actual applications, in order to host large-scale events (such as international competitions), and considering the specific competition venues, providing living areas and training areas for international athletes, etc., it is necessary to provide a complete distribution network project for such large-scale events and require high-reliability power supply.
[0003] At present, the distribution network projects for hosting large-scale events will face multiple backgrounds such as 100% renewable energy access, the impact of extremely severe weather, and the complexity of major social activities. How to ensure the reliability of the distribution network has always been a difficult problem in research. Summary of the invention
[0004] The present application provides a multi-dimensional coordinated distribution network reliability assurance method and device, the main purpose of which is to provide a more reliable "failure rate and repair time" influenced by the interaction of information, physics, and social multi-dimensional information, and to achieve multi-dimensional coordination from the perspective of information, physics, and society, thereby providing better and more reliable distribution network monitoring data for building better reliability indicators required for the distribution network, and responding to distribution network projects for large-scale events, so as to solve the problem of providing a better reliability assurance solution for the distribution network.
[0005] In order to achieve the above objectives, this application mainly provides the following technical solutions:
[0006] In a first aspect, the present application provides a multi-dimensional coordinated distribution network reliability assurance method, the method comprising:
[0007] Processing the target data information using the physical system model corresponding to the distribution network, and outputting the failure rate and repair time corresponding to the physical element, wherein the target data information at least includes: the physical system distribution network topology and the historical failure rate information, historical repair time information and historical operating condition information of the physical element;
[0008] The failure rate corresponding to the physical element is updated by using the first processing capability and the second processing capability provided by the information system model corresponding to the distribution network, wherein the information system model has two processing functions, including: a first processing function consisting of primary equipment status monitoring, fault diagnosis and environmental early warning, and a second processing function consisting of secondary equipment data perception and panoramic imaging;
[0009] The failure rate and the repair time corresponding to the physical element are updated by using the third processing capability and the fourth processing capability provided by the social system model corresponding to the distribution network, wherein the social system model has two processing functions, including: a third processing function for implementing a power protection plan by responding to the scheduling of patrol personnel, and a fourth processing function for responding to an emergency repair plan;
[0010] Based on the failure rate corresponding to the physical components updated according to the information system model, and based on the failure rate and repair time corresponding to the physical components updated according to the social system model, a reliability index corresponding to the distribution network is constructed, which is used to provide reliability assurance for the distribution network.
[0011] The second aspect of the present application provides a multi-dimensional coordinated distribution network reliability assurance device, the device comprising:
[0012] A first processing unit is used to process target data information using a physical system model corresponding to the distribution network, and output a failure rate and a repair time corresponding to the physical element, wherein the target data information at least includes: a physical system distribution network topology and historical failure rate information, historical repair time information, and historical operating condition information of the physical element;
[0013] A second processing unit is used to update the failure rate corresponding to the physical element by using a first processing capability and a second processing capability provided by an information system model corresponding to the distribution network, wherein the information system model has two processing functions, including: a first processing function consisting of primary equipment status monitoring, fault diagnosis and environmental early warning, and a second processing function consisting of secondary equipment data perception and panoramic imaging;
[0014] a third processing unit, configured to update the failure rate and the repair time corresponding to the physical element by using the third processing capability and the fourth processing capability provided by the social system model corresponding to the distribution network, wherein the social system model has two processing functions, including: a third processing function for implementing a power protection plan in response to the scheduling of patrol personnel, and a fourth processing function for implementing an emergency repair plan;
[0015] A construction unit is used to construct a reliability index corresponding to the distribution network based on the failure rate corresponding to the physical component updated corresponding to the information system model and the failure rate and repair time corresponding to the physical component updated corresponding to the social system model, which is used to provide reliability assurance for the distribution network.
[0016] A third aspect of the present application provides a storage medium, which includes a stored program, wherein when the program is running, the device where the storage medium is located is controlled to execute the above-mentioned multi-dimensional collaborative distribution network reliability assurance method.
[0017] A fourth aspect of the present application provides an electronic device, the device comprising at least one processor, and at least one memory and a bus connected to the processor;
[0018] Wherein, the processor and the memory communicate with each other through the bus;
[0019] The processor is used to call the program instructions in the memory to execute the above-mentioned multi-dimensional collaborative distribution network reliability assurance method.
[0020] By means of the above technical solution, the technical solution provided by this application has at least the following advantages:
[0021] The present application provides a multi-dimensional collaborative distribution network reliability assurance method and device. The present application pre-builds a physical system model, an information system model and a social system model for the distribution network project of a large-scale event, so that the distribution network project becomes a complex system influenced by the interaction of information, physics and social multiple information. Then, in such a complex system, the present application first uses the physical system model to comprehensively process the physical system distribution network topology and the historical failure rate information, historical repair time information and historical operating condition information of the physical components to output the failure rate and repair time corresponding to the physical components, and then uses the information system model's processing capabilities for primary equipment and secondary equipment to update the above-obtained failure rate; and then uses the social system model's processing capabilities for power protection plans and emergency repair plans to update the failure rate and repair time corresponding to the physical components. The above realizes information-physical coupling and integrates social factors to obtain the updated failure rates and repair times, which are ultimately used to construct more reliability indicators required for the distribution network, providing reliability assurance for the distribution network. This application provides a better "failure rate and repair time" influenced by the interaction of multiple information including information, physics and society, and realizes the multi-dimensional coordination from the perspective of information, physics and society, thereby providing better and more reliable distribution network monitoring data, which is used to build better reliability indicators required for distribution network, and should be used for distribution network projects of large-scale events, so as to provide a better reliability guarantee solution for distribution network.
[0022] The above description is only an overview of the technical solution of the present application. In order to more clearly understand the technical means of the present application, it can be implemented in accordance with the contents of the specification. In order to make the above and other purposes, features and advantages of the present application more obvious and easy to understand, the specific implementation methods of the present application are listed below. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] Various other advantages and benefits will become apparent to those of ordinary skill in the art by reading the detailed description of the preferred embodiments below. The accompanying drawings are only for the purpose of illustrating the preferred embodiments and are not to be considered as limiting the present application. Also, the same reference symbols are used throughout the accompanying drawings to represent the same components. In the accompanying drawings:
[0024] Figure 1 A flow chart of a multi-dimensional collaborative distribution network reliability assurance method provided in an embodiment of the present application;
[0025] Figure 2 A reliability assessment process provided for the implementation of the present application by utilizing cyber-physical coupling;
[0026] Figure 3 A reliability assessment process provided for implementation of the embodiment of the present application based on comprehensive social factors;
[0027] Figure 4 A block diagram of the composition of a multi-dimensional collaborative distribution network reliability assurance device provided in an embodiment of the present application. DETAILED DESCRIPTION
[0028] The exemplary embodiments of the present application will be described in more detail below with reference to the accompanying drawings. Although the exemplary embodiments of the present application are shown in the accompanying drawings, it should be understood that the present application can be implemented in various forms and should not be limited by the embodiments set forth herein. On the contrary, these embodiments are provided in order to enable a more thorough understanding of the present application and to fully convey the scope of the present application to those skilled in the art.
[0029] The present application embodiment provides a multi-dimensional coordinated distribution network reliability assurance method, such as Figure 1 As shown, the embodiment of the present invention provides the following specific steps:
[0030] 101. Use the physical system model corresponding to the distribution network to process the target data information and output the failure rate and repair time corresponding to the physical components. The target data information at least includes: the physical system distribution network topology and the historical failure rate information, historical repair time information and historical operating condition information of the physical components.
[0031] Physical elements are physical devices in the distribution network. The physical system model in the distribution network mainly focuses on the physical level of the distribution network, including: the operation of primary power equipment and the transmission of electrical quantities. It describes the physical level of the distribution network and the transmission process of electrical quantities, among which primary power equipment such as transformers, circuit breakers, transmission lines, etc.
[0032] This step 101 can be refined to include: inputting target data information into the physical system model, constructing a corresponding relationship between the physical components and the downtime rate under different operating conditions; and calculating the failure rate and repair time corresponding to the physical components based on the corresponding relationship.
[0033] Example 1: Taking the cable line as an example, data processing is performed in the physical system model to obtain the following formula (1) to express the relationship between the failure outage rate and the line power flow.
[0034]
[0035] Wherein, L represents the operating status of the device.
[0036] In the physical system model, the influence of the operating conditions of each physical component on its own outage probability is taken into account. Combined with the operating status of the physical system, the influence of changes in real-time operating conditions such as line flow, bus voltage, and physical system frequency on the outage probability of the physical component is considered. A time-varying reliability assessment model of physical components based on real-time operating conditions is established, and the failure rate of the physical component is updated according to the calculated outage probability of the physical component.
[0037] The embodiment of the present application integrates a large amount of data information (such as the physical system distribution network topology and the historical failure rate information, historical repair time information and historical operating condition information of the physical components) at the physical level of the distribution network, and uses the physical system model to process and output the failure rate and repair time of the physical components, which are actually used as the initial failure rate and initial repair time (i.e., as initial data), and then subsequently combined with the information dimension and the social factor dimension to update the initial data, so as to obtain more reliable failure rate and repair time that are suitable for the distribution network from multiple dimensions.
[0038] 102. Utilize the first processing capability and the second processing capability provided by the information system model corresponding to the distribution network to update the failure rate corresponding to the physical component, wherein the information system model has two processing functions, including: a first processing function consisting of primary equipment status monitoring, fault diagnosis and environmental early warning, and a second processing function consisting of secondary equipment data perception and panoramic imaging.
[0039] In the distribution network, the information system model is a model that reflects the internal structure of the distribution network and the connection between the various parts, such as an abstract representation used to describe how an information system is organized and operates. In the embodiments of the present application, the information system model is mainly used to achieve: primary equipment status monitoring, fault diagnosis and environmental warning; secondary equipment data perception and panoramic imaging, and based on the different processing objects, namely primary equipment and secondary equipment, the embodiments of the present application divide the information system model into two aspects of processing capabilities. And it should be noted that in order to facilitate the distinction between different aspects of processing capabilities, the embodiments of the present application use the words "first" and "second" for identification and only serve as identification.
[0040] The embodiment of the present application updates the availability of the physical components of the interface layer in consideration of the impact of the availability of the information system required for the distribution network on the availability of the physical components of the interface layer; wherein the above-mentioned impacts mainly include three categories: distribution automation system, health status of the equipment itself and external environmental factors, and information network transmission failures. Therefore, the embodiment of the present application can construct mathematical models for these three types of impacts in the information system model to quantify the three types of impacts. The ultimate goal of using such quantification is to update the failure rate of the physical components output based on the physical system model in 101 above, so as to achieve a more reliable failure rate in information-physical coupling.
[0041] 103. Utilize the third processing capability and the fourth processing capability provided by the social system model corresponding to the distribution network to update the failure rate and repair time corresponding to the physical components. The social system model has two processing functions, including: a third processing function for implementing a power supply protection plan in response to the scheduling of patrol personnel, and a fourth processing function for implementing an emergency repair plan.
[0042] The embodiments of the present application take into account the impact of the power supply protection scheme and emergency repair scheme in the social system required by the distribution network on the reliability of physical components. For example, in the power supply protection scheme (i.e., a scheme for protecting the distribution network that is customized as a non-emergency repair), the impact of the inspection cycle on the failure rate of physical components is taken into account, and in the emergency repair scheme, the impact of the travel time (i.e., the time to reach the fault point) and the maintenance time on the repair time is taken into account.
[0043] The embodiment of the present application pre-constructs a social system model corresponding to the distribution network, and mainly uses such a social system model to realize: the impact of the inspection cycle on the failure rate of physical components in the power supply protection plan (i.e., the plan for protecting the distribution network other than emergency repair); the impact of the travel time and maintenance time on the repair time in the emergency repair plan, and based on coping with different plans, the embodiment of the present application designs a social system model with corresponding two-sided processing capabilities, and it should be noted that in order to facilitate the distinction between different aspects of processing capabilities, the embodiment of the present application uses the words "third" and "fourth" for identification and they only serve as identification.
[0044] Therefore, by utilizing the above two processing capabilities of the social system model, the failure rate and repair time output by the physical system model in 101 can be updated by integrating social factors, so as to obtain more reliable failure rate and repair time integrating social factors.
[0045] 104. Based on the failure rate of the updated physical components using the information system model, and the failure rate and repair time of the updated physical components using the social system model, the reliability index of the distribution network is constructed to provide reliability assurance for the distribution network.
[0046] In the embodiment of the present application, a more reliable failure rate is obtained by implementing "information-physical coupling" based on the information system model, and a more reliable failure rate and repair time are obtained by implementing "integration of social factors" based on the social system model, which are used to construct reliability indicators corresponding to the distribution network. Some reliability indicators are exemplified as follows:
[0047] (1) Load point outage rate (λ): It indicates the probability of a load point in the distribution network being out of service within a unit time. It is usually related to the failure rate of the equipment supplying power to the load point.
[0048] (2) Average power outage duration for each load point fault (γ): indicates the average time required to restore power supply when a load point outage occurs.
[0049] As described above, the embodiment of the present application provides a multi-dimensional collaborative distribution network reliability assurance method. The embodiment of the present application pre-builds a physical system model, an information system model, and a social system model for the distribution network project of a large-scale event, so that the distribution network project becomes a complex system influenced by the interaction of information, physics, and social multiple information; then in such a complex system, the present application first uses the physical system model to comprehensively process the physical system distribution network topology and the historical failure rate information, historical repair time information, and historical operating condition information of the physical components to output the failure rate and repair time corresponding to the physical components, and then uses the information system model's processing capabilities for primary equipment and secondary equipment to update the above-obtained failure rate; and then uses the social system model's processing capabilities for power supply protection plans and emergency repair plans to update the failure rate and repair time corresponding to the physical components; the above realizes information-physical coupling and integrates social factors to obtain the updated failure rates and repair times, which are ultimately used to build better reliability indicators required for the distribution network and provide reliability assurance for the distribution network.
[0050] The embodiment of the present application provides "failure rate and repair time" affected by the interaction of multiple information including information, physics and society, and realizes the multi-dimensional coordination from the perspective of information, physics and society, thereby providing better and more reliable distribution network monitoring data for building better reliability indicators required for distribution networks, and responding to distribution network projects for large-scale events, so as to provide better reliability assurance solutions for distribution networks.
[0051] In some specific embodiments, 102 “updating the failure rate corresponding to the physical component by using the first processing capacity and the second processing capacity provided by the information system model corresponding to the distribution network” can be further refined to include: (A1-A2) and (B1-B2) are parallel execution steps:
[0052] (A1) utilizing the first processing capability of the information system model to obtain equipment operation status information, fault diagnosis cycle and effect data, early warning data, and algorithm accuracy data;
[0053] (A2) processing equipment operation status information, fault diagnosis cycle and effect data, early warning data and algorithm accuracy data based on the first processing capability, and outputting a real-time outage rate, a developmental failure rate and a destructive failure rate;
[0054] Among them, the developmental failure rate in the power grid usually refers to the phenomenon that the failure rate gradually increases during the operation of the power grid due to factors such as equipment aging, wear, and environmental changes. This change in failure rate is usually not sudden, but gradually accumulates with the increase in equipment operating time.
[0055] The developmental failure rate in the power grid is a dynamic process, which is affected by many factors. In order to reduce the failure rate, a series of measures need to be taken, including improving equipment quality, optimizing operating conditions, and strengthening equipment maintenance. At the same time, it is also necessary to pay attention to the impact of external factors on the power grid and take corresponding preventive measures. Through comprehensive measures, the developmental failure rate in the power grid can be effectively reduced and the safety and reliability of the power grid can be improved.
[0056] Among them, the destructive failure rate in the power grid refers to the failure rate of sudden failure of equipment or systems due to external factors. This failure rate is usually related to the physical protection of the equipment or system, the operating environment, and human factors.
[0057] The destructive failure rate in the power grid is closely related to external factors such as natural disasters, external force damage and malicious attacks. In order to reduce the destructive failure rate, a series of measures need to be taken, including strengthening the physical protection of power grid equipment, improving the disaster resistance of equipment, optimizing the power grid layout to reduce the impact of natural disasters, and strengthening the safety management around power grid facilities to prevent external force damage. At the same time, it is also necessary to establish a sound emergency response mechanism to deal with possible malicious attacks. Through the implementation of these measures, the destructive failure rate in the power grid can be effectively reduced and the safety and reliability of the power grid can be improved.
[0058] (B1) Using the second processing capability of the information system model, obtain the information transmission punctuality rate, information transmission accuracy rate, and secondary equipment failure rate;
[0059] (B2) processing the information transmission punctuality rate, the information transmission accuracy rate, and the secondary equipment failure rate based on the second processing capability, and outputting the channel information transmission punctuality rate, the channel information transmission accuracy rate, and the channel topology effectiveness data;
[0060] (AB) Based on the real-time outage rate, developmental failure rate and destructive failure rate, as well as the channel information transmission punctuality rate, channel information transmission accuracy rate and channel topology validity data, the failure rate corresponding to the physical component is updated.
[0061] For example, (A1-A2) is the data processing implemented for the primary equipment in the distribution network. The primary equipment refers to the equipment that directly participates in the production, transmission, distribution and use of electric energy in the power system. They are responsible for key functions such as converting voltage, transmitting electricity, switching on and isolating power supplies. Examples of primary equipment in the power distribution network include: transformers, transmission / distribution lines, circuit breakers, disconnectors, lightning arresters, current transformers (CTs) and voltage transformers (PTs).
[0062] In the embodiments of the present application, by using online data collection, equipment status perception and other technologies, the operation data of physical components such as line flow, node voltage, system frequency, etc. are obtained, and the equipment operation downtime rate of physical equipment such as distribution transformers, power cable lines, and switch elements is calculated. A relevant indicator system is established based on the collected data. These indicators can well reflect the operating characteristics and operating status of such power equipment. By evaluating the status of electrical equipment, the operating reliability data of the equipment can be more accurately grasped, providing a reliable reference basis for the formulation of daily maintenance plans for physical equipment, reducing the failure rate of physical components and thus improving the power supply reliability of the system.
[0063] In the above process, the data sampling frequency of physical equipment status perception, the accuracy of equipment status diagnosis algorithm, the accuracy of early warning mechanism, and the delay and error of information transmission channel will affect the calculation of real-time operation outage rate of physical equipment. All of the above will affect the actual failure rate of physical components in actual application, thus affecting the judgment of dispatchers on the current power supply reliability of the system.
[0064] Therefore, for primary equipment, the embodiment of the present application collects equipment operating status data, obtains fault diagnosis cycle and effect data, collects warning data and obtains the difficulty data of the algorithm used, so as to further calculate the real-time outage rate, developmental failure rate and destructive failure rate of physical components, so as to realize primary equipment status monitoring, fault diagnosis and environmental warning, and take these as considerations for the failure rate of physical components output by the physical system model in the subsequent update step 101.
[0065] For example, (B1-B2) is the data processing realized by the secondary equipment in the distribution network. The secondary equipment refers to: mainly used to monitor, control, measure, adjust and protect the working conditions of the power system and primary equipment. These devices are not directly connected to the main circuit of electric energy, but they are important auxiliary equipment to ensure the safe and efficient operation of the power system. Examples of primary equipment in the power distribution network include: measuring meters, insulation monitoring devices, control and signal devices, relay protection and automatic devices, DC power supply equipment, high-frequency wave arresters, standby automatic devices, communication equipment, etc.
[0066] In the embodiment of the present application, three-dimensional panoramic visualization and rapid imaging technology are used to collect operating data such as the temperature and humidity of the environment in which the secondary equipment is located, and a health model of each intelligent device in the substation is established. Based on the received real-time information, the health status of each intelligent device is comprehensively judged. The failure rate of the relay protection and safety automatic device body, channel communication equipment, secondary circuit and related equipment, and intelligent station auxiliary equipment in the secondary system is further reduced, the monitoring and protection effect of the secondary equipment on the primary equipment is improved, and the system reliability is improved.
[0067] For the information system in the distribution network, when the communication network supporting the normal operation of the distribution automation system occurs: topological failure of information elements or communication links, transmission delay and transmission error, the monitoring, control and control feedback information cannot be transmitted normally, which will affect the working state of the distribution automation system, thereby reducing the availability of physical elements and increasing the failure rate. Considering the above three failure conditions of the information system, an information system effectiveness model is established, and the channel topology availability calculation model is obtained by analogy with the physical system reliability series model; the channel information transmission accuracy calculation model is obtained by analogy with the physical system reliability series model; the information system availability model is obtained from the three perspectives of topological availability, delay characteristics and error characteristics of the information system, and the availability of each interface layer element of the physical system is updated, thereby reflecting the impact of the transmission effect of the secondary system communication network on the distribution network reliability.
[0068] In the processing of secondary equipment, on the one hand, the embodiment of the present application comprehensively considers the influence of the above-mentioned transmission effect on the reliability of the distribution network. This influence is often negative, and therefore will make the system reliability level slightly lower than before the transmission effect is considered; on the other hand, the embodiment of the present application further reduces the failure rate of secondary equipment and improves the transmission effect of the secondary system communication network by adopting secondary system panoramic imaging technology, thereby improving the reliability of the distribution system.
[0069] For example, the present application uses the failure rate of physical devices updated by information-physical coupling to provide a reliability assessment process, such as Figure 2 As shown: status monitoring, fault diagnosis and environmental warning are realized on the primary equipment (such as A1-A2), and data perception and panoramic imaging (such as B1-B2) are realized on the secondary equipment. In the two parallel execution steps, the real-time outage rate, development model failure rate and destructive failure rate are obtained on the primary equipment, and the channel information transmission punctuality rate, channel information transmission accuracy rate and channel topology validity are obtained on the secondary equipment. The failure rate of the physical components output by the physical system model in 101 is updated based on the data information obtained in the two parallel steps, so as to achieve a more reliable failure rate in information-physical coupling.
[0070] And if Figure 2 As shown, based on the updated physical component failure rate, the embodiment of the present application also performs the following steps: based on the distribution network topology, obtain the equipment and lines on the minimum path and non-minimum path of the load point (i=1, which is traversed one by one but less than N), convert the non-minimum facility failure rate to the minimum path using the series-parallel equivalent, enumerate the minimum path failure conditions of the load point (i), form a list of load point (i) failure rates and power outage times, and solve the load point (i) reliability index, and iterate the above (i=i+1, i<N) until the end. Based on the above steps, the embodiment of the present application provides "the updated failure rate on the information-physical coupling" to construct the reliability index of the distribution network.
[0071] In some specific embodiments, for the power protection solution, 103 "using the third processing capability and the fourth processing capability provided by the social system model corresponding to the distribution network to update the failure rate and repair time corresponding to the physical component" can be refined to include:
[0072] (C1) Using the third processing capability of the social system model to obtain historical inspection data and historical fault data;
[0073] (C2) estimating the defect occurrence probability and time delay parameter using a maximum likelihood estimation method based on the third processing capability;
[0074] (C3) Based on the third processing capability, the failure rate corresponding to the physical component is updated using the defect occurrence probability and the time delay parameter.
[0075] For example, (C1-C3) is the failure rate of the updated physical equipment in response to the power protection plan. Considering the influence between the inspection personnel scheduling (i.e., inspection cycle) and the inspection equipment failure rate in social factors, a mathematical model can be constructed based on the time delay theory. In the mathematical model, the development process of power component failure is divided into "defect occurrence" and "time delay process of defect development into failure" (i.e., two parts). The probability of defect occurrence in power equipment per unit time is regarded as satisfying the Poisson distribution P(α), and the time delay process of defect development into failure is regarded as satisfying the exponential distribution. Through historical failure data τ and historical inspection data T, the defect occurrence rate α and time delay parameter λ are obtained by maximum likelihood estimation. Considering that the failure rate after inspection satisfies the non-homogeneous Poisson distribution, the physical equipment failure rate after considering the social system inspection plan is obtained after further integration, which is used to update the initial failure rate of the equipment in the physical domain (i.e., the failure rate of the physical component output by the physical system model in 101).
[0076] Furthermore, considering the travel time and maintenance time, the emergency repair plan for 103 can be refined to include:
[0077] (D1) Based on the fourth processing capability of the social system model, historical emergency repair data is obtained, and the historical emergency repair data at least includes: repair personnel data, material data, vehicle data, the repair time of each repair personnel for the fault, and the geographical distance data between the fault and the repair personnel;
[0078] (D2) constructing an emergency repair fault repair time model based on the fourth processing capacity and historical repair data;
[0079] (D3) Using the emergency repair fault repair time model, update the repair time corresponding to the physical component.
[0080] For example, (D1-D3) is the repair time for updating physical equipment in response to the emergency repair plan. Compared with the power supply protection plan, the difference between the two lies in "emergency". The emergency repair plan mainly considers the travel time and maintenance time. On the basis of the power supply protection plan, the historical repair data obtained in the emergency repair plan at least includes: maintenance personnel α, materials m, vehicles β, the repair time Tre of each maintenance personnel for each fault, and the geographical distance L between the fault and the maintenance personnel. The travel time is determined by the speed of personnel and material deployment and the length of the path selected by the emergency repair plan. The travel time can be further solved through the "people-vehicle-object" collaborative emergency repair fault repair time model. The repair time of the fault point is mainly determined by the number of maintenance personnel and maintenance materials and the ability of maintenance personnel.
[0081] In summary, on the basis of power supply protection, emergency repair is also taken into account, so that the physical equipment failure repair time in the emergency repair plan is the sum of the travel time and the repair time. Accordingly, the embodiment of the present application updates the repair time output by the physical system model in 101 for comprehensive social factors, and obtains a more reliable repair time for comprehensive social factors.
[0082] For example, the present application uses the updated physical equipment failure rate and repair time by integrating social factors to provide a reliability assessment process, such as Figure 3 As shown: the failure rate of the physical components in 101 is updated in the power protection plan, and the repair time of the physical components in 101 is updated in the emergency repair plan.
[0083] It should be noted that the “power supply protection plan” and “emergency repair plan” referred to in the embodiments of the present application are essentially similar in their implementation methods, but the “emergency repair plan” implements “emergency” on the basis of the “power supply protection plan”, that is, it takes into account the maintenance journey time and maintenance time, which is equivalent to an optimization on the “power supply protection plan”. Therefore, the embodiments of the present application actually implement the update of the failure rate of the physical components in 101 on the basis of these two plans, but especially for the “emergency repair plan”, it also updates the repair time of the physical components in 101. Figure 3 In order to avoid repetition, the content of updating the failure rate of physical components in the "Emergency Repair Plan" is not reflected.
[0084] like Figure 3As shown, based on the updated failure rate and repair time, the embodiment of the present application also performs the following steps: based on the topological structure of the distribution network, obtain the equipment and lines on the minimum path and non-minimum path of the load point (i=1, which is traversed one by one but less than N), convert the non-minimum facility failure rate to the minimum path using the series-parallel equivalent, enumerate the minimum path failure conditions of the load point (i), form a list of the failure rate and power outage time of the load point (i), and solve the reliability index of the load point (i), and iterate the above (i=i+1, i<N) until the end. Based on the above steps, the embodiment of the present application provides "the updated failure rate on the information-physical coupling" to construct the reliability index of the distribution network.
[0085] Furthermore, as a response to the above Figure 1 The implementation of the method shown in the figure, the embodiment of the present application provides a multi-dimensional coordinated distribution network reliability assurance device. This device embodiment corresponds to the aforementioned method embodiment. For ease of reading, this device embodiment will no longer repeat the details of the aforementioned method embodiment one by one, but it should be clear that the device in this embodiment can correspond to all the contents of the aforementioned method embodiment. The device is applied to the distribution network engineering for large-scale events to solve the problem of providing a better reliability assurance solution for the distribution network, specifically as follows Figure 4 As shown, the device comprises:
[0086] The first processing unit 21 is used to process the target data information using the physical system model corresponding to the distribution network, and output the failure rate and repair time corresponding to the physical element, wherein the target data information at least includes: the physical system distribution network topology and the historical failure rate information, historical repair time information and historical operating condition information of the physical element;
[0087] The second processing unit 22 is used to update the failure rate corresponding to the physical element by using the first processing capability and the second processing capability provided by the information system model corresponding to the distribution network, wherein the information system model has two processing functions, including: a first processing function consisting of primary equipment status monitoring, fault diagnosis and environmental early warning, and a second processing function consisting of secondary equipment data perception and panoramic imaging;
[0088] The third processing unit 23 is used to update the failure rate and the repair time corresponding to the physical element by using the third processing capacity and the fourth processing capacity provided by the social system model corresponding to the distribution network, wherein the social system model has two processing functions, including: a third processing function for implementing a power protection plan by responding to the inspection personnel scheduling, and a fourth processing function for responding to the emergency repair plan;
[0089] The construction unit 24 is used to construct a reliability index corresponding to the distribution network based on the failure rate corresponding to the physical component updated corresponding to the information system model, and the failure rate and repair time corresponding to the physical component updated corresponding to the social system model, so as to provide reliability assurance for the distribution network.
[0090] In some modified embodiments, the first processing unit 21 is specifically configured to:
[0091] Inputting the target data information into the physical system model, and constructing a corresponding relationship between the physical element and the outage rate under different operating conditions;
[0092] According to the corresponding relationship, the failure rate and repair time corresponding to the physical element are calculated.
[0093] In some modified embodiments, the second processing unit 22 is specifically configured to:
[0094] Using the first processing capability of the information system model, obtaining equipment operation status information, fault diagnosis cycle and effect data, early warning data and algorithm accuracy data;
[0095] Processing the equipment operation status information, the fault diagnosis cycle and effect data, the warning data and the algorithm accuracy data based on the first processing capability, and outputting a real-time outage rate, a developmental failure rate and a destructive failure rate;
[0096] Using the second processing capability of the information system model, obtaining information transmission punctuality rate, information transmission accuracy rate, and secondary equipment failure rate;
[0097] Process the information transmission punctuality rate, the information transmission accuracy rate, and the secondary equipment failure rate based on the second processing capability, and output channel information transmission punctuality rate, channel information transmission accuracy rate, and channel topology effectiveness data;
[0098] Based on the real-time outage rate, the developmental failure rate and the destructive failure rate, as well as the channel information transmission punctuality rate, the channel information transmission accuracy rate and the channel topology validity data, the failure rate corresponding to the physical element is updated.
[0099] In some modified embodiments, in response to the power conservation solution, the third processing unit 23 is specifically used to:
[0100] Using the third processing capability of the social system model to obtain historical inspection data and historical fault data;
[0101] Based on the third processing capability, using a maximum likelihood estimation method to estimate the probability of defect occurrence and a time delay parameter;
[0102] Based on the third processing capability, the failure rate corresponding to the physical element is updated using the defect occurrence probability and the time delay parameter.
[0103] In some modified embodiments, in response to the emergency repair plan, the third processing unit 23 is further specifically used for:
[0104] Based on the fourth processing capability of the social system model, historical emergency repair data is obtained, wherein the historical emergency repair data at least includes: repair personnel data, material data, vehicle data, repair time of each repair personnel for the fault, and geographical distance data between the fault and the repair personnel;
[0105] Based on the fourth processing capability and the historical emergency repair data, construct an emergency repair fault repair time model;
[0106] The emergency repair fault restoration time model is used to update the restoration time corresponding to the physical element.
[0107] The multi-dimensional collaborative distribution network reliability assurance device provided in the embodiment of the present application includes a processor and a memory. The above-mentioned first processing unit, second processing unit, third processing unit and construction unit are all stored in the memory as program units, and the processor executes the above-mentioned program units stored in the memory to realize corresponding functions.
[0108] The processor contains a kernel, which calls the corresponding program unit from the memory. One or more kernels can be set, and by adjusting the kernel parameters, the "failure rate and repair time" affected by the interaction of information, physics, and social multi-information is provided, realizing the multi-dimensional coordination from the perspective of information, physics, and society, thereby providing better and more reliable distribution network monitoring data for building distribution network reliability indicators, and responding to the distribution network engineering of large-scale events, so as to provide a better reliability guarantee solution for the distribution network.
[0109] An embodiment of the present application provides a storage medium on which a program is stored. When the program is executed by a processor, the multi-dimensional collaborative distribution network reliability assurance method is implemented.
[0110] An embodiment of the present application provides a processor, which is used to run a program, wherein the multi-dimensional coordinated distribution network reliability assurance method is executed when the program is running.
[0111] The present application also provides a computer program product, which, when executed on a data processing device, is suitable for executing a program for initializing the steps of a distribution network reliability assurance method with multi-dimensional collaboration.
[0112] The present application is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the embodiments of the present application. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.
[0113] In a typical configuration, the device includes one or more processors (CPU), memory and bus. The device may also include input / output interface, network interface and the like.
[0114] The memory may include non-permanent memory in a computer-readable medium, random access memory (RAM) and / or non-volatile memory in the form of read-only memory (ROM) or flash RAM, and the memory includes at least one memory chip. The memory is an example of a computer-readable medium.
[0115] Computer readable media include permanent and non-permanent, removable and non-removable media that can be implemented by any method or technology to store information. Information can be computer readable instructions, data structures, program modules or other data. Examples of computer storage media include, but are not limited to, phase change memory (PRAM), static random access memory (SRAM), dynamic random access memory (DRAM), other types of random access memory (RAM), read-only memory (ROM), electrically erasable programmable read-only memory (EEPROM), flash memory or other memory technology, compact disk read-only memory (CD-ROM), digital versatile disk (DVD) or other optical storage, magnetic cassettes, magnetic tape magnetic disk storage or other magnetic storage devices or any other non-transmission media that can be used to store information that can be accessed by a computing device. As defined herein, computer readable media does not include temporary computer readable media (transitory media), such as modulated data signals and carrier waves.
[0116] It should also be noted that the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, commodity or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, commodity or device. In the absence of more restrictions, the elements defined by the sentence "comprises a ..." do not exclude the existence of other identical elements in the process, method, commodity or device including the elements.
[0117] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, systems or computer program products. Therefore, the present application may adopt the form of a complete hardware embodiment, a complete software embodiment or an embodiment in combination with software and hardware. Moreover, the present application may adopt the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) that contain computer-usable program code.
[0118] The above are only embodiments of the present application and are not intended to limit the present application. For those skilled in the art, the present application may have various changes and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application should be included within the scope of the claims of the present application.
Claims
1. A multi-dimensional coordinated distribution network reliability assurance method, characterized in that: The method comprises: Processing the target data information using the physical system model corresponding to the distribution network, and outputting the failure rate and repair time corresponding to the physical element, wherein the target data information at least includes: the physical system distribution network topology and the historical failure rate information, historical repair time information and historical operating condition information of the physical element; The failure rate corresponding to the physical element is updated by using the first processing capability and the second processing capability provided by the information system model corresponding to the distribution network, wherein the information system model has two processing functions, including: a first processing function consisting of primary equipment status monitoring, fault diagnosis and environmental early warning, and a second processing function consisting of secondary equipment data perception and panoramic imaging; The failure rate and the repair time corresponding to the physical element are updated by using the third processing capability and the fourth processing capability provided by the social system model corresponding to the distribution network, wherein the social system model has two processing functions, including: a third processing function for implementing a power protection plan by responding to the scheduling of patrol personnel, and a fourth processing function for responding to an emergency repair plan; Based on the failure rate corresponding to the physical components updated according to the information system model, and based on the failure rate and repair time corresponding to the physical components updated according to the social system model, a reliability index corresponding to the distribution network is constructed, which is used to provide reliability assurance for the distribution network.
2. The method according to claim 1, characterized in that The method of processing the target data information by using the physical system model corresponding to the distribution network and outputting the failure rate and repair time corresponding to the physical components includes: Inputting the target data information into the physical system model, and constructing a corresponding relationship between the physical element and the outage rate under different operating conditions; According to the corresponding relationship, the failure rate and repair time corresponding to the physical element are calculated.
3. The method according to claim 1, characterized in that: Updating the failure rate corresponding to the physical component by using the first processing capability and the second processing capability provided by the information system model corresponding to the distribution network includes: Using the first processing capability of the information system model, obtaining equipment operation status information, fault diagnosis cycle and effect data, early warning data and algorithm accuracy data; Processing the equipment operation status information, the fault diagnosis cycle and effect data, the warning data and the algorithm accuracy data based on the first processing capability, and outputting a real-time outage rate, a developmental failure rate and a destructive failure rate; Using the second processing capability of the information system model, obtaining information transmission punctuality rate, information transmission accuracy rate, and secondary equipment failure rate; Process the information transmission punctuality rate, the information transmission accuracy rate, and the secondary equipment failure rate based on the second processing capability, and output channel information transmission punctuality rate, channel information transmission accuracy rate, and channel topology effectiveness data; Based on the real-time outage rate, the developmental failure rate and the destructive failure rate, as well as the channel information transmission punctuality rate, the channel information transmission accuracy rate and the channel topology validity data, the failure rate corresponding to the physical element is updated.
4. The method according to claim 1, characterized in that: The method of utilizing the third processing capability and the fourth processing capability provided by the social system model corresponding to the distribution network to update the failure rate and the repair time corresponding to the physical element and applying them to the power protection solution includes: Using the third processing capability of the social system model to obtain historical inspection data and historical fault data; Based on the third processing capability, using a maximum likelihood estimation method to estimate the probability of defect occurrence and the time delay parameter; Based on the third processing capability, the failure rate corresponding to the physical element is updated using the defect occurrence probability and the time delay parameter.
5. The method according to claim 4, characterized in that The utilizing the third processing capability and the fourth processing capability provided by the social system model, based on the data processing capability provided by the social system model, to update the failure rate and the repair time corresponding to the physical component, in response to an emergency repair plan, includes: Based on the fourth processing capability of the social system model, historical emergency repair data is obtained, wherein the historical emergency repair data at least includes: repair personnel data, material data, vehicle data, repair time of each repair personnel for the fault, and geographical distance data between the fault and the repair personnel; Based on the fourth processing capability and the historical emergency repair data, construct an emergency repair fault repair time model; The emergency repair fault restoration time model is used to update the restoration time corresponding to the physical element.
6. A multi-dimensional coordinated distribution network reliability assurance device, characterized in that: The device comprises: A first processing unit is used to process target data information using a physical system model corresponding to the distribution network, and output a failure rate and a repair time corresponding to the physical element, wherein the target data information at least includes: a physical system distribution network topology and historical failure rate information, historical repair time information, and historical operating condition information of the physical element; A second processing unit is used to update the failure rate corresponding to the physical element by using a first processing capability and a second processing capability provided by an information system model corresponding to the distribution network, wherein the information system model has two processing functions, including: a first processing function consisting of primary equipment status monitoring, fault diagnosis and environmental early warning, and a second processing function consisting of secondary equipment data perception and panoramic imaging; a third processing unit, configured to update the failure rate and the repair time corresponding to the physical element by using the third processing capability and the fourth processing capability provided by the social system model corresponding to the distribution network, wherein the social system model has two processing functions, including: a third processing function for implementing a power protection plan in response to the scheduling of patrol personnel, and a fourth processing function for implementing an emergency repair plan; A construction unit is used to construct a reliability index corresponding to the distribution network based on the failure rate corresponding to the physical component updated corresponding to the information system model and the failure rate and repair time corresponding to the physical component updated corresponding to the social system model, which is used to provide reliability assurance for the distribution network.
7. The device according to claim 6, characterized in that The first processing unit is specifically configured to: Inputting the target data information into the physical system model, and constructing a corresponding relationship between the physical element and the outage rate under different operating conditions; According to the corresponding relationship, the failure rate and repair time corresponding to the physical element are calculated.
8. The device according to claim 6, characterized in that The second processing unit is specifically used for: Using the first processing capability of the information system model, obtaining equipment operation status information, fault diagnosis cycle and effect data, early warning data and algorithm accuracy data; Processing the equipment operation status information, the fault diagnosis cycle and effect data, the warning data and the algorithm accuracy data based on the first processing capability, and outputting a real-time outage rate, a developmental failure rate and a destructive failure rate; Using the second processing capability of the information system model, obtaining information transmission punctuality rate, information transmission accuracy rate, and secondary equipment failure rate; Process the information transmission punctuality rate, the information transmission accuracy rate, and the secondary equipment failure rate based on the second processing capability, and output channel information transmission punctuality rate, channel information transmission accuracy rate, and channel topology effectiveness data; Based on the real-time outage rate, the developmental failure rate and the destructive failure rate, as well as the channel information transmission punctuality rate, the channel information transmission accuracy rate and the channel topology validity data, the failure rate corresponding to the physical element is updated.
9. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the multi-dimensional collaborative distribution network reliability assurance method as described in any one of claims 1 to 5 is implemented.
10. An electronic device, characterized in that: The device includes at least one processor, and at least one memory and a bus connected to the processor; Wherein, the processor and the memory communicate with each other through the bus; The processor is used to call the program instructions in the memory to execute the multi-dimensional collaborative distribution network reliability assurance method as described in any one of claims 1-5.
Citation Information
Patent Citations
High-efficiency and high-reliability fault processing method aiming at complex power distribution network
CN103618297A
Power distribution network operational reliability evaluation and optimization system and operation method thereof
CN107749619A
Reliability assessment method, device and equipment and storage medium
CN110209515A
Electric power system load electricity protection control method, system and device and storage medium
CN111369172A
Method for evaluating reliability of power distribution information physical system
CN114519259A