Furnace end graphite electrode cooling liquid flow control method and system and storage medium

By adjusting the coolant flow rate of the liquid-cooled heat exchanger in real time, combining the power supply curve and temperature measurement value, dynamically controlling the temperature target value of the graphite electrode, the problem of quality and cost of the liquid-cooled process of the furnace head graphite electrode is solved, and the improvement is achieved Efficient cooling control.

CN119052968AActive Publication Date: 2024-11-29HUNAN HUAXIA TEBIAN CO LTD
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202411546813.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-11-01
Publication Date
2024-11-29
Estimated Expiration
2044-11-01

AI Technical Summary

Technical Problem

In the prior art, there is little research on the control technology of the furnace-head graphite electrode liquid cooling process, which leads to low quality of the cooling process and high operating cost, making it difficult to effectively control the temperature and temperature change rate of the graphite electrode.

Method used

By adjusting the coolant flow of the liquid-cooled heat exchanger in real time during the cooling process of graphite electrode, calculate the time-varying curve of the temperature target value of the graphite electrode based on the power transmission curve, and perform feedback control in combination with the temperature measurement value, the coolant flow is dynamically adjusted to achieve fineness Temperature control.

Benefits of technology

The quality of graphite electrode cooling control is improved, operating costs are reduced, production efficiency is improved, and thermal stress problems and energy waste are effectively avoided.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119052968A_ABST
    Figure CN119052968A_ABST
Patent Text Reader

Abstract

The invention provides a furnace end graphite electrode cooling liquid flow control method and system and a storage medium, and belongs to the technical field of control or adjustment systems. The method comprises the following steps: determining a temperature target value of a graphite electrode in a cooling process of the graphite electrode; subtracting a graphite electrode temperature target value obtained based on the graphite electrode temperature target value time-varying curve from the graphite electrode temperature measurement value to obtain an operation variable feedback change value; based on the operation variable feedback change value and the operation variable current value, determining an operation variable final value for adjusting the cooling liquid flow in real time; according to the furnace end graphite electrode cooling liquid flow control method, the graphite electrode temperature target value in the cooling liquid flow negative feedback control link is dynamically adjusted in combination with the graphite electrode temperature target value time-varying curve, the furnace end graphite electrode cooling control quality is improved, the energy efficiency index is improved, and the production efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of control or regulation systems, and in particular to a furnace head graphite electrode coolant flow control method, system and computer-readable storage medium. Background Art

[0002] As a device that uses high temperature to convert carbon materials into graphite, graphitization furnaces are widely used to produce negative electrode materials for batteries such as lithium-ion batteries and sodium-ion batteries. When the graphitization furnace is working, the graphite electrodes at both ends of the furnace need to be connected to the copper and aluminum bars outside the furnace to form a circuit. After power is turned on, high temperature is generated to complete the graphitization of the carbon materials in the furnace. Usually, the highest temperature of the graphitization transformation process of carbon materials in the furnace can reach about 3000℃. For each graphite electrode, one end is connected to the copper and aluminum bars outside the furnace through a power transmission clamp, and the other end is deep into the material in the furnace. Graphite is a material with relatively high thermal conductivity. Its working process has a very high temperature and a certain temperature change rate due to its own resistance heat generation and heat conduction of the materials in the furnace. High temperature will cause the oxidation of graphite electrodes to intensify, and the surface will produce obvious consumption or peeling; while the high temperature change rate such as rapid heating or rapid cooling will cause the graphite electrode to "thermally shock" due to the untimely release of thermal stress, causing cracks, surface peeling and even fracture. Therefore, the industry has vigorously developed the cooling technology of graphite electrodes.

[0003] However, in the currently known technical solutions, such as Chinese patents 201220304552.8, 201521103476.4, 201920540569.5, 202021246512.3, 202221959874.6, 202222986719.X and 202310542092.5, a lot of research has been carried out on the cooling device of the electrode, among which liquid cooling is the mainstream technical route for cooling graphite electrodes at present. However, there is little research on the control technology of the liquid cooling process of the furnace head graphite electrode. Therefore, it is necessary to propose a corresponding liquid cooling process control technology based on the characteristics of the working process of the furnace head graphite electrode, so as to improve the control quality of the cooling process and save operating costs. Summary of the invention

[0004] The main purpose of the present invention is to provide a furnace head graphite electrode coolant flow control method, system and computer-readable storage medium, aiming to solve the technical problem of how to improve the control quality of graphite electrode temperature and temperature change rate and save operating costs.

[0005] To achieve the above-mentioned purpose, the present invention provides a furnace head graphite electrode cooling liquid flow control method, wherein the graphite electrode is cooled based on a liquid-cooled heat exchanger in contact therewith, and is used to deliver power to the charge in the graphitization furnace; the method is applied to the furnace head graphite electrode cooling liquid flow control system to adjust the cooling liquid flow through the liquid-cooled heat exchanger in real time; The method comprises: During the cooling process of the graphite electrode, determine the target temperature value of the graphite electrode; Subtracting the graphite electrode temperature target value from the graphite electrode temperature measurement value to obtain an operating variable feedback change value; determining a final value of the manipulated variable for real-time adjustment of the coolant flow rate based on the manipulated variable feedback change value and the manipulated variable current value; Wherein, the step of determining the target temperature value of the graphite electrode comprises: Determine a time-varying curve of a graphite electrode temperature target value; the time-varying curve of the graphite electrode temperature target value is calculated based on a power transmission power curve; The target temperature value of the graphite electrode is obtained by reading the target temperature value time-varying curve of the graphite electrode; The step of determining the time-varying curve of the graphite electrode temperature target value comprises: Obtaining the graphite electrode temperature target initial value and the graphite electrode temperature target maximum value; Read the power transmission power corresponding to each moment in the power transmission power curve; The target graphite electrode temperature time-varying curve is calculated by using the target graphite electrode temperature initial value, the target graphite electrode temperature maximum value and the power transmission corresponding to each moment.

[0006] Optionally, the step of calculating a time-varying curve of a graphite electrode temperature target value by using the graphite electrode temperature target initial value, the graphite electrode temperature target maximum value, and the power transmission power corresponding to each moment includes: Determine the critical segmented moment when the accumulated power transmission reaches the preset multiple of the total power transmission; When the power transmission time is zero, the graphite electrode temperature target value is set to the graphite electrode temperature target initial value; When the power transmission moment is a critical segment moment, the graphite electrode temperature target value is set to the maximum value of the graphite electrode temperature target; When the power transmission time is between the zero time and the key segment time, the graphite electrode temperature target initial value, the graphite electrode temperature target maximum value and the power transmission power corresponding to each time are input into the preset time-varying curve calculation model to calculate the graphite electrode temperature target value time-varying curve.

[0007] Optionally, the preset time-varying curve calculation model includes: In the formula, Δt represents the time interval between adjacent moments; denote the target value of the graphite electrode temperature corresponding to the moment t = iΔt as F i , where i = 1, 2, …, n; n is the moment when power supply stops; the power transmission power at the moment t = iΔt is P i ; let the target value of the graphite electrode temperature F0 = T corresponding to the moment t = 0 init , and let the target values of the graphite electrode temperature corresponding to all moments after the critical segmentation moment t = jΔt be T max , for the target values of the graphite electrode temperature F at all moments between t > 0 and t < jΔt m , they are calculated from the above formula; T init and T max respectively represent the initial value of the target graphite electrode temperature and the maximum value of the target graphite electrode temperature, where m = 1, 2, …, j - 1.

[0008] Optionally, the method further includes: Using the initial value of the target graphite electrode temperature and a preset temperature rise threshold to correct the time-varying curve of the target graphite electrode temperature to obtain a corrected time-varying curve of the target graphite electrode temperature.

[0009] Optionally, the step of using the initial value of the target graphite electrode temperature and a preset temperature rise threshold to correct the time-varying curve of the target graphite electrode temperature to obtain a corrected time-varying curve of the target graphite electrode temperature includes: Denote each moment in the power transmission stage as the moment t = sΔt, where s = 0, 1, …, n, and correct the target value F of the graphite electrode temperature at each moment in the time-varying curve of the target graphite electrode temperature i , and perform correction according to the following steps to obtain the final target value T of the graphite electrode temperature at each moment s and the corrected time-varying curve of the target graphite electrode temperature: Let s = 0, and let the target value T0 = F0 of the graphite electrode temperature at the corresponding moment; Let s = 1, if F1 - T0 > T c , then let the target value T1 = T0 + T of the graphite electrode temperature at the corresponding moment c , otherwise let T1 = F1; where T c represents the preset temperature rise threshold; Let s increase by 1 on its original basis; If s > n, end the assignment of the target value of the graphite electrode temperature at each moment; If s ≤ n, calculate the cumulative under-temperature value A at the moment t = sΔt s : Determine the graphite electrode temperature target value T at time t=sΔt s : If F s -T s-1 >T c And T s-1 +T c ≤T max , then let T s =T s-1 +T c , and execute the step of increasing s by 1 on its original basis; If F s -T s-1 >T c And T s-1 +T c >T max , then let the target temperature value of the graphite electrode at all times between t=sΔt and t=nΔt be T max ; If F s -T s-1 ≤T c And the accumulated undertemperature value A s ≤0, then let T s =F s , and execute the step of increasing s by 1 on its original basis; If F s -T s-1 ≤T c And the accumulated undertemperature value A s >0 and T s-1 +T c ≤T max , then let T s =T s-1 +T c , and execute the step of increasing s by 1 on its original basis; If F s -T s-1 ≤T c And the accumulated undertemperature value A s >0 and T s-1 +T c >T max , then let the target temperature value of the graphite electrode at all times between t=sΔt and t=nΔt be T max .

[0010] Optionally, the graphite electrode temperature target value time-varying curve also includes a graphite electrode temperature target value time-varying curve in a cooling stage after power transmission is completed, and the acquisition method is: Let the target temperature of the graphite electrode at the beginning of the cooling phase be T max , and Tc The rate of / Δt decreases continuously until the target temperature of the graphite electrode drops to T min The cooling phase is considered to be over when T min is the minimum target temperature of the graphite electrode.

[0011] Optionally, the step of determining a final value of the manipulated variable for real-time adjustment of the coolant flow rate based on the manipulated variable feedback change value and the manipulated variable current value comprises: The sum of the manipulated variable feedback change value and the manipulated variable current value is calculated, and the sum is compared with the manipulated variable upper limit value and the manipulated variable lower limit value; If the sum is between the upper limit of the manipulated variable and the lower limit of the manipulated variable, then the sum is the final value of the manipulated variable; If the sum is higher than the manipulated variable upper limit value or lower than the manipulated variable lower limit value, the manipulated variable final value is the manipulated variable upper limit value or the manipulated variable lower limit value.

[0012] In addition, to achieve the above-mentioned purpose, the present invention also provides a furnace head graphite electrode coolant flow control system, the system is used to implement any one of the above furnace head graphite electrode coolant flow control methods, the system includes a graphite electrode, a measurement module, a storage module, a calculation module and an execution module: The measuring module includes a temperature sensor for measuring the temperature of the graphite electrode in real time; The storage module is used to store the measurement data of the measurement module; The operation module is used to read data from the measurement module and calculate the final value of the operation variable; the execution module obtains the final value of the operation variable from the operation module and executes it.

[0013] Optionally, the operation module includes a feedback controller, a summer and a truncation device, wherein: The feedback controller is used to calculate the feedback change value of the manipulated variable; The summator is used to obtain the sum of the current value of the manipulated variable and the feedback change value of the manipulated variable and output it; The truncation device is used to perform a truncation operation on the output result of the summer so as to control the final value of the manipulated variable to be between the upper limit value and the lower limit value of the manipulated variable.

[0014] Optionally, the feedback controller is a PID controller.

[0015] The present invention also provides a computer-readable storage medium, which stores a furnace head graphite electrode coolant flow control program, and the furnace head graphite electrode coolant flow control program is loaded and run by a processor according to any of the above-mentioned furnace head graphite electrode coolant flow control methods.

[0016] The beneficial effects of the present invention are: The furnace head graphite electrode coolant flow control method provided by the present invention obtains a time-varying curve of a graphite electrode temperature target value based on a power transmission power curve, and performs real-time dynamic and fine adjustment on the graphite electrode temperature target value of a coolant flow negative feedback control link in combination with the graphite electrode temperature target value time-varying curve, which is beneficial to improving the cooling control quality of the furnace head graphite electrode, improving energy efficiency indicators, saving operating costs and improving production efficiency.

[0017] More specifically, the beneficial effects of the technical solution of the present invention are described below in combination with the principle of the technical solution of the present invention: Usually, negative feedback closed-loop control is used in industry to achieve higher regulation quality, such as higher regulation accuracy, faster control response speed and lower operating cost. The main idea is to subtract the set target value from the real-time measurement value to obtain the feedback change value of the operating variable and make real-time adjustments. For the cooling process of the graphite electrode at the furnace head, the control purpose is to avoid the graphite electrode temperature value being too high and to avoid the graphite electrode temperature rising or falling too fast. Unlike the general cooling control object, the graphitization furnace is a periodic operation. In one cycle, it mainly goes through four stages: loading, power supply, cooling and unloading. Among them, the power supply (power heating) and cooling stages both involve the temperature control of the graphite electrode, and the graphite electrode undergoes huge temperature changes in these two stages: in the power supply stage, the entire graphitization furnace including the graphite electrode is powered on for heating, and the overall temperature of the graphitization furnace shows an upward trend. The temperature of the graphite electrode rises from room temperature to one or two hundred degrees Celsius or even higher; in the cooling stage, the graphite electrode is cooled from hundreds of degrees Celsius at the end of power supply to below 50°C to facilitate the subsequent manual unloading operation. Among them, the temperature rise of the graphitization furnace during the power transmission stage is also related to the power transmission curve. The power transmission curve is a curve of power transmission power variation over time, which is prepared in advance by on-site process personnel. Usually, the power is relatively small in the early stage to preheat the charge and promote the volatilization of moisture and impurities; while in the middle and late stages, it is increased to a larger power level to increase the heating speed of the charge and the graphitization conversion speed.

[0018] Therefore, how to scientifically and reasonably determine the temperature target value of the graphite electrode in the control process is a very critical technical issue.

[0019] If a fixed, low temperature target value is set for the graphite electrode, there will be the following three problems: First, after a certain period of power supply, the furnace temperature rises to a higher level, and the graphite electrode will also rise to a higher temperature through its thermal conductivity effect. At this time, it is actually difficult for the control system to maintain the graphite electrode at the preset temperature target value, which causes the control system to become saturated and actually lose its ability to adjust. Second, it causes the control system to work at a high load for a long time, resulting in high operating energy consumption and equipment depreciation rate, and causing a large amount of heat in the furnace to be dissipated through the graphite electrode, resulting in energy waste. Third, the cooling stage will cause the graphite electrode temperature to drop too quickly, which will damage the graphite electrode due to thermal stress problems and shorten the service life of the graphite electrode.

[0020] If a fixed, high temperature target value is set for the graphite electrode, there will be the following two problems: First, in the early stage of power transmission, the temperature of the graphite electrode rises too quickly, which will cause damage to the graphite electrode due to thermal stress and shorten the service life of the graphite electrode; second, the cooling stage will cause the temperature of the graphite electrode to drop too slowly, or even fail to drop to the required temperature for a long time, reducing work efficiency.

[0021] In fact, it is impossible to set a fixed temperature target value to meet the cooling control needs of the furnace head graphite electrode in the entire production process. Because no matter how large the temperature target value is set, there will always be a situation where the temperature target value can only meet the needs of a certain period of time but cannot meet the needs of other periods of time.

[0022] Based on the above analysis, the present invention designs a time-varying curve of the target temperature of the graphite electrode according to the specific characteristics of the production process of the graphitization furnace. In the curve, the target temperature of the graphite electrode changes at fixed time intervals Δt; and in the cooling process of the furnace head graphite electrode of each production batch, it is necessary to read the target temperature of the graphite electrode in real time and subtract it from the measured temperature of the graphite electrode to obtain the feedback change value of the operating variable, and determine the final value of the operating variable based on the feedback change value of the operating variable and the current value of the operating variable for real-time adjustment of the coolant flow.

[0023] The time-varying curve of the graphite electrode temperature target value is obtained based on three principles: First, the target value at each moment shall not exceed its maximum value T max ; The second principle is that the difference between the target value at any moment and the target value at the previous moment should not exceed T with Δt as the time interval. c , that is, the rising or falling speed of the target value does not exceed T c / Δt; The third principle is to take into account the specific characteristics of the production process, and on the premise of complying with the first and second principles, actively and reasonably increase the target temperature of the graphite electrode during the power transmission process, thereby reducing heat loss in the furnace, reducing the energy consumption of the cooling system and equipment loss, and ensuring the responsiveness of the work process control system.

[0024] Specifically, the target temperature of the graphite electrode in the power transmission stage is gradually increased mainly based on the power transmission curve.

[0025] First, based on the proportionality coefficient k, the power transmission stage is roughly divided into two sub-stages, and the division time point is the moment when the cumulative transmitted power reaches k times the total transmitted power, that is, the moment t = jΔt. Let the target value F0 of the graphite electrode temperature corresponding to t = 0 be T init and let the target values of the graphite electrode temperature corresponding to t = jΔt and all subsequent moments be T max .

[0026] Secondly, for all moments between t > 0 and t < jΔt, let the target value of the graphite electrode temperature in this time period increase linearly from T init with the cumulative transmitted power to T max , where the cumulative transmitted powers at the moments t = mΔt and t = jΔt are respectively and .

[0027] Finally, the target values of the graphite electrode temperature at all moments are corrected according to the first principle and the second principle to obtain the final target value of the graphite electrode temperature.

[0028] No correction is made for t = 0.

[0029] For t = Δt, that is, let s = 1, at this time t = sΔt = Δt. If F1 - T0 > T c , that is, the difference between the target value of the graphite electrode temperature at this moment and the target value of the graphite electrode temperature at the previous moment is greater than the temperature rise threshold T c , then let the target value T1 of the graphite electrode temperature at this moment be T0 + T c to lower the value to meet the second principle, otherwise let T1 = F1.

[0030] For all moments when t > Δt, that is, the case where s ≥ 2, taking a certain moment, that is, t = sΔt as an example, the correction is carried out in the following order: First, calculate the cumulative under-temperature value A s at this moment. The under-temperature value is the sum of the differences between the target values of the graphite electrode temperature at all historical moments before this moment and the target value of the graphite electrode temperature. If the cumulative under-temperature value A s > 0, it means that the target value of the graphite electrode temperature has been lowered several times in history to meet the second principle and there is a net under-temperature.

[0031] Then, based on the known target value F s of the graphite electrode temperature at this moment and the target value T s-1 of the graphite electrode temperature at the previous moment, the target value T of the graphite electrode temperature at this moment is corrected to obtains : (i) If F s -T s-1 >T c And T s-1 +T c ≤T max , indicating that if the graphite electrode temperature target value F at this moment is directly s As its target value, it violates the second principle, so it needs to be lowered. s =T s-1 +T c , and the graphite electrode temperature target value T at that moment is obtained after lowering s It also complies with the first principle; (ii) If F s -T s-1 >T c And T s-1 +T c >T max , indicating that even if the target graphite electrode temperature at this moment is lowered to T s-1 +T c , but its value is greater than T max , which violates the first principle. Since the target temperature of the graphite electrode is already very large from this moment, the target temperature of the graphite electrode at all times between this moment and the end of power transmission t=nΔt is directly set to T max ; (iii) If F s -T s-1 ≤T c And the accumulated undertemperature value A s ≤0, then let T s =F s , indicating that the target graphite electrode temperature F at this moment can be directly s as its target value; (iv) If F s -T s-1 ≤T c And the accumulated undertemperature value A s >0 and T s-1 +T c ≤T max , then let T s =T s-1 +T c , which shows that although the graphite electrode temperature target value F at this moment can be directly s As its target value, but considering that there is a net under-temperature in history, in order to maintain the heating rate, the target temperature value of the graphite electrode at that moment is artificially increased as much as possible without violating the first principle and the second principle; (v) If Fs -T s-1 ≤T c And the accumulated undertemperature value A s >0 and T s-1 +T c >T max , indicating that if the target graphite electrode temperature at this moment is set to T in order to compensate for the net undertemperature in history, s-1 +T c If the graphite electrode temperature exceeds the target maximum value T max , since the target temperature of the graphite electrode is already very large from this moment, the target temperature of the graphite electrode at all times between this moment and the end of power transmission t=nΔt is directly set to T max .

[0032] Therefore, the present invention aims at the cooling problem of furnace head graphite electrodes, aims at the control needs of the maximum temperature and temperature change rate of the graphite electrodes themselves, and comprehensively considers the control accuracy, energy efficiency and production efficiency factors, and combines the power transmission curve and historical data to dynamically adjust the electrode temperature target value of the coolant flow negative feedback control link. This method is scientific and reasonable, safe and reliable, low in cost, and has wide applicability. It is beneficial to improve the cooling control quality of furnace head graphite electrodes, improve energy efficiency indicators and improve production efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0033] Figure 1 1 is a flow chart of a furnace head graphite electrode coolant flow control method according to an embodiment of the present invention; Figure 2 Schematic diagram of a furnace head graphite electrode cooling flow control system according to an embodiment of the present invention; Figure 3 It is a control node framework diagram of the furnace head graphite electrode cooling flow control method in an embodiment of the present invention; Figure 4 It is a schematic diagram of the structure of the furnace head graphite electrode cooling flow control system in an embodiment of the present invention; Figure 5 It is a schematic diagram of the process of obtaining the time-varying curve of the graphite electrode temperature target value in the power transmission stage in the furnace head graphite electrode cooling flow control method in an embodiment of the present invention.

[0034] Description of reference numerals: 1. Graphite electrode; 2. Heat exchanger; 3. Controller; 4. Temperature sensor; 5. Liquid supply pump; 6. Refrigeration unit. DETAILED DESCRIPTION

[0035] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.

[0036] Embodiment 1: Please refer to Figure 1 , Figure 1 is a flow chart of a furnace head graphite electrode coolant flow control method according to an embodiment of the present invention; and combined with Figure 2 The present invention provides a furnace head graphite electrode cooling liquid flow control method, wherein the graphite electrode is cooled based on a liquid-cooled heat exchanger in contact therewith, and is used to deliver power to the charge in the graphitization furnace; the method is applied to the furnace head graphite electrode cooling liquid flow control system to adjust the cooling liquid flow through the liquid-cooled heat exchanger in real time; The method comprises: Step S10, determining a target temperature value of the graphite electrode during the cooling process of the graphite electrode; Step S20, subtracting the graphite electrode temperature target value from the graphite electrode temperature measurement value to obtain an operating variable feedback change value; Step S30, determining a final value of the manipulated variable based on the manipulated variable feedback change value and the manipulated variable current value for real-time adjustment of the coolant flow rate; In this embodiment, during the cooling process of the furnace head graphite electrode of each production batch, the graphite electrode temperature target value is read in real time and subtracted from the graphite electrode temperature measurement value to obtain the operating variable feedback change value, and the operating variable final value is determined based on the operating variable feedback change value and the operating variable current value for real-time adjustment of the coolant flow rate; The above graphite electrode temperature target value changes at fixed time intervals Δt, and the graphite electrode temperature target value at each moment is read based on the graphite electrode temperature target value time-varying curve; Specifically, the step of determining the target temperature value of the graphite electrode includes: Determine a time-varying curve of a graphite electrode temperature target value; the time-varying curve of the graphite electrode temperature target value is calculated based on a power transmission power curve; The target temperature value of the graphite electrode is obtained by reading the target temperature value time-varying curve of the graphite electrode; The step of determining the time-varying curve of the graphite electrode temperature target value comprises: Obtaining the graphite electrode temperature target initial value and the graphite electrode temperature target maximum value; Read the power transmission power corresponding to each moment in the power transmission power curve; The target graphite electrode temperature time-varying curve is calculated by using the target graphite electrode temperature initial value, the target graphite electrode temperature maximum value and the power transmission corresponding to each moment.

[0037] like Figure 5 As shown, the graphite electrode temperature target value time-varying curve includes the graphite electrode temperature target value time-varying curve in the power transmission stage obtained by calculating the power transmission power curve, and the acquisition steps are: Step S1: Denote the starting time of power transmission as the moment \(t = 0\). After \(i\) time intervals, it is the moment \(t = i\Delta t\). The end time of power transmission is the moment \(t = n\Delta t\). The power of power transmission at the moment \(t = i\Delta t\) is \(P\). i Calculate the moment (the key segmentation moment) when the cumulative power of power transmission reaches \(k\) times the total power of power transmission and denote it as the moment \(t = j\Delta t\). Here, \(k\) is a proportionality coefficient between \(0\) and \(1\), and \(j\) satisfies the following conditions: (1) Step S2: Denote the target value of the graphite electrode temperature corresponding to the moment \(t = i\Delta t\) as \(F\). i where \(i = 1, 2,\cdots, n\); let the target value of the graphite electrode temperature corresponding to the moment \(t = 0\) be \(F_0=T\). init Let the target value of the graphite electrode temperature corresponding to the moment \(t = j\Delta t\) and all subsequent moments be \(T\). max For all moments between \(t>0\) and \(t < j\Delta t\), calculate the corresponding target value \(T\) of the graphite electrode temperature respectively by the following formula: m : (2) \(\Delta t\) represents the time interval between adjacent moments; here, \(T\). init and \(T\). max are respectively the initial value of the target value of the graphite electrode temperature and the maximum value of the target value of the graphite electrode temperature, where \(m = 1, 2,\cdots, j - 1\); Step S3: Denote each moment in the power transmission stage as the moment \(t = s\Delta t\), where \(s = 0, 1,\cdots, n\). For the target values of the graphite electrode temperature at each moment obtained in Step S2, make the following corrections according to the following sub-steps to obtain the final target values \(T\) of the graphite electrode temperature at each moment s and the time-varying curve of the corrected target value of the graphite electrode temperature: Sub-step S3.1: Let \(s = 0\), and let the target value \(T_0 = F_0\) of the graphite electrode temperature at the corresponding moment. Sub-step S3.2: Let \(s = 1\). If \(F_1 - T_0>T\). c then let the target value \(T_1 = T_0+T\) of the graphite electrode temperature at the corresponding moment. c Otherwise, let \(T_1 = F_1\). Sub-step S3.3: Increase \(s\) by \(1\) on its original basis. Sub-step S3.4: If \(s>n\), then go to Sub-step S3.9; otherwise, enter Sub-step S3.5. Sub-step S3.5: Calculate the cumulative under-temperature value \(A\) at the moment \(t = s\Delta t\). s : (3) Sub-step S3.6: Determine the target value \(T\) of the graphite electrode temperature at the moment \(t = s\Delta t\). s : (i) If F s -T s-1 >T c And T s-1 +T c ≤T max , then let T s =T s-1 +T c , then proceed to sub-step S3.7; (ii) If F s -T s-1 >T c And T s-1 +T c >T max , then go to sub-step S3.8; (iii) If F s -T s-1 ≤T c And the accumulated undertemperature value A s ≤0, then let T s =F s , then proceed to sub-step S3.7; (iv) If F s -T s-1 ≤T c And the accumulated undertemperature value A s >0 and T s-1 +T c ≤T max , then let T s =T s-1 +T c , then proceed to sub-step S3.7; (v) If F s -T s-1 ≤T c And the accumulated undertemperature value A s >0 and T s-1 +T c >T max , then go to sub-step S3.8; Sub-step S3.7, proceed to sub-step S3.3; Sub-step S3.8, let the target temperature value of the graphite electrode at all times between t=sΔt and t=nΔt be T max ; Sub-step S3.9, ending the assignment of the graphite electrode temperature target value at each moment; Above T c is the preset temperature rise threshold.

[0038] Furthermore, in the above furnace head graphite electrode coolant flow control method, the graphite electrode temperature target value time-varying curve also includes a graphite electrode temperature target value time-varying curve in the cooling stage after power transmission is completed, and the acquisition method is: let the graphite electrode temperature target value at the start time of the cooling stage be T max , and T c The rate of Δt decreases continuously until the target temperature of the graphite electrode drops to T min The cooling phase is considered to be over when T min is the minimum target temperature of the graphite electrode.

[0039] Furthermore, in the above furnace head graphite electrode coolant flow control method, the step of determining the final value of the operating variable for real-time adjustment of the coolant flow based on the operating variable feedback change value and the operating variable current value comprises: The sum of the manipulated variable feedback change value and the manipulated variable current value is calculated, and the sum is compared with the manipulated variable upper limit value and the manipulated variable lower limit value; If the sum is between the upper limit of the manipulated variable and the lower limit of the manipulated variable, then the sum is the final value of the manipulated variable; If the sum is higher than the manipulated variable upper limit value or lower than the manipulated variable lower limit value, the manipulated variable final value is the manipulated variable upper limit value or the manipulated variable lower limit value.

[0040] Preferably, in the above furnace head graphite electrode coolant flow control method, the greater the amount by which the graphite electrode temperature measurement value corresponding to the current moment exceeds the graphite electrode temperature target value, the greater the output operating variable feedback change value thereof.

[0041] Preferably, in the above furnace head graphite electrode coolant flow control method, the final value of the operating variable is the valve opening or the liquid supply pump speed for controlling the coolant flow.

[0042] Furthermore, the above furnace head graphite electrode coolant flow control method further comprises: After the coolant cools the graphite electrode through the liquid-cooled heat exchanger, it flows into the refrigeration unit for cooling, and then flows back to the liquid-cooled heat exchanger through the liquid supply pump for continuous circulation.

[0043] Embodiment 2: like Figure 2~Figure 4 As shown, the present invention provides a furnace head graphite electrode coolant flow control system, the system is used to implement the furnace head graphite electrode coolant flow control method, the system includes a graphite electrode, a measurement module, a storage module, a calculation module and an execution module: The measuring module includes a temperature sensor for measuring the temperature of the graphite electrode in real time; The storage module is used to store the measurement data of the measurement module; The operation module is used to read data from the measurement module and calculate the final value of the operation variable; the execution module obtains the final value of the operation variable from the operation module and executes it.

[0044] Further, continue to refer to Figure 2~Figure 4 , the above furnace head graphite electrode coolant flow control system, the operation module includes a feedback controller, a summer and a truncation device, wherein: The feedback controller is used to calculate the feedback change value of the manipulated variable; The summator is used to obtain the sum of the current value of the manipulated variable and the feedback change value of the manipulated variable and output it; The truncation device is used to perform a truncation operation on the output result of the summer so as to control the final value of the manipulated variable to be between the upper limit value and the lower limit value of the manipulated variable.

[0045] Preferably, in the above furnace head graphite electrode coolant flow control system, the feedback controller is a PID controller.

[0046] The present invention also provides a computer-readable storage medium, which stores a furnace head graphite electrode coolant flow control program, and the furnace head graphite electrode coolant flow control program is loaded and run by a processor according to the above-mentioned furnace head graphite electrode coolant flow control method.

[0047] Among them, the method implemented when the furnace head graphite electrode coolant flow control program is executed can refer to the various embodiments of the furnace head graphite electrode coolant flow control method of the present invention, which will not be repeated here.

[0048] In a more specific embodiment: Please refer to Figures 1 to 5 Understand the following specific embodiment.

[0049] The graphite electrode of a furnace head is cooled by a heat exchanger in contact with it. The coolant flows through the heat exchanger, and the flow rate of the coolant is controlled online in real time by adjusting the speed of the liquid supply pump. After the coolant flows out of the refrigeration unit, it is pressurized by the liquid supply pump and transported to the heat exchanger, where the graphite electrode is indirectly cooled; the temperature of the coolant rises after heat exchange, and then flows back to the refrigeration unit for cooling and then restarts the next cycle.

[0050] The values ​​of the relevant parameters in this embodiment are: time interval Δt=10min, n=300, that is, the total duration of the power transmission stage=300×10min=3000min=50h, the proportional coefficient k=0.6, and the target initial value of the graphite electrode temperature T init =50℃, maximum target temperature of graphite electrode T max =250℃, temperature rise threshold T c =5℃, the minimum target temperature of graphite electrode is T min =50℃.

[0051] First, introduce the acquisition process of the time-varying curve of the target value of the graphite electrode temperature during the power transmission stage.

[0052] Based on the power transmission power curve, it is found that the moment when the cumulative power transmission reaches k times the total power transmission is t = 2200 min = 220×10 min, that is, j = 220. Specifically, when t = 2200 min, the cumulative power transmission is 0.60 times the total power transmission, and at the previous moment, that is, when t = 2190 min, the cumulative power transmission is 0.59 times the total power transmission.

[0053] Thus, the target value of the graphite electrode temperature at each moment is obtained: Let the target value of the graphite electrode temperature corresponding to t = 0 be F0 = T init = 50°C; Let the target value of the graphite electrode temperature corresponding to t = 2200 min and all subsequent moments be T max = 250°C; For all moments in (0, 2200 min), let the target value of the graphite electrode temperature increase linearly with the cumulative power transmission: The faster the cumulative power transmission increases in a time period, the more rapid the increase in the target value of the graphite electrode temperature. The target value of the graphite electrode temperature increases monotonically from 50°C to 250°C throughout the process of [0, 2200 min]. The target value of the graphite electrode temperature in the time period of [2200, 3000 min] is 250°C.

[0054] Record each moment in the power transmission stage as t = sΔt moment, where s = 0, 1,..., n. Modify the target value of the graphite electrode temperature at each obtained moment to obtain the final target value of the graphite electrode temperature T s .

[0055] Let s = 0, and let the target value of the graphite electrode temperature at the corresponding moment be T0 = F0 = 50°C.

[0056] Let s = 1, and check that F1 = 54°C, F1 - T0 = 54 - 50 = 4 < T c , does not meet the condition of "F1 - T0 > T c ", so let T1 = F1 = 54°C.

[0057] Let s increase by 1 on its original basis, that is, s = 1 + 1 = 2 < n; Calculate the cumulative under-temperature value A at t = sΔt = 2Δt = 20 min s =(F1 - T1)=54 - 54 = 0; Check that F2 = 57°C, F2 - T1 = 57 - 54 = 3°C ≤ T c , obviously meets the condition (iii) of sub-step S3.6: "F s -T s-1 ≤T c and the cumulative under-temperature value A s≤0”, so let T2 = F2 = 57°C.

[0058] Next, let s increase by 1 on its original basis, i.e., s = 2 + 1 = 3 < n; calculate the cumulative under-temperature value A at t = sΔt = 3Δt = 30 min s =(F1 - T1)+(F2 - T2)=(54 - 54)+(57 - 57)=0; look up F3 = 63°C, F3 - T2 = 63 - 57 = 6°C > T c , T s-1 +T c =T2 + T c =57 + 5 = 62°C ≤ T max , obviously it meets the condition (i) of sub-step S3.6: "F s -T s-1 >T c and T s-1 +T c ≤T max ", so let T3 = T2 + T c =57 + 5 = 62°C.

[0059] Next, let s increase by 1 on its original basis, i.e., s = 3 + 1 = 4 < n; calculate the cumulative under-temperature value A at t = sΔt = 4Δt = 40 min s =(F1 - T1)+(F2 - T2)+(F3 - T3)=(54 - 54)+(57 - 57)+(63 - 62)=1 > 0; look up F4 = 66°C, F4 - T3 = 66 - 62 = 4°C < T c , T s-1 +T c =T3 + T c =62 + 5 = 67°C ≤ T max , obviously it meets the condition (iv) of sub-step S3.6: "F s -T s-1 ≤T c and the cumulative under-temperature value A s >0 and T s-1 +T c ≤T max ", so let T4 = T3 + T c =62 + 5 = 67°C.

[0060] Next, let s increase by 1 on its original basis, i.e., s = 4 + 1 = 5 < n. Due to space limitations, the correction process for the time periods corresponding to s = 5 to s = 218 is omitted.

[0061] When s = 219, look up F 219 =248°C, while T 218=246℃, calculate the cumulative undertemperature value A at t=sΔt=219Δt=2190min s = 0, which obviously satisfies the condition (iii) of sub-step S3.6: “F s -T s-1 ≤T c And the accumulated undertemperature value A s ≤0", so let T 219 =F 219 =248℃.

[0062] Then let s increase by 1, that is, s=219+1=220 <n。

[0063] When s=220, we can find F 220 =250℃, and T 219 =248℃, calculate the cumulative undertemperature value A at t=sΔt=220Δt=2200min s = 0, which obviously satisfies the condition (iii) of sub-step S3.6: “F s -T s-1 ≤T c And the accumulated undertemperature value A s ≤0", so let T 220 =F 220 =250℃.

[0064] Then let s increase by 1, that is, s=220+1=221 <n。

[0065] When s=221, we can find F 221 =250℃, and T 220 =250℃, calculate the cumulative undertemperature value A at t=sΔt=221Δt=2210min s = 0, which obviously satisfies the condition (iii) of sub-step S3.6: “F s -T s-1 ≤T c And the accumulated undertemperature value A s ≤0", so let T 221 =F 221 =250℃.

[0066] Then let s increase by 1, that is, s=221+1=222 <n。

[0067] After that, the corresponding graphite electrode temperature target values ​​from s=222 to s=300 are also 250°C.

[0068] When s=300, let s increase by 1 on its original basis, that is, s=300+1=301>n, so the assignment of the graphite electrode temperature target value at each moment is completed.

[0069] The time-varying curve of the graphite electrode temperature target value in the cooling stage after power transmission is obtained as follows: Let the graphite electrode temperature target value at the start of the cooling stage be T max = 250℃, and T c / Δt=5℃ / 10min=0.5℃ / min, and the temperature of the graphite electrode decreases until the target value reaches T min =50℃, the cooling stage is considered to be over.

[0070] The operating variable of this embodiment is the rotation speed of the liquid supply pump, the upper limit value of the operating variable = 3000 r / min, the lower limit value = 500 r / min, the feedback controller is a PID controller with only a proportional coefficient, and its control logic is: subtract the graphite electrode temperature target value from the graphite electrode temperature measurement value and multiply by -10 as the operating variable feedback change value, wherein the units of the graphite electrode temperature target value and the graphite electrode temperature measurement value are ℃, and the unit of the operating variable feedback change value is r / min. For example, at a certain moment, the target value of graphite electrode temperature = 195℃, the measured value of graphite electrode temperature = 192℃, the current value of the operating variable, that is, the current speed of the liquid supply pump = 2300 r / min, then the operating variable feedback change value = (195-192)×(-10) = -30r / min, the sum of the operating variable feedback change value and the operating variable current value = 2300-30 = 2270r / min, the sum is between the upper limit and the lower limit of the operating variable, then the final value of the operated variable after adjustment = 2270r / min.

[0071] In this embodiment, the control needs of the maximum temperature and temperature change rate of the graphite electrode itself are taken into consideration, and the control accuracy, energy efficiency and production efficiency factors are comprehensively considered. The electrode temperature target value of the coolant flow negative feedback control link is dynamically adjusted in combination with the power transmission curve and historical data. This method is scientific and reasonable, safe and reliable, low in cost, and has wide applicability. It is beneficial to improve the cooling control quality of the furnace head graphite electrode, improve energy efficiency indicators and increase production efficiency.

[0072] It should be understood by those skilled in the art that embodiments of the present invention may be provided as methods, devices, or computer program products. Therefore, the present invention may take the form of a complete hardware embodiment, a complete software embodiment, or an embodiment combining software and hardware aspects. Moreover, the present invention may take the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code.

[0073] The present invention is described with reference to flowcharts and / or block diagrams of methods, apparatuses, and computer program products according to embodiments of the present invention. It should be understood that each process and / or block in the flowchart and / or block diagram, as well as the combination of processes and / or blocks in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the process in the flowchart. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.

[0074] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.

[0075] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process in the computer or other programmable device. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.

[0076] It should be noted that in the claims, any reference signs placed between brackets shall not be construed as limiting the claims. The word "comprising" does not exclude the presence of components or steps not listed in the claim. The word "a" or "an" preceding a component does not exclude the presence of a plurality of such components. The invention may be implemented by means of hardware comprising several different components and by means of a suitably programmed computer. In a unit claim enumerating several means, several of these means may be embodied by the same item of hardware. The use of the words first, second, and third etc. does not indicate any order. These words may be interpreted as names.

[0077] Although the preferred embodiments of the present invention have been described, those skilled in the art may make other changes and modifications to these embodiments once they have learned the basic creative concept. Therefore, the appended claims are intended to be interpreted as including the preferred embodiments and all changes and modifications that fall within the scope of the present invention.

[0078] The above description is only a preferred embodiment of the present invention, and does not limit the patent scope of the present invention. All equivalent structural changes made by using the contents of the present invention specification and drawings under the inventive concept of the present invention, or directly / indirectly applied in other related technical fields are included in the patent protection scope of the present invention.

Claims

1. A furnace head graphite electrode coolant flow control method, characterized in that: The graphite electrode is cooled based on a liquid-cooled heat exchanger in contact with it, and is used to deliver power and electricity to the charge in the graphitization furnace; The method is applied to a furnace head graphite electrode coolant flow control system to adjust the coolant flow through a liquid-cooled heat exchanger in real time; The method comprises: During the cooling process of the graphite electrode, determine the target temperature value of the graphite electrode; Subtracting the graphite electrode temperature target value from the graphite electrode temperature measurement value to obtain an operating variable feedback change value; determining a final value of the manipulated variable for real-time adjustment of the coolant flow rate based on the manipulated variable feedback change value and the manipulated variable current value; Wherein, the step of determining the target temperature value of the graphite electrode comprises: Determine a time-varying curve of a graphite electrode temperature target value; the time-varying curve of the graphite electrode temperature target value is calculated based on a power transmission power curve; The target temperature value of the graphite electrode is obtained by reading the target temperature value time-varying curve of the graphite electrode; The step of determining the time-varying curve of the graphite electrode temperature target value comprises: Obtaining the graphite electrode temperature target initial value and the graphite electrode temperature target maximum value; Read the power transmission power corresponding to each moment in the power transmission power curve; The target graphite electrode temperature time-varying curve is calculated by using the target graphite electrode temperature initial value, the target graphite electrode temperature maximum value and the corresponding power transmission at each moment.

2. The furnace head graphite electrode coolant flow control method according to claim 1, characterized in that: The step of calculating a time-varying curve of a graphite electrode temperature target value by using the graphite electrode temperature target initial value, the graphite electrode temperature target maximum value, and the power transmission power corresponding to each moment comprises: Determine the critical segment time when the accumulated power transmission reaches the preset multiple of the total power transmission; When the power transmission time is zero, the graphite electrode temperature target value is set to the graphite electrode temperature target initial value; When the power transmission moment is a critical segment moment, the graphite electrode temperature target value is set to the maximum value of the graphite electrode temperature target; When the power transmission time is between the zero time and the key segment time, the graphite electrode temperature target initial value, the graphite electrode temperature target maximum value and the power transmission power corresponding to each time are input into the preset time-varying curve calculation model to calculate the graphite electrode temperature target value time-varying curve.

3. The furnace head graphite electrode coolant flow control method according to claim 2, characterized in that: The preset time-varying curve calculation model includes: Where Δt represents the time interval between adjacent moments; denote the target value of the graphite electrode temperature corresponding to the moment t = iΔt as F i , where i = 1, 2, …, n; n is the power-off moment; the power transmission power at the moment t = iΔt is P i ; let the target value of the graphite electrode temperature corresponding to the moment t = 0 be F0 = T init , and let the target value of the graphite electrode temperature corresponding to all moments after the critical segmentation moment t = jΔt be T max , and for the target value F of the graphite electrode temperature at all moments between t > 0 and t < jΔt m , it is calculated from the above formula; T init and T max They represent the target initial value of graphite electrode temperature and the target maximum value of graphite electrode temperature respectively, m=1, 2,…,j-1.

4. The furnace head graphite electrode coolant flow control method according to claim 3, characterized in that: The method further comprises: The graphite electrode temperature target time-varying curve is corrected by using the graphite electrode temperature target initial value and the preset temperature rise threshold value to obtain a corrected graphite electrode temperature target time-varying curve.

5. The furnace head graphite electrode coolant flow control method according to claim 4, characterized in that: The step of correcting the time-varying curve of the graphite electrode temperature target value by using the graphite electrode temperature target initial value and the preset temperature rise threshold value to obtain a corrected time-varying curve of the graphite electrode temperature target value comprises: Each moment of the power transmission stage is t=sΔt, where s=0, 1,…,n. The graphite electrode temperature target value F at each moment in the graphite electrode temperature target value time-varying curve is i , perform correction according to the following steps to obtain the final graphite electrode temperature target value T at each moment s And the modified graphite electrode temperature target value time-varying curve: Let s=0, and let the target temperature value of the graphite electrode at the corresponding moment be T0=F0; Let s=1, if F1-T0>T c , then let the graphite electrode temperature target value at the corresponding time be T1=T0+T c , otherwise let T1=F1; where T c Indicates the preset temperature rise threshold; Let s increase by 1 from its original value; If s>n, the assignment of the graphite electrode temperature target value at each moment is terminated; If s≤n, calculate the cumulative undertemperature value A at time t=sΔt s : Determine the graphite electrode temperature target value T at time t=sΔt s : If F s -T s-1 >T c And T s-1 +T c ≤T max , then let T s =T s-1 +T c , and execute the step of increasing s by 1 on its original basis; If F s -T s-1 >T c And T s-1 +T c >T max , then let the target temperature value of the graphite electrode at all times between t=sΔt and t=nΔt be T max ; If F s -T s-1 ≤T c And the accumulated undertemperature value A s ≤0, then let T s =F s , and execute the step of increasing s by 1 on its original basis; If F s -T s-1 ≤T c And the accumulated undertemperature value A s >0 and T s-1 +T c ≤T max , then let T s =T s-1 +T c , and execute the step of increasing s by 1 on its original basis; If F s -T s-1 ≤T c And the accumulated undertemperature value A s >0 and T s-1 +T c >T max , then let the target temperature value of the graphite electrode at all times between t=sΔt and t=nΔt be T max .

6. The furnace head graphite electrode coolant flow control method according to claim 5, characterized in that: The graphite electrode temperature target value time-varying curve also includes the graphite electrode temperature target value time-varying curve in the cooling stage after power transmission is completed, and the acquisition method is: Let the target temperature of the graphite electrode at the beginning of the cooling phase be T max , and T c The rate of / Δt decreases continuously until the target temperature of the graphite electrode drops to T min The cooling phase is considered to be over when T min is the minimum target temperature of the graphite electrode.

7. The furnace head graphite electrode coolant flow control method according to claim 1, characterized in that: The step of determining a final value of the manipulated variable for real-time adjustment of the coolant flow rate based on the manipulated variable feedback change value and the manipulated variable current value comprises: The sum of the manipulated variable feedback change value and the manipulated variable current value is calculated, and the sum is compared with the manipulated variable upper limit value and the manipulated variable lower limit value; If the sum is between the upper limit of the manipulated variable and the lower limit of the manipulated variable, then the sum is the final value of the manipulated variable; If the sum is higher than the manipulated variable upper limit value or lower than the manipulated variable lower limit value, the manipulated variable final value is the manipulated variable upper limit value or the manipulated variable lower limit value.

8. A furnace head graphite electrode coolant flow control system, characterized in that: The system is used to implement the furnace head graphite electrode coolant flow control method according to any one of claims 1 to 7, and the system includes a graphite electrode, a measurement module, a storage module, a calculation module and an execution module: The measuring module includes a temperature sensor for measuring the temperature of the graphite electrode in real time; The storage module is used to store the measurement data of the measurement module; The operation module is used to read data from the measurement module and calculate the final value of the operation variable; the execution module obtains the final value of the operation variable from the operation module and executes it.

9. The furnace head graphite electrode coolant flow control system according to claim 8, characterized in that: The operation module includes a feedback controller, a summer and a truncation device, wherein: The feedback controller is used to calculate the feedback change value of the manipulated variable; The summator is used to obtain the sum of the current value of the manipulated variable and the feedback change value of the manipulated variable and output it; The truncation device is used to perform a truncation operation on the output result of the summer so as to control the final value of the manipulated variable to be between the upper limit value and the lower limit value of the manipulated variable.

10. A computer-readable storage medium, characterized in that: A furnace head graphite electrode coolant flow control program is stored therein, and the furnace head graphite electrode coolant flow control program is loaded and run by a processor to execute the furnace head graphite electrode coolant flow control method described in any one of claims 1 to 7.

Citation Information

Patent Citations

  • Cooling liquid flow control method and system for liquid cooling clamping plate for power transmission and storage medium

    CN118311995A

  • Operation control method and system based on power transmission vehicle

    CN118632398A

  • Converter transformer output power adjusting method, converter transformer and storage medium

    CN118689278A

  • Cooled furnace head for heavy-current resistance furnaces

    US4641321A