Method and device for constructing twin mechanism model of power transformation equipment, equipment and medium

By decoupling the equipment monitoring model of substation equipment and fusion of real-time data, a device mechanism model is built, which solves the problem that digital twin technology cannot penetrate into the equipment, and realizes the deep monitoring and self-evolution capabilities of equipment status.

CN119066880APending Publication Date: 2024-12-03CHINA ELECTRIC POWER RESEARCH INSTITUTE CO LTD +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411286469.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-13
Publication Date
2024-12-03

AI Technical Summary

Technical Problem

The current digital twin technology remains in static appearance simulation in substation equipment and cannot penetrate into the physical and logical processes within the equipment, resulting in limited improvements in equipment status perception and operation monitoring, which is difficult to support the substation's refined and digital management requirements.

Method used

By decoupling the equipment monitoring model of the substation equipment, obtaining refined component models, collecting real-time operation data, establishing equipment mechanism models, combining mathematical models and boundary object driving relationships, forming a refined component model of the equipment and correlating them. Splicing to build a device mechanism model.

Benefits of technology

It realizes the deep monitoring and operation of the status of substation equipment, provides a digital twin of equipment with self-evolution capabilities, and improves the accuracy and intelligence of equipment operation monitoring.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119066880A_ABST
    Figure CN119066880A_ABST
Patent Text Reader

Abstract

The invention belongs to the technical field of power system automation, and particularly relates to a power transformation equipment twinborn mechanism model construction method and device, equipment and a medium. According to the method, a refined equipment monitoring model is formed by performing modularization splitting on an existing equipment model, decomposing the existing equipment model to a chip level on a hardware level and decomposing the existing equipment model to functional logic nodes on a functional level; secondly, real-time data such as equipment chip-level operation data, logic state data of function nodes and service data are collected, and the driving relation between the real-time data and all assemblies of the refined equipment monitoring model is established; and finally, establishing an equipment mechanism model driven by real-time data according to the internal logic and mechanism of different service functions. And carrying out combined driving simulation on the space physical equipment and the real-time data in a digital dimension to construct an equipment digital twinborn supporting the equipment operation monitoring service so as to realize the deep monitoring of the equipment state.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of power system automation, and specifically relates to a method, device, equipment and medium for constructing a twin mechanism model of a substation equipment. Background Art

[0002] In a substation, the primary equipment is responsible for the conversion, transmission and disconnection of electric energy, while the secondary equipment is responsible for the collection of grid operation data and the monitoring of the status of the primary equipment. At present, in order to realize the operation management, maintenance and monitoring and control of substation equipment, information modeling is carried out on the primary and secondary equipment of the substation in various power industrial control systems and information systems, including the IEC61850 communication model, three-dimensional model, resource asset CIM model, etc. of the equipment. These models describe the capabilities of various aspects of substation equipment. The communication model describes the signals and services of the equipment's interaction with the outside world, the three-dimensional model describes the three-dimensional coordinate position and external size of the equipment in the physical space, and the resource asset CIM model describes the asset information such as the unit to which the equipment belongs, the model, and the maintenance record. As a hub node of the power grid, the digital transformation of substation equipment is the foundation for the comprehensive digitalization of the power grid. At present, smart substations have the foundation for digital transformation, and a lot of digital twin research based on three-dimensional views has been carried out. However, the current twin technology remains at the static appearance simulation, unable to delve into the physical and logical processes inside the equipment, and has minimal improvement in equipment status perception and operation monitoring. Objectively, it forms a "two-faced" system, with insufficient support for advanced digital business applications such as remote panoramic monitoring of equipment and intelligent diagnosis. It relies heavily on manual on-site analysis, and is difficult to support the requirements for refined and digital management of substations, affecting further transformation and upgrading. Summary of the invention

[0003] The purpose of the present invention is to provide a method, device, equipment and medium for constructing a twin mechanism model of substation equipment, so as to solve the problem in the prior art that the current twin technology remains at the static appearance simulation and cannot go deep into the physical and logical processes inside the equipment.

[0004] In order to achieve the above object, the present invention adopts the following technical solution: In a first aspect, the present invention provides a method for constructing a twin mechanism model of a transformer equipment, comprising the following steps: Decouple the equipment monitoring models of various substation equipment to obtain refined component models of various substation equipment; Collect the real-time operation data of various substation equipment and add the real-time operation data as a new object to the corresponding refined component model; The refined component models of the newly added objects are associated and spliced ​​to obtain the equipment mechanism model.

[0005] Furthermore, the equipment monitoring models of various types of substation equipment are decoupled to obtain refined component models of various types of substation equipment, including: Determine the information models of the substation equipment, and fuse the information models to obtain the substation equipment fusion model; determine the models corresponding to the primary equipment, secondary equipment and auxiliary equipment from the substation equipment fusion model; write the information of the models corresponding to the primary equipment, secondary equipment and auxiliary equipment into the corresponding preset equipment monitoring models; flatten the equipment monitoring models after the information is written, and obtain the flattened equipment monitoring models corresponding to the primary equipment, secondary equipment and auxiliary equipment; split the flattened equipment monitoring models according to components, and obtain the refined component models of the components of the primary equipment, secondary equipment and auxiliary equipment.

[0006] Furthermore, real-time operation data of various substation equipment are collected and added as new objects to the corresponding refined component models, including: Add a sensor circuit to the primary device; the collected data of the sensor circuit corresponds to at least an object reflecting the input and output status of the component, and the new object is added to the corresponding refined component model according to the component corresponding to the collected data of the sensor circuit; add a chip status collection interface to the secondary device and the auxiliary device respectively; obtain the collected data reflecting the chip status as a newly added object, and add it to the refined component model of the component corresponding to the collected data; in the software process of the secondary device and the auxiliary device, each component adds several objects reflecting the internal operating status of the component, and adds the newly added objects to the refined component model of the corresponding component; based on the refined component model corresponding to the hardware component after the secondary device and the auxiliary device have added objects, and the refined component model corresponding to the software component after the newly added objects, the hardware component objects involved in the software component objects are associated and bound.

[0007] Furthermore, the refined component models of the newly added objects are associated and spliced ​​to obtain the equipment mechanism model, including: According to the functions realized by the corresponding components of the refined monitoring model, the input and output objects of the refined monitoring model are extracted as the boundary objects of the corresponding components; in combination with the functional characteristics of the components, according to the mathematical models inside the components, the components are divided into types, and the real-time data associated with the input and output objects of the components are used for fitting simulation to form mathematical models of different types of components; according to the functional logic flow of the entire equipment, the boundary objects between the components of the equipment monitoring model corresponding to the primary equipment, secondary equipment and auxiliary equipment are associated, and the driving relationship of each boundary object is defined; the refined component model containing the mathematical model and the driving relationship of the boundary object is connected according to the association relationship of the boundary objects of the component; other objects in the refined component model except the boundary objects, according to the components to which the objects belong, are used as intermediate state data reflecting the operating status of the components to form an equipment mechanism model together.

[0008] Furthermore, the models corresponding to the primary equipment, secondary equipment and auxiliary equipment are determined from the substation equipment integration model, including: Determine the CIM model, primary equipment resource asset model and primary equipment 3D model corresponding to the primary equipment from the substation equipment fusion model; Determine the secondary equipment IEC61850 communication model, secondary equipment resource asset model and secondary equipment three-dimensional model corresponding to the secondary equipment from the substation equipment fusion model; The auxiliary equipment IEC61850 communication model, auxiliary equipment resource asset model and auxiliary equipment three-dimensional model corresponding to the auxiliary equipment are determined from the substation equipment fusion model.

[0009] Furthermore, the models corresponding to the primary equipment, the secondary equipment and the auxiliary equipment are written into the corresponding preset equipment monitoring model, including: The physical ID contained in the primary equipment resource asset model is used as the unique index, the mRid in the CIM model is associated with the physical ID, and all other information in the CIM model is written into the DATA part of the preset primary equipment monitoring model; the equipment object index id in the primary equipment 3D model is associated with the physical ID, and the three types of information of the primary equipment 3D model, namely, the geometric shape and size, material and texture, physical connection relationship and connection point, are written into the 3D part of the primary equipment monitoring model; the primary equipment resource asset model is written as a whole into the LEDGER part of the primary equipment monitoring model; The physical ID contained in the secondary equipment resource asset model is used as the unique index, the IEDName in the secondary equipment IEC61850 model is associated with the physical ID, and the device connection topology, measurement point data, and communication information in the secondary equipment IEC61850 model are written into the DATA part of the preset secondary equipment monitoring model; the device object index id in the secondary equipment three-dimensional model is associated with the physical ID, and the three types of information of the geometric shape and size, material and texture, and terminal connection relationship of the secondary equipment three-dimensional model are written into the 3D part of the secondary equipment monitoring model; the secondary equipment resource asset model is written as a whole into the LEDGER part of the secondary equipment monitoring model; Taking the physical ID contained in the auxiliary equipment resource asset model as the unique index, the IEDName in the auxiliary equipment IEC61850 model is associated with the physical ID, and the device connection topology, measurement point data, and communication information in the auxiliary equipment IEC61850 model are written into the DATA part of the preset auxiliary equipment monitoring model; the device object index id in the auxiliary equipment three-dimensional model is associated with the physical ID, and the three types of information of the auxiliary equipment three-dimensional model, namely the geometric shape and size, material and texture, and terminal connection relationship, are written into the 3D part of the auxiliary equipment monitoring model; the auxiliary equipment resource asset model is written as a whole into the LEDGER part of the auxiliary equipment monitoring model.

[0010] Furthermore, each device monitoring model after writing the information is flattened to obtain each flattened device monitoring model, including: The primary equipment monitoring model, secondary equipment monitoring model and auxiliary equipment monitoring model after the information is written are flattened according to "object name-object value-parent object" to obtain a flattened primary equipment monitoring model, a flattened secondary equipment monitoring model and a flattened auxiliary equipment monitoring model.

[0011] Furthermore, each flat device monitoring model is split into components to obtain a refined component model of each component, including: The flattened primary equipment monitoring model is split according to the components contained in the primary equipment to obtain a refined component model of each component of the primary equipment; the objects corresponding to the components are placed in the refined component model corresponding to the components.

[0012] In a second aspect, the present invention provides a device for constructing a twin mechanism model of a substation equipment, comprising: The component model building module is used to decouple the equipment monitoring models of various types of substation equipment to obtain refined component models of various types of substation equipment; The data association collection module is used to collect the real-time operation data of various substation equipment and add the real-time operation data as a new object to the corresponding refined component model; The mechanism model construction module is used to associate and splice the refined component models of the newly added objects to obtain the equipment mechanism model.

[0013] The component model construction module is specifically used to determine the information models of the substation equipment, and fuse the information models to obtain the substation equipment fusion model; determine the models corresponding to the primary equipment, secondary equipment and auxiliary equipment from the substation equipment fusion model; write the information of the models corresponding to the primary equipment, secondary equipment and auxiliary equipment into the corresponding preset equipment monitoring model; flatten the equipment monitoring models after the information is written, and obtain the flattened equipment monitoring models corresponding to the primary equipment, secondary equipment and auxiliary equipment; split the flattened equipment monitoring models according to the components, and obtain the refined component models of the components of the primary equipment, secondary equipment and auxiliary equipment respectively; The data association acquisition module is specifically used to add a sensor loop to the primary device; the acquisition data of the sensor loop corresponds to at least an object reflecting the input and output status of the component, and the new object is added to the corresponding refined component model according to the component corresponding to the acquisition data of the sensor loop; the acquisition interface of the chip status is added to the secondary device and the auxiliary device respectively; the acquisition data reflecting the chip status is obtained as a newly added object, and added to the refined component model of the component corresponding to the acquisition data; in the software process of the secondary device and the auxiliary device, each component adds several objects reflecting the internal operating status of the component, and the newly added objects are added to the refined component model of the corresponding component; the refined component model corresponding to the hardware component after the secondary device and the auxiliary device have newly added objects, and the refined component model corresponding to the software component after the newly added objects, based on the software component, associates and binds the hardware component objects involved in the software component objects; The mechanism model construction module is specifically used to extract the input and output objects of the refined monitoring model as the boundary objects of the corresponding components according to the functions realized by the corresponding components of the refined monitoring model; classify the components into types according to the mathematical models inside the components in combination with the functional characteristics of the components, and use the real-time data associated with the input and output objects of the components for fitting simulation to form mathematical models of different types of components; associate the boundary objects between the components of the equipment monitoring model corresponding to the primary equipment, secondary equipment and auxiliary equipment according to the functional logic flow of the entire equipment, and define the driving relationship of each boundary object; connect the refined component model containing the mathematical model and the boundary object driving relationship according to the boundary object association relationship of the component; other objects in the refined component model except the boundary objects, according to the components to which the objects belong, are used as intermediate state data reflecting the operating status of the components to form the equipment mechanism model together.

[0014] Furthermore, in the component model building module, the models corresponding to the primary equipment, secondary equipment, and auxiliary equipment are determined from the substation equipment fusion model, including: Determine the CIM model, primary equipment resource asset model and primary equipment 3D model corresponding to the primary equipment from the substation equipment fusion model; Determine the secondary equipment IEC61850 communication model, secondary equipment resource asset model and secondary equipment three-dimensional model corresponding to the secondary equipment from the substation equipment fusion model; The auxiliary equipment IEC61850 communication model, auxiliary equipment resource asset model and auxiliary equipment three-dimensional model corresponding to the auxiliary equipment are determined from the substation equipment fusion model.

[0015] Furthermore, in the component model construction module, the models corresponding to the primary equipment, the secondary equipment and the auxiliary equipment are written into the corresponding preset equipment monitoring model, including: The physical ID contained in the primary equipment resource asset model is used as the unique index, the mRid in the CIM model is associated with the physical ID, and all other information in the CIM model is written into the DATA part of the preset primary equipment monitoring model; the equipment object index id in the primary equipment 3D model is associated with the physical ID, and the three types of information of the primary equipment 3D model, namely, the geometric shape and size, material and texture, physical connection relationship and connection point, are written into the 3D part of the primary equipment monitoring model; the primary equipment resource asset model is written as a whole into the LEDGER part of the primary equipment monitoring model; The physical ID contained in the secondary equipment resource asset model is used as the unique index, the IEDName in the secondary equipment IEC61850 model is associated with the physical ID, and the device connection topology, measurement point data, and communication information in the secondary equipment IEC61850 model are written into the DATA part of the preset secondary equipment monitoring model; the device object index id in the secondary equipment three-dimensional model is associated with the physical ID, and the three types of information of the geometric shape and size, material and texture, and terminal connection relationship of the secondary equipment three-dimensional model are written into the 3D part of the secondary equipment monitoring model; the secondary equipment resource asset model is written as a whole into the LEDGER part of the secondary equipment monitoring model; Using the physical ID contained in the auxiliary equipment resource asset model as the unique index, the IEDName in the auxiliary equipment IEC61850 model is associated with the physical ID, and the device connection topology, measurement point data, and communication information in the auxiliary equipment IEC61850 model are written into the DATA part of the preset auxiliary equipment monitoring model; the device object index id in the auxiliary equipment three-dimensional model is associated with the physical ID, and three types of information, namely the geometric shape and size, material and texture, and terminal connection relationship of the auxiliary equipment three-dimensional model, are written into the auxiliary equipment monitoring model.

[0016] According to a third aspect of the present invention, there is provided an electronic device comprising a processor and a memory, wherein the processor is configured to execute a computer program stored in the memory to implement the method for constructing a twin mechanism model of a substation equipment as described above.

[0017] According to a fourth aspect of the present invention, a computer-readable storage medium is provided, wherein the computer-readable storage medium stores at least one instruction, and when the at least one instruction is executed by a processor, the method for constructing a twin mechanism model of a substation equipment as described above is implemented.

[0018] Compared with the prior art, the beneficial effects of the present invention are as follows: This solution integrates the existing equipment models, divides them into components according to functional logic, decouples them in fine granularity from the hardware chip and software function node levels, and integrates them with the real-time status data of the equipment. It proposes a method for building an equipment mechanism model with self-evolution capabilities, performs joint drive simulation of spatial physical equipment and real-time data in the digital dimension, builds a device digital twin that supports equipment operation monitoring services, and realizes in-depth monitoring of equipment status. The device for building a twin mechanism model of substation equipment, electronic equipment, and computer-readable storage medium provided by the present invention also solves the problems raised in the background technology section.

[0019] The existing equipment model only reflects the external characteristics of the equipment, including communication capabilities, three-dimensional appearance, equipment records, etc., but does not grasp the internal components of the equipment and their relationships. Based on professional equipment knowledge, this solution extracts the characteristics of each internal component, flattens the original model information to form several component models, which can deeply reflect the internal operating status of the equipment.

[0020] This solution establishes a mathematical model within the component, uses mathematical theoretical methods, establishes mathematical description formulas for different components according to their internal business logic, and fits the functions of the components through mathematical models.

[0021] This solution realizes the overall mechanism model of the equipment with self-evolution. Based on the refined mathematical modeling of components, each component is associated and coordinated according to the internal processing flow of the equipment. Each component has its own internal operation logic, which constitutes the mechanism model of the entire equipment. After completing the initialization data synchronization, the operation of the equipment digital twin can be realized, and a true digital twin device can be built. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] The drawings constituting a part of the present application are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. In the drawings: Figure 1A schematic diagram of a method for constructing a twin mechanism model of a substation equipment according to an embodiment of the present invention; Figure 2 This is a flow chart of a method for constructing a twin mechanism model of a substation equipment according to an embodiment of the present invention; Figure 3 This is a structural block diagram of a device for building a twin mechanism model of a substation equipment according to an embodiment of the present invention; Figure 4 The present invention is a structural block diagram of an electronic device according to an embodiment of the present invention. DETAILED DESCRIPTION

[0023] The present invention will be described in detail below with reference to the accompanying drawings and in combination with embodiments. It should be noted that the embodiments and features in the embodiments of the present application can be combined with each other without conflict.

[0024] The following detailed description is an exemplary description, which is intended to provide further detailed description of the present invention. Unless otherwise specified, all technical terms used in the present invention have the same meaning as those generally understood by those skilled in the art to which the present application belongs. The terms used in the present invention are only for describing specific embodiments, and are not intended to limit exemplary embodiments according to the present invention.

[0025] Explanation of relevant terms Chip-level operation data: In various embedded devices in substations, the CPU, power supply, network, storage, memory, FPGA, ADC and other chip operation data collected by adding sensors or updating drivers can directly reflect the operating status of the chip.

[0026] Functional-level logical node status data: In addition to the various components that make up the hardware part of the substation equipment, there is also a software part that realizes its functions. According to the business logic process of the software, the software of the entire equipment is divided into several nodes. Information such as the input, output, and intermediate process judgment status of the node belongs to the node status data.

[0027] Mechanism model: The mechanism model is the core of realizing the digital twin of the equipment. The mechanism model is an expression that reflects the internal evolution logic of the equipment. The initialized real-time data is output to the mechanism model of each device. The digital twin based on the mechanism model can perform self-calculation and evolution according to the inherent mathematical laws of the mechanism model.

[0028] Component model: Referring to the hardware structure, software business logic flow, etc. of the physical entity of the substation equipment, the equipment model is decoupled and split into different component models to reflect the physical entity equipment module corresponding to the component.

[0029] In order to break through the current bottleneck of digital twins, it is necessary to embed monitoring models and real-time data into digital twins, solve the fusion technology of digital twins and equipment operation monitoring, form a mechanism model of substation equipment, and enable twin equipment to have mechanism simulation, logical intelligence and process evolution capabilities, so as to promote the professional development of equipment with twin monitoring mode.

[0030] At present, the research on the mechanism modeling technology of power grid equipment is mainly focused on the fields of equipment monitoring, three-dimensional visualization display, equipment status evaluation, etc., and the existing communication model, resource asset model and three-dimensional model of substation equipment have been preliminarily integrated to improve the visualization effect of three-dimensional display of equipment status. The main technical idea is to use laser point cloud and CAD drawing automatic drawing technology to establish a three-dimensional model of the equipment, add the equipment communication model and resource asset model to the graphic vector display platform, and perform related queries through the equipment ID, so as to query the real-time operation data and resource asset ledger information of the equipment through the visualization interface on the basis of the three-dimensional model, and improve the display effect of equipment status monitoring.

[0031] First of all, digital twin technology must be able to characterize the multi-dimensional attributes, actual behaviors and states of physical objects. It must not only be able to organize and present information in a graphical way, but also be able to integrate various multi-source heterogeneous knowledge systems, so as to analyze the future development trends of physical objects, and then realize the actual functional services and application needs such as monitoring, simulation, prediction and optimization of physical objects.

[0032] Secondly, the existing digital twins only realize the three-dimensional display of the equipment, and do not digitally describe the internal behavioral logic and business logic of the equipment. They cannot predict and simulate the behavior of the equipment and do not have the ability to evolve on their own.

[0033] Finally, with the construction of the new power system, the company will further increase its digital transformation. The substation equipment, as the company's core asset, will inevitably need to establish its mechanism model to realize the digitalization of all links of the power grid and the entire production process, thereby helping the company to achieve digital transformation faster.

[0034] Example 1 This solution discloses a method for constructing a twin mechanism model of substation equipment, which decomposes the existing equipment model into components, decomposes it to the chip level at the hardware level, and decomposes it to functional logic nodes at the functional level, to form a refined equipment monitoring model; secondly, it collects real-time data such as equipment chip-level operation data, logical status data of functional nodes, and business data, and establishes a driving relationship between real-time data and each component of the refined equipment monitoring model; finally, according to the internal logic and mechanism of different business functions, an equipment mechanism model driven by real-time data is established.

[0035] like Figure 1 and Figure 2As shown, a method for constructing a twin mechanism model of a substation equipment includes the following steps: S1. Decouple the equipment monitoring models of various types of substation equipment to obtain refined component models of various types of substation equipment.

[0036] Specifically, they include the following: Determine the information models of the substation equipment, and fuse the information models to obtain the substation equipment fusion model; determine the models corresponding to the primary equipment, secondary equipment and auxiliary equipment from the substation equipment fusion model; write the information of the models corresponding to the primary equipment, secondary equipment and auxiliary equipment into the corresponding preset equipment monitoring models; flatten the equipment monitoring models after the information is written, and obtain the flattened equipment monitoring models corresponding to the primary equipment, secondary equipment and auxiliary equipment; split the flattened equipment monitoring models according to components, and obtain the refined component models of the components of the primary equipment, secondary equipment and auxiliary equipment.

[0037] Specifically, determining the models corresponding to the primary equipment, the secondary equipment and the auxiliary equipment from the substation equipment fusion model includes the following specific steps: From the substation equipment fusion model, determine the CIM model, primary equipment resource asset model and primary equipment three-dimensional model corresponding to the primary equipment, as well as the secondary equipment IEC61850 communication model, secondary equipment resource asset model and secondary equipment three-dimensional model corresponding to the secondary equipment, and the auxiliary equipment IEC61850 communication model, auxiliary equipment resource asset model and auxiliary equipment three-dimensional model corresponding to the auxiliary equipment.

[0038] Specifically, the information of each model corresponding to the primary equipment, the secondary equipment and the auxiliary equipment is written into the corresponding preset equipment monitoring model, including the following specific steps: Take the physical ID contained in the primary equipment resource asset model as the unique index, associate the mRid in the CIM model with the physical ID, and write other information in the CIM model (such as data name, belonging equipment, threshold and other data attributes) into the DATA part of the preset primary equipment monitoring model; associate the equipment object index id in the primary equipment three-dimensional model with the physical ID, and write three types of information such as the geometric shape and size, material and texture, physical connection relationship and connection point of the primary equipment three-dimensional model into the 3D part of the primary equipment monitoring model; retain the primary equipment resource asset model as a whole and write it into the LEDGER part of the primary equipment monitoring model.

[0039] Using the physical ID contained in the secondary equipment resource asset model as the unique index, the IEDName in the secondary equipment IEC61850 model is associated with the physical ID, and the device connection topology, measurement point data, and communication information in the secondary equipment IEC61850 model are written into the DATA part of the preset secondary equipment monitoring model; the device object index id in the secondary equipment three-dimensional model is associated with the physical ID, and the three types of information of the geometric shape and size, material and texture, and terminal connection relationship of the secondary equipment three-dimensional model are written into the 3D part of the secondary equipment monitoring model; the secondary equipment resource asset model is retained as a whole and written into the LEDGER part of the secondary equipment monitoring model.

[0040] Taking the physical ID contained in the auxiliary equipment resource asset model as the unique index, the IEDName in the auxiliary equipment IEC61850 model is associated with the physical ID, and the device connection topology, measurement point data, and communication information in the auxiliary equipment IEC61850 model are written into the DATA part of the preset auxiliary equipment monitoring model; the device object index id in the auxiliary equipment three-dimensional model is associated with the physical ID, and the three types of information of the auxiliary equipment three-dimensional model, namely, the geometric shape and size, material and texture, and terminal connection relationship, are written into the 3D part of the auxiliary equipment monitoring model; the auxiliary equipment resource asset model is retained as a whole and written into the LEDGER part in the auxiliary equipment monitoring model.

[0041] Specifically, each device monitoring model after writing information is flattened to obtain flattened device monitoring models corresponding to the primary device, the secondary device and the auxiliary device, respectively, including the following specific steps: The primary equipment monitoring model, secondary equipment monitoring model and auxiliary equipment monitoring model after writing information are flattened according to "object name-object value-parent object" to obtain flattened primary equipment monitoring model, flattened secondary equipment monitoring model and flattened auxiliary equipment monitoring model. Flattening refers to breaking up and splitting the data in the model into key-value pair information, and adding a parent object to the key-value pair information; this parent object describes the driving relationship of the data and is used to reflect the association logic between components.

[0042] The key-value pair information corresponding to the data in the CIM model is placed in the DATA part of the primary equipment monitoring model; the key-value pair information corresponding to the data in the primary equipment resource asset model is placed in the LEDGER part of the primary equipment monitoring model; the key-value pair information corresponding to the data in the primary equipment three-dimensional model is placed in the 3D part of the primary equipment monitoring model.

[0043] The key-value pair information corresponding to the data in the secondary equipment IEC61850 communication model is placed in the DATA part of the secondary equipment monitoring model; the key-value pair information corresponding to the data in the secondary equipment resource asset model is placed in the LEDGER part of the secondary equipment monitoring model; the key-value pair information corresponding to the data in the secondary equipment three-dimensional model is placed in the 3D part of the secondary equipment monitoring model.

[0044] The key-value pair information corresponding to the data in the auxiliary equipment IEC61850 communication model is placed in the DATA part of the auxiliary equipment monitoring model; the key-value pair information corresponding to the data in the auxiliary equipment resource asset model is placed in the LEDGER part of the auxiliary equipment monitoring model; the key-value pair information corresponding to the data in the auxiliary equipment three-dimensional model is placed in the 3D part of the secondary equipment monitoring model.

[0045] Specifically, each flattened equipment monitoring model is split according to components to obtain refined component models of each component of primary equipment, secondary equipment and auxiliary equipment, including the following specific steps: The flattened primary equipment monitoring model is split according to the components contained in the primary equipment to obtain the refined component models of each component of the primary equipment; the objects corresponding to the components are placed in the refined component models corresponding to the components. Among them, the primary equipment can be split into components according to the hardware structure that constitutes the primary equipment. For example, the flattened primary equipment monitoring model of the circuit breaker equipment can be split into several component parts such as the operating mechanism, contact system, arc extinguishing chamber, insulating parts, shell frame and circuit breaker body. Each object in the flattened primary equipment monitoring model is adjusted according to the component to which it belongs, and is placed in the refined component model of the corresponding component. Optionally, when summarizing the objects into the refined component model of the corresponding component, there may be an object describing the circuit breaker as a whole that has no corresponding component. In this case, the object describing the circuit breaker as a whole is placed in the root directory of the flattened primary equipment monitoring model corresponding to the circuit breaker equipment.

[0046] First, the secondary equipment is divided into hardware and software, and then the flat secondary equipment monitoring model is split into components according to the hardware and software of the equipment; the hardware part is split into four levels: chassis, board, module, and device; the software part is split into five levels: input, processing, transmission, storage, and output. Similar to the primary equipment, the objects in the flat secondary equipment monitoring model are summarized according to the split components to form a refined component model of the secondary equipment, and the objects belonging to the secondary equipment as a whole are placed in the root directory of the flat secondary equipment monitoring model.

[0047] First, the auxiliary equipment is divided into hardware and software, and then the flat auxiliary equipment monitoring model is split into components according to the hardware and software of the equipment; the hardware part is split into four levels: chassis, board, module, and device; the software part is split into five levels: input, processing, transmission, storage, and output. Similar to the primary equipment, the objects in the flat auxiliary equipment monitoring model are summarized according to the split components to form a refined component model of the auxiliary equipment, and the objects belonging to the auxiliary equipment as a whole are placed in the root directory of the flat auxiliary equipment monitoring model.

[0048] S2. Collect the real-time operation data of various substation equipment, and add the real-time operation data as a new object to the corresponding refined component model.

[0049] Specifically, they include the following: Add a sensor circuit to the primary device; the collected data of the sensor circuit corresponds to at least an object reflecting the input and output status of the component, and the new object is added to the corresponding refined component model according to the component corresponding to the collected data of the sensor circuit; add a chip status collection interface to the secondary device and the auxiliary device respectively; obtain the collected data reflecting the chip status as a newly added object, and add it to the refined component model of the component corresponding to the collected data; in the software process of the secondary device and the auxiliary device, each component adds several objects reflecting the internal operating status of the component, and adds the newly added objects to the refined component model of the corresponding component; based on the refined component model corresponding to the hardware component after the secondary device and the auxiliary device have added objects, and the refined component model corresponding to the software component after the newly added objects, the hardware component objects involved in the software component objects are associated and bound.

[0050] Specifically, a sensor circuit is added to the primary equipment, and objects are added corresponding to the data collected by the sensor circuit, including at least objects that reflect the input and output states of the component. The added objects refer to the collected data, such as partial discharge, SF6 gas concentration, trace water content, etc. The new objects are added to the corresponding refined component models according to the components corresponding to the collected data.

[0051] Specifically, a chip status acquisition interface (software) is added to the secondary equipment and auxiliary equipment respectively, and the chip driver program is upgraded to collect chip-level operation data such as processor junction temperature, power supply output voltage / current, network chip interaction rate, storage and memory chip write / write data, internal temperature and humidity of the equipment, and equipment abnormality and fault alarm signals as new objects, and add them to the refined component models of the components corresponding to these collected data.

[0052] Specifically, in the software process of secondary equipment and auxiliary equipment, the code is upgraded according to the five components of software input, processing, transmission, storage, and output that were split earlier. Several objects that reflect the internal operating status of each component are added. These objects are function-level logical node status data, and the newly added objects are added to the refined component model of the corresponding component.

[0053] Specifically, the refined component models corresponding to the hardware components of the newly added objects of the secondary equipment and auxiliary equipment and the refined component models corresponding to the software components of the newly added objects are integrated, and the hardware component objects involved in the software component objects are associated and bound based on the software components. For example, the AD signal processing part of the software of the measurement and control device associates and binds the signal processing state of the AD software component with the operating state of the AD chip.

[0054] S3. Associatively connect the refined component models of the newly added objects to obtain the equipment mechanism model.

[0055] Specifically, they include the following: According to the functions realized by the corresponding components of the refined monitoring model, the input and output objects of the refined monitoring model are extracted as the boundary objects of the corresponding components; in combination with the functional characteristics of the components, according to the mathematical models inside the components, the components are divided into types, and the real-time data associated with the input and output objects of the components are used for fitting simulation to form mathematical models of different types of components; according to the functional logic flow of the entire equipment, the boundary objects between the components of the equipment monitoring model corresponding to the primary equipment, secondary equipment and auxiliary equipment are associated, and the driving relationship of each boundary object is defined; the refined component model containing the mathematical model and the driving relationship of the boundary object is connected according to the association relationship of the boundary objects of the component; other objects in the refined component model except the boundary objects, according to the components to which the objects belong, are used as intermediate state data reflecting the operating status of the components to form an equipment mechanism model together.

[0056] Specifically, according to the functions realized by the corresponding components of the refined monitoring model, the input and output objects of the refined monitoring model are extracted as the boundary objects of the corresponding components.

[0057] Specifically, based on the functional characteristics of the components and according to the mathematical models within the components, the components are divided into eight types: algebraic model, differential equation model, statistical model, optimization model, numerical simulation model, discrete event simulation model, system dynamics model and logical model. The real-time data associated with the component input and output objects are used for fitting simulation to form different types of mathematical models of the components.

[0058] Specifically, according to the functional logic process of the entire device, the boundary objects between the components of the device monitoring model are associated, and the driving relationship of each boundary object is defined. More specifically, it includes: the functional logic process of the device is split according to the business processing link. For example, the substation measurement and control device can be split into analog signal sampling, analog-to-digital conversion, anti-shake / dead zone processing, data processing, data caching, message generation, message sending and other logical processes; the input and output of each logical process are associated with the refined component model. For example, the voltage analog quantity in the analog signal sampling process is the input of the AC sampling board component, and the output small signal of the AC sampling board component is the output of the analog signal sampling process. The output of the analog signal sampling process is the input of the ADC chip component and the input of the analog-to-digital conversion process. The digital signal output by the ADC chip component is the output of the analog-to-digital conversion. More specifically, the functional logic process is associated with the component model. After the previous process is processed, the next process is driven to realize the driving relationship between different components.

[0059] Specifically, the refined component model containing the mathematical model and the boundary object driving relationship is connected using the flattened object attribute "parent object" according to the component boundary object association relationship. Specifically, the specific data in the boundary object of the corresponding component is associated with other components, and according to the causal relationship of the driver, the physical ID of the driver's data object is written into the parent object information of the driven data.

[0060] Specifically, objects other than boundary objects, according to the components to which the objects belong, are used as intermediate state data reflecting the operating state of the components to form the equipment mechanism model. Specifically, on the basis of the component model that forms the boundary driving relationship, the intermediate process data of eight models, including algebraic model, differential equation model, statistical model, optimization model, numerical simulation model, discrete event simulation model, system dynamics model and logic model, are added to the component model to form the equipment mechanism model.

[0061] In summary, the present invention starts from the business needs of digital twins of secondary equipment in substations, decouples through refined equipment monitoring models, collects in-depth equipment operation data, and finally uses real-time data to drive refined models, and establishes equipment mechanism models with self-evolution and endogenous logic. This solution is based on the "component + data-driven" solution, splits complex equipment into fine-grained components, and uses the input / output real-time data of the components to build a mathematical model describing the equipment. The chip-level operation data and functional node status data are used to directly reflect the real-time data at the equipment component level, and the original overall equipment data is deeply integrated into the underlying hardware and software to provide accurate fitting real-time data for component mathematical modeling. A component-level drive interconnection solution is adopted, and the components are linked through the boundary data objects of the components to form a number of collaborative modules inside the device. The modules drive each other to form an overall equipment twin modeling.

[0062] Example 2 like Figure 3 As shown, based on the same inventive concept as the above embodiment, the present invention also provides a device for constructing a twin mechanism model of a substation equipment, comprising: The component model building module is used to decouple the equipment monitoring models of various types of substation equipment to obtain refined component models of various types of substation equipment; The data association collection module is used to collect the real-time operation data of various substation equipment and add the real-time operation data as a new object to the corresponding refined component model; The mechanism model construction module is used to associate and splice the refined component models of the newly added objects to obtain the equipment mechanism model.

[0063] The component model construction module is used to specifically determine the information models of the substation equipment, and fuse the information models to obtain the substation equipment fusion model; determine the models corresponding to the primary equipment, secondary equipment and auxiliary equipment from the substation equipment fusion model; write the information of the models corresponding to the primary equipment, secondary equipment and auxiliary equipment into the corresponding preset equipment monitoring model; flatten the equipment monitoring models after the information is written, and obtain the flattened equipment monitoring models corresponding to the primary equipment, secondary equipment and auxiliary equipment; split the flattened equipment monitoring models according to the components, and obtain the refined component models of the components of the primary equipment, secondary equipment and auxiliary equipment; The data association acquisition module is specifically used to add a sensor loop to the primary device; the acquisition data of the sensor loop corresponds to at least an object reflecting the input and output status of the component, and the new object is added to the corresponding refined component model according to the component corresponding to the acquisition data of the sensor loop; the acquisition interface of the chip status is added to the secondary device and the auxiliary device respectively; the acquisition data reflecting the chip status is obtained as a newly added object, and added to the refined component model of the component corresponding to the acquisition data; in the software process of the secondary device and the auxiliary device, each component adds several objects reflecting the internal operating status of the component, and the newly added objects are added to the refined component model of the corresponding component; the refined component model corresponding to the hardware component after the secondary device and the auxiliary device have newly added objects, and the refined component model corresponding to the software component after the newly added objects, based on the software component, associates and binds the hardware component objects involved in the software component objects; The mechanism model construction module is specifically used to extract the input and output objects of the refined monitoring model as the boundary objects of the corresponding components according to the functions realized by the corresponding components of the refined monitoring model; classify the components into types according to the mathematical models inside the components in combination with the functional characteristics of the components, and use the real-time data associated with the input and output objects of the components for fitting simulation to form mathematical models of different types of components; associate the boundary objects between the components of the equipment monitoring model corresponding to the primary equipment, secondary equipment and auxiliary equipment according to the functional logic flow of the entire equipment, and define the driving relationship of each boundary object; connect the refined component model containing the mathematical model and the boundary object driving relationship according to the boundary object association relationship of the component; other objects in the refined component model except the boundary objects, according to the components to which the objects belong, are used as intermediate state data reflecting the operating status of the components to form the equipment mechanism model together.

[0064] Furthermore, in the component model building module, the models corresponding to the primary equipment, secondary equipment, and auxiliary equipment are determined from the substation equipment fusion model, including: Determine the CIM model, primary equipment resource asset model and primary equipment 3D model corresponding to the primary equipment from the substation equipment fusion model; Determine the secondary equipment IEC61850 communication model, secondary equipment resource asset model and secondary equipment three-dimensional model corresponding to the secondary equipment from the substation equipment fusion model; The auxiliary equipment IEC61850 communication model, auxiliary equipment resource asset model and auxiliary equipment three-dimensional model corresponding to the auxiliary equipment are determined from the substation equipment fusion model.

[0065] Furthermore, in the component model construction module, the models corresponding to the primary equipment, the secondary equipment and the auxiliary equipment are written into the corresponding preset equipment monitoring model, including: The physical ID contained in the primary equipment resource asset model is used as the unique index, the mRid in the CIM model is associated with the physical ID, and all other information in the CIM model is written into the DATA part of the preset primary equipment monitoring model; the equipment object index id in the primary equipment 3D model is associated with the physical ID, and the three types of information of the primary equipment 3D model, namely, the geometric shape and size, material and texture, physical connection relationship and connection point, are written into the 3D part of the primary equipment monitoring model; the primary equipment resource asset model is written as a whole into the LEDGER part of the primary equipment monitoring model; The physical ID contained in the secondary equipment resource asset model is used as the unique index, the IEDName in the secondary equipment IEC61850 model is associated with the physical ID, and the device connection topology, measurement point data, and communication information in the secondary equipment IEC61850 model are written into the DATA part of the preset secondary equipment monitoring model; the device object index id in the secondary equipment three-dimensional model is associated with the physical ID, and the three types of information of the geometric shape and size, material and texture, and terminal connection relationship of the secondary equipment three-dimensional model are written into the 3D part of the secondary equipment monitoring model; the secondary equipment resource asset model is written as a whole into the LEDGER part of the secondary equipment monitoring model; Using the physical ID contained in the auxiliary equipment resource asset model as the unique index, the IEDName in the auxiliary equipment IEC61850 model is associated with the physical ID, and the device connection topology, measurement point data, and communication information in the auxiliary equipment IEC61850 model are written into the DATA part of the preset auxiliary equipment monitoring model; the device object index id in the auxiliary equipment three-dimensional model is associated with the physical ID, and three types of information, namely the geometric shape and size, material and texture, and terminal connection relationship of the auxiliary equipment three-dimensional model, are written into the auxiliary equipment monitoring model.

[0066] Example 3 like Figure 4 As shown, the present invention also provides an electronic device 100 for implementing a method for constructing a twin mechanism model of a substation equipment according to the above embodiment; The electronic device 100 includes a memory 101 , at least one processor 102 , a computer program 103 stored in the memory 101 and executable on the at least one processor 102 , and at least one communication bus 104 .

[0067] The memory 101 can be used to store a computer program 103. The processor 102 implements the steps of a method for constructing a twin mechanism model of a substation equipment in Example 1 by running or executing the computer program stored in the memory 101 and calling data stored in the memory 101.

[0068] The memory 101 may mainly include a program storage area and a data storage area, wherein the program storage area may store an operating system, an application required for at least one function (such as a sound playback function, an image playback function, etc.), etc.; the data storage area may store data (such as audio data) created according to the use of the electronic device 100, etc. In addition, the memory 101 may include a non-volatile memory, such as a hard disk, a memory, a plug-in hard disk, a smart memory card (Smart Media Card, SMC), a secure digital (Secure Digital, SD) card, a flash card (Flash Card), at least one disk storage device, a flash memory device, or other non-volatile solid-state storage devices.

[0069] At least one processor 102 may be a central processing unit (CPU), or other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. The processor 102 may be a microprocessor or any conventional processor, etc. The processor 102 is the control center of the electronic device 100, and uses various interfaces and lines to connect various parts of the entire electronic device 100.

[0070] The memory 101 in the electronic device 100 stores a plurality of instructions to implement a method for constructing a twin mechanism model of a transformer equipment, and the processor 102 can execute the plurality of instructions to implement: Decouple the equipment monitoring models of various substation equipment to obtain refined component models of various substation equipment; Collect the real-time operation data of various substation equipment and add the real-time operation data as a new object to the corresponding refined component model; The refined component models of the newly added objects are associated and spliced ​​to obtain the equipment mechanism model.

[0071] Example 4 If the module / unit integrated in the electronic device 100 is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the present invention implements all or part of the processes in the above-mentioned embodiment method, and can also be completed by instructing the relevant hardware through a computer program. The computer program can be stored in a computer-readable storage medium, and the computer program can implement the steps of the above-mentioned method embodiments when executed by the processor. Among them, the computer program includes computer program code, and the computer program code can be in source code form, object code form, executable file or some intermediate form. Computer-readable media may include: any entity or device capable of carrying computer program code, recording medium, U disk, mobile hard disk, disk, optical disk, computer memory and read-only memory (ROM, Read-Only Memory).

[0072] It will be appreciated by those skilled in the art that embodiments of the present invention may be provided as methods, systems, or computer program products. Therefore, the present invention may take the form of a complete hardware embodiment, a complete software embodiment, or an embodiment combining software and hardware. Furthermore, the present invention may take the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code.

[0073] The present invention is described with reference to flowcharts and / or block diagrams of methods, devices (systems), and computer program products according to embodiments of the present invention. It should be understood that each process and / or block in the flowchart and / or block diagram, as well as the combination of processes and / or blocks in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to produce a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.

[0074] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture including an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.

[0075] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process in the computer or other programmable device. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.

[0076] In the description of this specification, the description with reference to the terms "one embodiment", "example", "specific example", etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described can be combined in any one or more embodiments or examples in a suitable manner.

[0077] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the above embodiments, ordinary technicians in the relevant field should understand that the specific implementation methods of the present invention can still be modified or replaced by equivalents. Any modification or equivalent replacement that does not depart from the spirit and scope of the present invention should be covered within the scope of protection of the claims of the present invention.

Claims

1. A method for constructing a twin mechanism model of a substation equipment, characterized in that: The steps include: Decouple the equipment monitoring models of various substation equipment to obtain refined component models of various substation equipment; Collect the real-time operation data of various substation equipment and add the real-time operation data as a new object to the corresponding refined component model; The refined component models of the newly added objects are associated and spliced ​​to obtain the equipment mechanism model.

2. The method for constructing a twin mechanism model of a substation equipment according to claim 1, characterized in that: Decouple the equipment monitoring models of various substation equipment to obtain refined component models of various substation equipment, including: Determine each information model of the substation equipment, and fuse each information model to obtain a fusion model of the substation equipment; Determine the models corresponding to the primary equipment, the secondary equipment and the auxiliary equipment from the substation equipment fusion model; write the information of the models corresponding to the primary equipment, the secondary equipment and the auxiliary equipment into the corresponding preset equipment monitoring model; Flatten the monitoring models of each device after the information is written, and obtain the flattened device monitoring models corresponding to the primary device, the secondary device and the auxiliary device respectively; Each flattened equipment monitoring model is split into components to obtain refined component models of each component of the primary equipment, secondary equipment and auxiliary equipment.

3. The method for constructing a twin mechanism model of a substation equipment according to claim 2, characterized in that: Collect the real-time operation data of various substation equipment and add the real-time operation data as a new object to the corresponding refined component model, including: Add a sensor loop to the primary equipment; the collected data of the sensor loop corresponds to at least an object reflecting the input and output status of the component, and the new object is added to the corresponding refined component model according to the component corresponding to the collected data of the sensor loop; Add chip status acquisition interfaces to the secondary equipment and auxiliary equipment respectively; obtain the acquisition data reflecting the chip status as a newly added object, and add it to the refined component model of the component corresponding to the acquisition data; In the software process of secondary equipment and auxiliary equipment, each component adds several objects that reflect the internal operating status of the component, and the newly added objects are added to the refined component model of the corresponding component; The refined component models corresponding to the hardware components after the secondary equipment and auxiliary equipment objects are newly added, and the refined component models corresponding to the software components after the newly added objects are added, are based on the software components, and the hardware component objects involved in the software component objects are associated and bound.

4. The method for constructing a twin mechanism model of a substation equipment according to claim 3, characterized in that: The refined component models of the newly added objects are associated and spliced ​​to obtain the equipment mechanism model, including: According to the functions realized by the corresponding components of the refined monitoring model, the input and output objects of the refined monitoring model are extracted as the boundary objects of the corresponding components; Combined with the functional characteristics of the components, the components are divided into types according to the mathematical models inside the components, and the real-time data associated with the input and output objects of the components are used for fitting simulation to form different types of mathematical models of the components; According to the functional logic flow of the entire substation equipment, the boundary objects between the components of the equipment monitoring model corresponding to the primary equipment, secondary equipment and auxiliary equipment are associated, and the driving relationship of each boundary object is defined; The refined component model containing the mathematical model and the boundary object driving relationship is connected according to the boundary object association relationship of the component; other objects in the refined component model except the boundary object, according to the component to which the object belongs, serve as intermediate state data reflecting the operating status of the component, and together form the equipment mechanism model.

5. A device for constructing a twin mechanism model of a substation equipment, characterized in that: include: The component model building module is used to decouple the equipment monitoring models of various types of substation equipment to obtain refined component models of various types of substation equipment; The data association collection module is used to collect the real-time operation data of various substation equipment and add the real-time operation data as a new object to the corresponding refined component model; The mechanism model construction module is used to associate and splice the refined component models of the newly added objects to obtain the equipment mechanism model.

6. The device for constructing a twin mechanism model of a substation equipment according to claim 5, characterized in that: Component model building blocks, specifically for: Determine each information model of the substation equipment, and fuse each information model to obtain a fusion model of the substation equipment; Determine the models corresponding to the primary equipment, the secondary equipment and the auxiliary equipment from the substation equipment fusion model; write the information of the models corresponding to the primary equipment, the secondary equipment and the auxiliary equipment into the corresponding preset equipment monitoring model; Flatten the monitoring models of each device after the information is written, and obtain the flattened device monitoring models corresponding to the primary device, the secondary device and the auxiliary device respectively; Each flattened equipment monitoring model is split into components to obtain refined component models of each component of the primary equipment, secondary equipment and auxiliary equipment.

7. The device for constructing a twin mechanism model of a substation equipment according to claim 6, characterized in that: The data association acquisition module is specifically used for: Add a sensor loop to the primary equipment; the collected data of the sensor loop corresponds to at least an object reflecting the input and output status of the component, and the new object is added to the corresponding refined component model according to the component corresponding to the collected data of the sensor loop; Add chip status acquisition interfaces to the secondary equipment and auxiliary equipment respectively; obtain the acquisition data reflecting the chip status as a newly added object, and add it to the refined component model of the component corresponding to the acquisition data; In the software process of secondary equipment and auxiliary equipment, each component adds several objects that reflect the internal operating status of the component, and the newly added objects are added to the refined component model of the corresponding component; The refined component models corresponding to the hardware components after the secondary equipment and auxiliary equipment objects are newly added, and the refined component models corresponding to the software components after the newly added objects are added, are based on the software components, and the hardware component objects involved in the software component objects are associated and bound.

8. The device for constructing a twin mechanism model of a substation equipment according to claim 7, characterized in that: Mechanistic model building modules, specifically for: According to the functions realized by the corresponding components of the refined monitoring model, the input and output objects of the refined monitoring model are extracted as the boundary objects of the corresponding components; Combined with the functional characteristics of the components, the components are divided into types according to the mathematical models inside the components, and the real-time data associated with the input and output objects of the components are used for fitting simulation to form different types of mathematical models of the components; According to the functional logic flow of the entire substation equipment, the boundary objects between the components of the equipment monitoring model corresponding to the primary equipment, secondary equipment and auxiliary equipment are associated, and the driving relationship of each boundary object is defined; The refined component model containing the mathematical model and the boundary object driving relationship is connected according to the boundary object association relationship of the component; other objects in the refined component model except the boundary object, according to the component to which the object belongs, serve as intermediate state data reflecting the operating status of the component, and together form the equipment mechanism model.

9. An electronic device, characterized in that: It comprises a processor and a memory, wherein the processor is used to execute a computer program stored in the memory to implement the method for constructing a twin mechanism model of a substation equipment as described in any one of claims 1 to 4.

10. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores at least one instruction, and when the at least one instruction is executed by the processor, the method for constructing a twin mechanism model of a substation equipment as described in any one of claims 1 to 4 is implemented.