Building equipment multi-modal data acquisition method and device
Through intelligent robots, the inspection and data collection of building equipment is solved, and the problems of data acquisition lag and error caused by incomplete sensor layout are achieved, timely fault detection and energy conservation of building equipment are achieved, and the health status and safety of equipment are improved.
Patent Information
- Application Number
- CN202411571669.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-06
- Publication Date
- 2024-12-03
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
In the case of incomplete sensor layout, existing multimodal data acquisition methods in building equipment have problems such as lag in data acquisition, large errors, large engineering volumes and difficult detection data to be recovered, resulting in equipment being often in a sub-healthy state, increasing energy waste and safety. Hidden danger.
Intelligent robots are used to inspect building equipment, collect various data characteristic values, and filter abnormal equipment through data recycling and analysis, dynamically simulate the status of pedestrians riding elevators, reduce line modification and data loss, and improve data accuracy and collection efficiency.
It realizes timely collection and analysis of building equipment data, reduces abnormal states of equipment and energy waste, and improves the accuracy of elevator equipment detection and the overall safety of the building.
Smart Images

Figure CN119067642A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of data acquisition, and in particular to a method and device for acquiring multimodal data of building equipment. Background Art
[0002] With the development of building construction, more and more high-rise buildings are emerging. However, when many buildings were built, sensors were not deployed in various locations of building equipment, resulting in time lags and low cost-effectiveness in real-time detection and diagnostic insights of building equipment failures. The equipment is often in a sub-healthy state of running with illness, resulting in energy waste and loss of equipment life. Therefore, it is necessary to conduct multimodal data collection and early warning of equipment in buildings where sensors are not fully deployed.
[0003] Prior art, such as the invention patent application with announcement number: CN112687022A, discloses a video-based intelligent building inspection method and system, the method comprising: obtaining training data from historical building videos, processing and labeling the training data, and obtaining a labeled data set; constructing a training neural network; obtaining an inspection deployment plan, the inspection deployment plan specifically includes planning inspection routes, inspection times, and formulating inspection task lists; effectively judging the relationship between the target entity area of the image and adjacent equipment, lines, and environmental scenes, thereby effectively reducing inspection errors and meeting the requirements for achieving building inspection accuracy through video.
[0004] Prior art, such as the intelligent building energy consumption monitoring system disclosed in the invention patent application with announcement number: CN116540608A, includes: an energy consumption monitoring module for monitoring and collecting consumption data of various energy sources in the building; an energy consumption monitoring platform, which is in communication connection with the energy consumption monitoring module, and is used to obtain the energy consumption data collected by the energy consumption monitoring module, and perform analysis and control based on the energy consumption data. This invention accurately and intuitively classifies and sub-items all the content and information that need to be collected and monitored for energy consumption of intelligent buildings, so as to more accurately control and monitor the energy consumption information of the building itself. The present invention is applicable to the field of energy consumption monitoring technology.
[0005] It can be seen from the above scheme that the current multimodal data collection method for building equipment usually chooses to deploy sensors or detection devices at various equipment in the building. There is a lack of attention to sensors that do not rely on initial deployment and the use of intelligent robots for automatic inspection. At the beginning of building construction, sensors or detection devices are often not deployed at various equipment in the building. After the building is built, the various equipment in the building is scattered, the lines are complex, and some building equipment is installed in places with poor signals. If sensors or detection devices are deployed, it is easy to have problems such as large engineering workload and difficulty in recovering detection data, thereby increasing the incidence of sub-health status of building equipment and increasing the power consumption of building equipment. At the same time, there is a lack of attention to the use of intelligent robots to continuously change their own weight to detect the operating status of various elevator equipment in buildings. Many building elevator equipment rely on sensors that are installed at the beginning for monitoring. As the use time increases, the detection data of these sensors will have certain deviations, resulting in data distortion, and the workload of reinstalling these sensors is large. During the operation of the elevator equipment, due to the weight changes and different weight concentration points inside the elevator, the elevator equipment is prone to abnormalities under certain specific conditions. If the actual situation is not simulated using intelligent robots, the abnormalities of the elevator equipment cannot be discovered in time, thereby reducing the safety of the elevator equipment. Summary of the invention
[0006] The purpose of the present invention is to provide a method and device for collecting multimodal data of building equipment, which solves the problems existing in the background technology.
[0007] To solve the above technical problems, the present invention adopts the following technical solutions: The first aspect of the present invention provides a multimodal data collection method for building equipment, including: Step 1. Building data collection route setting: At the target monitoring time point, start the intelligent robot to conduct equipment inspection on the building.
[0008] Step 2. Building equipment data collection: During the building inspection process, the characteristic values of various data of each device in the building are collected by intelligent robots.
[0009] The characteristic values of various data of each device belonging to the building are collected, including: Step 2.1. Lighting equipment data collection: obtain the lighting intensity of each normally-on lighting device on each floor of the building at each monitoring time point, and obtain the lighting state of each sensing lighting device on each floor of the building after the sensing signal is sent. If the lighting state of a sensing lighting device on a certain floor of the building is a lighting-on state after the sensing signal is sent, then the sensing lighting device is marked as a lighting device to be analyzed, thereby screening the lighting devices to be analyzed on each floor of the building, and obtaining the sensing on time and the lighting intensity at each monitoring time point of each lighting device to be analyzed on each floor of the building.
[0010] Step 2.2. Electrical equipment data collection: Obtain the decibel value and appearance image of each electrical equipment on each floor of the building at each monitoring time point during operation.
[0011] Step 2.3. Elevator equipment data collection: Obtain each monitoring point of each elevator equipment in the building from the local database. After the intelligent robot enters the elevator equipment in the building, obtain the horizontality, operating decibel value and lighting intensity of each monitoring point of each elevator equipment in the building during each operation process. When each elevator equipment in the building reaches the floor, obtain the elevator leveling accuracy of each elevator equipment in the building after each operation process.
[0012] Step 3. Data recovery and analysis: The characteristic values of various data of each device belonging to the building are sent to the building fault analysis terminal through the intelligent robot, and the abnormal devices belonging to the building are screened.
[0013] The screening of abnormal devices belonging to the building includes: Step 3.1. Lighting device fault analysis: screening abnormal lighting devices on each floor of the building.
[0014] Step 3.2. Electrical equipment failure analysis: Screen the abnormal electrical equipment on each floor of the building.
[0015] Step 3.3. Elevator equipment failure analysis: Screen the abnormal elevator equipment on each floor of the building.
[0016] Step 3.4. Abnormal equipment summary: Count the abnormal electrical equipment and abnormal elevator equipment belonging to the building, and summarize the abnormal electrical equipment, abnormal elevator equipment and abnormal lighting equipment belonging to the building as abnormal equipment.
[0017] Step 4. Building equipment early warning processing: Obtain the serial number of each abnormal device belonging to the building from the local database, and send the serial number of each abnormal device belonging to the building to the person in charge of the building equipment.
[0018] A second aspect of the present invention provides a building equipment multimodal data acquisition device, which stores one or more programs. The one or more programs can be executed by one or more processors to implement the steps in a building equipment multimodal data acquisition method as described.
[0019] The beneficial effects of the present invention are:
[0020] (1) Step 1 of the present invention is to set up a building data collection route. By setting up a data collection route for an intelligent robot, it is ensured that the characteristic values of various data of various equipment belonging to the building can be collected. At the same time, the use of an intelligent robot can reduce the modification of the entire building line. In addition, when the signal is poor, the data can be first saved in the intelligent robot terminal, and then sent to the building fault analysis terminal when the signal is good. This avoids the problem of large engineering workload and reduces the problem of difficulty in data recovery. In addition, by using an intelligent robot to dynamically simulate the state of pedestrians taking an elevator, the accuracy of the detection data of the building elevator equipment is ensured.
[0021] (2) Step 2 of the present invention collects building equipment data, which is convenient for subsequent analysis by obtaining the characteristic values of various data of various equipment belonging to the building.
[0022] (3) Step 3 of the present invention is data recovery and analysis. By performing intelligent fault analysis on each device in the building, abnormal devices in the building are screened out. When the devices in the building are likely to enter a sub-healthy state, early warning is given in a timely manner, thereby ensuring that each device in the building is in a healthy state and reducing power consumption of the equipment in an abnormal state.
[0023] (4) Step 4 of the present invention is to perform early warning processing on building equipment. By issuing early warnings to the person in charge of building equipment, it is ensured that the person in charge of building equipment can send people to perform equipment maintenance in a timely manner, thereby reducing the incidence of sub-health conditions of building equipment and thus reducing the overall power consumption of the building. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0025] Figure 1 It is a schematic diagram of the method flow of the present invention. DETAILED DESCRIPTION
[0026] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0027] Reference Figure 1As shown, the first aspect of the present invention provides a multimodal data collection method for building equipment, including: Step 1. Building data collection route setting: at the target monitoring time point, start the intelligent robot to inspect the equipment in the building.
[0028] In a specific embodiment of the present invention, the intelligent robot is started to conduct equipment inspection on the building, and its specific inspection method is: obtaining from the local database the inspection route of each floor of the building, the inspection order of each floor, the weight gain of the carried objects of the intelligent robot after the inspection of each floor of the building, and the target elevator that the intelligent robot takes after the inspection of each floor of the building.
[0029] The intelligent robot starts its inspection from the first floor in the inspection order of the building, and monitors the lighting equipment and power equipment on the corresponding floor according to the inspection route of the first floor in the inspection order of the building.
[0030] After completing the inspection of the lowest floor of the building, the intelligent robot is controlled to go to the luggage storage area on the lowest floor of the building, the weight value of the intelligent robot's luggage is adjusted to the increased weight value of the intelligent robot's luggage after the inspection of the lowest floor of the building, and the intelligent robot is controlled to go to the target elevator after the inspection of the lowest floor of the building is completed, and take the target elevator to inspect each floor of the building in sequence according to the inspection order until the inspection of each floor of the building is completed.
[0031] It should be noted that the various equipment include: various lighting equipment, various electrical equipment and various elevators.
[0032] It should be noted that the lighting devices include: induction lighting devices and normally-on lighting devices.
[0033] It should be noted that the objects carried by the intelligent robot are metal objects, which are used to increase the overall weight of the intelligent robot and simulate multiple people taking the elevator.
[0034] It should be noted that after entering the elevator equipment, the intelligent robot will move among the monitoring points of the elevator equipment.
[0035] It should be noted that if the building has 30 floors and 3 elevators, and the serial numbers of the 3 elevators are 1, 2, and 3 respectively, the inspection order of each floor is: 1st floor, 30th floor, 2nd floor, 29th floor, ..., 15th floor, 16th floor. When the inspection of the 1st floor is completed, take the elevator with serial number 1 to the 30th floor. When the inspection of the 30th floor is completed, take the elevator with serial number 2 to the 2nd floor. When the inspection of the 2nd floor is completed, take the elevator with serial number 3 to the 29th floor. When the inspection of the 29th floor is completed, take the elevator with serial number 1 to the 3rd floor, and so on, until all 30 floors of the building are inspected, at which time each elevator is taken ten times, and the number of operating processes is ten times.
[0036] It should also be noted that the local database is used to store the inspection routes of each floor of the building, the inspection order of each floor, the weight gain of the intelligent robot's carry-on after the inspection of each floor of the building is completed, the target elevator that the intelligent robot takes after the inspection of each floor of the building is completed, the lighting intensity threshold, the allowed waiting time, the monitoring points of each elevator equipment in the building, the initial lighting intensity of each normally open lighting device on each floor of the building, the lighting fault coefficient threshold, the comprehensive fault coefficient threshold, the initial sensing turn-on time of each lighting device to be analyzed on each floor of the building, the initial decibel value of each electrical equipment on each floor of the building during operation, the electrical abnormality coefficient threshold, the initial elevator leveling accuracy of each elevator equipment in the building, the allowable elevator leveling accuracy deviation value corresponding to each weight value interval of the intelligent robot's carry-on, the wear abnormality coefficient threshold, the initial levelness of each elevator equipment in the building, the initial operation decibel value and initial lighting intensity, the allowable levelness deviation value corresponding to each weight value interval of the intelligent robot's carry-on, and the serial number of each abnormal equipment in the building.
[0037] Step 1 of the present invention is to set the building data collection route. By setting the data collection route for the intelligent robot, it is ensured that the characteristic values of various data of various equipment belonging to the building can be collected. At the same time, the use of the intelligent robot can reduce the modification of the overall line of the building. In places where the signal is poor, the data can be saved in the intelligent robot terminal first, and then the data can be sent to the building fault analysis terminal when the signal is good. While avoiding the problem of large engineering workload, the problem of difficulty in data recovery is reduced. In addition, by using the intelligent robot to dynamically simulate the state of pedestrians taking the elevator, the accuracy of the detection data of the building elevator equipment is guaranteed.
[0038] Step 2. Building equipment data collection: During the building inspection process, the characteristic values of various data of each device in the building are collected by intelligent robots.
[0039] In a specific embodiment of the present invention, the characteristic values of various data of each device belonging to the building are collected, including: Step 2.1. Lighting equipment data collection: obtain the lighting intensity of each normally-on lighting device on each floor of the building at each monitoring time point, and obtain the lighting state of each sensing lighting device on each floor of the building after the sensing signal is sent. If the lighting state of a sensing lighting device on a certain floor of the building is a lighting-on state after the sensing signal is sent, the sensing lighting device is marked as a lighting device to be analyzed, thereby screening the lighting devices to be analyzed on each floor of the building, and obtaining the sensing-on time and lighting intensity at each monitoring time point of each lighting device to be analyzed on each floor of the building.
[0040] In a specific embodiment, the lighting intensity of each normally-on lighting device on each floor of the building at each monitoring time point is obtained by a specific method: the lighting intensity of each normally-on lighting device on each floor of the building at each monitoring time point is obtained by a illuminance meter carried by the intelligent robot.
[0041] In a specific embodiment, the lighting status of each sensing lighting device on each floor of the building after the sensing signal is sent is obtained by the following specific method: after the intelligent robot sends a sensing signal to a sensing lighting device on a floor of the building, the illuminance meter carried by the intelligent robot is aimed at the sensing lighting device on the floor of the building to obtain the lighting intensity of the sensing lighting device on the floor of the building, and the lighting intensity threshold and the allowed waiting time are obtained from the local database. If the lighting intensity of the sensing lighting device on the floor of the building is lower than the lighting intensity threshold within the allowed waiting time, the lighting status of the sensing lighting device on the floor of the building after the sensing signal is sent is the lighting-off state; otherwise, the lighting status of the sensing lighting device on the floor of the building after the sensing signal is sent is the lighting-on state, thereby obtaining the lighting status of each sensing lighting device on each floor of the building after the sensing signal is sent.
[0042] It should be noted that the lighting state includes: a lighting off state and a lighting on state.
[0043] In a specific embodiment, the sensing on time of each lighting device to be analyzed on each floor of the building and the lighting intensity at each monitoring time point are obtained by the following specific method: the lighting intensity of each lighting device to be analyzed on each floor of the building is obtained at each monitoring time point through the illuminance meter carried by the intelligent robot, and the time point when the lighting intensity of a lighting device to be analyzed on a certain floor of the building is higher than the lighting intensity threshold for the first time within the allowed waiting time is used as the target time point to be analyzed, and the time point between the time point when the intelligent robot sends a sensing signal to the lighting device to be analyzed on the floor of the building and the target time point is used as the sensing on time, thereby obtaining the sensing on time of each lighting device to be analyzed on each floor of the building.
[0044] Step 2.2. Electrical equipment data collection: Obtain the decibel value and appearance image of each electrical equipment on each floor of the building at each monitoring time point during operation.
[0045] In a specific embodiment, the decibel value and appearance image of each electrical device on each floor of the building at each monitoring time point during operation are obtained by a specific method: the decibel value of each electrical device on each floor of the building at each monitoring time point during operation is obtained by a noise decibel detector carried by an intelligent robot, and the appearance image of each electrical device on each floor of the building at each monitoring time point during operation is obtained by a camera carried by the intelligent robot.
[0046] Step 2.3. Elevator equipment data collection: Obtain each monitoring point of each elevator equipment in the building from the local database. After the intelligent robot enters the elevator equipment in the building, obtain the horizontality, operating decibel value and lighting intensity of each monitoring point of each elevator equipment in the building during each operation process. When each elevator equipment in the building reaches the floor, obtain the elevator leveling accuracy of each elevator equipment in the building after each operation process.
[0047] In a specific embodiment, the horizontality, operating decibel value and lighting intensity of each monitoring point of each elevator equipment belonging to the building during each operation are obtained by a specific method: the horizontality of each monitoring point of each elevator equipment belonging to the building during each operation is obtained by a gyro sextant carried by the robot, the operating decibel value of each monitoring point of each elevator equipment belonging to the building during each operation is obtained by a noise decibel detector carried by the robot, and the lighting intensity of each monitoring point of each elevator equipment belonging to the building during each operation is obtained by a illuminometer carried by the robot.
[0048] In a specific embodiment, the method for obtaining the elevator leveling accuracy of each elevator device belonging to a building after each operation process is as follows: using a laser rangefinder carried by an intelligent robot to obtain the height difference between the elevator and the floor when each elevator device belonging to the building arrives, and using existing elevator leveling accuracy measurement technology to obtain the elevator leveling accuracy of each elevator device belonging to the building after each operation process.
[0049] Step 2 of the present invention collects building equipment data, which is convenient for subsequent analysis by obtaining the characteristic values of various data of various equipment belonging to the building.
[0050] Step 3. Data recovery and analysis: The characteristic values of various data of each device belonging to the building are sent to the building fault analysis terminal through the intelligent robot, and the abnormal devices belonging to the building are screened.
[0051] In a specific embodiment of the present invention, the screening of abnormal devices belonging to a building includes: Step 3.1. Lighting device fault analysis: screening abnormal lighting devices on each floor of the building.
[0052] Step 3.2. Electrical equipment failure analysis: Screen the abnormal electrical equipment on each floor of the building.
[0053] Step 3.3. Elevator equipment failure analysis: Screen the abnormal elevator equipment on each floor of the building.
[0054] Step 3.4. Abnormal equipment summary: Count the abnormal electrical equipment and abnormal elevator equipment belonging to the building, and summarize the abnormal electrical equipment, abnormal elevator equipment and abnormal lighting equipment belonging to the building as abnormal equipment.
[0055] In a specific embodiment of the present invention, the specific analysis method for screening each abnormal lighting device on each floor of the building is as follows: obtaining the initial lighting intensity of each normally-on lighting device on each floor of the building from the local database , where i represents the number of each floor, , j is a positive integer greater than 2, n represents the number of each normally open lighting device, , m is a positive integer greater than 2.
[0056] According to the lighting intensity of each normally open lighting device on each floor of the building at each monitoring time point , where x represents the number of each monitoring time point, , y is a positive integer greater than 2, and the lighting failure coefficient of each normally open lighting device on each floor of the building is analyzed .
[0057] According to the sensing on time of each lighting device to be analyzed on each floor of the building and the lighting intensity at each monitoring time point, the comprehensive failure coefficient of each lighting device to be analyzed on each floor of the building is analyzed.
[0058] If the lighting state of a certain induction lighting device on a certain floor of a building is a lighting-off state after a sensing signal is sent, the induction lighting device is marked as an abnormal lighting device.
[0059] A lighting failure coefficient threshold is obtained from a local database. If the lighting failure coefficient of a normally-on lighting device on a certain floor of the building is greater than the lighting failure coefficient threshold, the normally-on lighting device is marked as an abnormal lighting device.
[0060] A comprehensive fault coefficient threshold is obtained from a local database. If the comprehensive fault coefficient of a certain induction lighting device on a certain floor of a building is greater than the comprehensive fault coefficient threshold, the induction lighting device is marked as an abnormal lighting device.
[0061] Summarize the abnormal lighting equipment on each floor of the building.
[0062] In a specific embodiment of the present invention, the comprehensive failure coefficient of each lighting device to be analyzed on each floor of the building is analyzed, and the specific analysis method is: obtaining the initial sensing opening time of each lighting device to be analyzed on each floor of the building from the local database .
[0063] Based on the sensing opening time of each lighting device to be analyzed on each floor of the building , analyze the induction fault coefficient of each lighting device to be analyzed on each floor of the building , where e is a natural constant.
[0064] According to the method of analyzing the lighting failure coefficient of each normally open lighting device on each floor of the building, the lighting failure coefficient of each lighting device to be analyzed on each floor of the building is analyzed in the same way. .
[0065] Analyze the comprehensive failure coefficient of each lighting device to be analyzed on each floor of the building .
[0066] In a specific embodiment of the present invention, the specific screening method for screening abnormal electrical equipment on each floor of the building is as follows: obtaining the initial decibel value of each electrical equipment on each floor of the building when it is running from the local database , where r represents the number of each electrical equipment, , s is a positive integer greater than 2.
[0067] Based on the decibel values of each electrical equipment on each floor of the building at each monitoring time point during operation , where t represents the number of each monitoring time point during the operation of the electrical equipment, , k is a positive integer greater than 2, calculate the noise anomaly coefficient of each electrical equipment on each floor of the building .
[0068] According to the appearance images of each electrical device on each floor of the building at each monitoring time point during operation, the grayscale value of each pixel of the appearance images of each electrical device on each floor of the building at each monitoring time point during operation is obtained through grayscale transformation. , where u represents the number of each pixel, , w is a positive integer greater than 2, calculate the abnormal vibration coefficient of each electrical equipment on each floor of the building , where k represents the number of monitoring time points during the operation of the electrical equipment.
[0069] Calculate the electrical anomaly coefficient of each electrical device on each floor of the building .
[0070] The electrical anomaly coefficient threshold is obtained from the local database. If the electrical anomaly coefficient of an electrical device on a certain floor of the building is greater than the electrical anomaly coefficient threshold, the electrical device is marked as an abnormal electrical device, thereby screening the abnormal electrical devices on each floor of the building.
[0071] In a specific embodiment of the present invention, the specific screening method for screening abnormal elevator equipment on each floor of a building is: obtaining the weight value of the object carried by the intelligent robot during each operation of each elevator equipment in the building from the intelligent robot terminal.
[0072] Analyze the abnormal operation coefficient of each elevator equipment in the building according to the levelness, operation decibel value and lighting intensity of each monitoring point during each operation of each elevator equipment in the building , where N represents the number of each elevator equipment, , M is a positive integer greater than 2.
[0073] Get the initial elevator leveling accuracy of each elevator device in the building from the local database , the allowable elevator leveling accuracy deviation value corresponding to each weight value interval of the object carried by the intelligent robot, and the allowable elevator leveling accuracy deviation value of each elevator equipment in the building after each operation process is mapped , where K represents the number of each running process, , L is a positive integer greater than 2.
[0074] According to the elevator leveling accuracy of each elevator equipment in the building after each operation process , calculate the hovering abnormality coefficient of each elevator equipment in the building .
[0075] Calculate the wear and tear coefficient of each elevator equipment in the building .
[0076] The wear abnormality coefficient threshold is obtained from the local database. If the wear abnormality coefficient of an elevator device in the building is greater than the wear abnormality coefficient threshold, the elevator device is marked as an abnormal elevator device, thereby screening the abnormal elevator devices on each floor of the building.
[0077] In a specific embodiment of the present invention, the operation abnormality coefficient of each elevator device in the building is analyzed, and the specific analysis method is: obtaining the initial levelness of each elevator device in the building from the local database , Initial operation decibel value and the initial illumination intensity , the allowable horizontality deviation value corresponding to each weight value range of the object carried by the intelligent robot.
[0078] According to the weight value of the objects carried by the intelligent robot during each operation of each elevator equipment in the building, the allowable horizontal deviation value of each elevator equipment in the building during each operation is mapped. .
[0079] According to the levelness of each monitoring point of each elevator equipment in the building during each operation , Operation decibel value and lighting intensity , where P represents the number of each monitoring point, , Q is a positive integer greater than 2, and the abnormal operation coefficient of each elevator equipment in the building is analyzed .
[0080] Step 3 of the present invention is data recovery and analysis. By performing intelligent fault analysis on each device belonging to the building, abnormal devices belonging to the building are screened out, and timely warnings are issued when each device belonging to the building is likely to enter a sub-healthy state, thereby ensuring that each device in the building is in a healthy state and reducing power consumption of the equipment in an abnormal state.
[0081] Step 4. Building equipment early warning processing: Obtain the serial number of each abnormal device belonging to the building from the local database, and send the serial number of each abnormal device belonging to the building to the person in charge of the building equipment.
[0082] Step 4 of the present invention is to process early warnings for building equipment, thereby ensuring that the person in charge of building equipment can send people to perform equipment maintenance in a timely manner, reduce the incidence of sub-health conditions of building equipment, and thus reduce the overall power consumption of the building.
[0083] A second aspect of the present invention provides a building equipment multimodal data acquisition device, which stores one or more programs. The one or more programs can be executed by one or more processors to implement the steps in a building equipment multimodal data acquisition method as described.
[0084] The above contents are merely examples and explanations of the concept of the present invention. Those skilled in the art may make various modifications or additions to the specific embodiments described or replace them in a similar manner. As long as they do not deviate from the concept of the invention or exceed the scope defined by the present invention, they shall all fall within the protection scope of the present invention.
Claims
1. A multimodal data collection method for building equipment, characterized in that: include: Step 1. Setting the building data collection route: At the target monitoring time point, start the intelligent robot to inspect the equipment in the building; The intelligent robot is started to inspect the equipment in the building, and the specific inspection method is as follows: Obtain from the local database the inspection routes of each floor of the building, the inspection order of each floor, the weight gain of the objects carried by the intelligent robot after the inspection of each floor of the building, and the target elevator that the intelligent robot takes after the inspection of each floor of the building; The intelligent robot starts the inspection from the first floor in the inspection order of the building, and monitors the lighting equipment and power equipment on the corresponding floor according to the inspection route of the first floor in the inspection order of the building; After completing the inspection of the lowest floor of the building, the intelligent robot is controlled to go to the carrying pile on the lowest floor of the building, the weight value of the carrying object of the intelligent robot is adjusted to the weight increase value of the carrying object of the intelligent robot after the inspection of the lowest floor of the building is completed, and the intelligent robot is controlled to go to the target elevator after the inspection of the lowest floor of the building is completed, and take the target elevator to inspect each floor of the building in sequence according to the inspection order until the inspection of each floor of the building is completed; Step 2. Building equipment data collection: During the building inspection process, the intelligent robot collects the characteristic values of various data of each device in the building; Step 3. Data recovery analysis: The intelligent robot sends the characteristic values of various data of each device in the building to the building fault analysis terminal, and screens the abnormal devices in the building; Step 4. Building equipment early warning processing: obtain the serial number of each abnormal device belonging to the building from the local database, and send the serial number of each abnormal device belonging to the building to the person in charge of the building equipment.
2. A building equipment multimodal data collection method according to claim 1, characterized in that: The collecting of characteristic values of various data of various equipment belonging to the building includes: Step 2.
1. Lighting equipment data collection: obtain the lighting intensity of each normally-on lighting device on each floor of the building at each monitoring time point, and obtain the lighting state of each sensing lighting device on each floor of the building after the sensing signal is sent. If the lighting state of a sensing lighting device on a certain floor of the building is the lighting-on state after the sensing signal is sent, then mark the sensing lighting device as the lighting device to be analyzed, so as to screen the lighting devices to be analyzed on each floor of the building, and obtain the sensing-on time and lighting intensity at each monitoring time point of each lighting device to be analyzed on each floor of the building; Step 2.
2. Electrical equipment data collection: obtain the decibel value and appearance image of each electrical equipment on each floor of the building at each monitoring time point during operation; Step 2.
3. Elevator equipment data collection: Obtain each monitoring point of each elevator equipment in the building from the local database. After the intelligent robot enters the elevator equipment in the building, obtain the horizontality, operating decibel value and lighting intensity of each monitoring point of each elevator equipment in the building during each operation process. When each elevator equipment in the building reaches the floor, obtain the elevator leveling accuracy of each elevator equipment in the building after each operation process.
3. A building equipment multimodal data collection method according to claim 2, characterized in that: The screening of abnormal equipment belonging to the building includes: Step 3.
1. Lighting equipment fault analysis: Screen the abnormal lighting equipment on each floor of the building; Step 3.
2. Electrical equipment failure analysis: Screen the abnormal electrical equipment on each floor of the building; Step 3.
3. Elevator equipment failure analysis: Screen the abnormal elevator equipment on each floor of the building; Step 3.
4. Abnormal equipment summary: Count the abnormal electrical equipment and abnormal elevator equipment belonging to the building, and summarize the abnormal electrical equipment, abnormal elevator equipment and abnormal lighting equipment belonging to the building as abnormal equipment.
4. A building equipment multimodal data collection method according to claim 3, characterized in that: The specific analysis method for screening abnormal lighting equipment on each floor of the building is as follows: Get the initial lighting intensity of each normally-on lighting device on each floor of the building from the local database , where i represents the number of each floor, , j is a positive integer greater than 2, n represents the number of each normally open lighting device, , m is a positive integer greater than 2; According to the lighting intensity of each normally open lighting device on each floor of the building at each monitoring time point , where x represents the number of each monitoring time point, , y is a positive integer greater than 2, and the lighting failure coefficient of each normally open lighting device on each floor of the building is analyzed ; Analyze the comprehensive failure coefficient of each lighting device to be analyzed on each floor of the building according to the sensing opening time of each lighting device to be analyzed on each floor of the building and the lighting intensity at each monitoring time point; If the lighting state of a certain induction lighting device on a certain floor of the building is in the lighting off state after the induction signal is sent, the induction lighting device is marked as an abnormal lighting device; Obtain a lighting fault coefficient threshold from a local database, and if the lighting fault coefficient of a normally-on lighting device on a certain floor of the building is greater than the lighting fault coefficient threshold, mark the normally-on lighting device as an abnormal lighting device; Obtain a comprehensive fault coefficient threshold from a local database, and if the comprehensive fault coefficient of a certain induction lighting device on a certain floor of the building is greater than the comprehensive fault coefficient threshold, mark the induction lighting device as an abnormal lighting device; Summarize the abnormal lighting equipment on each floor of the building.
5. A building equipment multimodal data collection method according to claim 4, characterized in that: The specific analysis method of the comprehensive failure coefficient of each lighting device to be analyzed on each floor of the analyzed building is as follows: Obtain the initial sensing opening time of each lighting device to be analyzed on each floor of the building from the local database ; Based on the sensing opening time of each lighting device to be analyzed on each floor of the building , analyze the induction fault coefficient of each lighting device to be analyzed on each floor of the building , where e is a natural constant; According to the method of analyzing the lighting failure coefficient of each normally open lighting device on each floor of the building, the lighting failure coefficient of each lighting device to be analyzed on each floor of the building is analyzed in the same way. ; Analyze the comprehensive failure coefficient of each lighting device to be analyzed on each floor of the building .
6. A building equipment multimodal data collection method according to claim 5, characterized in that: The specific screening method for screening abnormal electrical equipment on each floor of the building is as follows: Get the initial decibel value of each electrical device on each floor of the building from the local database during operation , where r represents the number of each electrical equipment, , s is a positive integer greater than 2; Based on the decibel values of each electrical equipment on each floor of the building at each monitoring time point during operation , where t represents the number of each monitoring time point during the operation of the electrical equipment, , k is a positive integer greater than 2, calculate the noise anomaly coefficient of each electrical equipment on each floor of the building ; According to the appearance images of each electrical device on each floor of the building at each monitoring time point during operation, the grayscale value of each pixel of the appearance images of each electrical device on each floor of the building at each monitoring time point during operation is obtained through grayscale transformation. , where u represents the number of each pixel, , w is a positive integer greater than 2, calculate the abnormal vibration coefficient of each electrical equipment on each floor of the building , where k represents the number of monitoring time points of the electrical equipment during operation; Calculate the electrical anomaly coefficient of each electrical device on each floor of the building ; The electrical anomaly coefficient threshold is obtained from the local database. If the electrical anomaly coefficient of an electrical device on a certain floor of the building is greater than the electrical anomaly coefficient threshold, the electrical device is marked as an abnormal electrical device, thereby screening the abnormal electrical devices on each floor of the building.
7. A building equipment multimodal data collection method according to claim 6, characterized in that: The specific screening method for screening abnormal elevator equipment on each floor of the building is as follows: Obtain the weight value of the objects carried by the intelligent robot during each operation of each elevator equipment in the building from the intelligent robot terminal; Analyze the abnormal operation coefficient of each elevator equipment in the building according to the levelness, operation decibel value and lighting intensity of each monitoring point during each operation of each elevator equipment in the building , where N represents the number of each elevator equipment, , M is a positive integer greater than 2; Get the initial elevator leveling accuracy of each elevator device in the building from the local database , the allowable elevator leveling accuracy deviation value corresponding to each weight value interval of the object carried by the intelligent robot, and the allowable elevator leveling accuracy deviation value of each elevator equipment in the building after each operation process is mapped , where K represents the number of each running process, , L is a positive integer greater than 2; According to the elevator leveling accuracy of each elevator equipment in the building after each operation process , calculate the hovering abnormality coefficient of each elevator equipment in the building ; Calculate the wear and tear coefficient of each elevator equipment in the building ; The wear abnormality coefficient threshold is obtained from the local database. If the wear abnormality coefficient of an elevator device in the building is greater than the wear abnormality coefficient threshold, the elevator device is marked as an abnormal elevator device, thereby screening the abnormal elevator devices on each floor of the building.
8. A building equipment multimodal data collection method according to claim 7, characterized in that: The specific analysis method for analyzing the abnormal operation coefficient of each elevator equipment in the building is as follows: Get the initial level of each elevator equipment in the building from the local database , Initial operation decibel value and the initial illumination intensity , the allowable horizontal deviation value corresponding to each weight value interval of the object carried by the intelligent robot; According to the weight value of the objects carried by the intelligent robot during each operation of each elevator equipment in the building, the allowable horizontal deviation value of each elevator equipment in the building during each operation is mapped. ; According to the levelness of each monitoring point of each elevator equipment in the building during each operation , Operation decibel value and lighting intensity , where P represents the number of each monitoring point, , Q is a positive integer greater than 2, and the abnormal operation coefficient of each elevator equipment in the building is analyzed .
9. A multimodal data acquisition device for building equipment, characterized in that: The building equipment multimodal data acquisition device stores one or more programs, and the one or more programs can be executed by one or more processors to implement the steps in a building equipment multimodal data acquisition method as described in any one of claims 1-8.
Citation Information
Patent Citations
Video-based intelligent building inspection method and system
CN112687022A
Intelligent building energy consumption monitoring system
CN116540608A
Novel operation robot in building environments
CN104843103A
Fire-fighting and rescue robot system and control method
CN106334283A
Utility tunnel inspection system based on robot and interactive system
CN108356818A
Cited By
Building equipment operation state monitoring system and method
CN121050339A
