By setting holes on the palm surface of the tunnel to extend the wind and water electric pipeline, the problem of waste of power supply and water supply resources of equipment at the exit end is solved, and the safety of tunnel outflow construction and efficient utilization of resources are achieved.
Patent Information
- Application Number
- CN202411241052.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-05
- Publication Date
- 2024-12-06
AI Technical Summary
In the existing tunnel construction technology, large-scale water, air and power supply equipment need to be installed at the exit, resulting in waste of resources and occupying operating space.
The piercing holes are made on the palm surface of the tunnel, extending the wind and water electric pipelines in the tunnel to the outside of the tunnel, and providing operating equipment at the end of the tunnel, avoiding the installation of additional water, air and power supply equipment.
It effectively avoids the waste of resources and space occupation of additional equipment, ensuring the construction safety and stability of the hole exit.
Smart Images

Figure CN119084009A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of tunnel construction, in particular to a safe construction method for tunnel exit construction. Background Art
[0002] Before entering or exiting a mountain tunnel, drainage and temporary support work is usually done on the top slope of the tunnel portal to ensure the stability of the top slope of the tunnel portal. Temporary protection of the slope is generally carried out in the form of anchor net spraying, that is, mortar anchor rods are immediately applied after the excavation of the slope, steel mesh is laid and concrete is sprayed to prevent the slope from becoming unstable due to rain erosion.
[0003] The equipment for concrete spraying requires high-power air compressors, water pumps and transformers to continuously provide wind, water and electricity. Shorter tunnels are usually excavated in one direction, and high-power air compressors, water pumps and transformers are usually installed at the entrance. As the tunnel body continues to be excavated, the supply pipelines of wind, water and electricity are also lengthened and followed.
[0004] When the tunnel body is continuously excavated and approaches the exit, considering the stability of the side slope at the top of the tunnel portal at the exit, it is generally chosen to add a set of wind, water and electric power supply equipment at the exit to provide temporary side slope protection before opening the tunnel.
[0005] Large-scale water supply, air supply, and power supply equipment require a large amount of money to purchase and install, and require a certain amount of space on site to place them, consuming a lot of manpower and material resources and occupying limited working space, resulting in serious waste of resources. Summary of the invention
[0006] The purpose of the present invention is to overcome the defects of the prior art and provide a safe construction method for tunnel exit construction. By drilling holes on the heading face, the Feng Shui and electric pipelines in the tunnel are extended to the outside of the tunnel. The Feng Shui and electric pipelines are used to supply water, air and electricity to the operating equipment set up at the exit end, so as to avoid the installation of additional water supply, air supply and power supply equipment.
[0007] The technical solution to achieve the above purpose is a safe construction method for tunnel exit construction, wherein Fengshui electric pipelines are laid in the tunnel, and the construction method comprises the following steps:
[0008] Excavating the tunnel until the tunnel face approaches the tunnel exit;
[0009] A drilling hole is opened on the tunnel face, wherein the drilling hole is connected to the outside of the tunnel;
[0010] Pass the Fengshui electric pipeline through the penetration hole and extend it to the outside of the tunnel, and the part of the Fengshui electric pipeline extending outside the tunnel is connected with operating equipment;
[0011] Starting the operating equipment, and reinforcing the operating equipment at the exit end;
[0012] After the reinforcement is completed, the exit end is opened to connect the tunnel.
[0013] Furthermore, the operating equipment includes an operating vehicle, and concrete is sprayed at the exit end by the operating vehicle to support the exit end.
[0014] Furthermore, before the working vehicle sprays concrete, a steel mesh is laid at the exit end.
[0015] Furthermore, when the drilling hole is opened, a drilling device is provided, and the tunnel face is drilled by the drilling device to form the drilling hole.
[0016] Furthermore, the diameter of the penetration hole is matched with the diameter of the Feng Shui electric pipeline.
[0017] Furthermore, a plurality of steps are formed on the palm face, and the through hole is provided on the topmost step.
[0018] Compared with the prior art, the present invention has the following beneficial effects:
[0019] By drilling holes on the heading face, the Feng Shui and electric pipelines in the tunnel can be extended outside the tunnel. Water, air and electricity can be supplied to the operating equipment at the exit end through the Feng Shui and electric pipelines to avoid the installation of additional water supply, air supply and power supply equipment. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 This is a rendering of the effect of using a safe construction method for tunnel exit construction.
[0021] Figure 2 The figure is an overall structural diagram of a safe construction method for tunnel exit construction.
[0022] Legend: 1. Drilling hole; 2. Tunnel; 3. Stairs; 4. Feng Shui electric pipeline; 5. Work vehicle. DETAILED DESCRIPTION
[0023] The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments.
[0024] See also Figure 1 and Figure 2A safe construction method for tunnel exit construction, wherein a Feng Shui electric pipeline 4 is laid in the tunnel 2, and the construction method comprises the following steps: excavating the tunnel 2 until the tunnel face of the tunnel 2 is close to the tunnel exit end of the tunnel 2; opening a drilling hole 1 on the tunnel face of the tunnel 2, and the drilling hole 1 is connected to the outside of the tunnel 2; passing the Feng Shui electric pipeline 4 through the drilling hole 1 and extending it to the outside of the tunnel 2, and the part of the Feng Shui electric pipeline 4 extending outside the tunnel 2 is connected to an operating equipment; starting the operating equipment, and the operating equipment is reinforced at the tunnel exit end; after the reinforcement is completed, opening the tunnel exit end to connect with the tunnel 2.
[0025] In the present invention, a preferred implementation is: when excavating a tunnel 2 at a single end, a Feng Shui electric pipeline 4 is laid in the tunnel 2, and when excavating to the exit end near the tunnel 2, a penetration hole 1 is opened on the heading face at the light and dark interface of the tunnel 2, and the diameter of the penetration hole 1 is 60 cm to facilitate the passage of the Feng Shui electric pipeline 4, and the Feng Shui, electricity and other power pipelines in the tunnel 2 are connected through this small hole to the exit end of the tunnel to provide power for the spraying concrete operation equipment, thereby providing temporary support for the side slope of the shotcrete operation at the end of the tunnel, preventing surface water from eroding the top slope of the tunnel portal, and ensuring the safety of exiting the tunnel.
[0026] Furthermore, the operation equipment includes an operation vehicle 5, and concrete is sprayed at the exit end of the tunnel to support the exit end of the tunnel. Preferably, the operation vehicle 5 includes a high-power air compressor, a water pump and a transformer.
[0027] Furthermore, before the working vehicle 5 sprays concrete, a steel mesh is laid at the exit end.
[0028] Furthermore, reinforcement of the tunnel end includes: applying mortar anchor rods, laying steel mesh, and spraying concrete to prevent slope instability caused by rain erosion.
[0029] Furthermore, when the drilling hole 1 is opened, a drilling device is provided, and the tunnel face is drilled by the drilling device to form the drilling hole 1.
[0030] Furthermore, the diameter of the penetration hole 1 is matched with the diameter of the Feng Shui electric pipeline 4 .
[0031] Furthermore, a plurality of steps 3 are formed on the tunnel face, and the penetration hole 1 is provided on the topmost step 3. Preferably, the topmost step 3 is 5-10 m away from the light-dark interface of the tunnel 2.
[0032] The following is an explanation of the use process of a safe construction method for tunnel exit construction of the present invention.
[0033] When excavating the tunnel 2 at a single end, a Feng Shui electric pipeline 4 is laid in the tunnel 2. When excavating to the exit end of the tunnel 2, a penetration hole 1 is opened on the heading face at the light and dark interface of the tunnel 2. The diameter of the penetration hole 1 is 60 cm to facilitate the passage of the Feng Shui electric pipeline 4. The Feng Shui, electricity and other power pipelines in the tunnel 2 are connected through this small hole to the exit end to provide power for the shotcrete operation equipment outside the tunnel, thereby providing temporary support for the side slope of the shotcrete operation at the end of the tunnel, preventing surface water from eroding the top slope of the tunnel portal, and ensuring the safety of exiting the tunnel.
[0034] The present invention is described in detail above in conjunction with the embodiments of the accompanying drawings. A person skilled in the art can make various variations of the present invention according to the above description. Therefore, certain details in the embodiments should not constitute a limitation of the present invention, and the scope of protection of the present invention shall be defined by the scope of the attached claims.
Claims
1. A safe construction method for tunnel exit construction, wherein a Fengshui electric pipeline is laid in the tunnel, characterized in that: The construction method comprises the following steps: Excavating the tunnel until the tunnel face approaches the tunnel exit; A drilling hole is opened on the tunnel face, wherein the drilling hole is connected to the outside of the tunnel; Pass the Fengshui electric pipeline through the penetration hole and extend it to the outside of the tunnel, and the part of the Fengshui electric pipeline extending outside the tunnel is connected with operating equipment; Starting the operating equipment, and reinforcing the operating equipment at the exit end; After the reinforcement is completed, the exit end is opened to connect the tunnel.
2. A tunnel exit construction safety construction method according to claim 1, characterized in that: The operation equipment includes an operation vehicle, and concrete is sprayed at the exit end by the operation vehicle to support the exit end.
3. A safe construction method for tunnel exit construction according to claim 2, characterized in that: Before the working vehicle sprays concrete, a steel mesh is laid at the exit end.
4. A tunnel exit construction safety method according to claim 1, characterized in that: When the drilling hole is opened, a drilling device is provided, and the tunnel face is drilled by the drilling device to form the drilling hole.
5. A tunnel exit construction safety method according to claim 1, characterized in that: The diameter of the penetration hole is matched with the diameter of the Feng Shui electric pipeline.
6. A tunnel exit construction safety method according to claim 1, characterized in that: A plurality of steps are formed on the palm face, and the penetration hole is opened on the topmost step.