Blowout preventer for gas extraction drilling

By designing a gas extraction drilling anti-blasting device, the buffer chamber contains the Nagas gas, the safety threat caused by the injection hole phenomenon in the gas extraction drilling is solved, and the safety production conditions of the mine are improved.

CN119084065APending Publication Date: 2024-12-06CCTEG CHINA COAL RES INST +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410796347.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-19
Publication Date
2024-12-06

AI Technical Summary

Technical Problem

In high-burst mines and deep mines, hole spraying is prone to occur during the construction of gas extraction and drilling, resulting in abnormal gas outflow and slag injection, seriously threatening the mine's safety production.

Method used

A gas extraction drilling and spraying device is designed, including a collection assembly and a buffer assembly, and a large amount of gas gas is introduced into the buffer chamber through the first outlet. The buffer chamber contains the Nagas gas in a short time to prevent the spraying of gas and drilling slag. to improve the safety of the drilling process.

Benefits of technology

It effectively prevents gas exceeding limits, avoids equipment damage and accidents, improves the safety of gas extraction and drilling process, and ensures the safe production of the mine.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119084065A_ABST
    Figure CN119084065A_ABST
Patent Text Reader

Abstract

The gas extraction drilling blowout preventer comprises a collecting assembly and a buffering assembly, the collecting assembly comprises a collecting cover, the collecting cover is provided with a collecting cavity, a first outlet, a second outlet and a mounting channel allowing a drill rod to penetrate through, and the first outlet, the second outlet and the mounting channel all communicate with the collecting cavity; the first outlet is formed in the upper side of the second outlet; the buffering assembly comprises a buffering barrel, the buffering barrel is provided with a buffering cavity, a first air inlet and an air outlet used for being connected with an extraction pipeline, the first air inlet and the air outlet are both communicated with the buffering cavity, and the first air inlet is communicated with the first outlet of the collecting cover. According to the gas extraction drilling blowout preventer, when the hole spraying phenomenon occurs, a large amount of gas is sprayed into the buffer cavity through the first outlet, the buffer cavity can contain the large amount of gas in a short time, the phenomenon that a large amount of gas and drilling slag are sprayed out is prevented, and therefore the safety of the gas extraction drilling process is improved; and safe production of a mine is ensured.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of gas extraction blowout prevention equipment, and in particular to a gas extraction drilling blowout prevention device. Background Art

[0002] For high-burst mines and deep mines, due to the influence of high gas, high ground stress or soft and broken coal bodies, blowout is very likely to occur during the gas extraction drilling process. The abnormal outflow of a large amount of gas and the high-speed injection of drilling slag during the blowout process can easily cause gas over-limit in the construction area and damage to personnel and equipment, seriously threatening the safe production of the mine. Summary of the invention

[0003] The present invention aims to solve one of the technical problems in the related art at least to a certain extent.

[0004] To this end, an embodiment of the present invention proposes a gas extraction drilling blowout prevention device. When a blowout occurs, a large amount of gas is sprayed into the buffer chamber through the first outlet. The buffer chamber can accommodate a large amount of gas in a short period of time to prevent a large amount of gas and drill cuttings from being sprayed out, thereby improving the safety of the gas extraction drilling process and ensuring safe production in the mine.

[0005] The gas extraction drilling blowout prevention device of the embodiment of the present invention includes a collecting component and a buffer component, the collecting component includes a collecting hood, the collecting hood has a collecting chamber, a first outlet, a second outlet and an installation channel for the drill rod to pass through, the first outlet, the second outlet and the installation channel are all connected to the collecting chamber, and the first outlet is arranged on the upper side of the second outlet; the buffer component includes a buffer barrel, the buffer barrel has a buffer chamber, a first air inlet and an air outlet for connecting to an extraction pipeline, the first air inlet and the air outlet are both connected to the buffer chamber, and the first air inlet is connected to the first outlet.

[0006] In some embodiments, the gas extraction drilling blowout prevention device also includes a separation component, which includes a first mesh plate, a first plate and a second plate of a separation box; the separation box has an exhaust chamber, a cavity body, a total inlet and an exhaust port, and the total inlet is connected to the second outlet; the first mesh plate, the first plate and the second plate are all arranged in the separation box, the first mesh plate, the first plate and the second plate surround the exhaust chamber, the total inlet is connected to the cavity body, the exhaust port is connected to the exhaust chamber, and the buffer barrel also has a second air inlet connected to the buffer chamber, and the exhaust port is connected to the second air inlet.

[0007] In some embodiments, the separation assembly also includes a second mesh plate and a first spray head, the second mesh plate is arranged in the cavity and divides the cavity into a slag discharge chamber and a water discharge chamber, and the first spray head is arranged toward the main inlet; the separation box also has a water discharge port and a slag discharge port, the slag discharge port is connected to the slag discharge chamber, and the water discharge port is connected to the water discharge chamber.

[0008] In some embodiments, the buffer assembly further includes a second spray head, and the second spray head is disposed in the buffer cavity.

[0009] In some embodiments, the buffer assembly further includes a first pipe with both ends open, the first pipe is disposed in the buffer cavity, one end of the first pipe is connected to the first air inlet, and the other end of the first pipe is lower than the first air inlet.

[0010] In some embodiments, the buffer assembly also includes a partition, which divides the buffer chamber into a first chamber and a second chamber, the first air inlet is connected to the first chamber, the first pipe is arranged in the first chamber, the air outlet is connected to the second chamber, and the partition has a sieve hole connecting the first chamber and the second chamber.

[0011] In some embodiments, the bottom of the first cavity has a drain outlet, and the buffer assembly further includes a guide member, wherein the guide member has a guide surface, and the guide surface gradually extends from top to bottom toward a direction close to the drain outlet.

[0012] In some embodiments, the gas extraction drilling blowout prevention device also includes an air outlet pipe and a gas outflow sensor, the air outlet pipe is connected to the buffer barrel and communicates with the air outlet, and the gas outflow sensor is connected to the air outlet pipe.

[0013] In some embodiments, a weighing mesh plate is provided in the slag discharge chamber, and the weighing mesh plate is rotatably connected to the separation box so that the weighing mesh plate can switch between a weighing state and a unloading state; a control component is provided on the weighing mesh plate to control the weighing mesh plate to switch from the weighing state to the unloading state when the pressure on the weighing mesh plate reaches a preset pressure.

[0014] In some embodiments, a counting device is provided on the weighing mesh plate, and the counting device is used to record the number of times the weighing mesh plate switches from the weighing state to the unloading state.

[0015] The gas extraction drilling blowout prevention device of the embodiment of the present invention is mainly used for gas extraction drilling construction. During the drilling process, the drill rod is inserted into the installation channel of the collection cover, and the gas, drill cuttings, dust, etc. in the drilling process enter the collection chamber. The gas and part of the dust flow upward, enter the buffer chamber through the first outlet and the first air inlet, and then enter the extraction pipeline through the air outlet, and finally enter the mine extraction system; the drill cuttings and part of the dust fall under the action of gravity, and are discharged through the second outlet along with part of the gas for further processing.

[0016] When the blowhole phenomenon occurs, a large amount of gas is sprayed into the buffer chamber through the first outlet and the first air inlet. The buffer chamber can accommodate a large amount of gas in a short time, thereby achieving buffering and pressure relief of a large amount of gas, preventing the sudden increase in pressure from causing damage to the equipment and causing a large amount of gas and drilling cuttings to be sprayed out, and avoiding the phenomenon of gas exceeding the limit in the working space, thereby improving the safety of the gas extraction drilling process and ensuring safe production in the mine. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 The present invention is a schematic diagram of the overall structure of a gas extraction drilling blowout prevention device according to an embodiment of the present invention.

[0018] Figure 2 It is a schematic structural diagram of a collection component of a gas extraction drilling blowout prevention device according to an embodiment of the present invention.

[0019] Figure 3 The present invention is a schematic structural diagram of a buffer assembly of a gas extraction drilling blowout prevention device according to an embodiment of the present invention.

[0020] Figure 4 The present invention is a schematic structural diagram of a separation component of a gas extraction drilling blowout prevention device according to an embodiment of the present invention.

[0021] Figure 5 It is a schematic structural diagram of a fourth box wall of a separation box of a gas extraction drilling blowout prevention device according to an embodiment of the present invention, which is cut open.

[0022] Figure 6 The present invention is a schematic diagram of the internal structure of a separation box of a gas extraction drilling blowout prevention device according to an embodiment of the present invention.

[0023] Figure 7 It is a schematic structural diagram of a second box wall of a separation box of a gas extraction drilling blowout prevention device according to an embodiment of the present invention, which is cut open.

[0024] Reference numerals:

[0025] 100. Gas extraction drilling blowout prevention device;

[0026] 1. Collection assembly; 11. Collection cover; 111. Collection chamber; 112. First outlet; 113. Second outlet; 114. Installation channel; 12. Expansion sealing tube; 121. Tube; 122. Expansion part; 13. Spray assembly; 131. Ring tube; 132. Water receiving pipe;

[0027] 2. Buffer assembly; 21. Buffer barrel; 211. Buffer chamber; 212. First air inlet; 213. Second air inlet; 214. Air outlet; 215. Drain outlet; 22. Second spray head; 23. First pipeline; 24. Second pipeline; 25. Second cover plate; 26. Partition plate; 261. Screen hole; 27. Guide member; 28. Drain door; 29. ​​Air outlet pipe; 291. Gas outflow sensor;

[0028] 3. Separation assembly; 31. Separation box; 311. Main inlet; 312. Exhaust port; 313. Slag discharge port; 314. Drain port; 315. First box wall; 316. Second box wall; 317. Third box wall; 318. Fourth box wall; 319. First cover plate; 32. Exhaust chamber; 321. First mesh plate; 322. First plate; 323. Second plate; 324. Gas channel; 33. Three-way joint; 34. Second mesh plate; 341. Slag discharge chamber; 3411. Slag discharge door; 342. Drain chamber; 35. First spray head; 36. Weighing mesh plate; 361. Rotating shaft; 362. First gear; 363. Second gear; 37. Counting device. DETAILED DESCRIPTION

[0029] Embodiments of the present invention are described in detail below, and examples of the embodiments are shown in the accompanying drawings. The embodiments described below with reference to the accompanying drawings are exemplary and intended to be used to explain the present invention, but should not be understood as limiting the present invention.

[0030] like Figures 1 to 3 As shown, the gas extraction drilling blowout prevention device 100 of the embodiment of the present invention includes a collecting component 1 and a buffer component 2, the collecting component 1 includes a collecting cover 11, the collecting cover 11 has a collecting chamber 111, a first outlet 112, a second outlet 113 and an installation channel 114 for the drill rod to pass through, the first outlet 112, the second outlet 113 and the installation channel 114 are all connected to the collecting chamber 111, and the first outlet 112 is arranged on the upper side of the second outlet 113; the buffer component 2 includes a buffer barrel 21, the buffer barrel 21 has a buffer chamber 211, a first air inlet 212 and an air outlet 214 for connecting a extraction pipeline, the first air inlet 212 and the air outlet 214 are both connected to the buffer chamber 211, and the first air inlet 212 is connected to the first outlet 112.

[0031] The gas extraction drilling blowout prevention device of the embodiment of the present invention is mainly used for gas extraction drilling construction. During the drilling process, the drill rod is inserted into the installation channel of the collection cover, and the gas, drill cuttings, dust, etc. in the drilling process enter the collection chamber. The gas and part of the dust flow upward, enter the buffer chamber through the first outlet and the first air inlet, and then enter the extraction pipeline through the air outlet, and finally enter the mine extraction system; the drill cuttings and part of the dust fall under the action of gravity and are discharged through the second outlet along with part of the gas for further processing.

[0032] When the blowhole phenomenon occurs, a large amount of gas is sprayed into the buffer chamber 211 through the first outlet 112 and the first air inlet 212. The buffer chamber 211 can accommodate a large amount of gas in a short time, thereby achieving buffering and pressure relief of a large amount of gas, preventing a sudden increase in pressure from causing damage to the equipment and causing a large amount of gas and drilling cuttings to be sprayed out, and avoiding the phenomenon of gas exceeding the limit in the working space, thereby improving the safety of the gas extraction drilling process and ensuring safe production in the mine.

[0033] Optionally, the collection assembly 1 further comprises an expansion sealing tube 12, which is connected to the collection cover 11 and is used to be fixed to a substrate, which refers to an area such as a coal seam, a mine rock wall, etc. used for gas extraction drilling.

[0034] Thus, the collecting assembly 1 can be fixedly installed at the orifice position of the gas extraction borehole.

[0035] As an example, Figure 2 As shown, the collecting hood 11 includes a hood body, two vertical pipe sections and two horizontal pipe sections, the two vertical pipe sections are coaxially arranged, and the two horizontal pipe sections are also coaxially arranged, so that the collecting hood 11 has four interfaces. Among them, the vertical pipe section arranged upward forms the above-mentioned first outlet 112, the vertical pipe section arranged downward forms the above-mentioned second outlet 113, and the two horizontal pipe sections form the above-mentioned installation channel 114 inside.

[0036] The first outlet 112 is communicated with the first air inlet 212 through a hose.

[0037] The expansion sealing tube 12 includes a tube portion 121 and an expansion portion 122. The expansion portion 122 is made of rubber material. The expansion portion 122 sealing sleeve is arranged on the tube portion 121. The expansion portion 122 can expand when inflated. The horizontal pipe section of the collection cover 11 facing the expansion sealing tube 12 is coaxially arranged with the tube portion 121, and the two are fixedly connected by a flange. The collection cover 11 is open to the horizontal pipe section facing away from the expansion sealing tube 12 for the drill pipe to pass through.

[0038] During the drilling process, the base is first drilled by a drilling machine. When the drilling depth reaches the length of the expansion sealing tube 12, the drilling is stopped and the hole is expanded to form an expanded hole section for installing the expansion sealing tube 12. After the expansion is completed, the drill rod is passed through the installation channel 114 and the rod part in sequence, and after the expansion sealing tube 12 is placed in the expanded hole section, the expansion part 122 is inflated. When the air pressure in the expansion part 122 reaches the specified pressure, the collection assembly 1 is installed.

[0039] Alternatively, if Figure 2 As shown, a spray assembly 13 is provided in the collecting chamber 111 .

[0040] Thus, the spray assembly 13 can perform dust reduction treatment on the dust in the collection chamber 111 to improve the dust removal effect of the gas entering the buffer chamber 211 from the first outlet 112 , and the mixture of dust, water and drilling cuttings enters the separation box 31 through the second outlet 113 .

[0041] As an example, the spray assembly 13 includes an annular tube 131 and a water receiving tube 132. The annular tube 131 is arranged around the circumference of the installation channel 114 and is fixedly connected to the collection cover 11. The annular tube 131 has a plurality of spray holes, and the plurality of spray holes are evenly arranged along the circumferential direction of the annular tube 131, so that the dust in the collection chamber 111 can be sprayed and dusted. In addition, the water receiving tube 132 is connected to the annular tube 131, and the water receiving tube 132 passes through the side wall of the collection cover 11. The water receiving tube 132 is used to connect to the water supply system to realize the water supply to the annular tube 131.

[0042] In some embodiments, Figure 1 and Figure 4 As shown, the gas extraction drilling blowout prevention device 100 also includes a separation component 3, which includes a separation box 31, a first mesh plate 321, a first plate 322 and a second plate 323; the separation box 31 has an exhaust chamber 32, a chamber body, a total inlet 311 and an exhaust port 312, and the total inlet 311 is connected to the second outlet 113; the first mesh plate 321, the first plate 322 and the second plate 323 are all arranged in the separation box 31, the first mesh plate 321, the first plate 322 and the second plate 323 surround the exhaust chamber 32, the total inlet 311 is connected to the chamber body, the exhaust port 312 is connected to the exhaust chamber 32, and the buffer barrel 21 also has a second air inlet 213 connected to the buffer chamber 211, and the exhaust port 312 is connected to the second air inlet 213.

[0043] Through the above arrangement, the drilling cuttings, dust and a small amount of gas discharged from the second outlet 113 enter the separation box 31 through the main inlet 311. After that, part of the gas passes through the first mesh plate 321 into the air cavity, and enters the buffer cavity 211 through the exhaust port 312 and the second air inlet 213. The drilling cuttings and dust are isolated in the cavity by the first mesh plate 321 for further processing; thereby, the separation of drilling cuttings and gas can be achieved.

[0044] When the blowhole phenomenon occurs, the amount of gas entering the separation box 31 from the second outlet 113 increases instantly. The increased gas can enter the buffer chamber 211 for temporary storage, and finally be slowly discharged through the outlet 214 of the buffer chamber 211, which can prevent the sudden increase in pressure from causing damage to the equipment, thereby improving the safety of the gas extraction drilling process.

[0045] Alternatively, if Figure 1 As shown, the height of the separation box 31 is lower than the height of the second outlet 113 .

[0046] Thus, the drilling cuttings at the second outlet 113 can fall into the separation box 31 under the action of gravity, which is more convenient.

[0047] Optionally, the separation box 31 is configured as a split structure.

[0048] This makes it easier to install structures such as the first mesh plate 321 and the second mesh plate 34 in the separation box 31 .

[0049] As an example, Figures 4 to 6 As shown, the outer contour of the separation box 31 is rectangular, and the separation box 31 includes a first box wall 315 and a second box wall 316 arranged opposite to each other. The first mesh plate 321 is closer to the second box wall 316 than the first box wall 315, and the first mesh plate 321 is inclined from top to bottom in a direction away from the first box wall 315, and the plate surface of the first mesh plate 321 intersects with the center line of the total inlet 311.

[0050] The separation assembly 3 includes a three-way joint 33 welded and fixed to the separation box 31, the first end of the three-way joint 33 extends horizontally and is connected to the first box wall 315, the first end of the three-way joint 33 is connected to the main inlet 311, the second end of the three-way joint 33 extends obliquely upward and is connected to the second outlet 113 through a hose, and the drill cuttings discharged from the second outlet 113 pass through the second end and the first end of the three-way joint 33 in sequence under the action of gravity, and then enter the separation box 31 through the main inlet 311; the third end of the three-way joint 33 is vertically downward and is in a normally closed state. When the separation box 31 suddenly fails and cannot be used normally, the third end of the three-way joint 33 can be opened to quickly discharge the drill cuttings, gas, etc.

[0051] After the drilling cuttings, dust and gas enter the separation box 31 in the horizontal direction, since there is enough falling space between the first mesh plate 321 and the first box wall 315, most of the drilling cuttings fall under their own gravity before reaching the first mesh plate 321, and some gas and dust enter the air cavity through the first mesh plate 321. The first mesh plate 321 has a filtering effect on dust, thereby making it easier to separate dust and gas. In addition, by tilting the first mesh plate 321, when the spray hole phenomenon occurs, the first mesh plate 321 can change the direction of the airflow and slow down the flow rate of the gas, so as to buffer the gas and prevent the impact of the airflow from causing damage to the equipment.

[0052] As an example, Figure 1 and Figure 4 As shown, the exhaust port 312 is arranged on the top wall of the separation box 31, and the exhaust port 312 is connected to the second air inlet 213 through a hose.

[0053] Alternatively, if Figure 4 As shown, the top wall of the separation box 31 has a hinged first cover plate 319, and the first cover plate 319 can be opened or closed.

[0054] Therefore, when the gas extraction drilling blowout prevention device 100 is used, the first cover plate 319 is closed to ensure the sealing of the separation box 31. When the first cover plate 319 is opened, the interior of the separation box 31 can be cleaned, inspected, and repaired, which is more convenient.

[0055] As an example, Figure 7 As shown, the separation box 31 further includes a third box wall 317 and a fourth box wall 318 arranged opposite to each other, and the third box wall 317 is perpendicular to the first box wall 315. The first plate 322 and the second plate 323 are both arranged on the side of the first mesh plate 321 away from the main inlet 311, the first plate 322 is connected to the third box wall 317, the second plate 323 is connected to the fourth box wall 318, the first plate 322 is inclined from top to bottom in a direction close to the second plate 323, and the second plate 323 is inclined from top to bottom in a direction close to the first plate 322, and the side of the first plate 322 away from the third box wall 317 is higher than the side of the second plate 323 away from the fourth box wall 318. The projections of the first plate 322 and the second plate 323 on the horizontal plane can completely cover the area enclosed by the first mesh plate 321, the second box wall 316, the third box wall 317 and the fourth box wall 318, thereby, the first plate 322 and the second plate 323 form the bottom wall of the air cavity, and a gas channel 324 is formed between the first plate 322 and the second plate 323.

[0056] Part of the gas entering the separation box 31 from the main inlet 311 enters the air cavity through the first mesh plate 321, and another part of the gas does not pass through the first mesh plate 321 but reaches the lower side of the first plate 322 and the second plate 323, and then enters the air cavity through the gas channel 324, and then enters the buffer barrel 21 through the exhaust port 312, so that the gas in the separation box 31 can be discharged more thoroughly.

[0057] At the same time, when some gas and dust enter the air cavity through the gas channel 324, the combination of the first plate 322 and the second plate 323 can change the movement trajectory of the airflow, so that the dust hits and adheres to the lower plate surfaces of the first plate 322 and the second plate 323, and the gas can enter the air cavity through the gas channel 324, thereby realizing inertial dust removal and achieving better dust removal effect.

[0058] Optionally, the main inlet 311 is closer to the third box wall 317 than the fourth box wall 318 , and the projection of the gas channel 324 on the first chamber wall is closer to the fourth box wall 318 than the third box wall 317 .

[0059] In some embodiments, Figure 6 and Figure 7 As shown, the separation component 3 also includes a second mesh plate 34 and a first spray head 35. The second mesh plate 34 is arranged in the cavity and divides the cavity into a slag discharge chamber 341 and a water discharge chamber 342. The first spray head 35 is arranged toward the main inlet 311. The separation box 31 also has a water discharge port 314 and a slag discharge port 313. The slag discharge port 313 is connected to the slag discharge chamber 341, and the water discharge port 314 is connected to the water discharge chamber 342.

[0060] Through the above arrangement, the first spray head 35 can spray and remove dust entering the separation box 31, thereby improving the dust removal efficiency of the gas. The mixture of water, drilling slag and dust falls into the second mesh plate 34, and the water flows into the drainage chamber 342 through the mesh holes on the second mesh plate 34, and then flows out through the drainage port 314. The drilling slag accumulates on the second mesh plate 34. When the drilling slag on the second mesh plate 34 accumulates to a certain amount, the drilling slag can be discharged through the slag discharge port 313, thereby achieving the three-state separation of gas, water and slag, effectively improving the working environment and ensuring construction safety.

[0061] As an example, Figure 6 As shown, the first spray head 35 is disposed on the top wall of the separation box 31 and arranged toward the main inlet 311 , and one end of the first spray head 35 away from its spray hole passes through the top wall of the separation box 31 and is connected to the water supply system to realize water supply to the first spray head 35 .

[0062] Alternatively, if Figure 5 and Figure 6 As shown, the drain port 314 is provided with a drain valve.

[0063] The drain valve is more convenient for construction personnel to control the discharge of sewage in the drain chamber 342.

[0064] Alternatively, if Figure 7 As shown, the side of the separation box 31 has a hinged slag discharge door 3411, and the slag discharge door 3411 is used to block the slag discharge port 313.

[0065] The slag discharge door 3411 is in a normally closed state. When the drilling slag on the second mesh plate 34 accumulates to a certain amount, the slag discharge door 3411 can be opened to discharge the drilling slag.

[0066] Optionally, the second mesh plate 34 is arranged at an angle, and extends from top to bottom toward the slag discharge port 313 .

[0067] Therefore, the drill cuttings can be accumulated toward the slag discharge port 313 under the action of gravity, and when the slag discharge door 3411 is opened, it is more conducive to the discharge of the drill cuttings.

[0068] In some embodiments, Figure 3 As shown, the buffer assembly 2 further includes a second spray head 22 , and the second spray head 22 is disposed in the buffer cavity 211 .

[0069] The second spray head 22 can further spray the gas in the buffer chamber 211 to reduce dust, thereby improving the dust removal effect on the gas, so that the gas entering the extraction pipeline from the gas outlet 214 is cleaner.

[0070] In some embodiments, Figure 3 As shown, the buffer assembly 2 also includes a first pipe 23 with both ends open. The first pipe 23 is arranged in the buffer cavity 211 , one end of the first pipe 23 is connected to the first air inlet 212 , and the other end of the first pipe 23 is lower than the first air inlet 212 .

[0071] The gas enters the first pipe 23 from the first air inlet 212. The first pipe 23 can limit the diffusion range of the gas and dust, and prevent the dust from diffusing over a large area in the buffer chamber 211. The gas flows downward along the first pipe 23 and flows out through the lower end of the first pipe 23. In the process of the gas flowing in the first pipe 23, most of the dust in the gas settles to the bottom of the buffer chamber 211 under the action of gravity, so that the gas and most of the dust can be separated. In the process of the gas and a small amount of dust flowing out from the lower end of the first pipe 23 and moving upward, under the action of the second spray head 22, the dust combines with the water mist and settles to the bottom of the buffer chamber 211, thereby achieving a better dust removal effect.

[0072] As an example, Figure 3As shown, the outer contour of the buffer barrel 21 is cylindrical and is placed vertically, and the first air inlet 212 and the air outlet 214 are both arranged on the top wall of the buffer barrel 21; the first pipe 23 extends vertically, the upper end of the first pipe 23 is connected to the top wall of the buffer barrel 21, and is connected to the first air inlet 212, and the lower end faces the bottom wall of the buffer barrel 21.

[0073] The second spray head 22 is arranged on the top wall of the buffer barrel 21, and the spray hole of the second spray head 22 is arranged downward. The end of the second spray head 22 away from its spray hole passes through the top wall of the buffer barrel 21 and is connected to the water supply system to realize water supply to the second spray head 22.

[0074] Optionally, the top wall of the buffer barrel 21 has a hinged second cover plate 25, and the second cover plate 25 can be opened or closed.

[0075] Therefore, when the blowout prevention device is used normally, the second cover plate 25 is closed to ensure the sealing of the buffer barrel 21; when the second cover plate 25 is opened, the interior of the buffer barrel 21 can be cleaned, and the operation is more convenient.

[0076] Alternatively, if Figure 3 As shown, a plurality of air holes are evenly distributed on the wall of the first pipe 23, wherein a certain distance exists between the air hole at the highest position and the spray head.

[0077] Thus, when the position of the sediment in the buffer barrel 21 is higher than the lower end of the first pipe 23, the gas can flow out through the air holes.

[0078] In some embodiments, Figure 6 As shown, the buffer assembly 2 also includes a partition 26, which divides the buffer chamber 211 into a first chamber and a second chamber. The first air inlet 212 is connected to the first chamber, the first pipe 23 is arranged in the first chamber, and the air outlet 214 is connected to the second chamber. The partition 26 has a sieve hole 261 connecting the first chamber and the second chamber.

[0079] Through the above arrangement, the first cavity can limit the diffusion range of the gas, so that the gas and water mist are fully in contact, thereby achieving a better dust reduction effect.

[0080] Optionally, there are multiple sieve holes 261 , which are evenly distributed on the upper side of the partition 26 , and the sieve hole 261 at the lowest position is higher than the air hole at the highest position on the first pipe 23 .

[0081] Therefore, after the gas flows out from the lower end of the first pipe 23, it needs to flow upward to pass through the sieve hole 261 to enter the second chamber, and then enter the extraction pipeline through the gas outlet 214, which can increase the flow trajectory of the gas and play a buffering role for the gas when the blowhole phenomenon occurs; at the same time, the gas is fully in contact with the water mist to achieve a better dust removal effect.

[0082] Alternatively, if Figure 3 As shown, the second air inlet 213 is also in communication with the first chamber.

[0083] As a result, the gas flowing into the buffer chamber 211 from the separation box 31 is further sprayed to reduce dust through the second spray head 22, thereby improving the dust removal effect.

[0084] As an example, Figure 3 As shown, the buffer component 2 also includes a second pipe 24, which has a similar structure to the first pipe 23, and a diameter of the second pipe 24 is smaller than that of the first pipe 23; the upper end of the second pipe 24 is connected to the top wall of the buffer barrel 21, and is communicated with the second air inlet 213, and the lower end of the second pipe 24 faces the bottom wall of the buffer barrel 21; the pipe wall of the second pipe 24 is also evenly distributed with a plurality of air holes, and the gas entering the second pipe 24 from the second air inlet 213 can flow out through the air holes and the opening at the lower end of the second pipe 24.

[0085] The gas discharged from the exhaust port 312 of the separation box 31 enters the second pipeline 24 through the second air inlet 213, wherein dust, drilling cuttings and other solids carried by the gas settle on the guide member 27. The gas passes through the air holes on the second pipeline 24 and the sieve holes of the partition 26 in turn, and is discharged into the gas extraction pipeline through the air outlet, so that the gas discharged from the separation box 31 can be further processed to improve the cleanliness of the gas.

[0086] The second spray head 22 is disposed between the first pipe 23 and the second pipe 24 , and can remove dust from the gas gushing out of the first pipe 23 and the second pipe 24 at the same time.

[0087] Of course, in other embodiments, the number of the second spray heads 22 may also be multiple to improve the dust removal effect on the gas.

[0088] In some embodiments, the bottom of the first cavity has a drain port 215 , and the buffer assembly 2 further includes a guide member 27 , the guide member 27 has a guide surface, and the guide surface gradually extends from top to bottom toward the drain port 215 .

[0089] Through the above arrangement, dust and water are combined and then settled on the guide surface. Under the guidance of the guide surface, the mixture flows toward the sewage outlet 215 and is then discharged through the sewage outlet 215 .

[0090] Optionally, the side barrel wall of the buffer barrel 21 has a sewage discharge door 28 , and the sewage discharge door 28 can block the sewage discharge port 215 .

[0091] When the water level reaches a certain height, the sewage outlet 215 can be opened to discharge the sewage in the first chamber.

[0092] In some embodiments, Figure 3 As shown, the gas extraction drilling blowout prevention device 100 also includes an air outlet pipe 29 and a gas outflow sensor 291 . The air outlet pipe 29 is connected to the buffer barrel 21 and communicates with the air outlet 214 . The gas outflow sensor 291 is connected to the air outlet pipe 29 .

[0093] The gas outflow sensor 291 can monitor the gas concentration, flow rate and extraction negative pressure in the gas outlet pipe 29, so as to realize real-time monitoring of borehole gas outflow and quantitative analysis of gas occurrence during drilling.

[0094] Optionally, the gas outflow sensor 291 is a mine drilling gas wireless multi-parameter sensor.

[0095] The gas outflow sensor 291 not only detects the gas concentration, flow rate and extraction negative pressure in the gas outlet pipe 29, but also has an alarm function so as to remind construction personnel when a blowout occurs.

[0096] In some embodiments, Figure 6 and Figure 7 As shown, a weighing mesh plate 36 is provided in the slag discharge chamber 341, and the weighing mesh plate 36 is rotatably connected to the separation box 31 so that the weighing mesh plate 36 can switch between a weighing state and a discharging state; a control component is provided on the weighing mesh plate 36 to control the weighing mesh plate 36 to switch from a weighing state to a discharging state when the pressure on the weighing mesh plate 36 reaches a preset pressure.

[0097] Through the above arrangement, the mixture of drill cuttings, dust and water entering from the main inlet 311 first falls on the weighing mesh plate 36, wherein water enters the drainage chamber 342 through the weighing mesh plate 36 and the second mesh plate 34 in turn, and the mixture of drill cuttings and dust accumulates on the weighing mesh plate 36 and exerts pressure on the weighing mesh plate 36. When the pressure on the weighing mesh plate 36 reaches the preset pressure, the weighing mesh plate 36 switches from the weighing state to the unloading state, and the drill cuttings fall on the second mesh plate 34. Thus, the number of times the weighing mesh plate 36 switches from the weighing state to the unloading state can realize the quantitative measurement of the drill cuttings on the second mesh plate 34, that is, the quantitative measurement of the amount of drilling cuttings can be realized.

[0098] As an example, Figure 6 and Figure 7As shown, the weighing mesh plate 36 is arranged on the upper side of the second mesh plate 34, and there is a gap between the weighing mesh plate 36 and the first mesh plate 321; there are two weighing mesh plates 36, and the two weighing mesh plates 36 are arranged symmetrically. The projections of the two weighing mesh plates 36 on the horizontal plane can completely block the slag discharge cavity 341, so that the drilled cuttings entering the main inlet 311 first fall on the weighing mesh plates 36. The two weighing mesh plates 36 extend downwardly in a direction away from each other, and the drilled cuttings falling on the weighing mesh plates 36 are accumulated downward. When the weighing mesh plates 36 are in the weighing state, the two sides of the weighing mesh plates 36 away from each other stop at the third box wall 317 and the fourth box wall 318 of the separation box 31 respectively. When the weighing mesh plates 36 are switched from the weighing state to the unloading state, the weighing mesh plates 36 rotate downward, and a gap is formed between the weighing mesh plates 36 and the box wall of the separation box 31, and the drilled cuttings fall on the second mesh plate 34 through the gap.

[0099] A rotating shaft 361 is provided on the side where the two weighing mesh plates 36 are close to each other, and the two ends of the rotating shaft 361 pass through the first box wall 315 and the second box wall 316 of the separation box 31 and are rotatably connected thereto, so that the two weighing mesh plates 36 can rotate relative to the separation box 31. A rotating handle is provided at one end of the two rotating shafts 361, and the rotation of the two weighing mesh plates 36 can be manually controlled by rotating the handle; the first gear 362 and the second gear 363 are respectively provided at the other ends of the two rotating shafts 361, and the first gear 362 and the second gear 363 are meshed, thereby, the two weighing mesh plates 36 can rotate synchronously, that is, the two weighing mesh plates 36 can maintain a weighing state or a discharging state at the same time.

[0100] Optionally, the control member is a spring, and the weighing mesh plate 36 always has a tendency to rotate upward under the action of the spring, so that the side of the weighing mesh plate 36 away from its rotating shaft 361 stops at the box wall of the separation box 31. When the weighing mesh plate 36 is in a weighing state, the elastic force applied by the spring to the weighing mesh plate 36 matches the above-mentioned preset pressure.

[0101] Therefore, when the pressure on the weighing mesh plate 36 exceeds the preset pressure, the weighing mesh plate 36 rotates downward, the spring is deformed, and the weighing mesh plate 36 switches from the weighing state to the unloading state.

[0102] In some embodiments, a counting device 37 is provided on the weighing mesh plate 36, and the counting device 37 is used to record the number of times the weighing mesh plate 36 switches from the weighing state to the unloading state.

[0103] By setting a technical device, the automatic counting of the weighing mesh plate 36 can be realized, and the operation is more convenient. At the same time, when the number of times recorded by the counting device 37 reaches a certain value, it means that the drilling slag on the second mesh plate 34 has reached a certain amount, and the construction personnel can open the slag discharge door 3411 to discharge slag.

[0104] Although the embodiments of the present invention have been shown and described above, it is to be understood that the above embodiments are illustrative and are not to be construed as limitations on the present invention. Changes, modifications, substitutions and variations of the above embodiments by those of ordinary skill in the art are all within the scope of protection of the present invention.

Claims

1. A gas extraction drilling blowout prevention device (100), characterized in that: include: A collecting assembly (1), the collecting assembly (1) comprising a collecting cover (11), the collecting cover (11) having a collecting chamber (111), a first outlet (112), a second outlet (113) and an installation channel (114) for a drill rod to pass through, the first outlet (112), the second outlet (113) and the installation channel (114) all being in communication with the collecting chamber (111), the first outlet (112) being arranged on the upper side of the second outlet (113); A buffer assembly (2), the buffer assembly (2) comprising a buffer barrel (21), the buffer barrel (21) having a buffer cavity (211), a first air inlet (212) and an air outlet (214) for connecting to an extraction pipeline, the first air inlet (212) and the air outlet (214) both being in communication with the buffer cavity (211), and the first air inlet (212) being in communication with the first outlet (112).

2. The gas extraction drilling blowout prevention device (100) according to claim 1, characterized in that: It also includes a separation component (3), wherein the separation component (3) includes: A separation box (31), the separation box (31) comprising an exhaust chamber (32), a chamber body, a main inlet (311) and an exhaust port (312), the main inlet (311) being in communication with the second outlet (113); A first mesh plate (321), a first plate (322) and a second plate (323), wherein the first mesh plate (321), the first plate (322) and the second plate (323) are all arranged in the separation box (31), the first mesh plate (321), the first plate (322) and the second plate (323) enclose the exhaust cavity (32), the main inlet (311) is connected to the cavity, the exhaust port (312) is connected to the exhaust cavity (32), and the buffer barrel (21) also has a second air inlet (213) connected to the buffer cavity (211), and the exhaust port (312) is connected to the second air inlet (213).

3. The gas extraction drilling blowout prevention device (100) according to claim 2, characterized in that: The separation assembly (3) further comprises a second mesh plate (34) and a first spray head (35), wherein the second mesh plate (34) is arranged on the cavity and divides the cavity into a slag discharge cavity (341) and a water discharge cavity (342), and the first spray head (35) is arranged toward the main inlet (311); The separation box (31) further comprises a water discharge port (314) and a slag discharge port (313); the slag discharge port (313) is in communication with the slag discharge chamber (341); and the water discharge port (314) is in communication with the water discharge chamber (342).

4. The gas extraction drilling blowout prevention device (100) according to claim 1, characterized in that: The buffer assembly (2) further comprises a second spray head (22), wherein the second spray head (22) is arranged in the buffer cavity (211).

5. The gas extraction drilling blowout prevention device (100) according to claim 4, characterized in that: The buffer assembly (2) further comprises a first pipe (23) with two ends open, the first pipe (23) being arranged in the buffer chamber (211), one end of the first pipe (23) being in communication with the first air inlet (212), and the other end of the first pipe (23) being lower than the first air inlet (212).

6. The gas extraction drilling blowout prevention device (100) according to claim 5, characterized in that: The buffer assembly (2) further comprises a partition (26), wherein the partition (26) divides the buffer chamber (211) into a first chamber and a second chamber, wherein the first air inlet (212) is connected to the first chamber, the first pipe (23) is arranged in the first chamber, the air outlet (214) is connected to the second chamber, and the partition (26) has a sieve hole (261) connecting the first chamber and the second chamber.

7. The gas extraction drilling blowout prevention device (100) according to claim 6, characterized in that: The bottom of the first cavity is provided with a sewage outlet (215), and the buffer assembly (2) further comprises a guide member (27), wherein the guide member (27) has a guide surface, and the guide surface gradually extends from top to bottom in a direction close to the sewage outlet (215).

8. The gas extraction drilling blowout prevention device (100) according to claim 1, characterized in that: It also includes an air outlet pipe (29) and a gas outflow sensor (291); the air outlet pipe (29) is connected to the buffer barrel (21) and communicates with the air outlet (214); and the gas outflow sensor (291) is connected to the air outlet pipe (29).

9. The gas extraction drilling blowout prevention device (100) according to any one of claims 3 to 8, characterized in that: A weighing mesh plate (36) is provided in the slag discharge chamber (341), and the weighing mesh plate (36) is rotatably connected to the separation box (31) so that the weighing mesh plate (36) can be switched between a weighing state and a discharge state; The weighing mesh plate (36) is provided with a control component for controlling the weighing mesh plate (36) to switch from the weighing state to the unloading state when the pressure borne by the weighing mesh plate (36) reaches a preset pressure.

10. The gas extraction drilling blowout prevention device (100) according to claim 9, characterized in that: The weighing mesh plate (36) is provided with a counting device (37), and the counting device (37) is used to record the number of times the weighing mesh plate (36) switches from the weighing state to the unloading state.