Regional energy monitoring system based on big data
Through the regional energy monitoring system based on big data, the flow of people and electricity consumption data are analyzed, and the output power of the air conditioning system is dynamically adjusted, the energy consumption waste caused by changes in flow of people in public buildings is solved, and the energy consumption is significantly reduced.
Patent Information
- Application Number
- CN202411112731.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-14
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2044-08-14
AI Technical Summary
In the case of uneven flow of people in public buildings, it is difficult to effectively reduce energy consumption, resulting in waste of energy consumption.
Design a regional energy monitoring system based on big data, obtain and analyze the flow data through data collection, processing and visualization modules, build a flow and electricity consumption prediction model, dynamically adjust the output power of the air conditioning system, and realize energy consumption management.
While ensuring the comfort of the building, the energy consumption of public buildings is significantly reduced and energy consumption waste when there is less traffic or uneven distribution is avoided.
Smart Images

Figure CN119090059A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of energy monitoring, and in particular to a regional energy monitoring system based on big data. Background Art
[0002] In recent years, with the massive increase in public buildings in my country and the continuous improvement of the degree of building intelligence, the energy consumption of various equipment used in public buildings has increased significantly. Public buildings have become major energy consumers in buildings. According to statistics, the power consumption per unit area of public buildings is 10 to 15 times that of ordinary houses, and most of the energy consumed in public buildings throughout the year is consumed by air-conditioning, refrigeration and heating systems.
[0003] Therefore, for the main energy-consuming equipment and systems in public buildings, for a given public building, the building area, the location and quantity of air conditioners cannot be changed. However, the flow of people in public buildings is large, and the heat emitted by the human body as a heat source will have a greater impact on the indoor temperature, which cannot be ignored. In addition, the flow of people in public buildings is unevenly distributed, varies greatly over time, and varies greatly with festivals. If the air-conditioning system always maintains the same mode of operation under any circumstances, it will cause energy waste when the flow of people is small or unevenly distributed. How to achieve the goal of reducing building energy consumption while ensuring the comfort level of the building environment is an urgent problem to be solved. Summary of the invention
[0004] In order to solve the above technical problems, the object of the present invention is to provide a regional energy monitoring system based on big data, including a monitoring center, wherein the monitoring center is communicatively connected with a data acquisition module, a data storage module, a data processing module, a data visualization module and an air conditioning system control module; The data acquisition module is used to obtain personnel data and power consumption data in various areas of the target public building; The data storage module is used to store historical personnel data, historical traffic data, historical power consumption data and historical air conditioning system output power in each area of the target public building; The data processing module is used to obtain the flow of people data in each area according to the personnel data in each area of the target public building; The data visualization module is used to construct a scene area layer, a real-time data layer and a predicted data layer about the target public building, and obtain an integrated visual diagram of regional energy monitoring based on the scene area layer, the real-time data layer and the predicted data layer; The air conditioning system control module is used to obtain execution standard data and inspection standard data for different time periods in each area, and obtain the output power of the air conditioning system for different time periods in each area according to the execution standard data for each time period.
[0005] Furthermore, the process of the data acquisition module acquiring the personnel data and power consumption data of each area in the target public building includes: Acquire AR scene information of a target public building, extract functional characteristics according to the AR scene information, and split the target public building into a plurality of scene sub-areas according to the functional characteristics; Install energy consumption monitoring points in several scene sub-areas to obtain personnel data and power consumption data in different scene sub-areas, mark the collection time, and set the monitoring cycle; The personnel data includes personnel video stream data and personnel location information.
[0006] Furthermore, the process of the data processing module acquiring the pedestrian flow data in each area according to the personnel data in each area of the target public building includes: Obtain video stream data of a person in a scene sub-area, convert the video stream data into continuous video frame images, obtain skeletal point position data of the person in multiple video frame images through the OpenPose algorithm, obtain skeleton data of the person according to the skeletal point position data, convert the skeleton data in the multiple video frame images into a continuous skeleton action sequence, generate action information of the person according to the skeleton action sequence, and generate a motion trajectory of the person according to the action information of the person; Obtain the exit position and entrance position of each scene sub-area, set a preset distance, select a target scene sub-area, obtain a target person whose motion trajectory direction is the exit position of the target scene sub-area in the target scene sub-area, obtain the distance between the target person and the exit position according to the position information of the target person, compare the distance with the preset distance, and when the distance is less than or equal to the preset distance, mark the target person as a valid person, and when the distance is greater than the preset distance, mark the target person as a person who is about to leave; At the same time, a target person whose motion trajectory direction is the entrance position of the target scene sub-region in other scene sub-regions adjacent to the target scene sub-region is selected, and the distance between the target person and the entrance position is obtained according to the position information of the target person, and the distance is compared with a preset distance. When the distance is greater than the preset distance, the target person is marked as a pre-entry person; At the same time, the personnel whose trajectory direction of the target scene sub-region is not the entrance position of the target scene sub-region are marked as valid personnel; Obtain the number of valid personnel, the number of personnel expected to enter, and the number of personnel expected to leave, obtain the sum of the number of valid personnel and the number of personnel expected to enter, obtain the value of the sum of the number of valid personnel and the number of personnel expected to enter minus the number of personnel expected to leave, and mark the value as traffic data.
[0007] Furthermore, the data visualization module constructs a scene area layer, a real-time data layer, and a predicted data layer about the target public building, and obtains an integrated visual diagram of regional energy monitoring according to the scene area layer, the real-time data layer, and the predicted data layer, including: Construct a data twin virtual space, obtain a structural dimension diagram of a target public building and location information of several scene sub-areas, construct a three-dimensional model of the public building according to the structural dimension diagram of the target public building and map it into the digital twin virtual space, and divide the three-dimensional model into several scene sub-area three-dimensional models according to the location information of several scene sub-areas to obtain a scene area layer; Obtain the pedestrian flow data and electricity consumption data of the energy consumption monitoring points in each scene sub-area, perform data preprocessing, generate pedestrian flow twin data and electricity consumption twin data, match the pedestrian flow twin data and electricity consumption twin data with the three-dimensional models of several scene sub-areas of the basic scene layer, and obtain a real-time data layer; According to the data storage module, the historical pedestrian flow data and historical electric energy consumption data of each scene sub-area are stored to build a pedestrian flow and electric energy consumption prediction model; according to the pedestrian flow and electric energy consumption prediction model, the pedestrian flow prediction data and electric energy consumption prediction data of each time period of the current monitoring period of each scene sub-area are obtained; the pedestrian flow prediction data and electric energy consumption prediction data are preprocessed in data format, converted into pedestrian flow prediction twin data and electric energy consumption prediction twin data, and matched with several scene sub-area three-dimensional models of the basic scene layer to obtain a prediction data layer; Taking the scene area layer as the base layer, the real-time data layer and the prediction data layer are superimposed on the scene area layer to obtain an integrated visual diagram of regional energy monitoring.
[0008] Furthermore, the process of constructing a pedestrian flow and electric energy consumption prediction model by storing historical pedestrian flow data and historical electric energy consumption data of each scene sub-area in the prediction data layer according to the data storage module includes: The prediction data layer is communicatively connected with the data storage module, and a historical data set is constructed according to the pedestrian flow data and electric energy consumption data of each scene sub-area at each time of each day in each month of the previous year in the data storage module. The fault detection model is trained in real time by dividing the historical data set into a training set and a test set until the loss function training is stable, and the model parameters are saved. The energy consumption model is tested by the test set until it meets the preset requirements, and the pedestrian flow and electric energy consumption prediction model is output; The input layer of the crowd flow and power consumption prediction model is the historical personnel data and historical power consumption data within the historical monitoring period; The output layer of the pedestrian flow and electric energy consumption prediction model is the pedestrian flow prediction data and electric energy consumption prediction data for each time period in the current monitoring cycle.
[0009] Furthermore, the process of the air conditioning system control module acquiring execution standard data and inspection standard data of each area in different time periods, and acquiring the output power of the air conditioning system of each area in different time periods according to the execution standard data of each time period includes: According to the crowd flow and power consumption prediction model, the crowd flow prediction data and power consumption prediction data of each time period in the current monitoring cycle of the scene sub-area are obtained, and the crowd flow prediction data is used as the execution standard data, and the power consumption prediction data is used as the inspection standard data; The historical air conditioning system output power of each scenario sub-area under different execution standard data in each time period is obtained through the data storage module; The historical air-conditioning system output power with the highest similarity to the execution standard data of the current time period of the scenario sub-area is selected as the air-conditioning system output power of the current time period of the scenario sub-area.
[0010] Furthermore, the real-time data layer is used to compare the real-time data with the execution standard data and the inspection standard data, so as to monitor the status of the air conditioning system in real time, and the process includes: Compare the pedestrian flow data of the current scene sub-area obtained by the data processing module with the execution standard data, obtain the execution standard deviation value between the pedestrian flow data and the execution standard data, and set the execution standard deviation threshold; If the execution standard deviation value is greater than the execution standard deviation threshold, the execution standard data and the inspection standard data of the current monitoring period are updated; If the execution standard deviation value is less than or equal to the execution standard deviation threshold, then obtain the inspection standard deviation value of the electric energy consumption data collected by the energy consumption monitoring point in the current scene sub-area and the inspection standard data, and set the inspection standard deviation threshold; If the inspection standard deviation value is less than or equal to the inspection standard deviation threshold, the air conditioning system of the current scene sub-area is marked as normal; If the inspection standard deviation value is greater than the inspection standard deviation threshold, the air conditioning system in the current scene sub-area is marked as a fault state, and a fault alarm is generated and sent to the monitoring center.
[0011] Furthermore, when the execution standard deviation value of the real-time data layer is greater than the execution standard deviation threshold, the process of updating the execution standard data and the inspection standard data of the current monitoring period includes: The personnel data and power consumption data collected during the current monitoring cycle are input into the pedestrian flow and power consumption prediction model, and the pedestrian flow prediction data and power consumption prediction data for each time period in the current monitoring cycle output by the pedestrian flow and power consumption prediction model are used as new execution standard data and inspection standard data.
[0012] Compared with the prior art, the beneficial effect of the present invention is: compared with the public building energy consumption control system based on schedule control and temperature control in traditional technology, the present invention adds a strategy for energy consumption control of public buildings based on passenger flow on the basis of traditional schedule control and temperature control. In the face of the problems of uneven distribution of passenger flow in various areas of public buildings, large variability over time and large variability with festivals, the present invention can dynamically adjust the output power of the air-conditioning system in various areas of the public building when the passenger flow is small or unevenly distributed, thereby significantly reducing the building energy consumption while ensuring the environmental comfort requirements in the public building. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] Figure 1 This is a schematic diagram of a regional energy monitoring system based on big data according to an embodiment of the present application. DETAILED DESCRIPTION
[0014] The following is a clear and complete description of the technical solutions in the embodiments of the present application in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of the present application.
[0015] like Figure 1 As shown, a regional energy monitoring system based on big data includes a monitoring center, wherein the monitoring center is communicatively connected with a data acquisition module, a data storage module, a data processing module, a data visualization module and an air conditioning system control module; The data acquisition module is used to obtain personnel data and power consumption data in various areas of the target public building; The data storage module is used to store historical personnel data, historical traffic data, historical power consumption data and historical air conditioning system output power in each area of the target public building; The data processing module is used to obtain the flow of people data in each area according to the personnel data in each area of the target public building; The data visualization module is used to construct a scene area layer, a real-time data layer and a predicted data layer about the target public building, and obtain an integrated visual diagram of regional energy monitoring based on the scene area layer, the real-time data layer and the predicted data layer; The air conditioning system control module is used to obtain execution standard data and inspection standard data for different time periods in each area, and obtain the output power of the air conditioning system for different time periods in each area according to the execution standard data for each time period.
[0016] It should be further explained that, in the specific implementation process, the process of the data acquisition module acquiring the personnel data and power consumption data of each area in the target public building includes: Acquire AR scene information of a target public building, extract functional characteristics according to the AR scene information, and split the target public building into a plurality of scene sub-areas according to the functional characteristics; The scene sub-areas include public places such as restaurants, shops, gyms, and exhibition halls; Install energy consumption monitoring points in several scene sub-areas to obtain personnel data and power consumption data in different scene sub-areas, mark the collection time, and set the monitoring cycle; The personnel data includes personnel video stream data and personnel location information.
[0017] It should be further explained that, in the specific implementation process, the process of the data processing module acquiring the pedestrian flow data in each area according to the personnel data in each area of the target public building includes: Obtain video stream data of a person in a scene sub-area, convert the video stream data into continuous video frame images, obtain skeletal point position data of the person in multiple video frame images through the OpenPose algorithm, obtain skeleton data of the person according to the skeletal point position data, convert the skeleton data in the multiple video frame images into a continuous skeleton action sequence, generate action information of the person according to the skeleton action sequence, and generate a motion trajectory of the person according to the action information of the person; Obtain the exit position and entrance position of each scene sub-area, set a preset distance, select a target scene sub-area, obtain a target person whose motion trajectory direction is the exit position of the target scene sub-area in the target scene sub-area, obtain the distance between the target person and the exit position according to the position information of the target person, compare the distance with the preset distance, and when the distance is less than or equal to the preset distance, mark the target person as a valid person, and when the distance is greater than the preset distance, mark the target person as a person who is about to leave; At the same time, a target person whose motion trajectory direction is the entrance position of the target scene sub-region in other scene sub-regions adjacent to the target scene sub-region is selected, and the distance between the target person and the entrance position is obtained according to the position information of the target person, and the distance is compared with a preset distance. When the distance is greater than the preset distance, the target person is marked as a pre-entry person; At the same time, the personnel whose trajectory direction of the target scene sub-region is not the entrance position of the target scene sub-region are marked as valid personnel; Obtain the number of valid personnel, the number of personnel expected to enter, and the number of personnel expected to leave, obtain the sum of the number of valid personnel and the number of personnel expected to enter, obtain the value of the sum of the number of valid personnel and the number of personnel expected to enter minus the number of personnel expected to leave, and mark the value as traffic data.
[0018] It should be further explained that, in the specific implementation process, the data visualization module constructs a scene area layer, a real-time data layer and a predicted data layer about the target public building, and obtains an integrated visual diagram of regional energy monitoring based on the scene area layer, the real-time data layer and the predicted data layer. The process includes: Construct a data twin virtual space, obtain a structural dimension diagram of a target public building and location information of several scene sub-areas, construct a three-dimensional model of the public building according to the structural dimension diagram of the target public building and map it into the digital twin virtual space, and divide the three-dimensional model into several scene sub-area three-dimensional models according to the location information of several scene sub-areas to obtain a scene area layer; Obtain the pedestrian flow data and electricity consumption data of the energy consumption monitoring points in each scene sub-area, perform data preprocessing, generate pedestrian flow twin data and electricity consumption twin data, match the pedestrian flow twin data and electricity consumption twin data with the three-dimensional models of several scene sub-areas of the basic scene layer, and obtain a real-time data layer; The real-time data layer is used to compare the real-time data with the execution standard data and the inspection standard data, so as to monitor the status of the air conditioning system in real time; According to the data storage module, the historical pedestrian flow data and historical electric energy consumption data of each scene sub-area are stored to build a pedestrian flow and electric energy consumption prediction model; according to the pedestrian flow and electric energy consumption prediction model, the pedestrian flow prediction data and electric energy consumption prediction data of each time period of the current monitoring period of each scene sub-area are obtained; the pedestrian flow prediction data and electric energy consumption prediction data are preprocessed in data format, converted into pedestrian flow prediction twin data and electric energy consumption prediction twin data, and matched with several scene sub-area three-dimensional models of the basic scene layer to obtain a prediction data layer; The prediction data layer constructs a prediction model for human flow and electric energy consumption according to the historical human flow data and historical electric energy consumption data of each scene sub-area stored in the data storage module; Taking the scene area layer as the base layer, the real-time data layer and the prediction data layer are superimposed on the scene area layer to obtain an integrated visual diagram of regional energy monitoring.
[0019] It should be further explained that, in the specific implementation process, the process of the prediction data layer storing the historical pedestrian flow data and historical power consumption data of each scene sub-area in the data storage module to construct a pedestrian flow and power consumption prediction model includes: The prediction data layer is communicatively connected with the data storage module, and a historical data set is constructed according to the pedestrian flow data and electric energy consumption data of each scene sub-area at each time of each day in each month of the previous year in the data storage module. The fault detection model is trained in real time by dividing the historical data set into a training set and a test set until the loss function training is stable, and the model parameters are saved. The energy consumption model is tested by the test set until it meets the preset requirements, and the pedestrian flow and electric energy consumption prediction model is output; The input layer of the crowd flow and power consumption prediction model is the historical personnel data and historical power consumption data within the historical monitoring period; The output layer of the pedestrian flow and electric energy consumption prediction model is the pedestrian flow prediction data and electric energy consumption prediction data for each time period in the current monitoring cycle.
[0020] It should be further explained that, in the specific implementation process, the air conditioning system control module obtains the execution standard data and the inspection standard data of each area in different time periods, and obtains the output power of the air conditioning system in different time periods of each area according to the execution standard data of each time period, including: According to the crowd flow and power consumption prediction model, the crowd flow prediction data and power consumption prediction data of each time period in the current monitoring cycle of the scene sub-area are obtained, and the crowd flow prediction data is used as the execution standard data, and the power consumption prediction data is used as the inspection standard data; The historical air conditioning system output power of each scenario sub-area under different execution standard data in each time period is obtained through the data storage module; The historical air-conditioning system output power with the highest similarity to the execution standard data of the current time period of the scenario sub-area is selected as the air-conditioning system output power of the current time period of the scenario sub-area.
[0021] It should be further explained that, in the specific implementation process, the real-time data layer compares the real-time data with the execution standard data and the inspection standard data, so as to monitor the status of the air-conditioning system in real time, including: Compare the pedestrian flow data of the current scene sub-area obtained by the data processing module with the execution standard data, obtain the execution standard deviation value between the pedestrian flow data and the execution standard data, and set the execution standard deviation threshold; If the execution standard deviation value is greater than the execution standard deviation threshold, the execution standard data and the inspection standard data of the current monitoring period are updated; If the execution standard deviation value is less than or equal to the execution standard deviation threshold, then obtain the inspection standard deviation value of the electric energy consumption data collected by the energy consumption monitoring point in the current scene sub-area and the inspection standard data, and set the inspection standard deviation threshold; If the inspection standard deviation value is less than or equal to the inspection standard deviation threshold, the air conditioning system of the current scene sub-area is marked as normal; If the inspection standard deviation value is greater than the inspection standard deviation threshold, the air conditioning system in the current scene sub-area is marked as a fault state, and a fault alarm is generated and sent to the monitoring center.
[0022] It should be further explained that, in the specific implementation process, when the execution standard deviation value is greater than the execution standard deviation threshold value, the process of updating the execution standard data and the inspection standard data of the current monitoring cycle of the real-time data layer includes: The personnel data and power consumption data collected during the current monitoring cycle are input into the pedestrian flow and power consumption prediction model, and the pedestrian flow prediction data and power consumption prediction data for each time period in the current monitoring cycle output by the pedestrian flow and power consumption prediction model are used as new execution standard data and inspection standard data.
[0023] The above embodiments are only used to illustrate the technical method of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical method of the present invention may be modified or replaced by equivalents without departing from the spirit and scope of the technical method of the present invention.
Claims
1. A regional energy monitoring system based on big data, including a monitoring center, characterized in that: The monitoring center is communicatively connected to a data acquisition module, a data storage module, a data processing module, a data visualization module and an air conditioning system control module; The data acquisition module is used to obtain personnel data and power consumption data in various areas of the target public building; The data storage module is used to store historical personnel data, historical traffic data, historical power consumption data and historical air conditioning system output power in each area of the target public building; The data processing module is used to obtain the flow of people data in each area according to the personnel data in each area of the target public building; The data visualization module is used to construct a scene area layer, a real-time data layer and a predicted data layer about the target public building, and obtain an integrated visual diagram of regional energy monitoring based on the scene area layer, the real-time data layer and the predicted data layer; The air conditioning system control module is used to obtain execution standard data and inspection standard data for different time periods in each area, and obtain the output power of the air conditioning system for different time periods in each area according to the execution standard data for each time period.
2. According to the regional energy monitoring system based on big data in claim 1, it is characterized in that: The process of the data acquisition module acquiring personnel data and power consumption data of each area in the target public building includes: Acquire AR scene information of a target public building, extract functional characteristics according to the AR scene information, and split the target public building into a plurality of scene sub-areas according to the functional characteristics; Install energy consumption monitoring points in several scene sub-areas to obtain personnel data and power consumption data in different scene sub-areas, mark the collection time, and set the monitoring cycle; The personnel data includes personnel video stream data and personnel location information.
3. A regional energy monitoring system based on big data according to claim 2, characterized in that: The process of the data processing module acquiring the pedestrian flow data in each area according to the personnel data in each area of the target public building includes: Obtain video stream data of a person in a scene sub-area, convert the video stream data into continuous video frame images, obtain skeletal point position data of the person in multiple video frame images through the OpenPose algorithm, obtain skeleton data of the person according to the skeletal point position data, convert the skeleton data in the multiple video frame images into a continuous skeleton action sequence, generate action information of the person according to the skeleton action sequence, and generate a motion trajectory of the person according to the action information of the person; Obtain the exit position and entrance position of each scene sub-area, set a preset distance, select a target scene sub-area, obtain a target person whose motion trajectory direction is the exit position of the target scene sub-area in the target scene sub-area, obtain the distance between the target person and the exit position according to the position information of the target person, compare the distance with the preset distance, and when the distance is less than or equal to the preset distance, mark the target person as a valid person, and when the distance is greater than the preset distance, mark the target person as a person who is about to leave; At the same time, a target person whose motion trajectory direction is the entrance position of the target scene sub-region in other scene sub-regions adjacent to the target scene sub-region is selected, and the distance between the target person and the entrance position is obtained according to the position information of the target person, and the distance is compared with a preset distance. When the distance is greater than the preset distance, the target person is marked as a pre-entry person; At the same time, the personnel whose trajectory direction of the target scene sub-region is not the entrance position of the target scene sub-region are marked as valid personnel; Obtain the number of valid personnel, the number of personnel expected to enter, and the number of personnel expected to leave, obtain the sum of the number of valid personnel and the number of personnel expected to enter, obtain the value of the sum of the number of valid personnel and the number of personnel expected to enter minus the number of personnel expected to leave, and mark the value as traffic data.
4. A regional energy monitoring system based on big data according to claim 3, characterized in that: The data visualization module constructs a scene area layer, a real-time data layer, and a predicted data layer about the target public building, and obtains a process of an integrated visual diagram of regional energy monitoring based on the scene area layer, the real-time data layer, and the predicted data layer, including: Construct a data twin virtual space, obtain a structural dimension diagram of a target public building and location information of several scene sub-areas, construct a three-dimensional model of the public building according to the structural dimension diagram of the target public building and map it into the digital twin virtual space, and divide the three-dimensional model into several scene sub-area three-dimensional models according to the location information of several scene sub-areas to obtain a scene area layer; Obtain the pedestrian flow data and electricity consumption data of the energy consumption monitoring points in each scene sub-area, perform data preprocessing, generate pedestrian flow twin data and electricity consumption twin data, match the pedestrian flow twin data and electricity consumption twin data with the three-dimensional models of several scene sub-areas of the basic scene layer, and obtain a real-time data layer; According to the data storage module, the historical pedestrian flow data and historical electric energy consumption data of each scene sub-area are stored to build a pedestrian flow and electric energy consumption prediction model; according to the pedestrian flow and electric energy consumption prediction model, the pedestrian flow prediction data and electric energy consumption prediction data of each time period of the current monitoring period of each scene sub-area are obtained; the pedestrian flow prediction data and electric energy consumption prediction data are preprocessed in data format, converted into pedestrian flow prediction twin data and electric energy consumption prediction twin data, and matched with several scene sub-area three-dimensional models of the basic scene layer to obtain a prediction data layer; Taking the scene area layer as the base layer, the real-time data layer and the prediction data layer are superimposed on the scene area layer to obtain an integrated visual diagram of regional energy monitoring.
5. A regional energy monitoring system based on big data according to claim 4, characterized in that: The process of constructing a prediction model of pedestrian flow and electric energy consumption according to the prediction data layer storing the historical pedestrian flow data and the historical electric energy consumption data of each scene sub-area in the data storage module includes: The prediction data layer is communicatively connected with the data storage module, and a historical data set is constructed according to the pedestrian flow data and electric energy consumption data of each scene sub-area at each time of each day in each month of the previous year in the data storage module. The fault detection model is trained in real time by dividing the historical data set into a training set and a test set until the loss function training is stable, and the model parameters are saved. The energy consumption model is tested by the test set until it meets the preset requirements, and the pedestrian flow and electric energy consumption prediction model is output; The input layer of the crowd flow and power consumption prediction model is the historical personnel data and historical power consumption data within the historical monitoring period; The output layer of the pedestrian flow and electric energy consumption prediction model is the pedestrian flow prediction data and electric energy consumption prediction data for each time period in the current monitoring cycle.
6. A regional energy monitoring system based on big data according to claim 5, characterized in that: The process of the air conditioning system control module acquiring execution standard data and inspection standard data of each area in different time periods, and acquiring the output power of the air conditioning system in each area in different time periods according to the execution standard data of each time period includes: According to the crowd flow and power consumption prediction model, the crowd flow prediction data and power consumption prediction data of each time period in the current monitoring cycle of the scene sub-area are obtained, and the crowd flow prediction data is used as the execution standard data, and the power consumption prediction data is used as the inspection standard data; The historical air conditioning system output power of each scenario sub-area under different execution standard data in each time period is obtained through the data storage module; The historical air-conditioning system output power with the highest similarity to the execution standard data of the current time period of the scenario sub-area is selected as the air-conditioning system output power of the current time period of the scenario sub-area.
7. A regional energy monitoring system based on big data according to claim 6, characterized in that: The real-time data layer is used to compare the real-time data with the execution standard data and the inspection standard data, so as to monitor the status of the air conditioning system in real time, and the process includes: Compare the pedestrian flow data of the current scene sub-area obtained by the data processing module with the execution standard data, obtain the execution standard deviation value between the pedestrian flow data and the execution standard data, and set the execution standard deviation threshold; If the execution standard deviation value is greater than the execution standard deviation threshold, the execution standard data and the inspection standard data of the current monitoring period are updated; If the execution standard deviation value is less than or equal to the execution standard deviation threshold, then obtain the inspection standard deviation value of the electric energy consumption data collected by the energy consumption monitoring point in the current scene sub-area and the inspection standard data, and set the inspection standard deviation threshold; If the inspection standard deviation value is less than or equal to the inspection standard deviation threshold, the air conditioning system of the current scene sub-area is marked as normal; If the inspection standard deviation value is greater than the inspection standard deviation threshold, the air conditioning system in the current scene sub-area is marked as a fault state, and a fault alarm is generated and sent to the monitoring center.
8. The regional energy monitoring system based on big data according to claim 7 is characterized in that: When the execution standard deviation value of the real-time data layer is greater than the execution standard deviation threshold, the process of updating the execution standard data and the inspection standard data of the current monitoring period includes: The personnel data and power consumption data collected during the current monitoring cycle are input into the pedestrian flow and power consumption prediction model, and the pedestrian flow prediction data and power consumption prediction data for each time period in the current monitoring cycle output by the pedestrian flow and power consumption prediction model are used as new execution standard data and inspection standard data.
Citation Information
Patent Citations
Escalator flow monitoring method and system based on human skeleton information and multi-target tracking
CN111062238A
Public building operation energy consumption monitoring system
CN114048898A
Building energy efficiency intelligent supervision and prediction method based on digital twinning
CN114897241A
Park management method, device and system, electronic equipment and computer readable medium
CN115079589A
Central air conditioner control method of smart hospital and storage medium
CN115854506A
Cited By
Smart energy monitoring system based on Internet of Things technology
CN121544420A