Aggregation service system capable of adjusting load resources and power grid

By designing an adjustable load resource aggregation service system for responsive demand acquisition units, fault diagnosis units, data acquisition units and scheduling units in the power system, automatic distinction and scheduling of faulty or required verified load resources is realized, and the existing technology is solved The problem that resources in China cannot participate in scheduling in a timely manner has improved the scheduling efficiency and accuracy of the power system.

CN119109215APending Publication Date: 2024-12-10SHENZHEN POWER SUPPLY BUREAU
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411294981.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-14
Publication Date
2024-12-10

AI Technical Summary

Technical Problem

The existing power system aggregation service system cannot effectively distinguish and automatically schedule adjustable load resources that require fault elimination or approval before participating in scheduling, resulting in imbalance between power supply and demand and scheduling errors.

Method used

An adjustable load resource aggregation service system including a response demand acquisition unit, a fault diagnosis unit, a data acquisition unit and a scheduling unit is designed. By monitoring the operating status of load resources in real time, a fault identification is generated, and based on the fault identification, important level and Permission information classifies and dispatches load resources to realize automatic partitioning and automatic scheduling.

Benefits of technology

It realizes automatic distinction of load resources and automatic scheduling according to attribute requirements, improves the efficiency and accuracy of power system scheduling, and solves the problem that resources cannot participate in scheduling immediately after failure elimination or authentication is passed.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119109215A_ABST
    Figure CN119109215A_ABST
Patent Text Reader

Abstract

The invention provides an aggregation service system capable of adjusting load resources and a power grid, and the system comprises a response demand obtaining unit, a fault diagnosis unit, a data collection unit, a classification unit and a scheduling unit, the response demand obtaining unit determines the required electricity consumption according to a user order, and sends the required electricity consumption to the scheduling unit; the fault diagnosis unit is used for acquiring the running states of the load resources, determining fault identifiers based on the running states of the load resources and sending the fault identifiers to the data acquisition unit, and the data acquisition unit is used for generating a scheduling load resource list and sending the scheduling load resource list to the classification unit and the scheduling unit; the classification unit is used for classifying the load resources according to the scheduling load list to obtain a classification list and sending the classification list to the scheduling unit, and the scheduling unit regulates and controls the load resources according to the scheduling load resource list and the classification list. The problem in the prior art that the adjustable load cannot participate in power system dispatching immediately after the fault is eliminated or the authentication is passed is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of adjustable load resource aggregation, and in particular to an aggregation service system and a power grid for adjustable load resources. Background Art

[0002] In today's power system, demand-side resources are diverse and have huge differences in characteristics. Among them, adjustable loads, as an important component, have diverse situations. For example, some adjustable loads are currently in a fault state, but the fault may be eliminated later; some are not currently approved, and can only participate in scheduling after subsequent approval. However, these special adjustable load resources have not yet been effectively involved in the dispatching plan of the power system.

[0003] As for the classification modeling and aggregation methods of demand-side adjustable load resources, the current design has certain limitations. Usually, these methods take into account factors such as the importance level of the load and the size of the control area, but are only applicable to those adjustable load resources that can directly participate in the dispatch. For those adjustable load resources that need to be cleared before they can participate in the dispatch, and those that need to be approved before they can participate in the dispatch. Specifically, the current aggregation service system has obvious deficiencies in dispatch management. Since there is no clear setting for the attributes of participating in the dispatch, the system cannot automatically distinguish between adjustable load resources that directly participate in the dispatch, participate in the dispatch after the fault is eliminated, and participate in the dispatch after approval. This results in the system being unable to automatically operate according to the set attribute requirements, which seriously affects the efficiency and accuracy of the power system dispatch. For example, in actual power dispatch, if the adjustable load in an industrial area is temporarily unable to participate in the dispatch due to equipment failure, but the system cannot identify this situation and still dispatches in the conventional way, it may cause an imbalance between power supply and demand. For another example, the adjustable load resources in certain specific areas need to be approved before they can participate in the dispatch, and since the system cannot automatically distinguish this attribute, there may be erroneous operations of dispatching without approval, causing a series of problems.

[0004] In summary, solving the problem of imperfect dispatching management scheme of aggregation service system so that it can fully consider the adjustable load resources in various special situations and realize automatic differentiation and operation according to the set attribute requirements has become a key technical problem that needs to be solved urgently in the current power system optimization. Summary of the invention

[0005] The main purpose of the present application is to provide an aggregation service system and power grid for adjustable load resources, so as to at least solve the problem in the prior art that the adjustable load cannot immediately participate in the power system dispatch after the fault is eliminated or the certification is passed.

[0006] In order to achieve the above-mentioned purpose, according to one aspect of the present application, there is provided an aggregation service system for adjustable load resources, comprising: a response demand acquisition unit, a fault diagnosis unit, a data collection unit, a classification unit and a scheduling unit, wherein: the response demand acquisition unit is used to determine the required power consumption according to the user order and send it to the scheduling unit; the fault diagnosis unit is used to obtain the operating status of the load resources from the load resource management platform, determine the fault identifier based on the operating status of each load resource, and send the fault identifier to the data collection unit, the fault identifier is used to characterize whether the load resource is in a fault state; the data collection unit is used to generate a scheduling load resource list and send it to the classification unit and the scheduling unit, the load resource list includes the fault identifier, importance level, scheduling identifier and response level, and the scheduling identifier is used to characterize the scheduling identifier of the corresponding load resource; the classification unit is used to classify the load resources according to the scheduling load list, obtain the classification list and send it to the scheduling unit; the scheduling unit is used to regulate the load resources according to the scheduling load resource list and the classification list.

[0007] Optionally, the data acquisition unit includes: a response level determination module, used to determine the response level of the load resource based on the response time and response duration of the load resource; a load importance level determination module, used to determine the importance level of the load resource based on the function of the load resource; a scheduling mode determination module, used to determine the scheduling identifier of the load resource based on the fault identifier and authority information and generate the scheduling identifier.

[0008] Optionally, the scheduling unit includes: a storage module, used to store the load resources in corresponding storage areas according to the classification list, different storage areas correspond to different scheduling identifiers; an adjustment module, used to calculate the scheduling coefficient value according to the required power consumption and the scheduling load resource list, and sort each load resource according to the scheduling coefficient value, and adjust them in sequence.

[0009] Optionally, the fault identifier is determined based on the operating status of each of the load resources, including: generating a first fault identifier when a fault occurs in the load resource; generating a second fault identifier when no fault occurs in the load resource; and updating the fault identifier when the operating status of the load resource changes.

[0010] Optionally, the response level of the load resource is determined according to the response time and response duration of the load resource, including: when the response time is less than or equal to a first threshold and the response duration is greater than a second threshold, determining the response level as the first response level; when the response time is less than or equal to the first threshold and the response duration is greater than or equal to a third threshold and less than or equal to the second threshold, determining the response level as the second response level; when the response time is greater than the first threshold and less than or equal to a fourth threshold and the response duration is greater than the second threshold, determining the response level as the third response level; when the response time is greater than the first threshold and less than or equal to the fourth threshold and the response duration is greater than or equal to the third threshold and less than or equal to the second threshold, determining the response level as the fourth response level; when the response time is greater than the fourth threshold and less than or equal to the fourth threshold and the response duration is greater than or equal to the third threshold and less than or equal to the second threshold, determining the response level as the fifth response level.

[0011] Optionally, determining the dispatch identifier of the load resource according to the fault identifier and the authority information and generating the dispatch identifier also includes: when the fault identifier is the first fault identifier, generating a first dispatch identifier, the first dispatch identifier is used to characterize that the dispatch identifier of the load resource is adjusted after the fault is repaired; when the fault identifier is the second fault identifier and the authority information requires authentication, generating a second dispatch identifier, the second dispatch identifier is used to characterize that the dispatch identifier of the load resource is adjusted after authentication is passed; when the fault identifier is the second fault identifier and the authority information does not require authentication, generating a third dispatch identifier, the third dispatch identifier is used to characterize that the dispatch identifier of the load resource is directly adjusted.

[0012] Optionally, the load resources are classified according to the scheduling load list, including: when the importance level corresponding to the load resource is not the target level, the classification identifier of the load resource in the classification list is determined as a first identifier, and the first identifier is used to indicate that no adjustment is made; when the importance level corresponding to the load resource is the target level, the scheduling identifier is the second scheduling identifier, and the authentication fails, the classification identifier of the load resource in the classification list is determined as a second identifier, and the second identifier is used to indicate that the load resource is an illegal resource; when the importance level corresponding to the load resource is the target level, the scheduling identifier is the first scheduling identifier, and the repair is not completed, the classification identifier of the load resource in the classification list is determined as a third identifier, and the third identifier is used to indicate that the load resource does not participate in the adjustment temporarily; when the importance level corresponding to the load resource is the target level, the scheduling identifier is the second scheduling identifier, the authentication passes, or the scheduling identifier is the third scheduling identifier, the classification identifier of the load resource in the classification list is determined as a fourth identifier, and the fourth identifier is used to indicate that the load resource can be used for adjustment.

[0013] Optionally, the load resources are stored in a corresponding storage area according to the classification list, including: when the classification identifier corresponding to the load resource in the classification list is the second identifier, the load resources are stored in a first preset area; when the classification identifier corresponding to the load resource in the classification list is the third identifier, the load resources are stored in a second preset area; when the classification identifier corresponding to the load resource in the classification list is the fourth identifier, the load resources are stored in a third preset area.

[0014] Optionally, a dispatch coefficient value is calculated according to the demanded power consumption and the dispatched load resource list, and each load resource is sorted according to the dispatch coefficient value, including: obtaining a market electricity price, a target power, the demanded power consumption, a response level and a target weight, wherein the market electricity price is a real-time electricity selling price, the target power is the remaining power of the power grid, and the target weight is the weight of the number of times the load resource is adjusted according to the dispatch instruction to the total number of times the dispatch instruction is issued; querying a first mapping relationship according to the response level to obtain a response coefficient, wherein the first mapping relationship is a mapping relationship between the response level and the response coefficient; substituting the market electricity price, the target power, the demanded power consumption, the response coefficient and the target weight into a first target formula e=L / X+G*Y / J for calculation to obtain the dispatch coefficient value, wherein e is the dispatch coefficient value, L is the target power, J is the market electricity price, G is the response coefficient, Y is the target weight, and X is the demanded power consumption; and sorting is performed from large to small based on the dispatch coefficient value.

[0015] According to another aspect of the present application, a power grid is provided for executing any one of the systems described above.

[0016] Applying the technical solution of the present application, in the above-mentioned aggregation service system with adjustable load resources, the above-mentioned response demand acquisition unit is used to determine the required power consumption according to the user order and send it to the above-mentioned dispatching unit; the above-mentioned fault diagnosis unit is used to obtain the operating status of the above-mentioned load resources from the load resource management platform, determine the fault identifier based on the operating status of each of the above-mentioned load resources, and send the above-mentioned fault identifier to the data acquisition unit, and the above-mentioned fault identifier is used to characterize whether the above-mentioned load resources are in a faulty state; the above-mentioned data acquisition unit is used to generate a dispatching load resource list and send it to the classification unit and the dispatching unit, the above-mentioned load resource list includes the above-mentioned fault identifier, importance level, dispatching identifier and response level, and the above-mentioned dispatching identifier is used to characterize the dispatching identifier of the corresponding above-mentioned load resource; the above-mentioned classification unit is used to classify the above-mentioned load resources according to the above-mentioned dispatching load list, obtain the classification list and send it to the above-mentioned dispatching unit; the above-mentioned dispatching unit is used to regulate the above-mentioned load resources according to the above-mentioned dispatching load resource list and the above-mentioned classification list. An aggregation service system proposed in the present application monitors the operating status of load resources in real time through a fault diagnosis unit, generates a fault identification, and combines a data acquisition unit and a classification unit to update the adjustable status of load resources in real time, thereby realizing automatic partitioning and automatic scheduling, solving the problem in the prior art that adjustable loads cannot immediately participate in power system scheduling after the fault is eliminated or the authentication is passed. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1A schematic diagram of the structure of an aggregation service system capable of adjusting load resources provided according to an embodiment of the present application is shown;

[0018] Figure 2 A schematic diagram of the structure of a data acquisition unit provided according to an embodiment of the present application is shown;

[0019] Figure 3 A schematic diagram of the structure of a scheduling unit provided according to an embodiment of the present application is shown. DETAILED DESCRIPTION

[0020] It should be noted that, in the absence of conflict, the embodiments and features in the embodiments of the present application can be combined with each other. The present application will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.

[0021] In order to enable those skilled in the art to better understand the solution of the present application, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present application.

[0022] It should be noted that the terms "first", "second", etc. in the specification and claims of the present application and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequential order. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of the present application described here. In addition, the terms "including" and "having" and any of their variations are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device comprising a series of steps or units is not necessarily limited to those steps or units clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.

[0023] As introduced in the background technology, the scheduling management scheme of the aggregation service system in the prior art does not take into account the adjustable load resources that need to participate in scheduling after the fault is eliminated and the adjustable load resources that need to be approved before participating in scheduling. In order to solve the problem that the adjustable load cannot immediately participate in the power system scheduling after the fault is eliminated or the certification is passed, the embodiments of the present application provide an aggregation service system and power grid for adjustable load resources.

[0024] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the accompanying drawings in the embodiments of the present invention.

[0025] Figure 1is a structural diagram of an aggregation service system capable of adjusting load resources according to an embodiment of the present application. Figure 1 As shown, an aggregation service system capable of adjusting load resources includes: a response demand acquisition unit, a fault diagnosis unit, a data collection unit, a classification unit and a scheduling unit.

[0026] The response demand acquisition unit is used to determine the required power consumption according to the user order and send it to the scheduling unit;

[0027] Specifically, the above-mentioned response demand acquisition unit determines the required power consumption according to the user order, inputs the required power consumption through the power grid service demand setting unit, and sends it to the above-mentioned dispatching unit.

[0028] The fault diagnosis unit is used to obtain the operating status of the load resources from the load resource management platform, determine the fault identifier based on the operating status of each load resource, and send the fault identifier to the data acquisition unit. The fault identifier is used to indicate whether the load resource is in a fault state.

[0029] Specifically, the fault diagnosis unit obtains the operating status of the load resource from the load resource management platform, and obtains the load resource fault condition according to the load resource operating status. The load resource fault condition includes information such as the fault type and quantity, and defines a load resource fault identifier D. If a fault exists, D=1, and if no fault exists, D=0.

[0030] The data collection unit is used to generate a dispatch load resource list and send it to the classification unit and the dispatch unit. The load resource list includes the fault identification, importance level, dispatch identification and response level. The dispatch identification is used to represent the dispatch identification of the corresponding load resource.

[0031] Specifically, a dispatching load resource list is generated based on the fault identification, importance level, dispatch identification and response level of the above-mentioned load resources. The above-mentioned load resources are classified according to the above-mentioned information in the classification unit. The dispatching coefficient is calculated according to the above-mentioned information of each of the above-mentioned load resources for regulation in the dispatching unit. The above-mentioned importance level is divided into first-level load A1, second-level load A2 and third-level load A3 according to the GB50052-2009 standard. The above-mentioned dispatching identification represents the dispatching identification of the corresponding load resource, which is defined as C1 representing the above-mentioned load resources directly participating in the dispatching, C2 representing the above-mentioned load resources that can participate in the dispatching only after the fault is repaired, and C3 representing the above-mentioned load resources that can participate in the dispatching only after authentication. The above-mentioned response level is the classification of the response time and duration of the above-mentioned load resources in the dispatching pool.

[0032] The classification unit is used to classify the load resources according to the dispatch load list, obtain the classification list and send it to the dispatch unit;

[0033] Specifically, according to the importance level and dispatch identifier corresponding to the above-mentioned load resources, the classification identifier of the above-mentioned load resources in the above-mentioned classification list is determined as the first identifier, the above-mentioned first identifier is used to indicate that no adjustment is made, the second identifier, the above-mentioned second identifier is used to indicate that the above-mentioned load resources are illegal resources, the third identifier, the above-mentioned third identifier is used to indicate that the above-mentioned load resources are not temporarily involved in the adjustment, and the fourth identifier, the above-mentioned fourth identifier is used to indicate that the above-mentioned load resources can be used for adjustment.

[0034] The above-mentioned scheduling unit is used to regulate the above-mentioned load resources according to the above-mentioned scheduling load resource list and the above-mentioned classification list.

[0035] Specifically, for the above-mentioned load resources that can be adjusted, the market electricity price, target electricity, the above-mentioned demand electricity, response level, target weight and response coefficient are substituted into the formula e=L / X+G*Y / J to calculate the scheduling coefficient e of each of the above-mentioned load resources, and the above-mentioned scheduling coefficient values ​​​​e are sorted in order from large to small, divided into high-priority load resources, medium-priority load resources and low-priority load resources, and scheduled in the order of high, medium and low priority.

[0036] Applying the technical solution of the present application, in the above-mentioned aggregation service system with adjustable load resources, the above-mentioned response demand acquisition unit is used to determine the required power consumption according to the user order and send it to the above-mentioned dispatching unit; the above-mentioned fault diagnosis unit is used to obtain the operating status of the above-mentioned load resources from the load resource management platform, determine the fault identifier based on the operating status of each of the above-mentioned load resources, and send the above-mentioned fault identifier to the data acquisition unit, and the above-mentioned fault identifier is used to characterize whether the above-mentioned load resources are in a faulty state; the above-mentioned data acquisition unit is used to generate a dispatching load resource list and send it to the classification unit and the dispatching unit, the above-mentioned load resource list includes the above-mentioned fault identifier, importance level, dispatching identifier and response level, and the above-mentioned dispatching identifier is used to characterize the dispatching identifier of the corresponding above-mentioned load resource; the above-mentioned classification unit is used to classify the above-mentioned load resources according to the above-mentioned dispatching load list, obtain the classification list and send it to the above-mentioned dispatching unit; the above-mentioned dispatching unit is used to regulate the above-mentioned load resources according to the above-mentioned dispatching load resource list and the above-mentioned classification list. An aggregation service system proposed in the present application monitors the operating status of load resources in real time through a fault diagnosis unit, generates a fault identification, and combines a data acquisition unit and a classification unit to update the adjustable status of load resources in real time, thereby realizing automatic partitioning and automatic scheduling, solving the problem in the prior art that adjustable loads cannot immediately participate in power system scheduling after the fault is eliminated or the authentication is passed.

[0037] In the embodiments of the present application, Figure 2 As shown, the above-mentioned data acquisition unit includes:

[0038] A response level determination module, used to determine the response level of the above load resource according to the response time and response duration of the above load resource;

[0039] Specifically, according to the response time and response duration of the above-mentioned load resources, the response levels of the above-mentioned load resources are divided into one to five response levels: the response time is less than 5 minutes and the duration is greater than 24 hours, which is defined as the first response level, and the response to scheduling instructions can be quick and for a long time; the response time is less than 5 minutes and the duration is between 3 hours and 24 hours, which is defined as the second response level, and the response to scheduling instructions can be quick and for a longer time; the response time is between 5 minutes and 15 minutes and the duration is greater than 24 hours, which is defined as the third response level, and the response to scheduling instructions can be relatively quick and for a long time; the response time is between 5 minutes and 15 minutes and the duration is between 3 hours and 24 hours, which is defined as the fourth response level, and the response to scheduling instructions can be relatively quick and for a longer time; the rest are defined as the fifth response level.

[0040] A load importance level determination module, used to determine the importance level of the above load resources according to the functions of the above load resources;

[0041] Specifically, the above importance levels are divided into primary load A1, secondary load A2 and tertiary load A3 according to GB 50052-2009 standard. The importance levels of the above load resources are determined in the load importance level determination module, and the tertiary load A3 is used as the target level.

[0042] The scheduling mode determination module is used to determine the above-mentioned scheduling identifier of the above-mentioned load resource and generate the above-mentioned scheduling identifier based on the above-mentioned fault identifier and authority information, and judge whether the scheduling identifier of the above-mentioned load resource is to be adjusted after the fault is repaired, adjusted after authentication is passed, or adjusted directly.

[0043] Specifically, whether the above-mentioned load resource has a fault is determined based on the above-mentioned fault identifier, and the scheduling identifier of the above-mentioned load resource is determined based on the authority information of the above-mentioned load resource, and a scheduling identifier is generated, defining C1 as the above-mentioned load resource that can be directly adjusted, C2 as the above-mentioned load resource that needs to be adjusted after the fault is repaired, and C3 as the above-mentioned load resource that can participate in the adjustment only after passing the authentication.

[0044] In the embodiments of the present application, Figure 3 As shown, the above-mentioned scheduling unit includes:

[0045] A storage module, used for storing the load resources in corresponding storage areas according to the classification list, and different storage areas correspond to different dispatch identifiers;

[0046] Specifically, according to the above-mentioned classification identifier corresponding to the above-mentioned load resources in the above-mentioned classification list, the above-mentioned load resources are stored in three different preset areas, namely, a first preset area, a second preset area and a third preset area, wherein the first preset area is used to store illegal resources among the above-mentioned load resources, the second preset area is used to store resources whose faults are to be repaired among the above-mentioned load resources, and the third preset area is used to store the above-mentioned load resources that can be used for adjustment.

[0047] The adjustment module is used to calculate the dispatch coefficient value according to the above-mentioned demand power consumption and the above-mentioned dispatch load resource list, sort the above-mentioned load resources according to the above-mentioned dispatch coefficient value, and adjust them in sequence.

[0048] Specifically, the market electricity price, the target electricity, the above-mentioned demand electricity consumption, the response level and the target weight are obtained, and the response coefficient of the above-mentioned load resource is obtained by querying the first mapping relationship according to the above-mentioned response level. The above-mentioned market electricity price, the above-mentioned target electricity, the above-mentioned demand electricity consumption, the above-mentioned response coefficient and the above-mentioned target weight are substituted into the first target formula e=L / X+G*Y / J to calculate the scheduling coefficient e of each of the above-mentioned load resources, and the above-mentioned scheduling coefficient values ​​e are sorted in order from large to small, and the above-mentioned load resources are divided into high-priority load resources, medium-priority load resources and low-priority load resources, and are scheduled in the order of high, medium and low priority.

[0049] In an embodiment of the present application, determining a fault indicator based on the operating status of each of the above load resources includes:

[0050] In the event that the load resource fails, generating a first failure indicator;

[0051] Specifically, if the load resource has a fault, a first fault flag D=1 is generated.

[0052] In the case that the load resource does not have a fault, generating a second fault identifier;

[0053] Specifically, if there is no fault in the load resource, a second fault flag D=0 is generated.

[0054] When the operating state of the load resource changes, the fault flag is updated.

[0055] Specifically, if the operating state of the load resource changes, the fault flag is updated according to the operating state of the load resource.

[0056] In an embodiment of the present application, determining the response level of the load resource according to the response time and response duration of the load resource includes:

[0057] When the response time is less than or equal to the first threshold and the response duration is greater than the second threshold, determining the response level to be the first response level;

[0058] Specifically, when the first threshold is 5 minutes, the second threshold is 24 hours, and the response time is less than or equal to the first threshold and the response duration is greater than the second threshold, the response level is determined to be the first response level, and the scheduling instruction can be responded to quickly and for a long time.

[0059] When the response time is less than or equal to the first threshold and the response duration is greater than or equal to the third threshold and less than or equal to the second threshold, determining the response level to be the second response level;

[0060] Specifically, when the third threshold is 3h and the response time is less than or equal to the first threshold and the response duration is greater than or equal to the third threshold and less than or equal to the second threshold, the response level is determined to be the second response level, and the scheduling instruction can be responded to quickly and in a longer time.

[0061] When the response time is greater than the first threshold and less than or equal to the fourth threshold and the response duration is greater than the second threshold, determining the response level to be a third response level;

[0062] Specifically, the fourth threshold is 15 minutes. When the response time is greater than the first threshold and less than or equal to the fourth threshold and the response duration is greater than the second threshold, the response level is determined to be the third response level, and the scheduling instruction can be responded to more quickly and in a longer time.

[0063] When the response time is greater than the first threshold and less than or equal to the fourth threshold and the response duration is greater than or equal to the third threshold and less than or equal to the second threshold, the response level is determined as the fourth response level;

[0064] Specifically, the fourth response level can respond to the dispatch instruction faster and in a longer time.

[0065] When the response time is greater than the fourth threshold or the response duration is less than the third threshold, the response level is determined as a fifth response level.

[0066] Specifically, when the response time is greater than the fourth threshold or the response duration is less than the third threshold, that is, the response time or the response duration is outside the first to fourth response level thresholds, the fifth response level is used.

[0067] In an embodiment of the present application, determining the dispatch identifier of the load resource and generating the dispatch identifier according to the fault identifier and the authority information further includes:

[0068] In the case where the fault identifier is the first fault identifier, a first dispatch identifier is generated, wherein the first dispatch identifier is used to indicate that the dispatch identifier of the load resource is adjusted after the fault is repaired;

[0069] Specifically, when the fault identifier is identified as the first fault identifier, i.e. D=1, indicating that a fault exists in the load resource, and the authority information has approval qualifications, a first scheduling identifier, i.e. C2, is generated, indicating that the load resource needs to be repaired before it can be adjusted.

[0070] When the fault identifier is the second fault identifier and the authority information requires authentication, a second dispatch identifier is generated, and the second dispatch identifier is used to indicate that the dispatch identifier of the load resource is adjusted after authentication;

[0071] Specifically, when the fault identifier is identified as the second fault identifier, i.e. D=0, indicating that there is no fault in the load resource, and the authority information requires authentication, a second scheduling identifier, i.e. C3, is generated, indicating that the load resource needs authentication and can participate in the adjustment only after passing the authentication.

[0072] When the fault identifier is the second fault identifier and the authority information does not require authentication, a third scheduling identifier is generated, and the third scheduling identifier is used to represent that the scheduling identifier of the load resource is direct adjustment.

[0073] Specifically, when the fault identifier is identified as the second fault identifier, i.e. D=0, indicating that there is no fault in the load resource, and the authority information does not require authentication, a third scheduling identifier, i.e. C1, is generated, indicating that the load resource does not require authentication and can directly participate in the adjustment.

[0074] In an embodiment of the present application, the load resources are classified according to the scheduling load list, including:

[0075] In the case where the importance level corresponding to the load resource is not the target level, determining the classification identifier of the load resource in the classification list as the first identifier, wherein the first identifier is used to indicate that no adjustment is to be made;

[0076] Specifically, determine whether the above-mentioned importance level corresponding to the above-mentioned load resource is the target level three load A3. If it is not the above-mentioned target level, the load resource is regarded as very important and cannot be scheduled, and the classification identifier of the load resource is determined as the first identifier, indicating that the load resource will not be adjusted.

[0077] When the importance level corresponding to the load resource is the target level, the dispatch identifier is the second dispatch identifier, and the authentication fails, the classification identifier of the load resource in the classification list is determined as the second identifier, and the second identifier is used to indicate that the load resource is an illegal resource;

[0078] Specifically, determine the above-mentioned importance level corresponding to the above-mentioned load resource. If it is the target level three load A3, continue to determine the scheduling identifier of the above-mentioned load resource. If it is the above-mentioned second scheduling identifier C3, that is, the above-mentioned load resource needs to be authenticated and can only participate in the adjustment after the authentication is passed, then continue to authenticate. If the authentication fails or the authentication fails, the classification identifier of the load resource is determined as the second identifier, indicating that the load resource is an illegal resource.

[0079] When the importance level corresponding to the load resource is the target level, the dispatch identifier is the first dispatch identifier, and the repair is not completed, the classification identifier of the load resource in the classification list is determined as the third identifier, and the third identifier is used to indicate that the load resource is not temporarily involved in the adjustment;

[0080] Specifically, determine the above-mentioned importance level corresponding to the above-mentioned load resource. If it is the target level three load A3, continue to determine the scheduling identifier of the above-mentioned load resource. If it is the above-mentioned first scheduling identifier C2, that is, the above-mentioned load resource needs to be repaired before it can be adjusted. When the repair of the above-mentioned load resource is not completed, the classification identifier of the above-mentioned load resource in the above-mentioned classification list is determined as the third identifier, indicating that the above-mentioned load resource is not temporarily involved in the adjustment.

[0081] When the importance level corresponding to the above-mentioned load resource is the target level, the above-mentioned dispatching identifier is the above-mentioned second dispatching identifier and the authentication is passed, or the above-mentioned dispatching identifier is the above-mentioned third dispatching identifier, the classification identifier of the above-mentioned load resource in the above-mentioned classification list is determined as the fourth identifier, and the above-mentioned fourth identifier is used to characterize that the above-mentioned load resource can be used for adjustment.

[0082] Specifically, determine the above-mentioned importance level corresponding to the above-mentioned load resource. If it is the target level three load A3, continue to determine the dispatching identifier of the above-mentioned load resource. If it is the above-mentioned second dispatching identifier C3, that is, the above-mentioned load resource needs to be authenticated, and can participate in the adjustment only after the authentication is passed. If the above-mentioned load resource passes the authentication, the classification identifier of the above-mentioned load resource in the above-mentioned classification list is determined as the fourth identifier, or the above-mentioned dispatching identifier of the above-mentioned load resource is the above-mentioned third dispatching identifier C1, that is, the above-mentioned load resource does not need to be authenticated and can directly participate in the adjustment, and the classification identifier of the above-mentioned load resource in the above-mentioned classification list is determined as the fourth identifier.

[0083] In an embodiment of the present application, storing the load resources in corresponding storage areas according to the classification list includes:

[0084] When the classification identifier corresponding to the load resource in the classification list is the second identifier, storing the load resource in the first preset area;

[0085] Specifically, the first preset area is used to store illegal resources among the load resources, that is, load resources that have not passed authentication. After the illegal resources pass authentication, the authenticated load resources are updated to the third preset area.

[0086] When the classification identifier corresponding to the load resource in the classification list is the third identifier, storing the load resource in the second preset area;

[0087] Specifically, the second preset area is used to store load resources whose faults are to be repaired among the load resources, that is, load resources whose fault identifier is the first fault identifier D=1 among the load resources, and the fault of the load resources has not been repaired. After the fault of the load resources is repaired, that is, the fault identifier is updated to the second fault identifier D=0, the load resources whose faults have been repaired are transferred to the third preset area.

[0088] In a case where the classification identifier corresponding to the load resource in the classification list is the fourth identifier, the load resource is stored in the third preset area.

[0089] Specifically, the third preset area is used to store the load resources that can be used for adjustment, that is, the load resources whose importance level is the target level A3, the load resources whose scheduling identifier is load resources that can participate in adjustment, and the load resources that have no faults or whose faults have been repaired.

[0090] In an embodiment of the present application, calculating a dispatch coefficient value according to the required power consumption and the dispatch load resource list and sorting each of the above load resources according to the dispatch coefficient value includes:

[0091] Obtain the market electricity price, target electricity, the above-mentioned demand electricity consumption, response level and target weight, wherein the above-mentioned market electricity price is the real-time electricity selling price, the above-mentioned target electricity is the remaining electricity of the power grid, and the above-mentioned target weight is the weight of the number of times the above-mentioned load resources are adjusted according to the dispatching instruction to the total number of times the above-mentioned dispatching instruction is issued;

[0092] Specifically, the dispatch coefficient value of the load resource is calculated based on the market electricity price, the target electricity, the demand electricity, the response coefficient and the target weight. When the load resource is not dispatched according to the dispatch instruction but is reversely adjusted for more than 3 times, the target weight is assigned a value of 0.

[0093] According to the response level, a first mapping relationship is queried to obtain a response coefficient, wherein the first mapping relationship is a mapping relationship between the response level and the response coefficient;

[0094] Specifically, according to the above response levels, the response levels one to five are assigned according to the above first mapping relationship to obtain the above response coefficient G, and the specific mapping method is: first response level G=5; second response level G=4; third response level G=3, fourth response level G=2, fifth response level G=1.

[0095] Substituting the market electricity price, the target electricity, the demand electricity, the response coefficient and the target weight into the first target formula e=L / X+G*Y / J for calculation, the dispatch coefficient value is obtained, wherein e is the dispatch coefficient value, L is the target electricity, J is the market electricity price, G is the response coefficient, Y is the target weight, and X is the demand electricity;

[0096] Specifically, the scheduling coefficient of each load resource located in the third preset area is calculated according to the first target formula, and the scheduling order of the load resources that can be scheduled is sorted.

[0097] Sort by the above scheduling coefficient values ​​from large to small.

[0098] Specifically, the above-mentioned scheduling coefficient values ​​e are sorted in order from large to small, and the above-mentioned load resources are divided into high-priority load resources, medium-priority load resources and low-priority load resources in a ratio of 1:3:5. The above-mentioned load resources are scheduled in the order of high, medium and low priority, and the number of times each load resource is scheduled according to the scheduling instructions and the number of times the scheduling instructions are issued are recorded.

[0099] An embodiment of the present invention provides a power grid, comprising a system that executes any one of the above-mentioned aggregation service systems capable of adjusting load resources.

[0100] Specifically, an aggregation service system capable of adjusting load resources includes: a response demand acquisition unit, a fault diagnosis unit, a data collection unit, a classification unit and a scheduling unit.

[0101] The response demand acquisition unit is used to determine the required power consumption according to the user order and send it to the scheduling unit;

[0102] Specifically, the above-mentioned response demand acquisition unit determines the required power consumption according to the user order, inputs the required power consumption through the power grid service demand setting unit, and sends it to the above-mentioned dispatching unit.

[0103] The fault diagnosis unit is used to obtain the operating status of the load resources from the load resource management platform, determine the fault identifier based on the operating status of each load resource, and send the fault identifier to the data acquisition unit. The fault identifier is used to indicate whether the load resource is in a fault state.

[0104] Specifically, the fault diagnosis unit obtains the operating status of the load resource from the load resource management platform, and obtains the load resource fault condition according to the load resource operating status. The load resource fault condition includes information such as the fault type and quantity, and defines a load resource fault identifier D. If a fault exists, D=1, and if no fault exists, D=0.

[0105] The data collection unit is used to generate a dispatch load resource list and send it to the classification unit and the dispatch unit. The load resource list includes the fault identification, importance level, dispatch identification and response level. The dispatch identification is used to represent the dispatch identification of the corresponding load resource.

[0106] Specifically, a dispatching load resource list is generated based on the fault identification, importance level, dispatch identification and response level of the above-mentioned load resources. The above-mentioned load resources are classified according to the above-mentioned information in the classification unit. The dispatching coefficient is calculated according to the above-mentioned information of each of the above-mentioned load resources for regulation in the dispatching unit. The above-mentioned importance level is divided into first-level load A1, second-level load A2 and third-level load A3 according to the GB50052-2009 standard. The above-mentioned dispatching identification represents the dispatching identification of the corresponding load resource, which is defined as C1 representing the above-mentioned load resources directly participating in the dispatching, C2 representing the above-mentioned load resources that can participate in the dispatching only after the fault is repaired, and C3 representing the above-mentioned load resources that can participate in the dispatching only after authentication. The above-mentioned response level is the classification of the response time and duration of the above-mentioned load resources in the dispatching pool.

[0107] The classification unit is used to classify the load resources according to the dispatch load list, obtain the classification list and send it to the dispatch unit;

[0108] Specifically, according to the importance level and dispatch identifier corresponding to the above-mentioned load resources, the classification identifier of the above-mentioned load resources in the above-mentioned classification list is determined as the first identifier, the above-mentioned first identifier is used to indicate that no adjustment is made, the second identifier, the above-mentioned second identifier is used to indicate that the above-mentioned load resources are illegal resources, the third identifier, the above-mentioned third identifier is used to indicate that the above-mentioned load resources are not temporarily involved in the adjustment, and the fourth identifier, the above-mentioned fourth identifier is used to indicate that the above-mentioned load resources can be used for adjustment.

[0109] The above-mentioned scheduling unit is used to regulate the above-mentioned load resources according to the above-mentioned scheduling load resource list and the above-mentioned classification list.

[0110] Specifically, for the above-mentioned load resources that can be adjusted, the market electricity price, target electricity, the above-mentioned demand electricity, response level, target weight and response coefficient are substituted into the formula e=L / X+G*Y / J to calculate the scheduling coefficient e of each of the above-mentioned load resources, and the above-mentioned scheduling coefficient values ​​​​e are sorted in order from large to small, divided into high-priority load resources, medium-priority load resources and low-priority load resources, and scheduled in the order of high, medium and low priority.

[0111] It should also be noted that the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, commodity or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, commodity or device. In the absence of more restrictions, the elements defined by the sentence "comprises a ..." do not exclude the existence of other identical elements in the process, method, commodity or device including the elements.

[0112] From the above description, it can be seen that the above embodiments of the present application achieve the following technical effects:

[0113] In an aggregation service system of adjustable load resources of the present application, the above-mentioned response demand acquisition unit is used to determine the required power consumption according to the user order and send it to the above-mentioned dispatching unit; the above-mentioned fault diagnosis unit is used to obtain the operating status of the above-mentioned load resources from the load resource management platform, determine the fault identifier based on the operating status of each of the above-mentioned load resources, and send the above-mentioned fault identifier to the data acquisition unit, and the above-mentioned fault identifier is used to characterize whether the above-mentioned load resources are in a faulty state; the above-mentioned data acquisition unit is used to generate a dispatching load resource list and send it to the classification unit and the dispatching unit, the above-mentioned load resource list includes the above-mentioned fault identifier, importance level, dispatching identifier and response level, and the above-mentioned dispatching identifier is used to characterize the dispatching identifier of the corresponding above-mentioned load resource; the above-mentioned classification unit is used to classify the above-mentioned load resources according to the above-mentioned dispatching load list, obtain the classification list and send it to the above-mentioned dispatching unit; the above-mentioned dispatching unit is used to regulate the above-mentioned load resources according to the above-mentioned dispatching load resource list and the above-mentioned classification list. An aggregation service system proposed in the present application monitors the operating status of load resources in real time through a fault diagnosis unit, generates a fault identification, and combines a data acquisition unit and a classification unit to update the adjustable status of load resources in real time, thereby realizing automatic partitioning and automatic scheduling, solving the problem in the prior art that adjustable loads cannot immediately participate in power system scheduling after the fault is eliminated or the authentication is passed.

[0114] The above description is only the preferred embodiment of the present application and is not intended to limit the present application. For those skilled in the art, the present application may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application shall be included in the protection scope of the present application.

Claims

1. An aggregation service system capable of adjusting load resources, characterized in that: Response demand acquisition unit, fault diagnosis unit, data collection unit, classification unit and scheduling unit, where: The response demand acquisition unit is used to determine the required power consumption according to the user order and send it to the scheduling unit; The fault diagnosis unit is used to obtain the operating status of the load resources from the load resource management platform, determine the fault identifier based on the operating status of each load resource, and send the fault identifier to the data acquisition unit, wherein the fault identifier is used to indicate whether the load resource is in a fault state; The data acquisition unit is used to generate a dispatch load resource list and send it to the classification unit and the dispatch unit, the load resource list includes the fault identification, importance level, dispatch identification and response level, and the dispatch identification is used to represent the dispatch identification of the corresponding load resource; The classification unit is used to classify the load resources according to the scheduling load list, obtain the classification list and send it to the scheduling unit; The scheduling unit is used to regulate the load resources according to the scheduling load resource list and the classification list.

2. The system according to claim 1, characterized in that The data acquisition unit comprises: A response level determination module, used to determine the response level of the load resource according to the response time and response duration of the load resource; A load importance level determination module, used to determine the importance level of the load resource according to the function of the load resource; The scheduling mode determination module is used to determine the scheduling identifier of the load resource according to the fault identifier and authority information and generate the scheduling identifier.

3. The system according to claim 1, characterized in that The scheduling unit comprises: A storage module, used for storing the load resources in corresponding storage areas according to the classification list, and different storage areas correspond to different dispatch identifiers; The adjustment module is used to calculate the dispatch coefficient value according to the required power consumption and the dispatch load resource list, sort the load resources according to the dispatch coefficient value, and adjust them in sequence.

4. The system according to claim 1, characterized in that Determining a fault indicator based on the operating status of each of the load resources includes: When a fault occurs in the load resource, generating a first fault indicator; In the case that the load resource does not have a fault, generating a second fault identifier; When the operating state of the load resource changes, the fault flag is updated.

5. The system according to claim 2, characterized in that Determining the response level of the load resource according to the response time and the response duration of the load resource includes: When the response time is less than or equal to a first threshold and the response duration is greater than a second threshold, determining that the response level is a first response level; When the response time is less than or equal to the first threshold and the response duration is greater than or equal to a third threshold and less than or equal to the second threshold, determining that the response level is a second response level; In the case where the response time is greater than the first threshold and less than or equal to a fourth threshold and the response duration is greater than the second threshold, determining the response level to be a third response level; In a case where the response time is greater than the first threshold and less than or equal to the fourth threshold and the response duration is greater than or equal to the third threshold and less than or equal to the second threshold, determining the response level as a fourth response level; When the response time is greater than the fourth threshold or the response duration is less than the third threshold, the response level is determined as a fifth response level.

6. The system according to claim 4, characterized in that Determining the dispatch identifier of the load resource according to the fault identifier and the authority information and generating the dispatch identifier further includes: In the case where the fault identifier is the first fault identifier, a first dispatch identifier is generated, wherein the first dispatch identifier is used to indicate that the dispatch identifier of the load resource is to be adjusted after the fault is repaired; When the fault identifier is the second fault identifier and the authority information requires authentication, a second scheduling identifier is generated, wherein the second scheduling identifier is used to indicate that the scheduling identifier of the load resource is adjusted after authentication is passed; When the fault identifier is the second fault identifier and the authority information indicates that authentication is not required, a third scheduling identifier is generated, wherein the third scheduling identifier is used to indicate that the scheduling identifier of the load resource is direct regulation.

7. The system according to claim 6, characterized in that Classifying the load resources according to the dispatch load list includes: When the importance level corresponding to the load resource is not the target level, determining the classification identifier of the load resource in the classification list as a first identifier, wherein the first identifier is used to indicate that no adjustment is to be made; When the importance level corresponding to the load resource is the target level, the dispatch identifier is the second dispatch identifier, and the authentication fails, determining the classification identifier of the load resource in the classification list as the second identifier, and the second identifier is used to indicate that the load resource is an illegal resource; When the importance level corresponding to the load resource is the target level, the dispatch identifier is the first dispatch identifier, and the repair is not completed, the classification identifier of the load resource in the classification list is determined as a third identifier, and the third identifier is used to indicate that the load resource is not temporarily involved in the adjustment; When the importance level corresponding to the load resource is the target level, the dispatch identifier is the second dispatch identifier and the authentication is passed, or the dispatch identifier is the third dispatch identifier, the classification identifier of the load resource in the classification list is determined as the fourth identifier, and the fourth identifier is used to characterize that the load resource can be used for adjustment.

8. The system according to claim 7, characterized in that Storing the load resources in corresponding storage areas according to the classification list includes: When the classification identifier corresponding to the load resource in the classification list is the second identifier, storing the load resource in a first preset area; When the classification identifier corresponding to the load resource in the classification list is the third identifier, storing the load resource in a second preset area; When the classification identifier corresponding to the load resource in the classification list is the fourth identifier, the load resource is stored in the third preset area.

9. The system according to claim 8, characterized in that Calculating a dispatch coefficient value according to the required power consumption and the dispatch load resource list and sorting each of the load resources according to the dispatch coefficient value includes: Obtaining the market electricity price, the target electricity consumption, the required electricity consumption, the response level and the target weight, wherein the market electricity price is the real-time electricity selling price, the target electricity consumption is the remaining electricity of the power grid, and the target weight is the weight of the number of times the load resource is adjusted according to the dispatch instruction to the total number of times the dispatch instruction is issued; querying a first mapping relationship according to the response level to obtain a response coefficient, wherein the first mapping relationship is a mapping relationship between the response level and the response coefficient; Substitute the market electricity price, the target electricity consumption, the required electricity consumption, the response coefficient and the target weight into the first target formula e=L / X+G*Y / J for calculation to obtain the dispatch coefficient value, wherein e is the dispatch coefficient value, L is the target electricity consumption, J is the market electricity price, and G is the response coefficient. Y is the target weight, and X is the required power consumption; The scheduling coefficient values ​​are sorted from large to small.

10. A power grid, characterized in that: The method comprises executing the system described in any one of claims 1 to 9.

Citation Information