Large-section wide-width cast-in-place box girder hanging basket suspended casting system and construction method

Through the backpressure and pre-pressure technology of hanging basket jack, the adjustable width truss inner mold and intelligent maintenance device of synchronous walking, the stability and maintenance problems of hanging baskets during construction of large sections and wide cast-in-place box beams are solved, and the construction efficiency and quality are improved. Reduced security risks.

CN119308235APending Publication Date: 2025-01-14ANHUI PROVINCE HIGHWAY & PORT ENG CO LTD +1
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411722770.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-11-28
Publication Date
2025-01-14

AI Technical Summary

Technical Problem

During the construction of large section wide cast-in-place box girders, the hanging basket hanging technology requires high requirements, which requires ensuring the stability and safety of the hanging basket. At the same time, timely maintenance of the cast box girders is required, which increases the construction personnel. Operation difficulty and technical requirements, and construction quality and construction period are urgent.

Method used

Adopting the backpressure pre-pressure technology of hanging basket jacks, and the intelligent maintenance device of the truss inner mold and the suspended box girder when walking synchronously, the force transmission route of the jack is optimized, the turnover rate and maintenance effect of the template are improved, and the construction quality and safety are ensured. sex.

Benefits of technology

It improves construction efficiency and quality, reduces safety risks, and enhances the operational flexibility and economic benefits of construction personnel.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119308235A_ABST
    Figure CN119308235A_ABST
Patent Text Reader

Abstract

The invention provides a large-section wide-width cast-in-place box girder hanging basket suspended pouring system and a construction method. The system mainly relates to a hanging basket, a counter-force frame, a pre-pressing jack, a stress base, a walking device, a box girder, a synchronous walking width-adjustable truss inner mold, a suspended pouring box girder intelligent maintenance device and the like. According to the large-section wide-width cast-in-place box girder hanging basket suspended pouring system and the construction method, the construction efficiency of a large-section wide-width cast-in-place box girder is greatly improved, meanwhile, the construction efficiency is improved, the construction cost is reduced, the influence on traffic is reduced, and the construction quality and safety are improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of cast-in-place box girders, and in particular to a hanging basket suspended casting system and a construction method for large-section and wide-width cast-in-place box girders. Background Art

[0002] With the continuous development of modern bridge engineering technology, large-section wide cast-in-place box girder structures have been widely used in bridge construction. This structural form has the advantages of strong bearing capacity, good stability, and convenient construction, but it also puts forward higher requirements on construction technology. As an advanced bridge construction method, hanging basket suspended pouring construction technology plays an increasingly important role in the construction of large-section wide cast-in-place box girders due to its high efficiency, safety, and flexibility.

[0003] Due to the complex structure of large-section wide cast-in-place box girders, each construction link needs to be precisely controlled during the construction process, which increases the difficulty of construction operations. Especially in the hanging basket suspended pouring construction, it is necessary to ensure the stability and safety of the hanging basket, and at the same time ensure the stability of the formwork support. In addition, the cast box girders need to be maintained in a timely manner, which places high demands on the construction personnel's operating skills and experience.

[0004] Based on the actual requirements of complex construction conditions, high construction quality and tight construction period of engineering projects, an innovative hanging basket suspended casting system and construction method for large-section and wide-span cast-in-place box girders with high construction efficiency, excellent construction quality and low safety risk is of great significance for improving the construction quality of large-section and wide-span cast-in-place box girders. Summary of the invention

[0005] The object of the present invention is to provide a large-section wide-width cast-in-place box girder hanging basket suspended casting system and a construction method to solve the above-mentioned technical problems.

[0006] In order to solve the above technical problems, the present invention provides a construction method of a large-section wide cast-in-place box girder hanging basket suspended casting system, comprising the following steps:

[0007] Step 1: Installation of the traveling device of the hanging basket: Install the track on the top surface of the cast-in-place section of the box beam support, install the traveling devices on both sides of the bottom of the hanging basket, and fix the two symmetrically arranged traveling devices by bolts, set the gear on the side of the traveling device, and then install the auxiliary rolling rod and the eight-shaped inner support in sequence;

[0008] Step 2: Preloading of the hanging basket: an embedded plate is set on the cast-in-place section of the box beam support, a force seat bottom plate with a limit card is installed on the walking bottom plate of the hanging basket, and then the angle adjustment square wood is installed between the limit cards, and the distribution beam with the beam limit plate and the beam with the sleeve are installed on several angle adjustment square woods in turn, so that the angle adjustment square wood and the distribution beam are staggered, and then the reaction frame is installed on the embedded plate, and the preloading jack is placed in advance between the beam with the sleeve and the reaction frame. The reaction frame is hoisted after being made as a whole on the ground, and then the hanging basket preloading construction is carried out;

[0009] Step 3: Install the inner mold of the synchronously moving adjustable width truss: sequentially install the width-adjusting top mold, the width-adjusting front mold, the width-adjusting side mold, the width-adjusting truss, and the bottom mold to form the inner mold of the synchronously moving adjustable width truss. The connection points of adjacent width-adjusting trusses are connected through the rear flange. Then, the angle of the bottom mold is fine-tuned by adjusting the bottom mold angle fine-tuning screw and the rotating card. Finally, concrete is poured into the inner mold of the synchronously moving adjustable width truss to form a demoulded box beam.

[0010] Step 4: Intelligent curing device for suspended cast box beam: After the hanging basket slides once, several nozzles are installed on the ABS curing board and telescopic spray column in advance, a roller base is installed at the bottom of the truss, and then a telescopic spray column is installed on the roller base, and the water pipe is connected to the nozzle of the telescopic spray column. An ABS curing board with pipelines is installed on the hanging basket, and the water pipe and temperature and humidity sensor are simultaneously installed on the ABS curing board. The top of the ABS curing board is fixed to the extended track through a foldable connecting rod;

[0011] Step 5. Synchronous movement: When the hanging basket moves forward, it drives the synchronously moving adjustable width truss inner mold and the outer ABS curing plate to move, and the synchronously moving adjustable width truss inner mold drives the telescopic spray column with a roller base to move forward.

[0012] The beneficial effects of the present invention are:

[0013] 1. The present invention adopts the back-pressure preloading technology of the hanging basket jack, optimizes the jack reaction frame, and converts the original oblique force of the jack into a vertical force by adjusting the angle of the square wood, clarifies the force transmission route of the jack preloading, and improves the construction effect of the preloading.

[0014] 2. A synchronously moving and adjustable width truss inner formwork is adopted. This formwork system can construct box girders within a certain width range, thereby improving the turnover rate of the formwork and thus improving the economic benefits.

[0015] 3. The intelligent maintenance device for suspended cast box girders is adopted to improve the construction effect of hanging basket concrete maintenance and further improve the construction quality of hanging basket suspended cast construction. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 It is a three-dimensional schematic diagram of the jack counter-pressure preloading;

[0017] Figure 2 It is a schematic diagram of the reaction frame;

[0018] Figure 3 It is a schematic diagram of the reaction frame base;

[0019] Figure 4 It is a schematic diagram of the installation of the walking device;

[0020] Figure 5 This is a detailed view of the running gear;

[0021] Figure 6 This is a schematic diagram of the installation of the inner mold of the synchronously moving adjustable width truss;

[0022] Figure 7 It is a schematic diagram of the template system;

[0023] Figure 8 It is a schematic diagram of bottom mold adjustment;

[0024] Fig. 9 This is a schematic diagram of the installation of the intelligent maintenance device for cantilevered box girders;

[0025] Fig.10 Schematic diagram of intelligent maintenance device for cantilevered box beams

[0026] Fig.11 This is a schematic diagram of the ABS maintenance plate;

[0027] Fig.12 It is a schematic diagram of a telescopic sprinkler column.

[0028] Among them: 1. Basket 2. Reaction frame 3. Round cross bar 4. Closing plate 5. Jack base plate 6. Jack sleeve 7. Preload jack 8. Crossbeam with sleeve 9. Distribution beam 10. Angle adjustment square wood 11. Limit card 12. Force seat base plate 13. Crossbeam limit plate 14. Sleeve 15. Anchor steel 16. Diagonal brace 17. Anchor bar 18. Walking device 19. Device connecting plate 20. Connecting steel 21. Track 22. Door-shaped slide 23. Car stop bolt 24. Pulley 25. Car stop 26. Eight-shaped support 27. Track reinforcement plate 28. Auxiliary rolling rod 29. Track inner pull rod 30. Width adjustment Top mold 31. Inner support sleeve 32. Rear flange 33. Side mold 34. Adjustable side mold 35. Bottom mold angle fine-tuning screw 36. Bottom mold angle fine-tuning plate 37. Adjustable width truss 38. Adjustable front mold 39. Base truss 40. Bottom mold 41. Rotating card 42. ABS curing plate 43. Side nozzle 44. Temperature and humidity sensor 45. Extended track beam 46. Foldable connecting rod 47. Top nozzle 48. Bolts connecting to hanging basket 49. Water pipe 50. Pipeline 51. Telescopic spray column 52. Horizontal support 53. Base with rollers 54. Connecting truss 55. Demoulded box beam 56. Fine-tuning rear plate. DETAILED DESCRIPTION

[0029] The following will be combined with the accompanying drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field belong to the scope of protection of the present invention.

[0030] Those skilled in the art should understand that, in the disclosure of the present invention, the orientation or position relationship indicated by the terms "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc. are based on the orientation or position relationship shown in the drawings, which are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operate in a specific orientation. Therefore, the above terms should not be understood as limiting the present invention.

[0031] It is to be understood that the term "one" should be understood as "at least one" or "one or more", that is, in one embodiment, the number of an element may be one, while in another embodiment, the number of the element may be multiple, and the term "one" should not be understood as a limitation on the quantity.

[0032] like Figure 1-Figure 12 The present invention provides a large-section wide cast-in-place box girder hanging basket suspended casting system and construction method, comprising the following steps:

[0033] Step 1, installation of the hanging basket walking device 18: install the track 21 on the top surface of the cast-in-place section of the box girder support, set a groove on the upper part of the track 21 and weld the track reinforcement plate 27, then install the track inner pull rod 29 on the track 21, install the walking device 18 on both sides of the bottom of the hanging basket 1, and fix the two symmetrically arranged walking devices 18 by bolts, set a car stop 25 on the side of the walking device 18, and then install the auxiliary rolling rod 28 and the eight-shaped inner support 26 in sequence.

[0034] Step 2, pre-stressing the hanging basket 1: an embedded plate is set in advance on the cast-in-place section of the box beam support, and a force seat bottom plate 12 with a limit card 11 is installed on the bottom plate of the hanging basket. Then, the angle adjustment square timber 10 is installed between the limit cards 11, and the distribution beam 9 with the beam limit plate 13 and the beam 8 with the sleeve are installed to several angle adjustment square timbers 10 in turn, so that the angle adjustment square timber 10 and the distribution beam 9 are staggered. Then, the reaction frame 2 is installed on the embedded plate, and the pre-stressing jack 7 is placed in advance between the beam 8 with the sleeve and the reaction frame 2. The reaction frame 2 is hoisted after being made as a whole on the ground, and then the hanging basket pre-stressing construction is carried out.

[0035] Step 3, installation of the synchronously moving adjustable width truss inner mold: according to the cross-sectional size of the box girder, the width-adjustable top mold 30, the width-adjustable front mold 38, the width-adjustable side mold 34, the width-adjustable truss 37 and the bottom mold 40 are manufactured in sequence, and then installed in sequence to form the synchronously moving adjustable width truss inner mold. The connection of the width-adjustable truss 37 is connected by the rear flange 32, and then the angle of the bottom mold 40 is fine-tuned by adjusting the bottom mold angle fine-tuning screw 35 and the rotating card 41. Finally, concrete is poured into the synchronously moving adjustable width truss inner mold to form a demolded box girder 55.

[0036] Among them, the bottom mold angle fine-tuning screw 35 is threadedly matched with the bottom mold angle fine-tuning plate 36, and the rotating card 41 is threadedly matched with the fine-tuning rear plate 56, so that when the bottom mold angle fine-tuning screw 35 and the rotating card 41 are rotated, the height direction can be adjusted, and then the angle of the bottom mold 40 can be changed by adjusting the support height of the bottom mold 40.

[0037] Step 4, intelligent maintenance device for suspended cast box girder: After the hanging basket 1 slides once, several nozzles are installed on the ABS maintenance plate 42 and the telescopic spray column 51 in advance, and a roller base 53 is installed at the bottom of the truss. Then, the telescopic spray column 51 is installed on the roller base 53, and the water pipe 49 is connected to the nozzle of the telescopic spray column 51. An ABS maintenance plate 42 with a pipeline 50 is installed on the hanging basket 1, and the water pipe 49 and the temperature and humidity sensor 44 are simultaneously installed on the ABS maintenance plate 42. The top of the ABS maintenance plate 42 is fixed to the extension rail 45 through a foldable connecting rod 46.

[0038] Step 5, synchronous movement: When the hanging basket 1 moves forward, it drives the template system and the outer ABS maintenance plate 42 to move, and the template system drives the telescopic spray column 51 with a roller base 53 to move forward.

[0039] A force-bearing seat bottom plate 12 is arranged on the walking bottom plate of the hanging basket 1, a limit card 11 is arranged on the force-bearing seat bottom plate 12, an angle-adjusting square wood 10 is arranged between the limit cards 11, distribution beams 9 are staggered on the angle-adjusting square wood 10, cross beam limit plates 13 are staggered on the distribution beams 9, a cross beam 8 with a sleeve is arranged in the cross beam limit plate 13, a sleeve 14 is arranged on the cross beam 8 with a sleeve, an anchor plate is arranged on the cast-in-place section of the box beam support, an anchor bar 17 is arranged on the upper anchor plate, an anchoring steel 15 is arranged on the lower anchor plate, a reaction frame 2 is arranged between the upper anchor plate and the lower anchor plate, diagonal braces 16 are provided on both sides of the reaction frame 2, a number of round cross bars 3 are connected between two adjacent diagonal braces 16, a sealing plate 4 is arranged at the front of the reaction frame 2, the bottom of the reaction frame 2 is connected to the jack sleeve 6 through two jack bottom plates 5, a pre-stressing jack 7 is arranged in the jack sleeve 6, and the end of the pre-stressing jack 7 is connected to the sleeve 14.

[0040] Three walking devices 18 are arranged on the hanging basket 1, and the walking device 18 includes a device connecting plate 19 connected to the side of the hanging basket 1, and a connecting steel 20 is arranged on the device connecting plate. The device connecting plates 19 symmetrically arranged on both sides of the hanging basket 1 are pulled by screws, and a door-shaped slide groove 22 is arranged at the lower part of the connecting steel 20. Bolt holes are arranged on the door-shaped slide groove 22. The car gear 25 is slidably connected in the door-shaped slide groove 22, and a car gear bolt 23 for limiting the movement of the car gear 25 is arranged in the bolt hole, so that the car gear 25 can be moved up and down by removing the car gear bolt 23. A pulley 24 that is rotatably matched with the side of the track 21 is rotatably arranged at the bottom of the connecting steel 20, and a track inner pull rod 29 and a track reinforcement plate 27 are arranged on the track 21. An auxiliary rolling rod 28 is rotatably arranged between the walking devices 18 on both sides, so that when the hanging basket 1 moves, the auxiliary rolling rod 28 rolls along the track 21.

[0041] A synchronously moving truss inner mold with adjustable width, a bottom mold angle fine-tuning plate 36 is arranged at the front of the bottom mold 40, a bottom mold angle fine-tuning screw 35 is arranged on the fine-tuning plate 36, a fine-tuning rear plate 56 is arranged at the rear of the bottom mold 40, a rotating card 41 is arranged on the fine-tuning rear plate 56, a side mold 33 is arranged on the bottom mold 10, a width-adjusting side mold 34 is arranged in the middle of the adjacent two side molds 33, a width-adjusting front mold 38 is arranged on the outer side of the top of the adjacent two side molds 33, a width-adjusting top mold 30 is arranged on the inner side of the top of the adjacent two side molds 33, an inner support sleeve 31 is arranged at the relative position of the inner side of the adjacent two side molds 33, the end of the inner support frame is connected to the inner support sleeve 31, a width-adjusting truss 37 is arranged between the two adjacent inner support frames, the width-adjusting truss 37 is fixed to the inner support frame by a rear flange 32, two inner support frames are arranged, and the width-adjusting truss 37 is synchronously manufactured according to the size of the box girder width-adjusting template.

[0042] The intelligent curing device for cantilevered box beams comprises an outer ABS curing plate 42 and a telescopic spray column 51, wherein the ABS curing plate 42 is arranged on the outer side of the demoulding box beam 55, a base truss 39 is arranged at the bottom of the ABS curing plate 42, and the front part of the base truss 39 is connected to the bottom beam of the hanging basket by threaded steel anchors, so that the ABS curing plate 42 slides with the hanging basket 1, a pipeline 50 is arranged inside the ABS curing plate 42, and a side spray head 43 is arranged on the inner surface of the ABS curing plate 42, and the top of the ABS curing plate 42 has a corner section and is hung on the cross beam of the hanging basket 1, so that the ABS curing plate 42 is connected to the hanging basket 1 by connecting bolts 48, and the top of the ABS curing plate 42 is provided with a side spray head 43. The ends of the top nozzle 47, the water pipe 49 and the temperature and humidity sensor 44 are connected to the extended track 45 on the top surface of the box beam through the foldable connecting rod 46. A roller base 53 is arranged on the lower side of the interior of the demoulding box beam 55, and a telescopic spray column 51 is arranged on the upper part of the roller base 53. The side nozzles 43 are arranged on the telescopic spray column 51, and the top nozzle 47 is arranged on the top of the telescopic spray column 51, so that the side nozzles 43 and the top nozzle 47 are connected to the water pipe 49. A lateral support 52 is arranged on the side, and an oblique connecting truss 54 is arranged on the roller base 53. One end of the oblique connecting truss 54 is fixed on the inner support frame and moves with the template of the inner mold of the synchronously moving adjustable width truss.

[0043] The present invention is not limited to the above-mentioned optimal implementation mode. Anyone can derive other various forms of products under the inspiration of the present invention. However, no matter what changes are made in the shape or structure, all technical solutions that are the same or similar to those of the present application fall within the protection scope of the present invention.

Claims

1. The construction method of the large-section wide cast-in-place box beam hanging basket suspended casting system is characterized in that: The following steps are involved: Step 1, installation of the hanging basket walking device (18): installing a track (21) on the top surface of the cast-in-place section of the box beam support, installing the walking devices (18) on both sides of the bottom of the hanging basket (1), the two symmetrically arranged walking devices (18) are fixed by bolts, and a gear (25) is set on the side of the walking device (18) for lifting and lowering, and then installing the auxiliary rolling rod (28) and the eight-shaped inner support (26) in sequence; Step 2, pre-stressing the hanging basket (1): an embedded plate is set on the cast-in-place section of the box beam support, a force-bearing seat bottom plate (12) with a limit card (11) is installed on the walking bottom plate of the hanging basket (1), and then the angle adjustment square wood (10) is installed between the limit cards (11), and the distribution beam (9) with a beam limit plate (13) and the cross beam (8) with a sleeve are installed on a plurality of angle adjustment square woods (10) in sequence, so that the angle adjustment square woods (10) and the distribution beam (9) are arranged alternately, and then the reaction frame (2) is installed on the embedded plate, and the pre-stressing jack (7) is placed in advance between the cross beam (8) with the sleeve and the reaction frame (2), and the reaction frame (2) is hoisted after being integrally manufactured on the ground, and then the hanging basket (1) is pre-stressed; Step 3: Installing the inner mold of the synchronously moving adjustable width truss: sequentially install the width-adjusting top mold (30), the width-adjusting front mold (38), the width-adjusting side mold (34), the width-adjusting truss (37), and the bottom mold (40) to form the inner mold of the synchronously moving adjustable width truss; the connection points of adjacent width-adjusting trusses (37) are connected by the rear flange (32); then, the angle of the bottom mold (40) is finely adjusted by adjusting the bottom mold angle fine-tuning screw (35) and the rotating clamp (41); finally, concrete is poured into the inner mold of the synchronously moving adjustable width truss to form a demoulding box beam (55); Step 4, intelligent maintenance device for suspended cast box beam: after the hanging basket (1) slides once, a plurality of nozzles are installed on the ABS maintenance plate (42) and the telescopic spray column (51) in advance, a roller base (53) is installed at the bottom of the truss, and then the telescopic spray column (51) is installed on the roller base (53), and the water pipe (49) is connected to the nozzle of the telescopic spray column (51), and the ABS maintenance plate (42) with the pipeline (50) is installed on the hanging basket (1), and the water pipe (49) and the temperature and humidity sensor (44) are simultaneously installed on the ABS maintenance plate (42), and the top of the ABS maintenance plate (42) is fixed to the extension track (45) through a foldable connecting rod (46); Step 5, synchronous movement: When the hanging basket (1) moves forward, it drives the synchronously moving adjustable width truss inner mold and the outer ABS maintenance plate (42) to move, and the synchronously moving adjustable width truss inner mold drives the telescopic spray column (51) provided with a roller base (53) to move forward.

2. The construction method of the large-section wide cast-in-place box beam hanging basket suspended casting system according to claim 1 is characterized in that: A sleeve (14) is arranged on the sleeve crossbeam (8), an anchor plate is arranged on the cast-in-place section of the box beam support, the anchor plate comprises an upper anchor plate and a lower anchor plate, anchor bars (17) are arranged on the upper anchor plate, anchoring steel (15) is arranged on the lower anchor plate, and a reaction frame (2) is arranged between the upper anchor plate and the lower anchor plate.

3. The construction method of the large-section wide cast-in-place box beam hanging basket suspended casting system according to claim 2 is characterized in that: The reaction frame (2) has diagonal braces (16) on both sides, and a plurality of round cross bars (3) are connected between two adjacent diagonal braces (16). A sealing plate (4) is arranged at the front of the reaction frame (2). The bottom of the reaction frame (2) is connected to a jack sleeve (6) through a plurality of jack bottom plates (5). A preload jack (7) is arranged in the jack sleeve (6), and the end of the preload jack (7) is connected to the sleeve (14).

4. The construction method of the large-section wide cast-in-place box beam hanging basket suspended casting system according to claim 1 is characterized in that: A plurality of walking devices (18) are arranged on the hanging basket (1), wherein the walking devices (18) include a device connecting plate (19) connected to the side of the hanging basket (1), a connecting steel (20) is arranged on the device connecting plate (19), the device connecting plates (19) symmetrically arranged on both sides of the hanging basket (1) are pulled by screws, a gate-shaped slide groove (22) is arranged at the lower part of the connecting steel (20), a bolt hole is arranged on the gate-shaped slide groove (22), a car stop (25) is slidably connected to the gate-shaped slide groove (22), and a car stop bolt (23) for limiting the movement of the car stop (25) is arranged in the bolt hole.

5. The construction method of the large-section wide cast-in-place box beam hanging basket suspended casting system according to claim 4 is characterized in that: A pulley (24) is rotatably provided at the bottom of the connecting steel (20) and is rotatably matched with the side of the track (21). A track inner pull rod (29) and a track reinforcement plate (27) are provided on the track (21). An auxiliary rolling rod (28) is rotatably provided between the walking devices (18) on both sides so that when the hanging basket (1) moves, the auxiliary rolling rod (28) rolls along the track (21).

6. The construction method of the large-section wide cast-in-place box beam hanging basket suspended casting system according to claim 1 is characterized in that: A bottom mold angle fine-adjusting plate (36) is arranged at the front of the bottom mold (40), a bottom mold angle fine-adjusting screw rod (35) is arranged on the fine-adjusting plate (36), a fine-adjusting rear plate (56) is arranged at the rear of the bottom mold (40), a rotating clamp (41) is arranged on the fine-adjusting rear plate (56), a side mold (33) is arranged on the bottom mold (10), a width-adjusting side mold (34) is arranged in the middle of the adjacent two side molds (33), and a width-adjusting front mold (38) is arranged on the outer sides of the tops of the adjacent two side molds (33).

7. The construction method of the large-section wide cast-in-place box beam hanging basket suspended casting system according to claim 6 is characterized by: A width-adjusting top mold (30) is arranged on the inner side of the top of the adjacent two side molds (33), an inner support sleeve (31) is arranged at a relative position on the inner side of the adjacent two side molds (33), the end of the inner support frame is connected to the inner support sleeve (31), a width-adjusting truss (37) is arranged between the two adjacent inner support frames, and the width-adjusting truss (37) is fixed to the inner support frame through a rear flange (32).

8. The construction method of the large-section wide cast-in-place box beam hanging basket suspended casting system according to claim 1 is characterized in that: The intelligent curing device for a suspended cast box girder comprises an outer ABS curing plate (42) and a telescopic spray column (51), wherein the ABS curing plate (42) is arranged on the outer side of a demoulding box girder (55), a base truss (39) is arranged at the bottom of the ABS curing plate (42), the front part of the base truss (39) is connected to the bottom beam of a hanging basket so that the ABS curing plate (42) slides with the hanging basket (1), a pipeline (50) is arranged inside the ABS curing plate (42), a side spray head (43) is arranged on the inner surface of the ABS curing plate (42), the top of the ABS curing plate (42) has a corner section and is hung on the cross beam of the hanging basket (1) so that the ABS curing plate (42) is connected to the hanging basket (1), and a top spray head (47), a water pipe (49) and a temperature and humidity sensor (44) are arranged on the top of the ABS curing plate (42), and the end is connected to an extended track (45) on the top surface of the box girder through a foldable connecting rod (46).

9. The construction method of the large-section wide cast-in-place box beam hanging basket suspended casting system according to claim 1 is characterized in that: A roller base (53) is arranged at the lower side of the demoulding box beam (55), a telescopic spray column (51) is arranged on the upper part of the roller base (53), a side spray head (43) is arranged on the telescopic spray column (51), a top spray head (47) is arranged on the top of the telescopic spray column (51), so that the side spray head (43) and the top spray head (47) are connected to a water pipe (49), a transverse support (52) is arranged on the side of the telescopic spray column (51), an oblique connection truss (54) is arranged on the roller base (53), and one end of the oblique connection truss (54) is fixed on the inner support frame, so that the telescopic spray column (51) moves with the template of the synchronously moving adjustable width truss inner mold.

10. A large-section wide cast-in-place box beam hanging basket suspended casting system, characterized in that: It is obtained by the construction method of the hanging basket suspended casting system of the large-section wide cast-in-place box girder according to any one of claims 1-9.

Citation Information

Cited By

  • Trackless triangular hanging basket suspension casting construction device and control system

    CN120759208A