Regulation and control method, device and equipment for in-situ leaching mining and medium
By obtaining the actual injection constant and selecting the target pipe pressurization pump, a simulated hierarchical pressurization liquid injection system is constructed, and the frequency of the pipe pipe pressurization pump is calculated and adjusted, the unbalanced leaching problem caused by the differences in the leaching strength of the ore body at different locations in the ore layer is solved. A balanced leaching of each location of the ore layer is achieved.
Patent Information
- Application Number
- CN202411235615.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-04
- Publication Date
- 2025-02-18
AI Technical Summary
There are differences in the leaching strength of ore bodies at different locations in the ore layer, resulting in the uneven leaching problem of ore layer.
By obtaining the actual injection constant, selecting the target pipe pressurization pump, building a simulated hierarchical pressure fluid injection system, calculating the drilling fluid injection pressure under hierarchical pressure and the boosting amount of the pipe pressurization pump, and finally adjusting the frequency of the pipe The pipe pressurization pump is regulated to achieve balanced leaching of ore bodies at each location of the ore layer.
The balanced leaching of ore bodies at each location of the ore layer is achieved, and the problem of unbalanced leaching of ore layer is solved.
Smart Images

Figure CN119466714A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of liquid injection engineering, and in particular to a control method, device, equipment and medium for in-situ leaching mining. Background Art
[0002] In the existing field of liquid injection engineering, generally, liquid extraction drilling and liquid injection drilling are carried out in the ore layer, and the uranium mineral is dissolved and lifted to the surface by the full reaction of the leaching agent and the mineral underground. In the existing technology, the injection pressure is controlled uniformly and the injection is carried out at normal pressure. Under the real formation conditions, the ore layer is anisotropic, resulting in differences in the leaching intensity of the ore body at different positions of the ore layer, causing the problem of non-balanced leaching of the ore layer. Therefore, there is an urgent need for a control method, device, equipment and medium for in-situ leaching mining to solve the problem of non-balanced leaching of the ore layer caused by differences in the leaching intensity of the ore body at different positions of the ore layer. Summary of the invention
[0003] The object of the present invention is to provide a control method, device, equipment and medium for in-situ leaching mining to improve the above problems. In order to achieve the above object, the technical solution adopted by the present invention is as follows:
[0004] In a first aspect, the present application provides a control method for in-situ leaching mining, comprising:
[0005] Get the actual injection constant;
[0006] The sub-charge booster pump is selected by preset satisfying conditions to obtain the target sub-charge booster pump;
[0007] Based on the target branch booster pump and the preset main booster pump, a simulated graded pressurized injection system is constructed;
[0008] Performing a pressurization simulation on the preset injection pipeline in the simulated graded pressurized injection system to obtain the injection pressure of the injection main pipe, wherein the pressurization process is the minimum pump pressure of the preset main pipe pressurization pump;
[0009] Calculating according to the actual injection constant and the branch injection volume preset in the target branch pressure pump to obtain the drilling injection pressure under graded pressurization;
[0010] The boosting amount of the branch pressure pump is obtained by calculating based on the drilling injection pressure under the step-by-step pressurization and the injection pressure of the injection main pipe;
[0011] The boosting amount of the sub-management boosting pump and the preset sub-management liquid injection amount are input into the preset actual main control system for solution to obtain the sub-management adjustment frequency;
[0012] The target branch-managed booster pump is regulated and controlled through the branch-managed adjustment frequency according to the preset actual main control system.
[0013] In a second aspect, the present application also provides a control device for in-situ leaching mining, comprising:
[0014] A first acquisition module is used to acquire an actual injection constant;
[0015] The second acquisition module is used to select the sub-charge booster pumps according to preset conditions to obtain the target sub-charge booster pumps;
[0016] A third acquisition module is used to construct a simulated graded pressurized liquid injection system based on the target branch pressurized pump and the preset main pressurized pump;
[0017] A fourth acquisition module is used to perform a pressurization simulation on the preset injection pipeline in the simulated graded pressurized injection system to obtain the injection pressure of the injection main pipe, wherein the pressurization process is the minimum pump pressure of the preset main pipe pressurization pump;
[0018] A first calculation module is used to calculate according to the actual injection constant and the branch injection volume preset in the target branch pressure pump to obtain the drilling injection pressure under graded pressurization;
[0019] A second calculation module is used to calculate based on the drilling injection pressure under the graded pressurization and the injection pressure of the injection main pipe to obtain the boosting amount of the branch pressure pump;
[0020] The third calculation module is used to input the boosting amount of the sub-management boosting pump and the preset sub-management liquid injection amount into the preset actual main control system for solution to obtain the sub-management adjustment frequency;
[0021] The first processing module is used to control the target branch-managed booster pump through the branch-managed adjustment frequency according to a preset actual main control system.
[0022] In a third aspect, the present application also provides a control device for in-situ leaching mining, comprising:
[0023] Memory for storing computer programs;
[0024] A processor is used to implement the steps of the control method for in-situ leaching mining when executing the computer program.
[0025] In a fourth aspect, the present application further provides a readable storage medium having a computer program stored thereon, and when the computer program is executed by a processor, the steps of the above-mentioned control method based on in-situ leaching mining are implemented.
[0026] The beneficial effects of the present invention are:
[0027] The present invention determines how to obtain a target branch-in-charge booster pump, then obtains the boost volume of the branch-in-charge booster pump through the target branch-in-charge booster pump, and then solves it with a preset branch-in-charge injection volume to obtain a branch-in-charge adjustment frequency. By determining the control range of the branch-in-charge adjustment frequency, balanced leaching of ore bodies at different positions of the ore layer is achieved, which solves the problem of non-balanced leaching of the ore layer caused by differences in leaching intensity of ore bodies at different positions of the ore layer in the prior art.
[0028] Other features and advantages of the present invention will be described in the following description, and partly become apparent from the description, or be understood by implementing the embodiments of the present invention. The purpose and other advantages of the present invention can be realized and obtained by the structures particularly pointed out in the written description, claims, and drawings. BRIEF DESCRIPTION OF THE DRAWINGS
[0029] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings required for use in the embodiments are briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present invention and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without creative work.
[0030] Figure 1 It is a schematic flow chart of the control method for in-situ leaching mining described in an embodiment of the present invention;
[0031] Figure 2 It is a schematic diagram of the structure of the control equipment used for in-situ leaching mining described in an embodiment of the present invention.
[0032] Markings in the figure: 800, control equipment for in-situ leaching mining; 801, processor; 802, memory; 803, multimedia component; 804, I / O interface; 805, communication component. DETAILED DESCRIPTION
[0033] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, rather than all of the embodiments. The components of the embodiments of the present invention generally described and shown in the drawings here can be arranged and designed in various different configurations. Therefore, the following detailed description of the embodiments of the present invention provided in the drawings is not intended to limit the scope of the claimed invention, but merely represents selected embodiments of the present invention. Based on the embodiments in the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention.
[0034] It should be noted that similar reference numerals and letters represent similar items in the following drawings, so once an item is defined in one drawing, it does not need to be further defined and explained in the subsequent drawings. At the same time, in the description of the present invention, the terms "first", "second", etc. are only used to distinguish the description and cannot be understood as indicating or implying relative importance.
[0035] Embodiment 1:
[0036] This embodiment provides a control method for in-situ leaching mining.
[0037] See also Figure 1 , the figure shows that the method includes steps S1 to S8, including:
[0038] S1: Get the actual injection constant;
[0039] In order to clarify the specific method of obtaining the actual injection constant, step S1 includes S11 to S15, which are specifically:
[0040] S11: Obtain the injection pressure of a theoretical single borehole;
[0041] In order to clarify the specific method of obtaining the injection pressure of a theoretical single borehole, step S11 includes S111 to S115, which are specifically:
[0042] S111: Obtaining injection volume, permeability of the ore layer and density of the leaching agent;
[0043] S112: Calculating based on the injection volume and a preset permeability of the ore layer to obtain an injection constant of the ore layer permeability water conduction pressure;
[0044] In this step, the ore layer seepage water pressure injection constant is:
[0045]
[0046] In the above formula (1), C represents the ore layer permeation water pressure injection constant, μ represents the dynamic viscosity coefficient of the leaching agent, and L 孔间距 represents the spacing between the pumping holes, k represents the permeability of the ore layer, and a represents the water-passing area at the bottom of the well.
[0047] S113: Calculating based on the injection volume, the density of the leaching agent and a preset friction coefficient of the inner wall of the injection pipe to obtain a surface pipeline resistance pressure injection constant;
[0048] In this step, the surface pipeline resistance pressure injection constant is:
[0049]
[0050] In the above formula (2), B represents the surface pipeline resistance pressure injection constant, f represents the friction coefficient of the inner wall of the injection pipe, and L 注管 represents the length of the surface injection pipe, ρ represents the density of the leaching agent, and D represents the diameter of the injection pipe.
[0051] S114: Calculating based on the density of the leaching agent, the preset water level burial depth of the injection hole, and the preset water level burial depth of the extraction hole to obtain a pressure differential injection constant caused by the water level difference between the injection and extraction holes;
[0052] In this step, the pressure differential injection constant caused by the water level difference between the injection holes is:
[0053] A=ρg(H 抽孔 -H 注孔 ) (3)
[0054] In the above formula (3), A represents the pressure difference injection constant caused by the water level difference between the injection holes, ρ represents the density of the leaching agent, g represents the gravitational acceleration, and H 抽孔 Indicates the depth of water level in the pumping hole, H 注孔 Indicates the depth of water level in the injection hole.
[0055] S115: Calculate the injection pressure of a theoretical single borehole according to the injection constant of the ore layer seepage water conduction pressure, the injection constant of the surface pipeline resistance pressure, and the pressure difference injection constant caused by the water level difference between the injection and extraction holes.
[0056] In this step, the theoretical injection pressure of a single borehole is:
[0057]
[0058] In the above formula (4), P represents the injection pressure of a theoretical single borehole, μ represents the dynamic viscosity coefficient of the leaching agent, and L 孔间距 represents the spacing between the pumping and injection holes, k represents the permeability of the ore layer, a represents the water flow area at the bottom of the well, Q represents the target drilling injection volume, B represents the surface pipeline resistance pressure injection constant, f represents the friction coefficient of the inner wall of the injection pipe, l 注管 represents the length of the surface injection pipe, ρ represents the density of the leaching agent, D represents the diameter of the injection pipe, A represents the pressure difference injection constant caused by the water level difference between the injection holes, g represents the gravitational acceleration, H 抽孔 Indicates the depth of water level in the pumping hole, H 注孔 Indicates the depth of water level in the injection hole.
[0059] In this step, the injection pressure of the theoretical single borehole, the pressure difference injection constant caused by the water level difference between the extraction and injection holes, the surface pipeline resistance pressure injection constant and the ore layer seepage water conduction pressure injection constant are obtained according to the characteristic parameters such as the bottom hole morphology, ore layer permeability, leachate properties or injection pipe properties. However, in actual applications, since some parameters cannot be accurately measured or are difficult to obtain, such as the bottom hole water flow area, the inner wall friction coefficient of the injection pipe and the water level burial depth of the extraction hole, it is impossible to obtain a complete injection pressure expression based on theoretical analysis. In order to facilitate the calculation of injection pressure, the injection constant in the formula is obtained by conducting a normal pressure injection test. When the calculation accuracy is high, three groups of normal pressure injection tests can be carried out to respectively obtain the pressure difference injection constant caused by the water level difference between the actual extraction and injection holes, the actual surface pipeline resistance pressure injection constant and the actual stratum seepage water conduction pressure injection constant, so as to characterize the pressure difference injection constant caused by the water level difference between the extraction and injection holes, the surface pipeline resistance pressure injection constant and the stratum seepage water conduction pressure injection constant.
[0060] Preferably, for the in-situ leaching mining process, the borehole injection pressure under graded pressurization is generally 0.5~5MPa, and the injection pipe resistance pressure is generally 0.01~0.05MPa. For the case where the calculation accuracy is not high, the influence of the inner wall resistance of the injection pipe on the injection pressure can be ignored, so that the theoretical single borehole injection pressure can be further simplified as follows:
[0061]
[0062] In the above formula: P represents the injection pressure of a theoretical single borehole, C represents the injection constant of the ore layer permeability water pressure, Q represents the injection volume of the target borehole, A represents the pressure difference injection constant caused by the water level difference between the injection holes, μ represents the dynamic viscosity coefficient of the leaching agent, and L 孔间距 represents the distance between the injection and extraction holes, k represents the permeability of the ore layer, a represents the water flow area at the bottom of the well, ρ represents the density of the leaching agent, A represents the pressure difference injection constant caused by the water level difference between the injection and extraction holes, g represents the gravity acceleration, H 抽孔 Indicates the depth of water level in the pumping hole, H 注孔 Indicates the depth of water level in the injection hole.
[0063] S12: performing a normal pressure injection test based on the theoretical injection pressure of the single borehole to obtain a first actual injection pressure value of the single borehole;
[0064] In this step, the injection pressure value of the first actual single borehole is P1.
[0065] S13: adjusting the injection pressure according to the first actual injection pressure value of the single borehole to obtain a second actual injection pressure value of the single borehole;
[0066] In this step, the second actual injection pressure value of the single borehole is P2.
[0067] S14: acquiring the injection pressure value of the first actual single borehole and the injection pressure value of the second actual single borehole to obtain the injection volume of the first main pipe and the injection volume of the second main pipe;
[0068] In this step, the first main pipe has a liquid injection volume of Q1, and the second main pipe has a liquid injection volume of Q2.
[0069] S15: Calculate based on the first actual injection pressure of the single borehole, the second actual injection pressure of the single borehole, the injection volume of the first main pipe and the injection volume of the second main pipe to obtain an actual injection constant.
[0070] The actual injection constant includes the pressure difference injection constant caused by the water level difference between the actual pumping and injection holes and the actual ore layer seepage water conduction pressure injection constant;
[0071] In this step, the pressure differential injection constant caused by the water level difference between the actual injection holes is:
[0072]
[0073] In the above formula (5), A′ represents the pressure difference injection constant caused by the water level difference between the actual injection holes, P1 represents the injection pressure value of the first actual single borehole, P2 represents the injection pressure value of the second actual single borehole, Q1 represents the injection volume of the first main pipe, and Q2 represents the injection volume of the second main pipe.
[0074] The actual ore layer seepage water conduction pressure injection constant is:
[0075]
[0076] In the above formula (6), C′ represents the actual stratum seepage water pressure injection constant, P1 represents the injection pressure value of the first actual single borehole, P2 represents the injection pressure value of the second actual single borehole, Q1 represents the injection volume of the first main pipe, and Q2 represents the injection volume of the second main pipe.
[0077] S2: Select the booster pumps in charge by presetting the conditions to obtain the target booster pumps in charge;
[0078] In order to clarify the specific method of obtaining the target charge booster pump, step S2 includes S21 to S24, which are:
[0079] S21: judging the preset rated head and rated flow of the main pipe booster pump and preset constraint conditions to obtain whether the main pipe booster pump satisfies the conditions;
[0080] The rated head of the main pipe booster pump is not less than the preset minimum drilling injection pressure of the main pipe booster pump;
[0081] In this step, the minimum drilling injection pressure is Min(P).
[0082] In this step, the rated head of the main booster pump satisfies the formula:
[0083]
[0084] In the above formula (7), It indicates the rated head of the main booster pump, and Min (P) indicates the minimum drilling injection pressure.
[0085] Preferably, the minimum borehole injection pressure is the minimum borehole injection pressure in the injection borehole for carrying out the original leaching of sandstone uranium ore under the preset branch injection volume.
[0086] The rated flow rate of the main booster pump is not less than the product of the preset number of injection holes and the preset branch injection volume of the target branch booster pump;
[0087] In this step, the rated flow rate of the main booster pump satisfies the formula:
[0088]
[0089] In the above formula (8), It indicates the rated flow rate of the main booster pump, m indicates the number of branch injection holes, Q e Indicates the preset liquid filling volume of the branch pipe.
[0090] S22: determining based on the rated head of the branch pipe, the preset drilling injection pressure under the staged pressurization, and the preset minimum pump pressure of the main pipe pressurization pump to obtain a first satisfying condition;
[0091] In this step, the first satisfying condition is:
[0092]
[0093] In the above formula (9), Indicates the rated head of the branch pipe, P i It indicates the drilling injection pressure under graded pressurization, and Min (P) indicates the minimum drilling injection pressure.
[0094] Preferably, the drilling injection pressure under graded pressurization is the drilling injection pressure required for the i-th injection hole in the grade under a preset branch injection volume.
[0095] S23: determining based on the branch pipe rated flow rate and the preset branch pipe injection volume to obtain a second satisfying condition;
[0096] In this step, the second satisfying condition is:
[0097]
[0098] In the above formula (10), Indicates the rated flow rate of the branch pipe, Q e Indicates the preset liquid filling volume of the branch pipe.
[0099] S24: selecting a preset branch-management pressure pump according to the main-management pressure pump satisfying condition, the first satisfying condition and the second satisfying condition to obtain a target branch-management pressure pump.
[0100] S3: constructing a simulated graded pressurized injection system based on the target branch pressurized pump and the preset main pressurized pump;
[0101] The main pipe booster pump is arranged on the main pipe, and the target branch pipe booster pump is arranged on the branch pipe.
[0102] S4: performing a pressurization simulation on the preset injection pipeline in the simulated graded pressurized injection system to obtain the injection pressure of the injection main pipe, wherein the pressurization process is the minimum pump pressure of the preset main pipe pressurization pump;
[0103] The injection pressure P of the injection main pipe 主 .
[0104] S5: Calculating according to the actual injection constant and the branch injection volume preset in the target branch pressure pump to obtain the drilling injection pressure under graded pressurization;
[0105] The actual injection constant includes the actual ore layer permeation water pressure injection constant and the pressure difference injection constant caused by the water level difference between the actual injection holes;
[0106] In this step, the drilling fluid injection pressure under the graded pressurization is:
[0107] P i =C′Q e +A′ (11)
[0108] In the above formula (11), P i represents the drilling injection pressure under graded pressure, C′ represents the actual stratum permeability water pressure injection constant, Q e It represents the preset injection volume of each pipe, and A′ represents the pressure difference injection constant caused by the water level difference between the actual injection holes.
[0109] Preferably, the drilling injection pressure under the graded pressurization is the drilling injection pressure required for the i-th injection hole at a preset branch injection volume.
[0110] S6: Calculating based on the drilling injection pressure under the graded pressurization and the injection pressure of the injection main pipe to obtain the boosting amount of the branch pressure pump;
[0111] In this step, the boosting amount of the sub-charge boosting pump is:
[0112] PH=P i -P 主 (12)
[0113] In the above formula (12), PH represents the boosting amount of the boosting pump, P i Indicates the drilling fluid injection pressure under graded pressurization, P 主 Indicates the injection pressure of the injection main pipe.
[0114] Preferably, the drilling injection pressure under the graded pressurization is the drilling injection pressure required for the i-th injection hole at a preset branch injection volume.
[0115] S7: inputting the boosting amount of the sub-charge booster pump and the preset sub-charge liquid injection amount into the preset actual main control system for solving, and obtaining the sub-charge adjustment frequency;
[0116] In order to clarify the specific calculation method of the divided adjustment frequency, step S7 includes S71 to S74, which are:
[0117] S71: selecting a sub-in-charge pressure pump according to the boosting amount of the sub-in-charge pressure pump and a preset sub-in-charge liquid injection amount to obtain a target sub-in-charge pressure pump;
[0118] S72: extracting the performance information of the target sub-charge booster pump to obtain the sub-charge rated head and sub-charge rated flow rate;
[0119] In this step, the rated head of the branch pipe is The rated flow rate of the branch pipe is
[0120] S73: inputting the boosting amount of the branch pressure pump, the preset branch injection amount, the branch rated head and the branch rated flow into the preset actual main control system;
[0121] S74: Calculate the boosting amount of the branch pressure pump, the rated head, the rated flow rate and the preset branch injection amount according to the preset actual main control system to obtain the branch adjustment frequency.
[0122] In this step, the frequency of the sub-management adjustment is:
[0123]
[0124] In the above formula (15), PH represents the boosting amount of the boosting pump in charge, Indicates the rated head of the branch. Indicates the rated flow rate of the branch pipe, Q eIndicates the preset injection volume of each pipe. Indicates the frequency of the division adjustment.
[0125] Preferably, the drilling injection pressure under the graded pressurization is the drilling injection pressure required for the i-th injection hole at a preset branch injection volume.
[0126] S8: According to the preset actual main control system, the target branch-managed booster pump is regulated through the branch-managed adjustment frequency.
[0127] The control is to increase the frequency, decrease the frequency or maintain the current frequency, and the frequency is adjusted by 0.1 Hz each time.
[0128] In order to clarify the specific determination method of adjusting the frequency, step S8 includes S81 to S85, which are specifically:
[0129] S81: Detecting the preset branch pipes of the simulated graded pressurized liquid injection system using a preset detection device to obtain branch pipe flow rates;
[0130] S82: judging according to the branch flow rate and the preset branch injection volume;
[0131] S83: when the branch flow rate is lower than the preset branch injection volume, increasing the control of the frequency of the target branch booster pump;
[0132] S84: when the branch flow rate is higher than the preset branch injection volume, reducing the control of the frequency of the target branch booster pump;
[0133] S85: When the difference between the branch flow rate and the preset branch injection volume is less than 0.1m 3 / h, stop regulating the frequency of the target branch booster pump.
[0134] Achieve balanced injection of each injection hole.
[0135] Embodiment 2:
[0136] This embodiment provides a control device for in-situ leaching mining, the device comprising
[0137] A first acquisition module is used to acquire an actual injection constant;
[0138] The second acquisition module is used to select the sub-charge booster pumps according to preset conditions to obtain the target sub-charge booster pumps;
[0139] To clarify the specific method of obtaining the target booster pump:
[0140] The first processing unit is used to judge the preset rated head and rated flow of the main pipe booster pump and the preset constraint conditions to obtain whether the main pipe booster pump meets the conditions;
[0141] A first judgment unit is used to judge based on the branch pipe rated lift, the preset drilling injection pressure under graded pressurization, and the preset minimum pump pressure of the main pipe pressure pump to obtain a first satisfaction condition;
[0142] A second judgment unit is used to judge based on the branch pipe rated flow rate and the preset branch pipe injection volume to obtain a second satisfaction condition;
[0143] The second acquisition unit is used to select a preset branch-management pressure pump according to the condition satisfied by the main-management pressure pump, the first condition satisfied, and the second condition satisfied, to obtain a target branch-management pressure pump.
[0144] A third acquisition module is used to construct a simulated graded pressurized liquid injection system based on the target branch pressurized pump and the preset main pressurized pump;
[0145] A fourth acquisition module is used to perform a pressurization simulation on the preset injection pipeline in the simulated graded pressurized injection system to obtain the injection pressure of the injection main pipe, wherein the pressurization process is the minimum pump pressure of the preset main pipe pressurization pump;
[0146] A first calculation module is used to calculate according to the actual injection constant and the branch injection volume preset in the target branch pressure pump to obtain the drilling injection pressure under graded pressurization;
[0147] A second calculation module is used to calculate based on the drilling injection pressure under the graded pressurization and the injection pressure of the injection main pipe to obtain the boosting amount of the branch pressure pump;
[0148] The third calculation module is used to input the boosting amount of the sub-management boosting pump and the preset sub-management liquid injection amount into the preset actual main control system for solution to obtain the sub-management adjustment frequency;
[0149] To clarify the specific method of obtaining the frequency of the above-mentioned divisional adjustment:
[0150] A first acquisition unit is used to select a sub-in-charge pressure pump according to the boosting amount of the sub-in-charge pressure pump and a preset sub-in-charge liquid injection amount to obtain a target sub-in-charge pressure pump;
[0151] A first calculation unit is used to extract preset performance information of the target branch-in-charge booster pump to obtain a branch-in-charge rated head and a branch-in-charge rated flow rate;
[0152] The second calculation unit is used to input the boosting amount of the branch pressure pump, the preset branch injection amount, the branch rated head and the branch rated flow into the preset actual main control system;
[0153] The third calculation unit is used to calculate the boosting amount of the branch booster pump, the branch rated head, the branch rated flow rate and the preset branch injection amount according to the preset actual main control system to obtain the branch adjustment frequency.
[0154] The first processing module is used to control the target branch-managed booster pump through the branch-managed adjustment frequency according to a preset actual main control system.
[0155] In order to clarify how to regulate the target sub-charge booster pump:
[0156] A second processing unit is used to detect the preset branch pipes of the simulated graded pressurized liquid injection system according to a preset detection device to obtain the branch pipe flow rate;
[0157] A third judgment unit, used for making a judgment based on the branch flow rate and a preset branch injection volume;
[0158] A third processing unit is used to increase the control of the frequency of the target branch pipe booster pump when the branch pipe flow rate is lower than a preset branch pipe injection volume;
[0159] The fourth processing unit is used to reduce the control of the frequency of the target branch pipe booster pump when the branch pipe flow rate is higher than the preset branch pipe injection volume;
[0160] The fifth processing unit is used for processing the flow rate of the branch pipe and the preset injection volume of the branch pipe when the difference is less than 0.1m 3 / h, stop regulating the frequency of the target branch booster pump.
[0161] It should be noted that, regarding the device in the above embodiment, the specific manner in which each module performs the operation has been described in detail in the embodiment of the method, and will not be elaborated here.
[0162] Embodiment 3:
[0163] Corresponding to the above method embodiment, this embodiment also provides a control device for in-situ leaching mining. The control device for in-situ leaching mining described below and the control method for in-situ leaching mining described above can refer to each other.
[0164] Figure 2 FIG. 8 is a block diagram of a control device 800 for in-situ leaching mining according to an exemplary embodiment. Figure 2 As shown, the control device 800 for in-situ leaching mining may include: a processor 801, a memory 802. The control device 800 for in-situ leaching mining may also include one or more of a multimedia component 803, an I / O interface 804, and a communication component 805.
[0165] The processor 801 is used to control the overall operation of the control device 800 for in-situ leaching mining to complete all or part of the steps in the control method for in-situ leaching mining. The memory 802 is used to store various types of data to support the operation of the control device 800 for in-situ leaching mining, and these data may include, for example, instructions for any application or method operated on the control device 800 for in-situ leaching mining, and application-related data, such as contact data, sent and received messages, pictures, audio, video, etc. The memory 802 can be implemented by any type of volatile or non-volatile storage device or a combination thereof, such as static random access memory (SRAM), electrically erasable programmable read-only memory (EEPROM), erasable programmable read-only memory (EPROM), programmable read-only memory (PROM), read-only memory (ROM), magnetic memory, flash memory, disk or optical disk. The multimedia component 803 may include a screen and an audio component. The screen may be, for example, a touch screen, and the audio component is used to output and / or input audio signals. For example, the audio component may include a microphone, which is used to receive external audio signals. The received audio signal may be further stored in the memory 802 or sent via the communication component 805. The audio component also includes at least one speaker for outputting audio signals. The I / O interface 804 provides an interface between the processor 801 and other interface modules, and the above-mentioned other interface modules can be keyboards, mice, buttons, etc. These buttons can be virtual buttons or physical buttons. The communication component 805 is used for wired or wireless communication between the control device 800 for in-situ leaching mining and other devices. Wireless communication, such as Wi-Fi, Bluetooth, Near Field Communication (NFC), 2G, 3G or 4G, or a combination of one or more of them, so the corresponding communication component 805 can include: Wi-Fi module, Bluetooth module, NFC module.
[0166] In an exemplary embodiment, the control device 800 for in-situ leaching mining can be implemented by one or more application specific integrated circuits (Application Specific Integrated Circuit, referred to as ASIC), digital signal processors (Digital Signal Processor, referred to as DSP), digital signal processing devices (Digital Signal Processing Device, referred to as DSPD), programmable logic devices (Programmable Logic Device, referred to as PLD), field programmable gate arrays (Field Programmable Gate Array, referred to as FPGA), controllers, microcontrollers, microprocessors or other electronic components to execute the above-mentioned control method for in-situ leaching mining.
[0167] In another exemplary embodiment, a computer-readable storage medium including program instructions is also provided, and when the program instructions are executed by a processor, the steps of the above-mentioned control method for in-situ leaching mining are implemented. For example, the computer-readable storage medium can be the above-mentioned memory 802 including program instructions, and the above-mentioned program instructions can be executed by the processor 801 of the control device 800 for in-situ leaching mining to complete the above-mentioned control method for in-situ leaching mining.
[0168] Embodiment 4:
[0169] Corresponding to the above method embodiment, a readable storage medium is also provided in this embodiment. The readable storage medium described below and the control method for in-situ leaching mining described above can refer to each other.
[0170] A readable storage medium stores a computer program, which, when executed by a processor, implements the steps of the control method for in-situ leaching mining of the above method embodiment.
[0171] The readable storage medium may specifically be a U disk, a mobile hard disk, a read-only memory (ROM), a random access memory (RAM), a magnetic disk or an optical disk, or other readable storage medium that can store program codes.
[0172] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
[0173] The above is only a specific embodiment of the present invention, but the protection scope of the present invention is not limited thereto. Any person skilled in the art can easily think of changes or substitutions within the technical scope disclosed by the present invention, which should be included in the protection scope of the present invention. Therefore, the protection scope of the present invention should be based on the protection scope of the claims.
Claims
1. A control method for in-situ leaching mining, characterized in that: include: Get the actual injection constant; The sub-charge booster pump is selected by preset satisfying conditions to obtain the target sub-charge booster pump; Based on the target branch booster pump and the preset main booster pump, a simulated graded pressurized injection system is constructed; Performing a pressurization simulation on the preset injection pipeline in the simulated graded pressurized injection system to obtain the injection pressure of the injection main pipe, wherein the pressurization process is the minimum pump pressure of the preset main pipe pressurization pump; Calculating according to the actual injection constant and the branch injection volume preset in the target branch pressure pump to obtain the drilling injection pressure under graded pressurization; The boosting amount of the branch pressure pump is obtained by calculating based on the drilling injection pressure under the step-by-step pressurization and the injection pressure of the injection main pipe; The boosting amount of the sub-management boosting pump and the preset sub-management liquid injection amount are input into the preset actual main control system for solution to obtain the sub-management adjustment frequency; The target branch-managed booster pump is regulated and controlled through the branch-managed adjustment frequency according to the preset actual main control system.
2. The control method for in-situ leaching mining according to claim 1 is characterized in that the boosting amount of the branch pressure pump and the preset branch injection amount are input into a preset main control system to obtain the branch adjustment frequency, including: The sub-in-charge pressure pump is selected according to the boosting amount of the sub-in-charge pressure pump and the preset sub-in-charge liquid injection amount to obtain a target sub-in-charge pressure pump; Extracting preset performance information of the target branch booster pump to obtain a branch rated head and a branch rated flow rate; Inputting the boosting amount of the branch booster pump, the preset branch injection amount, the branch rated head and the branch rated flow into the preset actual main control system; The boosting amount of the branch booster pump, the branch rated head, the branch rated flow rate and the preset branch injection amount are calculated according to the preset actual main control system to obtain the branch adjustment frequency.
3. The control method for in-situ leaching mining according to claim 1 is characterized in that the sub-charge booster pump is selected by preset conditions to obtain the target sub-charge booster pump, comprising: The preset rated head and rated flow of the main pipe booster pump are judged against the preset constraint conditions to obtain whether the main pipe booster pump satisfies the conditions; A first satisfying condition is obtained by judging based on the rated head of the branch pipe, the preset drilling injection pressure under the staged pressurization, and the preset minimum pump pressure of the main pipe pressurization pump; A second satisfying condition is obtained by judging based on the branch pipe rated flow rate and the preset branch pipe injection volume; A preset branch-management pressure pump is selected according to the main-management pressure pump satisfaction condition, the first satisfaction condition, and the second satisfaction condition to obtain a target branch-management pressure pump.
4. The control method for in-situ leaching mining according to claim 1 is characterized in that the target branch pressure pump is controlled by the branch adjustment frequency according to the preset actual main control system, and the control is to increase the frequency, reduce the frequency or maintain the current, including: Testing the preset branch pipes of the simulated graded pressurized liquid injection system according to the preset testing equipment to obtain the branch pipe flow rate; Making a judgment based on the branch flow rate and the preset branch injection volume; When the branch flow rate is lower than the preset branch injection volume, increasing the control of the frequency of the target branch booster pump; When the branch flow rate is higher than the preset branch injection volume, the frequency of the target branch booster pump is reduced; When the difference between the branch flow rate and the preset branch injection volume is less than 0.1m 3 / h, stop regulating the frequency of the target branch booster pump.
5. A control device for in-situ leaching mining, characterized in that: include: A first acquisition module is used to acquire an actual injection constant; The second acquisition module is used to select the sub-charge booster pumps according to preset conditions to obtain the target sub-charge booster pumps; A third acquisition module is used to construct a simulated graded pressurized liquid injection system based on the target branch pressurized pump and the preset main pressurized pump; A fourth acquisition module is used to perform a pressurization simulation on the preset injection pipeline in the simulated graded pressurized injection system to obtain the injection pressure of the injection main pipe, wherein the pressurization process is the minimum pump pressure of the preset main pipe pressurization pump; A first calculation module is used to calculate according to the actual injection constant and the branch injection volume preset in the target branch pressure pump to obtain the drilling injection pressure under graded pressurization; A second calculation module is used to calculate based on the drilling injection pressure under the graded pressurization and the injection pressure of the injection main pipe to obtain the boosting amount of the branch pressure pump; The third calculation module is used to input the boosting amount of the sub-management boosting pump and the preset sub-management liquid injection amount into the preset actual main control system for solution to obtain the sub-management adjustment frequency; The first processing module is used to control the target branch-managed booster pump through the branch-managed adjustment frequency according to a preset actual main control system.
6. The control device for in-situ leaching mining according to claim 5 is characterized in that the boosting amount of the branch pressure pump and the preset branch injection amount are input into the preset main control system to obtain the branch adjustment frequency, and the performance parameters of the pressure pump include rated head, rated flow and rated frequency, including: A first acquisition unit is used to select a sub-in-charge pressure pump according to the boosting amount of the sub-in-charge pressure pump and a preset sub-in-charge liquid injection amount to obtain a target sub-in-charge pressure pump; A first calculation unit is used to extract preset performance information of the target branch-in-charge booster pump to obtain a branch-in-charge rated head and a branch-in-charge rated flow rate; The second calculation unit is used to input the boosting amount of the branch pressure pump, the preset branch injection amount, the branch rated head and the branch rated flow into the preset actual main control system; The third calculation unit is used to calculate the boosting amount of the branch booster pump, the branch rated head, the branch rated flow rate and the preset branch injection amount according to the preset actual main control system to obtain the branch adjustment frequency.
7. The control device for in-situ leaching mining according to claim 5 is characterized in that the sub-charge booster pump is selected by preset conditions to obtain the target sub-charge booster pump, including: The first processing unit is used to judge the preset rated head and rated flow of the main pipe booster pump and the preset constraint conditions to obtain whether the main pipe booster pump meets the conditions; A first judgment unit is used to judge based on the branch pipe rated lift, the preset drilling injection pressure under graded pressurization, and the preset minimum pump pressure of the main pipe pressure pump to obtain a first satisfaction condition; A second judgment unit is used to judge based on the branch pipe rated flow rate and the preset branch pipe injection volume to obtain a second satisfaction condition; The second acquisition unit is used to select a preset branch-management pressure pump according to the condition satisfied by the main-management pressure pump, the first condition satisfied, and the second condition satisfied, to obtain a target branch-management pressure pump.
8. The control device for in-situ leaching mining according to claim 5 is characterized in that the target branch pressure pump is controlled by the branch adjustment frequency according to the preset actual main control system, and the control is to increase the frequency, reduce the frequency or maintain the current frequency, including: A second processing unit is used to detect the preset branch pipes of the simulated graded pressurized liquid injection system according to a preset detection device to obtain the branch pipe flow rate; A third judgment unit, used for making a judgment based on the branch flow rate and a preset branch injection volume; A third processing unit is used to increase the control of the frequency of the target branch pipe booster pump when the branch pipe flow rate is lower than a preset branch pipe injection volume; The fourth processing unit is used to reduce the control of the frequency of the target branch pipe booster pump when the branch pipe flow rate is higher than the preset branch pipe injection volume; The fifth processing unit is used for processing the flow rate of the branch pipe and the preset injection volume of the branch pipe when the difference is less than 0.1m 3 / h, stop regulating the frequency of the target branch booster pump.
9. A control device for in-situ leaching mining, characterized in that: include: Memory for storing computer programs; A processor, for implementing the steps of the control method for in-situ leaching mining as claimed in any one of claims 1 to 4 when executing the computer program.
10. A readable storage medium, characterized in that : A computer program is stored on the readable storage medium, and when the computer program is executed by the processor, the steps of the control method for in-situ leaching mining as described in any one of claims 1 to 4 are implemented.