Ecological slope protection construction equipment for water conservancy project
By designing a slope protection construction equipment with slide rails and lifting components, the problems of low construction efficiency and poor safety caused by high inclination angles and environmental diversity in the prior art are solved, and more efficient and safer slope protection construction is achieved, and the construction needs of different geological environments are adapted.
Patent Information
- Application Number
- CN202411649227.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-19
- Publication Date
- 2025-02-28
AI Technical Summary
During the construction process, existing slope protection construction equipment has low construction efficiency and poor safety due to high inclination angle and environmental diversity, and it is difficult to flexibly adjust the construction location.
A device including the main body of the slope protection and a double-position side construction structure is designed, and structures such as slide rails and lifting components can be used to move and adjust the construction position horizontally, and the stable reinforcement of the slope protection and vegetation spraying is achieved through grid laying components and spraying structures.
It improves the efficiency and safety of slope protection construction, reduces the exposure time of construction workers, and can flexibly adjust the construction scope and location to adapt to the slope protection construction needs of different geological environments.
Smart Images

Figure CN119531301A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of slope protection construction, and more specifically, to an ecological slope protection construction equipment for water conservancy projects. Background Art
[0002] Ecological slope protection in water conservancy projects is a technology for supporting slopes or side slopes. This technology can not only stabilize the slope surface, but also restore and protect the natural environment and promote ecological balance. The construction background technology of ecological slope protection is mainly to deal with the stability problems that may arise from traditional slope protection methods under long-term rain and river erosion, as well as to improve the ecological functions of slope protection, such as preventing soil erosion, providing biological habitats and improving landscapes. This system usually includes plant planting and specific engineering measures, such as using materials such as eco-bags, grids or baffles to fix the soil and provide conditions for plant growth; After searching, the existing application number: CN201910391651.0 discloses a slope or retaining wall construction trolley, including a trolley body of a double-track structure that can move laterally along the slope, the trolley body is a truss structure, and is arranged in parallel with the simulated inclined surface of the slope or retaining wall; the trolley body has at least one of a grooving operation area, a drilling operation area, and a grid frame operation area; in the scheme with a grooving operation area, the grooving operation area is located at the front end of the trolley construction travel direction; in the combination scheme with a grid frame operation area, the grid frame operation area is located at the tail end of the trolley construction travel direction; wherein a grooving machine is provided in the grooving operation area, and a drilling machine for drilling anchor holes is provided in the drilling operation area; the grid frame operation area is provided with a lifting device for installing prefabricated grid frame components; or, a concrete grid frame cast-in-place operation facility. The beneficial effects of the present invention are that the slope construction efficiency is high, the construction is safe, the number of operators is reduced, the labor intensity is reduced, and the trolley structure is simple, and the installation and construction operations are convenient. The inventor discovered the following problems in the prior art during the implementation of this application: When existing slope protection is being constructed, due to the problems of its construction environment, the types of slope protection are often used beside buildings, on both sides of roads, on river banks, and on hillsides. Therefore, the environment around the slope protection is often diverse. When ecological slope protection and vegetation slope protection are being carried out on the slope protection, it is often necessary to manually lay a grid for reinforcement on the construction surface of the slope protection. Due to the inclination angle of the slope protection, the degree of danger is often higher when constructing on an inclined surface than on a flat surface. Therefore, in view of the above problems, a kind of ecological slope protection construction equipment for water conservancy projects is proposed. Summary of the invention
[0003] In order to overcome the above-mentioned defects of the prior art, the present application provides an ecological slope protection construction equipment for water conservancy projects to solve the problems raised in the above-mentioned background technology.
[0004] To achieve the above-mentioned purpose, the present application provides the following technical solutions: an ecological slope protection construction equipment for water conservancy projects, comprising a slope protection body and a double-position side construction structure, wherein slide rails are arranged on the upper and lower planes of the slope protection body, and the double-position side construction structure is arranged above the slide rails, and the double-position side construction structure comprises a lifting component, a counterweight component, a rail support bracket, a grid laying component, a first limiting bracket, a spraying structure and a ground-attaching component, and a counterweight component is arranged on the side of the lifting component away from the slope protection body, and the lifting component is away from the counterweight A track support bracket is provided on one side of the component, and a grid laying component is provided on the side of the track support bracket, and a first limiting bracket is provided below the track support bracket, and a spraying structure is slidably connected at the center of the two groups of the track support brackets, and a ground-attached component is provided on the side of the spraying structure away from the lifting component, the sliding rail is linked with the two-way lateral construction structure, and drives the track support bracket to move horizontally along the ground surface of the slope protection body, and the spraying structure includes a sliding component and a spraying component, and a spraying component is installed above the sliding component.
[0005] Preferably, the lifting assembly includes a motor box, a positioning bracket and an assembly groove, and positioning brackets are provided on both sides of the motor box, and assembly grooves are provided on the inner walls of the positioning brackets, and the positioning brackets and the rail support brackets are rotatably connected through the assembly grooves.
[0006] Preferably, the sliding assembly includes a first motor chamber, a groove guard plate, a supporting gear, a fixed rod, a second motor chamber, a first gear, a second gear and a servo motor, and two groups of fixed rods are arranged on the side of the first motor chamber, and a groove guard plate is arranged on the side of the two groups of fixed rods away from the first motor chamber, and a supporting gear is arranged on the side of the groove guard plate away from the two groups of fixed rods, and a second motor chamber is arranged on the side of the first motor chamber away from the two groups of fixed rods, and a first gear is arranged on the side of the second motor chamber away from the first motor chamber, and a second gear is arranged on the side of the first gear, and a servo motor is installed above the inner wall of the second motor chamber.
[0007] Preferably, the spray assembly includes a rotating plate, a fixed base, a mounting bracket, a third motor chamber, a mounting plate and a spray rod, and a fixed base is provided above the rotating plate, and a mounting bracket is provided above the fixed base, and the third motor chamber is installed above the mounting bracket, and a mounting plate is installed above the third motor chamber by bolts, and spray rods are installed on both sides of the inner wall of the mounting plate.
[0008] Preferably, the ground-attaching component includes a steering bracket, a rotating ring and a positioning component, and rotating rings are provided on both sides of the steering bracket, and the steering bracket and the rail-attaching support bracket are rotatably connected through the rotating ring, and a positioning component is provided below the steering bracket.
[0009] Preferably, the positioning assembly includes a connecting bracket, a ground bracket, a guard wheel, a connecting shaft and an adjustment groove, and a ground bracket is arranged at the center of the two groups of connecting brackets, and a guard wheel is installed below the inner wall of the ground bracket, and a connecting shaft is installed above the connecting bracket, and adjustment grooves are arranged on both sides of the inner wall of the connecting bracket, and a sliding connection is formed between the connecting bracket and the ground bracket through the adjustment groove.
[0010] Preferably, the grid laying assembly includes a first sliding groove, a second sliding groove, a placement plate, a second limiting bracket, a plug-in block and a mounting block, and second sliding grooves are provided on both upper and lower sides of the first sliding groove, and a second limiting bracket is provided on the side of the placement plate, and a sliding connection is formed between the placement plate and the second limiting bracket through the first sliding groove and the second sliding groove, and a plug-in block is provided on the side of the placement plate away from the second limiting bracket, and a mounting block is provided at the center of the two groups of the plug-in blocks.
[0011] Preferably, the first limiting bracket includes a second connecting plate, a connecting head and a support rod, and the connecting head is provided on the side of the second connecting plate, and the support rod is provided at the center of the two groups of the second connecting plates.
[0012] Preferably, the counterweight assembly includes a first connecting plate, a placement plate, a counterweight block, a mounting groove and an extension groove, and a placement plate is provided on the side of the first connecting plate, and counterweight blocks are placed on the inner wall of the placement plate, and a mounting block is provided on the side of the first connecting plate away from the placement plate, and an extension groove is provided on the side of the placement plate away from the mounting groove.
[0013] Technical effects and advantages of this application: Compared with the prior art, this ecological slope protection construction equipment for water conservancy projects uses a double-position side construction structure. When the slope protection is leveled, the position for assembling the slide rail is confirmed according to the environment of the slope protection, so that the construction position of the double-position side construction structure can be adjusted at any time to facilitate the construction process. The double-position side construction structure can complete a construction range of the slope protection body that is twice its own.
[0014] Compared with the prior art, the ecological slope protection construction equipment for water conservancy projects uses a grid laying component, wherein the grid laying component is used to lock the grid. When laying, the double-position side construction structure drives the grid in the grid laying component to be laid during the movement. When laying, the construction position of the double-position side construction structure can be adjusted at any time, so that the double-position side construction structure can be laid from bottom to bottom, or from top to bottom, so as to facilitate the flexibility of adjusting the slope protection construction.
[0015] Compared with the prior art, this ecological slope protection construction equipment for water conservancy projects performs secondary construction on the slope protection through a spraying structure, wherein the spraying structure can slide along the rail support bracket through a sliding component, so that the sliding component drives the spraying component to spray along the outer surface of the slope protection body, thereby allowing the spraying component to evenly spray the range of the slope protection body. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 This is a schematic diagram of the overall structure of this application; Figure 2 This is a schematic diagram of the structure of the slope protection body of this application; Figure 3 This is a structural schematic diagram of the double-position side construction structure of this application; Figure 4 This is a schematic diagram of the structure of the spraying structure of the present application; Figure 5 This is a schematic diagram of the structure of the lifting assembly of the present application; Figure 6 This is a schematic diagram of the structure of the placement plate of this application; Figure 7 This is a schematic diagram of the structure of the first motor room of the present application; Figure 8 This is a schematic diagram of the structure of the rotating plate of the present application; Fig. 9 This is a schematic diagram of the structure of the motor box of this application; Fig.10 This is a schematic diagram of the structure of the ground-attaching component of the present application; Fig.11 This is a schematic diagram of the structure of the positioning component of the present application; Fig.12 This is a schematic diagram of the structure of the first limiting bracket of the present application; Fig.13 This is a schematic diagram of the structure of the counterweight assembly of the present application.
[0017] The accompanying drawings are marked as follows: 1. slope protection body; 2. slide rail; 3. double-position side construction structure; 4. lifting assembly; 5. counterweight assembly; 501. first connecting plate; 502. placement plate; 503. counterweight block; 504. installation groove; 505. extension groove; 6. track support bracket; 7. grid laying assembly; 701. first sliding groove; 702. second sliding groove; 8. first limit bracket; 801. second connecting plate; 802. connector; 803. support rod; 9. spraying structure; 10. ground assembly; 1001. rotating ring; 11. first motor room; 12. groove guard plate; 13. support gear; 14, fixing rod; 15, second motor chamber; 16, first gear; 17, second gear; 18, servo motor; 19, rotating plate; 20, fixing base; 21, mounting bracket; 22, third motor chamber; 23, mounting plate; 24, spraying rod; 25, motor box; 26, positioning bracket; 27, assembly slot; 28, steering bracket; 29, positioning assembly; 30, connecting bracket; 31, ground bracket; 32, guard wheel; 33, connecting shaft; 34, adjusting slot; 35, second limit bracket; 36, plug-in block; 37, mounting block; 38, sliding assembly; 39, spraying assembly. DETAILED DESCRIPTION
[0018] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application. Example 1
[0019] As attached Figures 1 to 13The device is a kind of ecological slope protection construction equipment for water conservancy projects, which includes a slope protection body 1 and a double-position side construction structure 3. The upper and lower planes of the slope protection body 1 are both provided with slide rails 2, and the double-position side construction structure 3 is arranged above the slide rails 2. The double-position side construction structure 3 includes a lifting component 4, a counterweight component 5, a rail support bracket 6, a grid laying component 7, a first limiting bracket 8, a spraying structure 9 and a ground-attaching component 10. The counterweight component 5 is arranged on the side of the lifting component 4 away from the slope protection body 1, and the lifting component 4 is away from the counterweight component 5. A track support bracket 6 is provided on one side of the component 5, and a grid laying component 7 is provided on the side of the track support bracket 6, and a first limiting bracket 8 is provided below the track support bracket 6, and a spraying structure 9 is slidably connected at the center of the two groups of track support brackets 6, and a ground-attaching component 10 is provided on the side of the spraying structure 9 away from the lifting component 4, the slide rail 2 is linked with the two-way lateral construction structure, and drives the track support bracket 6 to move horizontally along the ground surface of the slope protection body 1, and the spraying structure 9 includes a sliding component 38 and a spraying component 39, and the spraying component 39 is installed above the sliding component 38.
[0020] Among them, the construction site of the slope protection is still in the process of construction. Due to the different geological environments, the inclination angle of the leveled slope protection itself during the construction process may not meet the manual construction standards. Therefore, when faced with problems such as unknown geology, high slope protection inclination angle and long slope protection range, the time that construction workers are in the slope protection range is reduced by laying slide rails 2 on the construction surfaces at the upper and lower ends of the slope protection body 1 and erecting a double-position side construction structure 3. At the same time, because of the construction of its equipment, even if the inclination angle of the slope protection is differentiated, its equipment can still build the grid. When laying normal slope protection, only It is necessary to selectively lay the slide rail on either side of the upper and lower ends of the slope protection according to the actual situation. At this time, the grid is installed inside the grid laying component 7, and the beginning of the grid is pulled out to complete the installation of the grid. Then the double-position side construction structure 3 is installed on the slide rail 2. At this time, the lifting component 4 drives the track support bracket 6 to be parallel to the outer surface of the slope protection body 1. When the height of the track support bracket 6 in the double-position side construction structure 3 is higher than the height of the slope protection body 1, the ground component 10 in the track support bracket 6 is rotated along the track support bracket 6, so that the positioning component 29 of the ground component 10 is moved along the adjustment groove 34 in the connecting bracket 30. The double-position lateral construction structure 3 is moved by sliding, thereby grounding the positioning assembly 29, thereby grounding the guard wheel 32 in the positioning assembly 29. When the double-position lateral construction structure 3 moves, the ground-attaching assembly 10 supports the top position of the double-position lateral construction structure 3, thereby maintaining the stability of the double-position lateral construction structure 3 during operation. At this time, the pulled-out grid is docked with the slope protection by the construction personnel at the periphery of the slope protection. After one side of the grid is fixed, during the movement of the double-position lateral construction structure 3, the grid is pulled, so that the second limiting bracket 35 on both sides of the grid is cancelled, so that the grid is continuously pulled out, The grid is continuously laid on the outer surface of the slope protection body 1, thereby completing the laying of the grid. Then, when the laying of the grid is completed, the track support bracket 6 in the double-position side construction structure 3 is lifted away from the slope protection body 1, and then the construction personnel process the grid and lay backfill soil. Then, after the backfill soil is laid, the pipeline of the vegetation liquid is installed on the spray assembly 39 in the spray structure 9. At this time, the track support bracket 6 is reset and made parallel to the slope protection body 1 again. At this time, the spray structure 9 sprays the vegetation liquid on the outer surface of the slope protection body 1, thereby completing the processing of the slope protection body 1. Example 2
[0021] Based on Example 1, the solution in Example 1 is further detailed in combination with the following specific working method. Figures 1 to 13 As shown, see the following description for details: As a preferred embodiment, the lifting component 4 includes a motor box 25, a positioning bracket 26 and an assembly groove 27, and positioning brackets 26 are provided on both sides of the motor box 25, and the inner walls of the positioning bracket 26 are provided with assembly grooves 27, and the positioning bracket 26 and the rail support bracket 6 are rotatably connected through the assembly groove 27, wherein when the lifting component 4 is in use, the dual-axis motor inside the motor box 25 rotates, and the output end of the dual-axis motor is connected to the rail support bracket 6 in the positioning bracket 26. Because the output end shaft of the dual-axis motor is flat, when the motor box 25 is connected to the rail support bracket 6, because the output end of the dual-axis motor is flat, when the lifting component 4 is lifted, its flat structure can provide a stronger support effect for the rail support bracket 6 during the process of lifting the rail support bracket 6, wherein the rail support bracket 6 is placed inside the assembly groove 27 in the positioning bracket 26, thereby placing the positioning bracket 26.
[0022] As a preferred embodiment, the sliding assembly 38 includes a first motor chamber 11, a groove guard plate 12, a support gear 13, a fixed rod 14, a second motor chamber 15, a first gear 16, a second gear 17 and a servo motor 18, and two groups of fixed rods 14 are arranged on the side of the first motor chamber 11, and the groove guard plate 12 is arranged on the side of the two groups of fixed rods 14 away from the first motor chamber 11, and the support gear 13 is arranged on the side of the groove guard plate 12 away from the two groups of fixed rods 14, and the second motor chamber 15 is arranged on the side of the first motor chamber 11 away from the two groups of fixed rods 14, and the first gear 16 is arranged on the side of the second motor chamber 15 away from the first motor chamber 11, and the second gear 17 is arranged on the side of the first gear 16, and the servo motor 18 is installed on the upper part of the inner wall of the second motor chamber 15, and then when the sliding assembly 38 moves, the servo motor 1 in the second motor chamber 15 8 drives the second gear 17 to rotate, so that the second gear 17 of the track support bracket 6 is installed in the groove of the track support bracket 6. Therefore, when the servo motor 18 drives the second gear 17 to rotate through the fan gear, the second gear 17 is meshed with the rack in the track support bracket 6, and the first gear 16 when the second gear 17 rotates, the first gear 16 and the second gear 17 and the track support bracket 6 constitute a supporting structure, so that the spraying structure 9 can maintain the stability of the spraying structure 9 during the movement, so that the spraying structure 9 can slide up and down through the second motor chamber 15, and the other end of the first motor chamber 1 is installed with the groove guard plate 12 through the fixing rod 14, so that the supporting gear 13 on the groove guard plate 12 is also installed inside the track support bracket 6, so that the spraying structure 9 can move along the track support bracket 6.
[0023] As a preferred embodiment, the spray assembly 39 includes a rotating plate 19, a fixed base 20, a mounting bracket 21, a third motor chamber 22, a mounting plate 23 and a spray rod 24, and a fixed base 20 is arranged above the rotating plate 19, and a mounting bracket 21 is arranged above the fixed base 20, and a third motor chamber 22 is installed above the mounting bracket 21, and a mounting plate 23 is installed above the third motor chamber 22 by bolts, and spray rods 24 are installed on both sides of the inner wall of the mounting plate 23, and the rotating plate 17 in the spray assembly 39 is connected to the first motor chamber 11, so that the first motor chamber The motor in 11 drives the rotating plate 19, thereby driving the spraying assembly 39 on the rotating plate 19 to rotate, and then the fixed base 20 of the rotating plate 19 supports the mounting bracket 21, and the third motor chamber 22 is installed and fixed above the mounting bracket 21, wherein the motor in the third motor chamber 22 is used to drive the mounting plate 23 to swing, so that the mounting plate 23 can drive the spraying rod 24 to swing through the third motor chamber 22, so that the vegetation liquid sprayed by the spraying rod 24 can be driven by the motor in the third motor chamber 22, so that the spraying rod 24 can spray over a large range.
[0024] As a preferred embodiment, the ground-attaching component 10 includes a steering bracket 28, a rotating ring 1001 and a positioning component 29, and rotating rings 1001 are provided on both sides of the steering bracket 28, and the steering bracket 28 and the rail-attaching support bracket 6 are rotatably connected through the rotating rings 1001, and a positioning component 29 is provided below the steering bracket 28. Then, when facing a slope protection smaller than the double-position side construction structure 3, when the double-position side construction structure 3 is unfolded, in order to maintain the stability of the double-position side construction structure 3, the rotating bracket 28 in the ground-attaching component 10 can be turned along the top of the rail-attaching support bracket 6 through the rotating ring 1001, so that the positioning component 29 of the ground-attaching component 10 is aligned with the ground, and then the positioning component 29 contacts the ground, thereby completing the support of the ground, so that when the double-position side construction structure 3 is parallel, its double-position side construction structure 3 can be supported by the ground-attaching component 10.
[0025] As a preferred embodiment, the positioning assembly 29 includes a connecting bracket 30, a ground bracket 31, a guard wheel 32, a connecting shaft 33 and an adjustment groove 34, and a ground bracket 31 is arranged at the center of the two groups of connecting brackets 30, and a guard wheel 32 is installed below the inner wall of the ground bracket 31, and a connecting shaft 33 is installed above the connecting bracket 30, and adjustment grooves 34 are arranged on both sides of the inner wall of the connecting bracket 30, and a sliding connection is formed between the connecting bracket 30 and the ground bracket 31 through the adjustment groove 34, and then the connecting bracket 30 is connected to the ground bracket 10 through the adjustment groove 34, and then the ground bracket 31 slides along the adjustment groove 34, so that the height of the positioning assembly 29 can be adjusted according to different slope protection heights, and then the guard wheel 32 in the ground bracket 31 is unfolded so that the guard wheel 32 of the ground bracket 31 contacts the ground, and then the positioning assembly 29 is installed with the steering bracket 28 through the connecting shaft 33 of the connecting bracket 30, so that the positioning assembly 29 can rotate along the steering bracket 28.
[0026] As a preferred embodiment, the grid laying component 7 includes a first sliding groove 701, a second sliding groove 702, a placement plate 502, a second limiting bracket 35, a plug-in block 36 and a mounting block 37, and the second sliding groove 702 is provided on both sides of the upper and lower sides of the first sliding groove 701, and the second limiting bracket 35 is provided on the side of the placement plate 502, and the placement plate 502 and the second limiting bracket 35 are slidably connected through the first sliding groove 701 and the second sliding groove 702, and the plug-in block 36 is provided on the side of the placement plate 502 away from the second limiting bracket 35, and the mounting block 37 is provided at the center of the two groups of plug-in blocks 36, and then when the grid laying component 7 is used, the second limiting bracket 35 and The first sliding groove 701 is connected to the second sliding groove 702, so the second limiting bracket 35 can slide through the first sliding groove 701 and the second sliding groove 702, so that the grid laying component 7 can clamp the grid through the second limiting bracket 35, and then the groove of the second limiting bracket 35 leaves space for when the grid is stretched, the grid is restricted by the second limiting bracket 35. When the force on the grid is too large, the restriction of the second limiting bracket 35 on the grid disappears, so that a page of the grid is pulled out, and the plug-in block 36 and the mounting block 37 installed on the placement plate 502 are used to engage with the second connecting plate 801 in the first limiting bracket 8, thereby completing the assembly of the grid laying component 7.
[0027] As a preferred embodiment, the first limiting bracket 8 includes a second connecting plate 801, a connecting head 802 and a support rod 803, and the connecting head 802 is arranged on the side of the second connecting plate 801, and a support rod 803 is arranged at the center of the two groups of second connecting plates 801, and the first limiting bracket 8 is supported by the second connecting plate 801 and the support rod 803, so that the double-position side construction structure 3 is supported by the first limiting bracket 8, thereby maintaining the stability of the track support bracket 6.
[0028] As a preferred embodiment, the counterweight assembly 5 includes a first connecting plate 501, a placement plate 502, a counterweight block 503, a mounting groove 504 and an extension groove 505, and the placement plate 502 is arranged on the side of the first connecting plate 501, and the counterweight blocks 503 are placed on the inner wall of the placement plate 502, and a mounting block 37 is arranged on the side of the first connecting plate 501 away from the placement plate 502, and an extension groove 505 is arranged on the side of the placement plate 502 away from the mounting groove 504. When the height of the slope protection is greater than the double-position side construction structure 3, the slide rail 2 can be installed at the upper and lower double positions of the slope protection body 1. When the ground-attached component 10 of the double-position side construction structure 3 cannot be used, in order to maintain the stability of the double-position side construction structure 3, the placement plate 502 of the counterweight component 5 can be unfolded, and then the counterweight block 503 can be placed above the placement plate 502, thereby enhancing the stability of the lifting component 4 area to facilitate the construction of the double-position side construction structure 3. Then, when the slope protection construction at one end is completed, the double-position side construction structure 3 can be separated from the slide rail 2, and the double-position side construction structure 3 can be replaced on another group of slide rails 2 to complete the processing of the slope protection on the other side.
[0029] The working process of this application is as follows: first, the construction site of the slope protection is still in the process of construction. Due to the different geological environments, the slope protection leveled during the construction process has a tilt angle that is inconsistent with the manual construction standards. Therefore, when faced with problems such as unknown geology, high slope protection tilt angles, and long slope protection ranges, the time that construction workers are within the slope protection range is reduced by laying slide rails 2 on the construction surfaces at the upper and lower ends of the slope protection body 1 and erecting a double-position side construction structure 3. At the same time, because of the construction of the equipment, even if the slope protection has a differentiated tilt angle, the equipment can still build the grid. When laying normal slope protection, It is only necessary to selectively lay the slide rail on either side of the upper and lower ends of the slope protection according to the actual situation. At this time, the grid is installed inside the grid laying component 7, and the beginning of the grid is pulled out to complete the installation of the grid. Then the double-position side construction structure 3 is installed on the slide rail 2. At this time, the lifting component 4 drives the track support bracket 6 to be parallel to the outer surface of the slope protection body 1. When the height of the track support bracket 6 in the double-position side construction structure 3 is higher than the height of the slope protection body 1, the ground component 10 in the track support bracket 6 rotates along the track support bracket 6, so that the positioning component 29 of the ground component 10 slides along the adjustment slot 34 in the connecting bracket 30, so that the positioning component 29 of the ground component 10 slides along the adjustment slot 34 in the connecting bracket 30, so that the positioning component 29 of the ground component 10 The positioning assembly 29 is grounded, so that the guard wheel 32 in the positioning assembly 29 is grounded, so that when the double-position lateral construction structure 3 moves, the ground-attaching assembly 10 supports the top position of the double-position lateral construction structure 3, so as to maintain the stability of the double-position lateral construction structure 3 during operation. At this time, the pulled-out grid is docked with the slope protection by the construction personnel at the periphery of the slope protection. After the fixation of one side of the grid is completed, during the movement of the double-position lateral construction structure 3, the grid is pulled, so that the second limiting bracket 35 on both sides of the grid is cancelled, so that the grid is continuously pulled out, so that the grid is continuously laid on the outside of the slope protection body 1. On the surface, the laying of the grid is completed, and then when the laying of the grid is completed, the track support bracket 6 in the double-position side construction structure 3 is lifted away from the slope protection body 1, and then the construction personnel process the grid and lay the backfill soil, and then after the backfill soil is laid, the pipeline of the vegetation liquid is installed on the spraying assembly 39 in the spraying structure 9, and the track support bracket 6 is reset, and the track support bracket 6 is parallel to the slope protection body 1 again, and the spraying structure 9 sprays the vegetation liquid on the outer surface of the slope protection body 1, thereby completing the treatment of the slope protection body 1. The above is the working principle of this ecological slope protection construction equipment for water conservancy projects.
[0030] Finally: The above description is only a preferred embodiment of the present application and is not intended to limit the present application. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present application should be included in the protection scope of the present application.
Claims
1. An ecological slope protection construction device for water conservancy projects, comprising a slope protection body (1) and a double-position side construction structure (3), characterized in that: The upper and lower planes of the slope protection body (1) are both provided with slide rails (2), and the double-position side construction structure (3) is arranged above the slide rails (2), and the double-position side construction structure (3) comprises a lifting component (4), a counterweight component (5), a track-attaching support bracket (6), a grid laying component (7), a first limit bracket (8), a spraying structure (9) and a ground-attaching component (10), and the lifting component (4) is provided with a counterweight component (5) on a side away from the slope protection body (1), and the lifting component (4) is provided with a track-attaching support bracket (6) on a side away from the counterweight component (5), and the track-attaching support bracket (6) is provided with a A grid laying component (7) is arranged on the side, and a first limiting bracket (8) is arranged below the track support bracket (6), and a spraying structure (9) is slidably connected at the center of the two groups of the track support brackets (6), and a ground-attaching component (10) is arranged on the side of the spraying structure (9) away from the lifting component (4), the slide rail (2) is linked with the double-position side construction structure (3), and drives the track support bracket (6) to move horizontally along the ground surface of the slope protection body (1), and the spraying structure (9) includes a sliding component (38) and a spraying component (39), and the spraying component (39) is installed above the sliding component (38).
2. The ecological slope protection construction equipment for water conservancy projects according to claim 1 is characterized by: The lifting assembly (4) comprises a motor box (25), a positioning bracket (26) and an assembly groove (27), and positioning brackets (26) are provided on both sides of the motor box (25), and the inner wall of the positioning bracket (26) is provided with an assembly groove (27), and the positioning bracket (26) and the rail support bracket (6) are rotatably connected via the assembly groove (27).
3. The ecological slope protection construction equipment for water conservancy projects according to claim 1 is characterized by: The sliding assembly (38) comprises a first motor chamber (11), a groove protection plate (12), a supporting gear (13), a fixing rod (14), a second motor chamber (15), a first gear (16), a second gear (17) and a servo motor (18), and two groups of fixing rods (14) are arranged on the side of the first motor chamber (11), and the groove protection plate (12) is arranged on the side of the two groups of fixing rods (14) away from the first motor chamber (11), and the supporting gear (13) is arranged on the side of the groove protection plate (12) away from the two groups of fixing rods (14), and the second motor chamber (15) is arranged on the side of the first motor chamber (11) away from the two groups of fixing rods (14), and the first gear (16) is arranged on the side of the second motor chamber (15) away from the first motor chamber (11), and the second gear (17) is arranged on the side of the first gear (16), and the servo motor (18) is installed on the upper part of the inner wall of the second motor chamber (15).
4. The ecological slope protection construction equipment for water conservancy projects according to claim 1 is characterized by: The spray assembly (39) comprises a rotating plate (19), a fixed base (20), a mounting bracket (21), a third motor chamber (22), a mounting plate (23) and a spray rod (24), wherein the fixed base (20) is arranged above the rotating plate (19), the mounting bracket (21) is arranged above the fixed base (20), the third motor chamber (22) is installed above the mounting bracket (21), the mounting plate (23) is installed above the third motor chamber (22) by bolts, and the spray rods (24) are installed on both sides of the inner wall of the mounting plate (23).
5. The ecological slope protection construction equipment for water conservancy projects according to claim 1 is characterized by: The ground-contacting component (10) comprises a steering bracket (28), a rotating ring (1001) and a positioning component (29), wherein the rotating rings (1001) are arranged on both sides of the steering bracket (28), and the steering bracket (28) and the track-contacting supporting bracket (6) are rotatably connected via the rotating rings (1001), and the positioning component (29) is arranged below the steering bracket (28).
6. The ecological slope protection construction equipment for water conservancy projects according to claim 5 is characterized by: The positioning assembly (29) comprises a connecting bracket (30), a ground-contacting bracket (31), a guard wheel (32), a connecting shaft (33) and an adjusting groove (34), wherein a ground-contacting bracket (31) is arranged at the center of the two groups of connecting brackets (30), a guard wheel (32) is installed below the inner wall of the ground-contacting bracket (31), a connecting shaft (33) is installed above the connecting bracket (30), and adjusting grooves (34) are arranged on both sides of the inner wall of the connecting bracket (30), and a sliding connection is formed between the connecting bracket (30) and the ground-contacting bracket (31) via the adjusting groove (34).
7. The ecological slope protection construction equipment for water conservancy projects according to claim 1 is characterized by: The grid laying component (7) comprises a first sliding groove (701), a second sliding groove (702), a placement plate (502), a second limiting bracket (35), a plug-in block (36) and a mounting block (37), and the second sliding grooves (702) are arranged on both upper and lower sides of the first sliding groove (701), and the second limiting bracket (35) is arranged on the side of the placement plate (502), and the placement plate (502) and the second limiting bracket (35) are slidably connected through the first sliding groove (701) and the second sliding groove (702), and the plug-in block (36) is arranged on the side of the placement plate (502) away from the second limiting bracket (35), and the mounting block (37) is arranged at the center of the two groups of the plug-in blocks (36).
8. The ecological slope protection construction equipment for water conservancy projects according to claim 1 is characterized by: The first limiting bracket (8) comprises a second connecting plate (801), a connecting head (802) and a support rod (803), wherein the connecting head (802) is arranged on the side of the second connecting plate (801), and the support rod (803) is arranged at the center of the two groups of the second connecting plates (801).
9. The ecological slope protection construction equipment for water conservancy projects according to claim 1 is characterized by: The counterweight assembly (5) comprises a first connecting plate (501), a placement plate (502), a counterweight block (503), a mounting groove (504) and an extension groove (505), wherein the placement plate (502) is arranged on the side of the first connecting plate (501), and the counterweight block (503) is placed on the inner wall of the placement plate (502), and a mounting block (37) is arranged on the side of the first connecting plate (501) away from the placement plate (502), and an extension groove (505) is arranged on the side of the placement plate (502) away from the mounting groove (504).