Device and method for testing performance of building integrated photovoltaic component

By designing a photovoltaic building integrated component performance testing device including a base plate, a test box, an installation part to be tested and a adjustment mechanism, the problem of difficulty in testing the heat transfer coefficient and power generation efficiency of photovoltaic components in the prior art is solved, and accurate testing and data acquisition of the performance of photovoltaic components are achieved.

CN119543827AInactive Publication Date: 2025-02-28CHINA ACAD OF BUILDING RES
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN202411695871.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-11-25
Publication Date
2025-02-28
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The prior art is difficult to effectively test the heat transfer coefficient and power generation efficiency of photovoltaic building integrated components, which affects its application in actual projects.

Method used

A photovoltaic building integrated component performance testing device is designed, including a base plate, a first test box, an installation part to be tested, a second test box and an adjustment mechanism. The device realizes accurate testing of photovoltaic components through a temperature and humidity detection mechanism, a simulated light source and a barrier simulation unit, combined with a controller and a power display.

Benefits of technology

The device can easily perform performance testing on different photovoltaic components, simulate sunlight irradiation in different seasons, detect the power generation efficiency and heat transfer coefficient of the components, and provide accurate performance data.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119543827A_ABST
    Figure CN119543827A_ABST
Patent Text Reader

Abstract

The invention relates to a building integrated photovoltaic component performance testing device and method, and the device comprises a bottom plate, one end of the top of the bottom plate is fixedly connected with a first testing box, the first testing box is internally provided with a first temperature and humidity detection mechanism, and one end of the first testing box is fixedly connected with a to-be-tested piece installation part. A photovoltaic component is detachably mounted in the to-be-tested piece mounting part, a second test box is fixedly connected to the side, away from the first test box, of the to-be-tested piece mounting part, an adjusting mechanism is arranged in the second test box, a simulation light source is fixedly connected to the adjusting mechanism, and the simulation light source faces the to-be-tested piece mounting part; a barrier simulation part and a second temperature and humidity detection mechanism are arranged between the simulation light source and the to-be-detected piece mounting part, and the first temperature and humidity detection mechanism, the to-be-detected piece mounting part, the adjusting mechanism, the simulation light source, the barrier simulation part and the second temperature and humidity detection mechanism are electrically connected with a controller. According to the invention, the performance of the building integrated photovoltaic component can be accurately tested.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of photovoltaic component performance testing devices, and in particular relates to a photovoltaic building integrated component performance testing device and a testing method. Background Art

[0002] Photovoltaic building integration technology uses BIPV components as part of the building envelope (roof, exterior wall, curtain wall, etc.), while providing clean electric energy for the building, saving materials and alleviating energy demand. The combination of BIPV components and buildings must meet both the thermal insulation performance of the envelope and the electrical performance of the photovoltaic components. The heat transfer coefficient of BIPV components is an important indicator for evaluating the thermal insulation performance of the components, and the electrical efficiency is an important indicator for evaluating the electrical performance of the components. As a new type of building component, obtaining the heat transfer coefficient and power generation efficiency of BIPV components is of great significance for the application of components in actual projects.

[0003] Therefore, it is necessary to design a photovoltaic building integrated component heat transfer performance testing device and testing method to solve the above problems. Summary of the invention

[0004] The purpose of the present invention is to provide a photovoltaic building integrated component performance testing device and testing method to solve the above-mentioned problems and achieve the purpose of being able to accurately test the photovoltaic building integrated component.

[0005] To achieve the above-mentioned purpose, the present invention provides the following scheme: A photovoltaic building integrated component performance testing device comprises a base plate, a first test box is fixedly connected to one end of the top of the base plate, a first temperature and humidity detection mechanism is arranged inside the first test box, a DUT mounting part is fixedly connected to one end of the first test box, a photovoltaic component is detachably installed inside the DUT mounting part, a second test box is fixedly connected to a side of the DUT mounting part away from the first test box, an adjustment mechanism is arranged inside the second test box, a simulated light source is fixedly connected to the adjustment mechanism, the simulated light source faces the DUT mounting part, an obstacle simulation part and a second temperature and humidity detection mechanism are arranged between the simulated light source and the DUT mounting part, and the first temperature and humidity detection mechanism, the DUT mounting part, the adjustment mechanism, the simulated light source, the obstacle simulation part and the second temperature and humidity detection mechanism are electrically connected to a controller.

[0006] Preferably, the adjusting mechanism includes a first motor, which is fixedly connected to the top of the base plate, the output shaft of the first motor is fixedly connected to the bottom end of a vertically arranged lead screw, the top end of the lead screw is rotatably connected to the top wall of the second test box, the lead screw is threadedly connected to one end of a horizontally arranged lifting plate, the other end of the lifting plate is slidably penetrated by a guide rod, the two ends of the guide rod are respectively fixedly connected to the top of the base plate and the top wall of the second test box, an oblong hole is opened in the middle of the lifting plate, the simulated light source is rotatably arranged in the oblong hole by a fixing rod and is fixedly connected to an angle adjustment part fixedly embedded in the lifting plate, and the first motor, the angle adjustment part and the controller are electrically connected.

[0007] Preferably, the angle adjustment part includes a third motor, the third motor is fixedly embedded in the lifting plate, the output shaft of the third motor is fixedly connected to a driving gear, the outer side wall of the fixed rod is fixedly connected to two symmetrically arranged connecting shafts, the fixed rod is rotatably arranged in the oblong hole through the two connecting shafts, one of the connecting shafts is fixedly connected to a driven gear, the driven gear is meshed with the driving gear, and the third motor is electrically connected to the controller.

[0008] Preferably, the obstacle simulation part includes a second motor, the second motor is fixedly connected to the top wall of the second test box, the output shaft of the second motor is fixedly connected to one end of a horizontally arranged rotating shaft, the other end of the rotating shaft is rotatably connected to a fixed seat, the fixed seat is fixedly connected to the top wall of the second test box, the outer side wall of the rotating shaft is fixedly connected to one end of a gauze curtain, the gauze curtain is wound around the outside of the rotating shaft and the other end is a free end, and the second motor is electrically connected to the controller.

[0009] Preferably, the second temperature and humidity detection mechanism includes a third fixed rod and a fourth fixed rod, the third fixed rod and the fourth fixed rod are both vertically arranged, the bottom end of the third fixed rod is fixedly connected to a second temperature sensor, the bottom end of the fourth fixed rod is fixedly connected to a second humidity sensor, a second humidifier is fixedly connected to the outer top wall of the second test box, the second humidifier is connected to the interior of the second test box, and the second temperature sensor, the second humidity sensor, the second humidifier are electrically connected to the controller.

[0010] Preferably, the installation part of the test piece includes a fixed frame, which is U-shaped and open, the bottom end of the fixed frame is fixedly connected to the top of the base plate, the two ends of the fixed frame are respectively fixedly connected to the first test box and the second test box, the photovoltaic component is detachably installed inside the fixed frame, the photovoltaic component is electrically connected to a battery, the battery is electrically connected to a power display, the battery and the power display are both fixedly connected to the top of the outer wall of the first test box, and the battery and the power display are electrically connected to the controller.

[0011] Preferably, the first temperature and humidity detection mechanism includes a first fixed rod and a second fixed rod, the first fixed rod and the second fixed rod are both vertically arranged and the top ends are fixedly connected to the top wall of the first test box, the bottom end of the first fixed rod is fixedly connected to a first humidity sensor, the bottom end of the second fixed rod is fixedly connected to a first temperature sensor, two opposite inner walls of the first test box are also fixedly connected to a number of first temperature sensors, the outer top wall of the first test box is fixedly connected to a first humidifier, the first humidifier is connected to the interior of the first test box, and the first temperature sensor, the first humidity sensor, the first humidifier and the controller are electrically connected.

[0012] A testing method for a photovoltaic building integrated component testing device comprises the following steps:

[0013] S1. Install the standard building comparison component in the installation part of the test piece;

[0014] S2, controlling the simulated light source to turn on, and adjusting the height and tilt angle of the simulated light source through the adjustment mechanism;

[0015] S3, controlling the simulated light source to irradiate the first test box, the standard building comparison component, and the interior of the second test box for a set time;

[0016] S4, detecting the temperature and humidity inside the first test box by the first temperature and humidity detection mechanism, detecting the temperature and humidity inside the second test box by the second temperature and humidity detection mechanism, and calculating the difference between the two as comparison data;

[0017] S5. Install the photovoltaic component to be tested in the test component installation part;

[0018] S6, controlling the simulated light source to turn on again, and adjusting the height and tilt angle of the simulated light source through the adjustment mechanism, so that the simulated light source irradiates the first test box, the second test box, and the photovoltaic component for a set time;

[0019] S7, detecting the temperature and humidity inside the first test box by the first temperature and humidity detection mechanism, detecting the temperature and humidity inside the second test box by the second temperature and humidity detection mechanism, calculating the difference between the two and comparing them with the comparison data, and detecting the power generation of the photovoltaic component by the power display;

[0020] S8. Based on the power generation of the photovoltaic components and the comparison results, the power generation efficiency and heat transfer coefficient test results of the photovoltaic components are obtained.

[0021] Compared with the prior art, the present invention has the following advantages and technical effects:

[0022] The present invention can disassemble and install different photovoltaic components through the set test piece mounting part, so that performance tests can be easily performed on different photovoltaic components. The set adjustment mechanism can adjust the different heights and angles of the simulated light source to simulate the irradiation of the photovoltaic components with sunlight in different seasons. The set first temperature and humidity detection mechanism and the second temperature and humidity detection mechanism can respectively detect different temperatures and humidities in the first test box and the second test box, and then compare the temperature and humidity results of the two, so as to obtain various performance data of the photovoltaic components that need to be tested. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments are briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For those of ordinary skill in the art, other drawings can be obtained based on these drawings without creative labor:

[0024] Figure 1 It is a schematic diagram of the overall structure of the present invention;

[0025] Figure 2 This is a schematic diagram of the internal structure of the first test box of the present invention;

[0026] Figure 3 This is a schematic diagram of the internal structure of the second test box of the present invention;

[0027] Figure 4 It is a structural schematic diagram of the angle adjustment part of the present invention.

[0028] Among them, 1. bottom plate; 2. first test box; 3. second test box; 4. fixing frame; 5. second humidifier; 6. first humidifier; 7. battery; 8. power display; 9. photovoltaic component; 10. first fixing rod; 11. first temperature sensor; 12. second fixing rod; 13. first humidity sensor; 14. first motor; 15. lead screw; 16. lifting plate; 17. guide rod; 18. oblong hole; 19. fixing rod; 20. simulated light source; 21. second motor; 22. fixing seat; 23. rotating shaft; 24. gauze curtain; 25. third fixing rod; 26. fourth fixing rod; 27. second temperature sensor; 28. second humidity sensor; 29. ​​connecting shaft; 30. third motor; 31. driving gear; 32. driven gear. DETAILED DESCRIPTION

[0029] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0030] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the present invention is further described in detail below with reference to the accompanying drawings and specific embodiments.

[0031] Reference Figures 1 to 4 As shown, the present invention provides a photovoltaic building integrated component performance testing device, including a base plate 1, a first test box 2 is fixedly connected to one end of the top of the base plate 1, a first temperature and humidity detection mechanism is arranged inside the first test box 2, a DUT mounting portion is fixedly connected to one end of the first test box 2, a photovoltaic component 9 is detachably installed inside the DUT mounting portion, a second test box 3 is fixedly connected to the side of the DUT mounting portion away from the first test box 2, an adjustment mechanism is arranged inside the second test box 3, a simulated light source 20 is fixedly connected to the adjustment mechanism, the simulated light source 20 faces the DUT mounting portion, an obstacle simulation portion and a second temperature and humidity detection mechanism are arranged between the simulated light source 20 and the DUT mounting portion, and the first temperature and humidity detection mechanism, the DUT mounting portion, the adjustment mechanism, the simulated light source 20, the obstacle simulation portion, and the second temperature and humidity detection mechanism are electrically connected to a controller.

[0032] A further optimized solution is provided, wherein the adjustment mechanism comprises a first motor 14, the first motor 14 is fixedly connected to the top of the base plate 1, the output shaft of the first motor 14 is fixedly connected to the bottom end of a vertically arranged lead screw 15, the top end of the lead screw 15 is rotatably connected to the top wall of the second test box 3, the lead screw 15 is threadedly connected to one end of a horizontally arranged lifting plate 16, the other end of the lifting plate 16 is slidably penetrated by a guide rod 17, the two ends of the guide rod 17 are respectively fixedly connected to the top of the base plate 1 and the top wall of the second test box 3, an oblong hole 18 is opened in the middle of the lifting plate 16, the simulated light source 20 is rotatably arranged in the oblong hole 18 by a fixing rod 19 and is fixedly connected to an angle adjustment part fixedly embedded in the lifting plate 16, and the first motor 14, the angle adjustment part and the controller are electrically connected.

[0033] A further optimized solution is that the angle adjustment part includes a third motor 30, which is fixedly embedded in the lifting plate 16, and the output shaft of the third motor 30 is fixedly connected to the driving gear 31, and the outer side wall of the fixed rod 19 is fixedly connected to two symmetrically arranged connecting shafts 29, and the fixed rod 19 is rotatably arranged in the oblong hole 18 through the two connecting shafts 29, one of the connecting shafts 29 is fixedly connected to the driven gear 32, and the driven gear 32 is meshed with the driving gear 31, and the third motor 30 is electrically connected to the controller.

[0034] The first motor 14 drives the lead screw 15 to rotate to adjust the height of the lifting plate 16. At the same time, the third motor 30 adjusts the inclination angle of the fixed rod 19 through the driving gear 31 and the driven gear 32. The cooperation of the two can adjust the height and inclination angle of the simulated light source 20, thereby simulating the sunlight shining on the photovoltaic component 9 in different seasons.

[0035] A further optimized solution is that the obstacle simulation part includes a second motor 21, the second motor 21 is fixedly connected to the top wall of the second test box 3, the output shaft of the second motor 21 is fixedly connected to one end of a horizontally arranged rotating shaft 23, the other end of the rotating shaft 23 is rotatably connected to a fixed seat 22, the fixed seat 22 is fixedly connected to the top wall of the second test box 3, the outer side wall of the rotating shaft 23 is fixedly connected to one end of a gauze curtain 24, the gauze curtain 24 is wound around the outside of the rotating shaft 23 and the other end is a free end, and the second motor 21 is electrically connected to the controller.

[0036] The second motor 21 drives the rotating shaft 23 to unfold the gauze curtain 24, which is blocked between the simulated light source 20 and the photovoltaic component 9. It can simulate the floating dust in the air or the dust adhering to the surface of the photovoltaic component 9 under actual irradiation conditions, so as to obtain the performance data of the photovoltaic component 9 under the influence of dust.

[0037] To further optimize the solution, the second temperature and humidity detection mechanism includes a third fixed rod 25 and a fourth fixed rod 26, the third fixed rod 25 and the fourth fixed rod 26 are both vertically arranged, the bottom end of the third fixed rod 25 is fixedly connected to a second temperature sensor 27, the bottom end of the fourth fixed rod 26 is fixedly connected to a second humidity sensor 28, the outer top wall of the second test box 3 is fixedly connected to a second humidifier 5, the second humidifier 5 is connected to the interior of the second test box 3, and the second temperature sensor 27, the second humidity sensor 28, the second humidifier 5 and the controller are electrically connected.

[0038] A further optimized solution is provided, in which the installation portion of the test piece includes a fixed frame 4, which is U-shaped and open in an open direction, the bottom end of the fixed frame 4 is fixedly connected to the top end of the base plate 1, and the two ends of the fixed frame 4 are respectively fixedly connected to the first test box 2 and the second test box 3, and the photovoltaic component 9 is detachably installed inside the fixed frame 4, the photovoltaic component 9 is electrically connected to the battery 7, and the battery 7 is electrically connected to the power display 8, the battery 7 and the power display 8 are both fixedly connected to the top end of the outer wall of the first test box 2, and the battery 7 and the power display 8 are electrically connected to the controller.

[0039] A further optimized solution is provided, wherein the first temperature and humidity detection mechanism comprises a first fixed rod 10 and a second fixed rod 12, wherein the first fixed rod 10 and the second fixed rod 12 are both vertically arranged and the top ends are fixedly connected to the top wall of the first test box 2, the bottom end of the first fixed rod 10 is fixedly connected to a first humidity sensor 13, the bottom end of the second fixed rod 12 is fixedly connected to a first temperature sensor 11, and the two opposite inner walls of the first test box 2 are also fixedly connected to a plurality of first temperature sensors 11, the outer top wall of the first test box 2 is fixedly connected to a first humidifier 6, the first humidifier 6 is connected to the interior of the first test box 2, and the first temperature sensor 11, the first humidity sensor 13, the first humidifier 6 and the controller are electrically connected.

[0040] A testing method for a photovoltaic building integrated component testing device comprises the following steps:

[0041] S1. Install the standard building comparison component in the installation part of the test piece;

[0042] S2, controlling the simulated light source 20 to turn on, and adjusting the height and tilt angle of the simulated light source 20 through the adjustment mechanism;

[0043] S3, controlling the simulated light source 20 to illuminate the first test box 2, the standard building comparison component, and the interior of the second test box 3 for a set time;

[0044] S4, detecting the temperature and humidity inside the first test box 2 by the first temperature and humidity detection mechanism, detecting the temperature and humidity inside the second test box 3 by the second temperature and humidity detection mechanism, and calculating the difference between the two as comparison data;

[0045] S5, installing the photovoltaic component 9 to be tested in the test piece installation part;

[0046] S6, controlling the simulated light source 20 to turn on again, and adjusting the height and tilt angle of the simulated light source 20 through the adjustment mechanism, so that the simulated light source 20 irradiates the first test box 2, the second test box 3, and the photovoltaic component 9 for a set time;

[0047] S7, detecting the temperature and humidity inside the first test box 2 by the first temperature and humidity detection mechanism, detecting the temperature and humidity inside the second test box 3 by the second temperature and humidity detection mechanism, calculating the difference between the two and comparing them with the comparison data, and detecting the power generation of the photovoltaic component by the power display 8;

[0048] S8. According to the power generation of the photovoltaic component and the comparison results, the power generation efficiency and heat transfer coefficient test results of the photovoltaic component 9 are obtained.

[0049] The testing method of the present invention can test the performance data of the photovoltaic component 9 under various scenarios:

[0050] First, a blank experiment is performed as a comparison. When performing the blank experiment, the photovoltaic component 9 is not installed in the fixing frame 4. The height and the tilt angle of the simulated light source 20 are adjusted by the lifting plate 16 and the fixing rod 19. Then, the first humidifier 6 and the second humidifier 5 are turned on at the same time to make the first test box 2 and the second test box 3 reach the same humidity condition. The humidity data is obtained by the first humidity sensor 13 and the second humidity sensor 28. Then, the simulated light source 20 is turned on to irradiate the first test box 2 and the second test box 3 until the first test box 2 and the second test box 3 reach the same temperature. The temperature data and the time data used to reach the temperature are recorded as comparison data.

[0051] Then, the photovoltaic component 9 to be tested is installed in the fixing frame 4, and the height and tilt angle of the simulated light source 20 are adjusted again to the same state as in the blank experiment. The simulated light source 20 is turned on to irradiate the photovoltaic component 9, and the irradiation time is the same as that in the blank experiment. Then, the temperature data inside the first test box 2 is measured by the first temperature sensor 11, and the temperature data inside the second test box 3 is measured by the second temperature sensor 27 to obtain the data difference between the two, and the data is compared with the temperature data of the blank experiment to obtain the performance test result of the photovoltaic component 9. When testing the photovoltaic component 9, the humidity inside the first test box 2 and the second test box 3 can be controlled under the same conditions by the first humidifier 6 and the second humidifier 5, or the humidity inside the two can be controlled under different conditions, so that the performance of the photovoltaic component 9 under the same and different humidity conditions indoors and outdoors can be obtained;

[0052] In addition, the second motor 21 can be used to control whether the gauze curtain 24 is unfolded. When the gauze curtain 24 is unfolded, the performance of the photovoltaic component 9 can be tested when there is a lot of floating dust. When the gauze curtain 24 is retracted, the performance of the photovoltaic component 9 can be tested when there is less floating dust.

[0053] When the simulated light source 20 irradiates the photovoltaic component 9, the photovoltaic component 9 can convert part of the light energy into electrical energy and store it in the battery 7. The power in the battery 7 is displayed by the power display 8. In this way, the solar energy conversion performance under the state of floating dust and the different humidity conditions on both sides of the photovoltaic component 9 can be tested.

[0054] In the description of the present invention, it should be understood that the terms "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside" and "outside" etc., indicating orientations or positional relationships, are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention.

[0055] The embodiments described above are only descriptions of the preferred embodiments of the present invention, and are not intended to limit the scope of the present invention. Without departing from the design spirit of the present invention, various modifications and improvements made to the technical solutions of the present invention by ordinary technicians in this field should fall within the protection scope of the present invention.

Claims

1. A photovoltaic building integrated component performance testing device, characterized in that: The invention comprises a bottom plate (1), a first test box (2) being fixedly connected to one end of the top of the bottom plate (1), a first temperature and humidity detection mechanism being arranged inside the first test box (2), a device under test mounting portion being fixedly connected to one end of the first test box (2), a photovoltaic component (9) being detachably mounted inside the device under test mounting portion, a second test box (3) being fixedly connected to a side of the device under test mounting portion away from the first test box (2), an adjustment mechanism being arranged inside the second test box (3), a simulated light source (20) being fixedly connected to the adjustment mechanism, the simulated light source (20) being directed toward the device under test mounting portion, an obstacle simulation portion and a second temperature and humidity detection mechanism being arranged between the simulated light source (20) and the device under test mounting portion, and the first temperature and humidity detection mechanism, the device under test mounting portion, the adjustment mechanism, the simulated light source (20), the obstacle simulation portion and the second temperature and humidity detection mechanism being electrically connected to a controller.

2. A photovoltaic building integrated component performance testing device according to claim 1, characterized in that: The adjustment mechanism comprises a first motor (14), the first motor (14) is fixedly connected to the top of the base plate (1), the output shaft of the first motor (14) is fixedly connected to the bottom end of a vertically arranged lead screw (15), the top end of the lead screw (15) is rotatably connected to the top wall of the second test box (3), the lead screw (15) is threadedly connected to one end of a horizontally arranged lifting plate (16), the other end of the lifting plate (16) is slidably penetrated by a guide rod (17), the two ends of the guide rod (17) are respectively fixedly connected to the top of the base plate (1) and the top wall of the second test box (3), the middle part of the lifting plate (16) is provided with an oblong hole (18), the simulated light source (20) is rotatably arranged in the oblong hole (18) through a fixing rod (19) and is fixedly connected to an angle adjustment part fixedly embedded in the lifting plate (16), and the first motor (14), the angle adjustment part and the controller are electrically connected.

3. A photovoltaic building integrated component performance testing device according to claim 2, characterized in that: The angle adjustment unit comprises a third motor (30), the third motor (30) is fixedly embedded in the lifting plate (16), the output shaft of the third motor (30) is fixedly connected to a driving gear (31), the outer side wall of the fixed rod (19) is fixedly connected to two symmetrically arranged connecting shafts (29), the fixed rod (19) is rotatably arranged in the oblong hole (18) through the two connecting shafts (29), one of the connecting shafts (29) is fixedly connected to a driven gear (32), the driven gear (32) is meshed with the driving gear (31), and the third motor (30) is electrically connected to the controller.

4. A photovoltaic building integrated component performance testing device according to claim 1, characterized in that: The obstacle simulation unit comprises a second motor (21), the second motor (21) is fixedly connected to the top wall of the second test box (3), the output shaft of the second motor (21) is fixedly connected to one end of a horizontally arranged rotating shaft (23), the other end of the rotating shaft (23) is rotatably connected to a fixed seat (22), the fixed seat (22) is fixedly connected to the top wall of the second test box (3), the outer wall of the rotating shaft (23) is fixedly connected to one end of a gauze curtain (24), the gauze curtain (24) is wound around the outside of the rotating shaft (23) and the other end is a free end, and the second motor (21) is electrically connected to the controller.

5. A photovoltaic building integrated component performance testing device according to claim 1, characterized in that: The second temperature and humidity detection mechanism comprises a third fixed rod (25) and a fourth fixed rod (26); the third fixed rod (25) and the fourth fixed rod (26) are both arranged vertically; the bottom end of the third fixed rod (25) is fixedly connected to a second temperature sensor (27); the bottom end of the fourth fixed rod (26) is fixedly connected to a second humidity sensor (28); the outer top wall of the second test box (3) is fixedly connected to a second humidifier (5); the second humidifier (5) is communicated with the interior of the second test box (3); the second temperature sensor (27), the second humidity sensor (28) and the second humidifier (5) are electrically connected to the controller.

6. A photovoltaic building integrated component performance testing device according to claim 1, characterized in that: The test piece mounting portion comprises a fixing frame (4), the fixing frame (4) is U-shaped and open-facing, the bottom end of the fixing frame (4) is fixedly connected to the top end of the bottom plate (1), the two ends of the fixing frame (4) are respectively fixedly connected to the first test box (2) and the second test box (3), the photovoltaic component (9) is detachably mounted inside the fixing frame (4), the photovoltaic component (9) is electrically connected to a storage battery (7), the storage battery (7) is electrically connected to a power display (8), the storage battery (7) and the power display (8) are both fixedly connected to the top end of the outer wall of the first test box (2), and the storage battery (7) and the power display (8) are electrically connected to the controller.

7. A photovoltaic building integrated component performance testing device according to claim 1, characterized in that: The first temperature and humidity detection mechanism comprises a first fixed rod (10) and a second fixed rod (12); the first fixed rod (10) and the second fixed rod (12) are both vertically arranged and the top ends are fixedly connected to the top wall of the first test box (2); the bottom end of the first fixed rod (10) is fixedly connected to a first humidity sensor (13); the bottom end of the second fixed rod (12) is fixedly connected to a first temperature sensor (11); two opposite inner side walls of the first test box (2) are also fixedly connected to a plurality of first temperature sensors (11); the outer top wall of the first test box (2) is fixedly connected to a first humidifier (6); the first humidifier (6) is communicated with the interior of the first test box (2); the first temperature sensor (11), the first humidity sensor (13) and the first humidifier (6) are electrically connected to the controller.

8. A testing method for the photovoltaic building integrated component testing device according to any one of claims 1, characterized in that: The following steps are involved: S1. Install the standard building comparison component in the installation part of the test piece; S2, controlling the simulated light source (20) to turn on, and adjusting the height and tilt angle of the simulated light source (20) through the adjustment mechanism; S3, controlling the simulated light source (20) to illuminate the first test box (2), the standard building comparison component, and the interior of the second test box (3) for a set time; S4, detecting the temperature and humidity inside the first test box (2) by means of a first temperature and humidity detection mechanism, detecting the temperature and humidity inside the second test box (3) by means of a second temperature and humidity detection mechanism, and calculating the difference between the two as comparison data; S5, installing the photovoltaic component (9) to be tested in the test component installation part; S6, controlling the simulated light source (20) to turn on again, and adjusting the height and tilt angle of the simulated light source (20) through the adjustment mechanism, so that the simulated light source (20) irradiates the first test box (2), the second test box (3), and the photovoltaic component (9) for a set time; S7, detecting the temperature and humidity inside the first test box (2) by means of a first temperature and humidity detection mechanism, detecting the temperature and humidity inside the second test box (3) by means of a second temperature and humidity detection mechanism, calculating the difference between the two and comparing the difference with the comparison data, and detecting the power generation of the photovoltaic component by means of a power display (8); S8. Based on the power generation of the photovoltaic component and the comparison results, the power generation efficiency and heat transfer coefficient test results of the photovoltaic component (9) are obtained.

Citation Information

Patent Citations

  • Photovoltaic support for special scene

    CN118554861A

  • Synchronous detection system of heat transfer coefficient and electricity generating property of photovoltaic building component

    CN203275335U

  • Photovoltaic member electric performance and thermal insulation performance synchronization detection platform

    CN203632618U

  • Automatic testing device for electrical performance of double-sided assembly

    CN216490400U

  • Photovoltaic module current testing device

    CN219960529U