Bridge reinforcement and maintenance construction operation platform

By designing a bridge reinforcement and maintenance construction platform for double-sided mobile components and lifting components, the problems of unadjustable height and one-sided lower hanging in the existing technology are solved, and highly flexible adjustment and two-sided lower hanging are achieved, improving construction efficiency and safety.

CN119663736APending Publication Date: 2025-03-21HENAN TRAFFIC CONTROL CONSTR ENG CO LTD
0 Cites 0 Cited by

Patent Information

Application Number
CN202411956594.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-12-29
Publication Date
2025-03-21

AI Technical Summary

Technical Problem

The existing bridge reinforcement and maintenance construction platform cannot adjust the height of the working platform, and is hung on one side and cannot extend to the other side of the bridge, resulting in low construction efficiency and high safety risks.

Method used

A bridge reinforcement and maintenance construction work platform is designed, using double-sided mobile components and lifting components, and connecting the construction platform through the upper connection components and the side-sided connection components to realize double-sided downhook and height adjustment.

Benefits of technology

It realizes highly flexible adjustment and double-sided downhook of the construction platform, improves construction efficiency and safety, and can carry out comprehensive construction work in all locations of the bridge.

✦ Generated by Eureka AI based on patent content.
Patent Text Reader

Abstract

A bridge reinforcement and maintenance construction operation platform comprises two moving assemblies which are located on the two sides of a beam face respectively. The upper connecting assembly is mounted above the moving assembly and extends to the outer side of the bridge; the side edge connecting assemblies are installed below the outer side of the upper connecting assembly and located on the two sides of the bridge; the lifting assembly is mounted in the middle of the side edge connecting assembly; the construction platform is installed below the lifting assembly and located below the bridge; according to the technical scheme, the double-side moving assembly is designed to be matched with the upper connecting assembly and the side edge connecting assembly to connect the construction platform and double-side downward hanging, so that the construction platform penetrates through the lower portion of the bridge, construction operation can be conducted on all positions of the bridge, stability is good, the bearing capacity is large, and detection personnel can conveniently enter the construction platform from the bridge floor or return to the bridge floor; meanwhile, the height of the construction platform can be flexibly adjusted according to site conditions in cooperation with the lifting assembly.
Need to check novelty before this filing date? Find Prior Art