Network path planning method and device, equipment, storage medium and program product
By determining the initial network path for the service information of network services and optimizing it, the problem that traffic scheduling solutions in the prior art may over-utilize network resources, and more efficient utilization of network resources is achieved.
CN119676173APending Publication Date: 2025-03-21CHINA TELECOM CORP LTD TECHNOLOGY INNOVATION CENTER +1
0 Cites 0 Cited by
Patent Information
- Application Number
- CN202411791767.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-06
- Publication Date
- 2025-03-21
AI Technical Summary
Technical Problem
When existing traffic scheduling schemes meet high SLA requirements, they may over-utilize network resources and there is room for optimization.
Method used
By determining the initial network path based on the service information of the target network service and optimizing based on the path information, the service adjustment conditions are met to optimize the network path.
Benefits of technology
It realizes that network resource utilization is optimized and network path efficiency and reliability are improved without reducing network service quality.
✦ Generated by Eureka AI based on patent content.
Abstract
The invention relates to a network path planning method and device, equipment, a storage medium and a program product. The method comprises the following steps: determining an initial network path meeting a service requirement of a target network service according to service information of the target network service; determining an optimized network path of the initial network path according to the path information of the initial network path; and taking the optimized network path as a target network path of the target network service under the condition of determining that the optimized network path meets an adjustment condition of the target network service according to the path information of the initial network path and the path information of the optimized network path. By adopting the method, the initial network path meeting the corresponding service requirement can be subjected to feedback adjustment in the range allowed by the adjustment condition of the target network service, and the optimized network path is obtained, so that the transmission service is ensured, the flow distribution is optimized, and the overall utilization rate of network resources is improved through a network path re-planning mode.
Need to check novelty before this filing date? Find Prior Art