Method and device for predicting on-way attenuation change of daily regulating wave of hydropower station
By simplifying the process of solving the one-dimensional water flow motion equation of open channels, predicting the attenuation changes of the daily regulated wave along the hydropower station, the problems of high modeling costs and long cycles in the existing technology are solved, and fast and simple daily regulated wave prediction and shipping scheduling are achieved.
Patent Information
- Application Number
- CN202411598215.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-11
- Publication Date
- 2025-03-25
- Estimated Expiration
- 2044-11-11
AI Technical Summary
When predicting the attenuation changes of the daily regulation waves in hydropower stations, the prior art relies on detailed river terrain data and expensive test and computing equipment, resulting in high modeling costs and long cycles, high professional level requirements for technicians, and it is difficult to quickly and easily conduct impact assessment and shipping scheduling.
A process of simplifying the solution of the one-dimensional water flow motion equation of open channels is proposed. By selecting several sections, terrain data and water level-flow relationship curves are obtained, hydraulic parameters under different characteristic flow rates are calculated, and the amplitude attenuation factor and hysteresis phase angle of the daily regulated wave are predicted, and the attenuation distance of the daily regulated wave is obtained.
It realizes fast and simple calculation of the amplitude, phase, and additional ratio reduction of the daily regulated wave waves, reduces data demand and calculation volume, improves the simplicity and reliability of the application, and is suitable for the prediction and shipping scheduling of daily regulated waves in hydropower stations.