Method and device for calculating departure countdown
By judging the reception status of the ATO operation plan when the train is fully stopped, determining the train's complete stop time and calculating the departure countdown, the problem of departure countdown calculation caused by the long reception period of the ATO operation plan is solved, and the efficiency of automatic operation of the train is improved.
Patent Information
- Application Number
- CN202411868293.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-18
- Publication Date
- 2025-03-28
- Estimated Expiration
- 2044-12-18
AI Technical Summary
Since the ATO system sends the ATO operation plan for a long period, it is impossible to guarantee the receipt of the ATO operation plan within each full docking cycle, and it is impossible to automatically calculate the departure countdown when the train is fully stopped, affecting the efficiency of the automatic operation of the train.
By obtaining the ATO operation plan containing the departure time of the target stop, it is determined whether it is received within the train's full stop cycle. If received, it is determined that the current ground moment in the ATO operation plan is the full stop time; if not received, the full stop time is determined based on the first data processing cycle and the full stop cycle of the ATO operation plan received, and the departure countdown is calculated.
Each time the train stops completely, the departure countdown can be accurately calculated, ensuring that the on-board system can automatically control the opening and closing of the train doors, and improving the efficiency of the automatic operation of the train.