Large standard knot attachment frame and square installation method
By designing an integrated installation method and a bidirectional wedge-tightening device for large standard section attachment frames, the problems of complex installation and uneven stress in the prior art are solved, and a more efficient and safe installation process is achieved.
Patent Information
- Application Number
- CN202411900436.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-23
- Publication Date
- 2025-03-28
AI Technical Summary
When installing large tower crane attachment frames, the number of lifting times and complex installations are installed, especially difficult to operate in high altitudes, and the design of the wedge tightening device for holding the hoop is unreasonable, which can easily lead to uneven force under the main string.
A large standard section attachment frame is designed, and the attachment half frame and clamping hoop is integrated, and a pin bracket is installed on the clamping hoop is simplified. A bidirectional wedge tightening device is installed on the clamping hoop to ensure the reliable connection between the main string and the clamping hoop.
The number of lifting times of the attachment frame is reduced, the installation efficiency and safety is improved, the main string and the attachment frame are uniformly subjected to, and the installation problems caused by manufacturing errors are avoided.