Dowel bar mounting structure for airport pavement pouring connection and construction method of dowel bar mounting structure
By adopting a force-transmission rod installation structure including longitudinal formwork, sub-hole support and clamps in the construction of the airport road, the problems of inaccurate installation and positioning of the force-transmission rod, leakage of slurry at the hole position, and difficulty in dismantling the mold are solved, and the effects of precise positioning, stable installation and cost reduction are achieved.
Patent Information
- Application Number
- CN202411936517.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-26
- Publication Date
- 2025-03-28
AI Technical Summary
During the construction of the airport road surface, the installation and positioning of the force transmission rod is not accurate, the hole position leaks, and the mold removal is difficult, and the longitudinal template and the force transmission rod are not universally applicable, which increases the equipment cost.
The force transmission rod installation structure includes a longitudinal template, a sub-hole support and a clamping member is adopted. Through the gap fit of the sub-hole support and the clamping mechanism of the clamping member, the precise positioning and stable installation of the force transmission rod are ensured, and the gap between the force transmission rod and the support ring is sealed through a sealing ring to avoid slurry leakage.
The precise positioning and stable installation of the force transmission rod is achieved, which reduces the problem of slurry leakage, simplifies the mold removal process, reduces the cost of equipment, and adapts the longitudinal template to the force transmission rod of different specifications.