Seepage deformation control method for foundation adjacent to existing high-rise building in canal foundation pit excavation process
By combining the steel plate buried depth, foundation pit precipitation depth and seepage deformation control index (SCI) for data processing, the combination of steel plate buried depth and foundation pit precipitation depth is optimized and the combination of steel plate buried depth and foundation pit precipitation is set up around the foundation pit for water separation treatment, which solves the problems of the foundation pit not meeting the standards and the unreasonable steel plate buried depth during the excavation of canal foundation pit, and effectively control seepage deformation and reduce construction costs.
Patent Information
- Application Number
- CN202411840369.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-13
- Publication Date
- 2025-03-28
AI Technical Summary
During the excavation of canal foundation pits, it is difficult for the existing technology to effectively control the foundation pit precipitation and steel plate burial depth, resulting in the foundation pit precipitation not meeting the standards or the steel plate burial depth is unreasonable, which increases construction costs and affects the foundation stability of surrounding buildings.
By combining the steel plate buried depth, foundation pit precipitation depth and seepage deformation control index (SCI) for data processing, the combination of steel plate buried depth and foundation pit precipitation depth is optimized, steel sheet piles are set up around the foundation pit for water isolation treatment, and anti-absorbent silicone particles are filled between the steel sheet piles and the inner wall of the foundation pit to enhance the water isolation ability.
A comprehensive analysis and control of the seepage deformation of canal foundation pits has been achieved, which reduces the deformation risk caused by seepage, ensures the smooth progress of the project, and reduces construction costs and construction volume.