Building ground waterproof system and construction method
By designing a multi-layer waterproofing system on the floor of the building, combining the design of sewer holes and adapters, the problem of slow secondary drainage efficiency in traditional bathroom waterproofing processes is solved, and efficient and economical waterproofing effects are achieved.
Patent Information
- Application Number
- CN202510152428.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-02-12
- Publication Date
- 2025-03-28
AI Technical Summary
The traditional bathroom waterproofing process has the problem of slow secondary drainage efficiency, and the ceramic backfill cost is high, so the traditional waterproof layer is easy to be damaged.
A building ground waterproofing system is adopted that includes ground base layer, leveling water guide layer, secondary waterproof layer, ceramic filling layer, strong ground leveling layer, and primary waterproof layer from bottom to top, and combines the design of sewage holes and adapters to form an efficient secondary drainage structure.
It achieves efficient secondary drainage, extends the life of waterproof materials, improves the waterproof level, reduces the cost of filling materials, and enhances the stability of the waterproof layer.