Bottom water gas reservoir physical simulation system and method for multi-well alternate production
By establishing a physical simulation system for bottom water gas reservoirs with multiple wells replacement production, the problem of difficulty in analyzing the impact of gas well water escape height on development effect in the existing technology is solved, and accurate analysis of gas well water escape height and effective simulation of multi-well replacement production is achieved, and the gas reservoir development strategy is optimized.
Patent Information
- Application Number
- CN202311262110.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2023-09-27
- Publication Date
- 2025-03-28
AI Technical Summary
The prior art is difficult to accurately analyze the impact of the gas well water escape height on the development effect of bottom water gas reservoirs, and it is impossible to effectively simulate the situation of multiple wells taking over production, resulting in severe pressure changes and fast water invasion speed, making it difficult to predict water invasion dynamics and optimize the production system.
The physical simulation system of bottom water gas reservoir produced by multiple wells is adopted. A physical simulation device is used to establish a physical model similar to the actual reservoir based on the actual parameters of the reservoir and well, and the acquisition device is used to measure the production dynamics of wells at different locations to establish the impact of the gas well water escape height on the development effect.
The accurate analysis of the impact of the gas well water escape height on the pressure, output and recovery rate during gas reservoir development is achieved, which can effectively simulate the production of multiple wells, save experimental cycles and costs, and optimize gas reservoir development strategies.