Deepwater jacket offshore wind power foundation design method

By scientifically selecting the foundation parameters of the deep-water conduit frame and setting reasonable design loads and working conditions, building a detailed SACS design model, and conducting comprehensive mechanical analysis, the problems of low design accuracy of the offshore wind power foundation of the deep-water conduit frame are solved, and a more efficient design and more reliable structure are achieved.

CN119760828AInactive Publication Date: 2025-04-04CSSC WIND POWER INVESTMENT (BEIJING) CO LTD +1
4 Cites 0 Cited by

Patent Information

Application Number
CN202411813188.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-12-10
Publication Date
2025-04-04
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

In the prior art, the design of offshore wind power foundation of deep water conduit frames is not very accurate, resulting in a lot of waste of materials.

Method used

By selecting the foundation parameters of the deep water conduit frame, setting the design load and working conditions, determining the foundation top elevation, building a SACS design model, and conducting static, modal, fatigue, seismic analysis and evaluation, considering the basic deformation control standards, bearing capacity control standards, stress control standards and the frequency of the whole machine.

Benefits of technology

It effectively improves the accuracy of the offshore wind power foundation design of deep-water conduit frames, reduces material waste, and ensures the safety and reliability of the structure.

✦ Generated by Eureka AI based on patent content.
Patent Text Reader

Abstract

The invention relates to a deepwater jacket offshore wind power foundation design method. The method comprises the steps that S10, deepwater jacket foundation design parameters are selected; s20, setting a design load and working conditions of a deepwater jacket foundation; s30, determining the top elevation of the deepwater jacket foundation; s40, an SACS design model is built; and S50, static force, modal, fatigue and earthquake analysis and evaluation criteria. According to the technical scheme, the problems that in the prior art, the design accuracy of a deepwater jacket offshore wind power foundation is not high, and more materials are wasted are effectively solved.
Need to check novelty before this filing date? Find Prior Art