A walking trolley
By designing a walking trolley installed on the bridge deck, the problems of insufficient safety and small construction range when working at high altitudes on the bridge are solved, and more efficient and safer construction results are achieved.
Patent Information
- Application Number
- CN202411960242.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-30
- Publication Date
- 2025-04-08
AI Technical Summary
The traditional outer suspension construction platform is insufficient for high altitude work on the side of the bridge, and the construction range is small, so it cannot guarantee continuous construction, and the transfer is labor-intensive and the cycle is long.
A walking trolley is designed, installed on the bridge deck, equipped with a walking track, including a trolley body, a first and second workbenches independently arranged, and a lifting assembly supporting these workbenches. The lifting assembly realizes the height adjustment of the workbench and the composition of a combined workbench through structures such as support plates, telescopic rods, threaded rods and sleeves.
It improves the safety and efficiency of construction, increases the flexibility of construction, and can select appropriate workbench configurations according to specific application scenarios, realizes continuous construction, and reduces construction cycle and transfer costs.