Auxiliary correcting device for fire-fighting vertical pipe construction

By designing auxiliary correction devices for fire-fighting upright pipe construction, and using electric lifting tables and clamping mechanisms to automatically erect and correct fire-fighting upright pipes, the problem of high labor intensity for construction workers during the erecting and correction process is solved, automated construction is achieved, and efficiency and reliability are improved.

CN119873694AInactive Publication Date: 2025-04-25SHANDONG YILU TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202510079528.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-01-18
Publication Date
2025-04-25
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

During the installation of fire-fighting upright pipes, construction personnel need to hold heavy-duty upright pipes for vertical and vertical correction, resulting in high labor intensity and difficult to meet construction needs.

Method used

An auxiliary correction device for fire-fighting upright pipe construction is designed, and the upright pipe is automatically raised by an electric lifting platform, and the vertical position of the upright pipe is stabilized through the clamping mechanism and the airbag system to reduce the labor intensity of construction workers.

Benefits of technology

The device can automatically erect and correct fire-fighting upright pipes, reduce the gravity burden on construction workers, save manpower, and improve construction efficiency and reliability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119873694A_ABST
    Figure CN119873694A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of fire-fighting vertical pipe installation and construction, and discloses an auxiliary correction device for fire-fighting vertical pipe construction, which comprises a movable base, an electric lifting platform is arranged on the movable base, and a rotating plate is rotationally installed on the electric lifting platform. A first clamping mechanism used for clamping a vertical pipe is arranged on the rotating plate and comprises a first clamping plate and a second clamping plate which are arranged on the rotating plate, a vertical rod is installed on the movable base, a first rack is installed at the top end of the vertical rod, the rotating shaft is fixedly connected with the rotating plate, and a first gear used for being meshed with the first rack is arranged on the rotating shaft. When the first rack is meshed with the first gear, the rotating plate rotates by 90 degrees. After the vertical pipe is erected, a constructor moves the electric lifting table to the vertical pipe installation position for installation, in the process, the constructor does not need to hold the vertical pipe by hand to rotate the vertical pipe, the gravity burden of holding the vertical pipe by hand is relieved, manpower is saved, and the practicability of the device is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of fire standpipe installation and construction, in particular to an auxiliary correction device for fire standpipe construction. Background Art

[0002] A fire riser is a vertical pipe that plays a key role in a building's fire protection system. When a fire occurs, the fire riser can quickly transport water from fire water sources (such as fire water pools, fire water pump connectors, etc.) to each floor of the building, providing fire-fighting water for indoor fire hydrants and other fire-fighting equipment. When installing the fire riser, first erect the riser, then correct the verticality of the riser so that the riser is in a vertical state. The two ends of the riser correspond to the interfaces of the horizontal pipe respectively, and sealing gaskets are installed at both ends of the riser. Finally, the flange of the riser and the flange on the horizontal pipe are fixed together with bolts and nuts.

[0003] In the prior art, when installing the fire riser, the construction workers stand on an electric lifting platform, hold one end of the fire riser and stand it up. When the fire riser is docked and installed, the construction workers manually correct the verticality of the riser. Since the fire riser is generally heavy, it is more difficult for the construction workers to erect and correct the fire riser. Therefore, it does not meet the existing needs. In this regard, we propose an auxiliary correction device for the construction of fire risers. Summary of the invention

[0004] The present invention provides an auxiliary correction device for fire riser construction, which has the beneficial effect of automatically erecting the fire riser by using an electric lifting platform, saving manpower, and solves the problem mentioned in the above background technology that when installing the fire riser, the construction workers stand on the electric lifting platform, hold one end of the fire riser to erect the fire riser, and when the fire riser is docked and installed, the construction workers manually correct the verticality of the riser. Since the fire riser is generally heavy, it is more laborious for the construction workers to erect and correct the fire riser.

[0005] The present invention provides the following technical solution: an auxiliary correction device for fire vertical pipe construction, comprising a mobile base, an electric lifting platform is arranged on the mobile base, a rotating plate is rotatably installed on the electric lifting platform, a first clamping mechanism for clamping the vertical pipe is arranged on the rotating plate, the first clamping mechanism comprises a first clamping plate and a second clamping plate arranged on the rotating plate, and the first clamping plate and the second clamping plate clamp the vertical pipe together.

[0006] As an optional solution of the auxiliary correction device for fire vertical pipe construction described in the present invention, wherein: a vertical rod is installed on the mobile base, a No. 1 rack is installed on the top of the vertical rod, a fixed seat is installed on the electric lifting platform, a rotating shaft is rotatably installed on the fixed seat, the rotating shaft is fixedly connected to the rotating plate, and a No. 1 gear for meshing with the No. 1 rack is arranged on the rotating shaft; When the first rack is meshed with the first gear, the rotating plate rotates 90 degrees.

[0007] As an optional solution of the auxiliary correction device for fire vertical pipe construction described in the present invention, wherein: the second clamping plate is slidably mounted on the rotating plate, a fixed sleeve is arranged on the side of the second clamping plate, a No. 1 piston plate is slidably mounted in the fixed sleeve, a moving rod is installed at one end of the No. 1 piston plate, and the moving rod is fixedly connected to the second clamping plate; An airbag is arranged on the electric lifting platform, a one-way valve is arranged at the air inlet of the airbag, a No. 1 pipe is installed on the airbag, and one end of the No. 1 pipe is connected to the fixed sleeve.

[0008] As an optional solution of the auxiliary correction device for fire vertical pipe construction described in the present invention, wherein: a No. 2 gear is installed at one end of the rotating shaft, a No. 2 rack is slidably installed on the electric lifting platform, the No. 2 rack is meshed with the No. 2 gear, and a limiting plate for limiting the No. 2 rack is installed on the electric lifting platform, and a pair of limiting plates are provided, and the pair of limiting plates are located on both sides of the No. 2 rack; A pressure plate is installed at one end of the second rack, and the pressure plate is in conflict with the airbag.

[0009] As an optional scheme of the auxiliary correction device for the construction of a fire vertical pipe described in the present invention, wherein: a second clamping mechanism is also arranged on the rotating plate, the second clamping mechanism is arranged in the same manner as the first clamping mechanism, the second clamping mechanism comprises a third clamping plate and a fourth clamping plate installed on the rotating plate, the third clamping plate and the fourth clamping plate are arranged in the same manner as the first clamping plate and the second clamping plate respectively, and the third clamping plate and the fourth clamping plate jointly clamp the bottom end of the vertical pipe.

[0010] As an optional scheme of the auxiliary correction device for fire vertical pipe construction described in the present invention, a bracket is detachably provided at the bottom of the flange to be connected, and a positioning plate for auxiliary correction of the vertical pipe is vertically installed on the bracket.

[0011] As an optional solution of the auxiliary correction device for fire vertical pipe construction described in the present invention, wherein: a No. 1 correction mechanism is arranged on the first clamping mechanism, the No. 1 correction mechanism comprises a movable sleeve, a sliding groove is provided on the side of the first clamping plate, and the movable sleeve is slidably installed in the sliding groove; A No. 1 compression spring is arranged in the slide groove, a buffer plate is installed at one end of the No. 1 compression spring, the buffer plate abuts against the movable sleeve, and a limiting strip for limiting the movable sleeve is also arranged in the slide groove; A No. 2 compression spring is arranged in the movable sleeve, a No. 2 piston plate is slidably mounted on the movable sleeve, the No. 2 piston plate abuts against one end of the No. 2 compression spring, a connecting rod is mounted on one side of the No. 2 piston plate, a compression rod for correcting the vertical pipe is rotatably mounted on one end of the connecting rod; A No. 1 correction plate is installed at one end of the movable sleeve. When the No. 1 correction plate conflicts with the positioning plate, the pressure rod presses the vertical pipe onto the rotating plate.

[0012] As an optional scheme of the auxiliary correction device for fire vertical pipe construction described in the present invention, wherein: the No. 1 correction mechanism also includes a No. 1 piston cylinder installed on the rotating plate, a tension spring is arranged in the No. 1 piston cylinder, a No. 3 piston plate is slidably installed in the No. 1 piston cylinder, one end of the tension spring is fixedly connected to the No. 3 piston plate, a No. 2 moving rod is installed on one side of the No. 3 piston plate, a No. 2 pipe is installed on the airbag, and when the No. 2 moving rod moves upward, the No. 2 pipe is connected to the No. 1 piston cylinder; The No. 2 moving rod is provided with a groove, and the No. 1 correcting plate is provided with a No. 1 wedge block for inserting into the groove. When the No. 1 wedge block is inserted into the groove, the No. 2 moving rod moves upward.

[0013] As an optional solution of the auxiliary correction device for fire vertical pipe construction described in the present invention, wherein: a second correction mechanism is provided on the second clamping mechanism, and the second correction mechanism is configured in the same manner as the first correction mechanism; The No. 2 correction mechanism comprises a No. 2 piston cylinder mounted on the rotating plate, the No. 2 piston cylinder is configured in the same manner as the No. 1 piston cylinder, a No. 2 connecting pipe is mounted on the No. 2 piston cylinder, and the No. 2 connecting pipe is connected to the No. 1 piston cylinder; A No. 3 moving rod is arranged in the No. 2 piston cylinder. The No. 3 moving rod is arranged in the same manner as the No. 2 moving rod. An air outlet is opened on the No. 2 piston cylinder. When the No. 3 moving rod moves downward, the air outlet is communicated with the No. 2 piston cylinder.

[0014] As an optional scheme of the auxiliary correction device for the construction of a fire riser described in the present invention, wherein: the No. 2 correction mechanism also includes a No. 2 correction plate, the No. 2 correction plate is configured the same as the No. 1 correction plate, and a No. 2 wedge block is installed on the No. 2 correction plate, and the No. 2 wedge block is configured the same as the No. 1 wedge block, and when the No. 2 wedge block is inserted into the groove on the No. 3 moving rod, the No. 3 moving rod moves downward.

[0015] The present invention has the following beneficial effects: 1. The auxiliary correction device for the construction of the fire vertical pipe, before the vertical pipe is installed, the construction personnel first install the vertical pipe horizontally on the rotating plate, and the first clamping plate and the second clamping plate clamp the vertical pipe. When the electric lifting platform moves upward, the No. 1 rack and the No. 1 gear will be meshed, thereby driving the rotation of the rotating plate, and further driving the rotation of the vertical pipe, so that the horizontally installed vertical pipe is erected. After the vertical pipe is erected, the construction personnel move the mobile base to the vertical pipe installation location for installation. During this process, the construction personnel do not need to hold the vertical pipe to rotate it, which reduces the gravity burden of holding the vertical pipe, thereby saving manpower and improving the practicality of the device.

[0016] 2. The auxiliary correction device for the construction of the fire vertical pipe, when the No. 1 rack is meshed with the No. 1 gear, the No. 2 gear drives the rotating shaft to rotate, and further drives the No. 2 gear to rotate, the No. 2 gear is meshed with the No. 2 rack, and the No. 2 rack moves toward the direction of the airbag, the pressure plate squeezes the airbag, and the gas in the airbag enters the fixed sleeve from the No. 1 pipe. The gas pressure in the fixed sleeve increases, thereby driving the No. 1 piston plate to move, and finally the No. 1 piston plate drives the second clamping plate to move toward the first clamping plate through the moving rod to clamp the vertical pipe, thereby strengthening the clamping effect of the vertical pipe, making the process of turning from horizontal to vertical more stable, preventing the vertical pipe from sliding and falling during the rotation process, thereby increasing the reliability of the device.

[0017] 3. The auxiliary correction device for the construction of the fire vertical pipe. After the vertical pipe is initially vertical, the electric lifting platform moves toward the positioning plate. At this time, the No. 1 correction plate and the No. 2 correction plate conflict with the positioning plate, and the pressure rods on the No. 1 correction mechanism and the No. 2 correction mechanism conflict with the vertical pipe respectively. When the No. 1 correction plate conflicts with the first clamping plate, and the No. 2 correction plate conflicts with the third clamping plate, under the action of the No. 2 compression spring, the pressure rod presses the two ends of the vertical pipe against the rotating plate, so that the vertical pipe is further kept vertical. At the same time, the No. 1 wedge block and the No. 2 wedge block slide in contact with the groove, so that the No. 3 The movable rod moves downward and the No. 2 movable rod moves upward, so that the No. 2 pipe, the No. 1 piston cylinder, and the No. 2 piston cylinder are connected to the air outlet, the airbag is exhausted, the clamping force of the second clamping plate and the fourth clamping plate on the vertical pipe is reduced, and the friction between the vertical pipe and the first clamping mechanism and the second clamping mechanism is reduced. The vertical pipe slowly moves down and falls on the flange surface waiting for connection. During this process, the vertical pipe always remains vertical, thereby replacing the need for construction personnel to further fine-tune the verticality of the vertical pipe during installation, saving manpower, and further increasing the practicality of the device. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 It is a schematic diagram of the overall structure of the present invention.

[0019] Figure 2 It is a schematic structural diagram of the first clamping mechanism and the second clamping mechanism of the present invention.

[0020] Figure 3 It is a schematic diagram of the structure of the first correction mechanism and the second correction mechanism of the present invention.

[0021] Figure 4 It is a side view schematic diagram of the first correction mechanism and the second correction mechanism of the present invention.

[0022] Figure 5 It is a schematic diagram of the structure of the present invention from a top view.

[0023] Figure 6 It is a schematic cross-sectional structure diagram of the first correction mechanism and the second correction mechanism of the present invention.

[0024] Figure 7 It is a structural schematic diagram of the electric lifting platform of the present invention.

[0025] Figure 8 It is a schematic diagram of the explosion structure of the No. 2 correction mechanism of the present invention.

[0026] Fig. 9 For the present invention Figure 6 Schematic diagram of the enlarged structure at point A in the middle.

[0027] In the figure: 101, mobile base; 103, electric lifting platform; 2100, first clamping mechanism; 2200, second clamping mechanism; 201, vertical rod; 202, rack No. 1; 203, gear No. 1; 204, rotating plate; 205, fixed seat; 206, first clamping plate; 207, second clamping plate; 208, pipe No. 1; 209, third clamping plate; 210, fourth clamping plate; 212, rotating shaft; 213, slide groove; 214, limit strip; 215, compression spring No. 1; 216, buffer plate; 219, one-way valve; 301, air bag; 303, fixed sleeve; 304, gear No. 2; 307, rack No. 2; 308, pressure plate; 309, limit plate; 3 10. Moving rod; 311. Piston plate No. 1; 4100. Correction mechanism No. 1; 4400. Correction mechanism No. 2; 401. Pipeline No. 2; 402. Bracket; 403. Positioning plate; 404. Correction plate No. 1; 406. Wedge block No. 1; 407. Piston cylinder No. 1; 408. Connecting pipe No. 2; 409. Piston cylinder No. 2; 410. Wedge block No. 2; 411. Correction plate No. 2; 412. Air outlet; 413. Moving rod No. 3; 414. Groove; 415. Piston plate No. 3; 416. Tension spring; 417. Moving sleeve; 418. Compression spring No. 2; 419. Piston plate No. 2; 420. Connecting rod; 421. Compression rod; 423. Moving rod No. 2. DETAILED DESCRIPTION

[0028] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0029] Embodiment 1: This embodiment is intended to solve the problem that when installing the fire standpipe, the construction worker stands on the electric lifting platform, holds one end of the fire standpipe and stands it up. When the fire standpipe is docked and installed, the construction worker manually corrects the verticality of the standpipe. Since the fire standpipe is generally heavy, it is more difficult for the construction worker to erect and correct the fire standpipe. Please refer to Figures 1 to 9 An auxiliary correction device for fire vertical pipe construction includes a mobile base 101, an electric lifting platform 103 is arranged on the mobile base 101, a rotating plate 204 is rotatably installed on the electric lifting platform 103, and a first clamping mechanism 2100 for clamping the vertical pipe is arranged on the rotating plate 204. The first clamping mechanism 2100 includes a first clamping plate 206 and a second clamping plate 207 arranged on the rotating plate 204, and the first clamping plate 206 and the second clamping plate 207 clamp the vertical pipe together.

[0030] For details, please refer to Figure 1 A vertical rod 201 is installed on the mobile base 101, and a No. 1 rack 202 is installed on the top of the vertical rod 201. A fixed seat 205 is installed on the electric lifting platform 103. A rotating shaft 212 is rotatably installed on the fixed seat 205. The rotating shaft 212 is fixedly connected to the rotating plate 204. A No. 1 gear 203 for meshing with the No. 1 rack 202 is provided on the rotating shaft 212. When the No. 1 rack 202 meshes with the No. 1 gear 203, the rotating plate 204 rotates 90 degrees.

[0031] In the present embodiment: before the vertical pipe is installed, the construction personnel first install the vertical pipe horizontally on the rotating plate 204, and the first clamping plate 206 and the second clamping plate 207 clamp the vertical pipe. When the electric lifting platform 103 moves upward, the No. 1 rack 202 and the No. 1 gear 203 will be meshed, thereby driving the rotating plate 204 to rotate 90 degrees, and further driving the vertical pipe to rotate 90 degrees, so that the horizontally installed vertical pipe is erected. After the vertical pipe is erected, the construction personnel move the mobile base 101 to the vertical pipe installation location for installation. During this process, the construction personnel do not need to hold the vertical pipe to rotate it, which reduces the gravity burden of holding the vertical pipe, thereby saving manpower and improving the practicality of the device.

[0032] Embodiment 2: This embodiment aims to solve the problem that the vertical tube is easy to slip when it is fixed by the friction between the first clamping plate 206 and the second clamping plate 207 during rotation. This embodiment is an improvement made on the basis of embodiment 1. For details, please refer to Figures 1 to 9 The second clamping plate 207 is slidably installed on the rotating plate 204, and a fixed sleeve 303 is arranged on the side of the second clamping plate 207. A No. 1 piston plate 311 is slidably installed in the fixed sleeve 303. A moving rod 310 is installed at one end of the No. 1 piston plate 311. The moving rod 310 is fixedly connected to the second clamping plate 207. An airbag 301 is arranged on the electric lifting platform 103, and a one-way valve 219 is arranged at the air inlet of the airbag 301. A No. 1 pipe 208 is installed on the airbag 301, and one end of the No. 1 pipe 208 is connected to the fixed sleeve 303.

[0033] The one-way valve 219 is generally composed of a pipeline and a sealing plate hinged in the pipeline. The sealing plate can only rotate in one direction through a spring, thereby ensuring that the gas can only pass in one direction. The specific structure and principle of the one-way valve 219 are well known to technical personnel in this field and will not be elaborated here.

[0034] Also, please refer to Figure 7 A No. 2 gear 304 is installed at one end of the rotating shaft 212, and a No. 2 rack 307 is slidably installed on the electric lifting platform 103. The No. 2 rack 307 is meshed with the No. 2 gear 304. A limiting plate 309 for limiting the No. 2 rack 307 is installed on the electric lifting platform 103. A pair of limiting plates 309 are provided. The pair of limiting plates 309 are located on both sides of the No. 2 rack 307. A pressure plate 308 is installed at one end of the No. 2 rack 307, and the pressure plate 308 is in conflict with the airbag 301.

[0035] In this embodiment: when the No. 1 rack 202 is meshed with the No. 1 gear 203, the No. 2 gear 304 drives the rotating shaft 212 to rotate, further driving the No. 2 gear 304 to rotate, the No. 2 gear 304 is meshed with the No. 2 rack 307, the No. 2 rack 307 moves toward the airbag 301, the pressure plate 308 squeezes the airbag 301, and the gas in the airbag 301 enters the fixed sleeve 303 through the No. 1 pipe 208. The gas pressure in the fixed sleeve 303 increases, thereby driving the No. 1 piston plate 311 to move, and finally the No. 1 piston plate 311 drives the second clamping plate 207 to move toward the first clamping plate 206 through the moving rod 310 to clamp the vertical pipe, thereby strengthening the clamping effect on the vertical pipe, making the process of turning from horizontal to vertical more stable, preventing the vertical pipe from sliding and falling during the rotation process, thereby increasing the reliability of the device.

[0036] Embodiment 3: This embodiment is intended to solve the problem that after the vertical pipe is erected, only a rough correction is achieved. During installation, the construction personnel also need to fine-tune the verticality of the vertical pipe. This embodiment is an improvement made on the basis of embodiment 2. For details, please refer to Figures 1 to 9 A second clamping mechanism 2200 is also provided on the rotating plate 204. The second clamping mechanism 2200 is configured in the same manner as the first clamping mechanism 2100. The second clamping mechanism 2200 includes a third clamping plate 209 and a fourth clamping plate 210 installed on the rotating plate 204. The third clamping plate 209 and the fourth clamping plate 210 are configured in the same manner as the first clamping plate 206 and the second clamping plate 207, respectively. The third clamping plate 209 and the fourth clamping plate 210 clamp the bottom end of the vertical pipe together.

[0037] Also, please refer to Figure 1 A bracket 402 is detachably provided at the bottom of the flange to be connected, and a positioning plate 403 for assisting in the correction of the vertical pipe is vertically installed on the bracket 402.

[0038] For details, please refer to Figure 6 A No. 1 correction mechanism 4100 is arranged on the first clamping mechanism 2100, and the No. 1 correction mechanism 4100 includes a movable sleeve 417. A sliding groove 213 is opened on the side of the first clamping plate 206. The movable sleeve 417 is slidably installed in the sliding groove 213. A No. 1 compression spring 215 is arranged in the sliding groove 213. A buffer plate 216 is installed at one end of the No. 1 compression spring 215. The buffer plate 216 is in contact with the movable sleeve 417. A limiting strip 214 for limiting the movable sleeve 417 is also arranged in the sliding groove 213.

[0039] In addition, a No. 2 compression spring 418 is provided in the movable sleeve 417, and a No. 2 piston plate 419 is slidably installed on the movable sleeve 417. The No. 2 piston plate 419 is in contact with one end of the No. 2 compression spring 418. A connecting rod 420 is installed on one side of the No. 2 piston plate 419, and a pressure rod 421 for correcting the vertical pipe is rotatably installed on one end of the connecting rod 420. A No. 1 correction plate 404 is installed at one end of the movable sleeve 417. When the No. 1 correction plate 404 is in contact with the positioning plate 403, the pressure rod 421 presses the vertical pipe against the rotating plate 204.

[0040] Also, please refer to Figure 6The No. 1 correction mechanism 4100 also includes a No. 1 piston cylinder 407 installed on the rotating plate 204, a tension spring 416 is arranged in the No. 1 piston cylinder 407, a No. 3 piston plate 415 is slidably installed in the No. 1 piston cylinder 407, one end of the tension spring 416 is fixedly connected to the No. 3 piston plate 415, a No. 2 moving rod 423 is installed on one side of the No. 3 piston plate 415, a No. 2 pipe 401 is installed on the airbag 301, when the No. 2 moving rod 423 moves upward, the No. 2 pipe 401 is connected with the No. 1 piston cylinder 407, a groove 414 is opened on the No. 2 moving rod 423, a No. 1 wedge block 406 for inserting into the groove 414 is installed on the No. 1 correction plate 404, when the No. 1 wedge block 406 is inserted into the groove 414, the No. 2 moving rod 423 moves upward.

[0041] In addition, a No. 2 correction mechanism 4400 is arranged on the second clamping mechanism 2200. The No. 2 correction mechanism 4400 has the same arrangement as the No. 1 correction mechanism 4100. The No. 2 correction mechanism 4400 includes a No. 2 piston cylinder 409 installed on the rotating plate 204. The No. 2 piston cylinder 409 has the same arrangement as the No. 1 piston cylinder 407. A No. 2 connecting pipe 408 is installed on the No. 2 piston cylinder 409. The No. 2 connecting pipe 408 is connected to the No. 1 piston cylinder 407. The No. 2 correction mechanism 4400 also includes a No. 3 moving rod 413. The No. 3 moving rod 413 has the same arrangement as the No. 2 moving rod 423. An air outlet 412 is opened on the No. 2 piston cylinder 409. When the No. 3 moving rod 413 moves downward, the air outlet 412 is connected to the No. 2 piston cylinder 409.

[0042] Among them, the No. 2 correction mechanism 4400 includes a No. 2 correction plate 411, which has the same configuration as the No. 1 correction plate 404, and a No. 2 wedge block 410 is installed on the No. 2 correction plate 411, which has the same configuration as the No. 1 wedge block 406. When the No. 2 wedge block 410 is inserted into the groove 414 on the No. 3 moving rod 413, the No. 3 moving rod 413 moves downward.

[0043] In this embodiment: after the vertical tube is initially vertical, the electric lifting platform 103 moves toward the positioning plate 403. At this time, the No. 1 correction plate 404 and the No. 2 correction plate 411 are in conflict with the positioning plate 403, and the pressure rods 421 on the No. 1 correction mechanism 4100 and the No. 2 correction mechanism 4400 are in conflict with the vertical tube respectively. When the No. 1 correction plate 404 is in conflict with the first clamping plate 206, and the No. 2 correction plate 411 is in conflict with the third clamping plate 209, under the action of the No. 2 compression spring 418, the pressure rod 421 presses the two ends of the vertical tube against the rotating plate 204, so that the vertical tube is further kept vertical. At the same time, the No. 1 wedge block 406 and the No. 2 wedge block 410 are in sliding contact with the groove 414. , causing the No. 3 moving rod 413 to move downward and the No. 2 moving rod 423 to move upward, so that the No. 2 pipe 401, the No. 1 piston cylinder 407, and the No. 2 piston cylinder 409 are connected to the air outlet 412, and the airbag 301 is exhausted. The clamping force of the second clamping plate 207 and the fourth clamping plate 210 on the vertical pipe is reduced, and the friction between the vertical pipe and the first clamping mechanism 2100 and the second clamping mechanism 2200 is reduced. The vertical pipe slowly moves down and falls on the flange surface waiting for connection. During this process, the vertical pipe always remains vertical, thereby replacing the need for construction personnel to further fine-tune the verticality of the vertical pipe during installation, saving manpower, and further increasing the practicality of the device.

[0044] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.

[0045] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the technical principles of the present invention. These improvements and modifications should also be regarded as the scope of protection of the present invention.

Claims

1. An auxiliary correction device for fire vertical pipe construction, comprising a mobile base (101), wherein an electric lifting platform (103) is arranged on the mobile base (101), characterized in that: A rotating plate (204) is rotatably mounted on the electric lifting platform (103), and a first clamping mechanism (2100) for clamping the vertical pipe is arranged on the rotating plate (204). The first clamping mechanism (2100) comprises a first clamping plate (206) and a second clamping plate (207) arranged on the rotating plate (204), and the first clamping plate (206) and the second clamping plate (207) clamp the vertical pipe together.

2. The auxiliary correction device for fire vertical pipe construction according to claim 1 is characterized in that: The movable base (101) is provided with a vertical rod (201), a top end of the vertical rod (201) is provided with a first rack (202), a fixed seat (205) is provided on the electric lifting platform (103), a rotating shaft (212) is rotatably provided on the fixed seat (205), the rotating shaft (212) is fixedly connected to the rotating plate (204), and a first gear (203) for meshing with the first rack (202) is provided on the rotating shaft (212); When the first rack (202) is meshed with the first gear (203), the rotating plate (204) rotates 90 degrees.

3. The auxiliary correction device for fire vertical pipe construction according to claim 2 is characterized in that: The second clamping plate (207) is slidably mounted on the rotating plate (204); a fixed sleeve (303) is provided on the side of the second clamping plate (207); a first piston plate (311) is slidably mounted in the fixed sleeve (303); a moving rod (310) is mounted at one end of the first piston plate (311); and the moving rod (310) is fixedly connected to the second clamping plate (207); An air bag (301) is provided on the electric lifting platform (103), a one-way valve (219) is provided at the air inlet of the air bag (301), a first pipe (208) is installed on the air bag (301), and one end of the first pipe (208) is connected to the fixed sleeve (303).

4. The auxiliary correction device for fire vertical pipe construction according to claim 3 is characterized in that: A second gear (304) is installed at one end of the rotating shaft (212); a second rack (307) is slidably installed on the electric lifting platform (103); the second rack (307) is meshed with the second gear (304); a limiting plate (309) for limiting the second rack (307) is installed on the electric lifting platform (103); a pair of limiting plates (309) are provided, and the pair of limiting plates (309) are located on both sides of the second rack (307); A pressure plate (308) is installed at one end of the second rack (307), and the pressure plate (308) is in contact with the airbag (301).

5. The auxiliary correction device for fire vertical pipe construction according to claim 1 is characterized in that: The rotating plate (204) is also provided with a second clamping mechanism (2200), and the second clamping mechanism (2200) is configured in the same manner as the first clamping mechanism (2100). The second clamping mechanism (2200) comprises a third clamping plate (209) and a fourth clamping plate (210) mounted on the rotating plate (204). The third clamping plate (209) and the fourth clamping plate (210) are configured in the same manner as the first clamping plate (206) and the second clamping plate (207), respectively. The third clamping plate (209) and the fourth clamping plate (210) jointly clamp the bottom end of the vertical pipe.

6. The auxiliary correction device for fire vertical pipe construction according to claim 5, characterized in that: A bracket (402) is detachably provided at the bottom of the flange to be connected, and a positioning plate (403) for assisting in the correction of the vertical pipe is vertically mounted on the bracket (402).

7. The auxiliary correction device for fire vertical pipe construction according to claim 6, characterized in that: A first correction mechanism (4100) is provided on the first clamping mechanism (2100), the first correction mechanism (4100) comprising a movable sleeve (417), a sliding groove (213) is provided on the side of the first clamping plate (206), and the movable sleeve (417) is slidably installed in the sliding groove (213); A No. 1 compression spring (215) is disposed in the slide groove (213), a buffer plate (216) is installed at one end of the No. 1 compression spring (215), the buffer plate (216) abuts against the movable sleeve (417), and a limiting strip (214) for limiting the movable sleeve (417) is also disposed in the slide groove (213); A No. 2 compression spring (418) is disposed in the movable sleeve (417), a No. 2 piston plate (419) is slidably mounted on the movable sleeve (417), the No. 2 piston plate (419) abuts against one end of the No. 2 compression spring (418), a connecting rod (420) is mounted on one side of the No. 2 piston plate (419), and a compression rod (421) for correcting the vertical pipe is rotatably mounted on one end of the connecting rod (420); A No. 1 correction plate (404) is installed at one end of the movable sleeve (417), and when the No. 1 correction plate (404) contacts the positioning plate (403), the pressing rod (421) presses the vertical pipe onto the rotating plate (204).

8. The auxiliary correction device for fire vertical pipe construction according to claim 7, characterized in that: The No. 1 correction mechanism (4100) further comprises a No. 1 piston cylinder (407) mounted on the rotating plate (204), a tension spring (416) being arranged in the No. 1 piston cylinder (407), a No. 3 piston plate (415) being slidably mounted in the No. 1 piston cylinder (407), one end of the tension spring (416) being fixedly connected to the No. 3 piston plate (415), a No. 2 moving rod (423) being mounted on one side of the No. 3 piston plate (415), a No. 2 pipe (401) being mounted on the airbag (301), and when the No. 2 moving rod (423) moves upward, the No. 2 pipe (401) is communicated with the No. 1 piston cylinder (407); The second moving rod (423) is provided with a groove (414), and the first correcting plate (404) is provided with a first wedge block (406) for inserting into the groove (414). When the first wedge block (406) is inserted into the groove (414), the second moving rod (423) moves upward.

9. The auxiliary correction device for fire vertical pipe construction according to claim 8, characterized in that: The second clamping mechanism (2200) is provided with a second correction mechanism (4400), and the second correction mechanism (4400) is configured in the same manner as the first correction mechanism (4100); The No. 2 correction mechanism (4400) comprises a No. 2 piston cylinder (409) mounted on the rotating plate (204), the No. 2 piston cylinder (409) having the same configuration as the No. 1 piston cylinder (407), a No. 2 connecting pipe (408) being mounted on the No. 2 piston cylinder (409), the No. 2 connecting pipe (408) being connected to the No. 1 piston cylinder (407); A No. 3 moving rod (413) is arranged in the No. 2 piston cylinder (409), and the No. 3 moving rod (413) is arranged in the same manner as the No. 2 moving rod (423). An air outlet (412) is provided on the No. 2 piston cylinder (409), and when the No. 3 moving rod (413) moves downward, the air outlet (412) is communicated with the No. 2 piston cylinder (409).

10. The auxiliary correction device for fire vertical pipe construction according to claim 9, characterized in that: The No. 2 correction mechanism (4400) further comprises a No. 2 correction plate (411), wherein the No. 2 correction plate (411) is configured in the same manner as the No. 1 correction plate (404), and a No. 2 wedge block (410) is mounted on the No. 2 correction plate (411), wherein the No. 2 wedge block (410) is configured in the same manner as the No. 1 wedge block (406), and when the No. 2 wedge block (410) is inserted into the groove (414) on the No. 3 moving rod (413), the No. 3 moving rod (413) moves downward.