Deflection early warning control and correction method for cantilever casting bridge with large-span continuous beam using hanging basket
By monitoring the elongation of the slings and adjusting the concrete pouring speed, hanging basket height and prestressing time, the problem of unstable bridge deflection warning caused by over-tight installation of the slings was solved, thereby improving the safety and quality of bridge construction.
Patent Information
- Application Number
- CN202510991320.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2025-07-18
- Publication Date
- 2025-09-19
- Estimated Expiration
- 2045-07-18
AI Technical Summary
In the prior art, due to the over-tight installation of the slings, the stability of the bridge deflection warning control during the cantilever casting process of the hanging basket is reduced, affecting the safety of the bridge construction and the quality of the completed bridge.
By monitoring the elongation of the sling, adjusting the concrete pouring speed, the vertical height of the hanging basket and the prestressing time, the stability of the bridge deflection warning is ensured, including reducing the concrete pouring speed, increasing the hanging basket height and extending the prestressing time to compensate for the prestress loss.
It improves the control stability of bridge deflection early warning, enhances the crack resistance and bearing capacity of the bridge structure, and ensures construction safety and quality.