Artificial intelligence computing power center construction management method and system
By reconstructing the mesh of the BIM model and merging and storing similar components, combined with neural network and particle swarm optimization algorithms, the construction plan is optimized, which solves the construction difficulties and instability problems caused by the complexity of the BIM model in sudden situations, and achieves improvements in construction efficiency and stability.
Patent Information
- Application Number
- CN202510739502.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-06-04
- Publication Date
- 2025-10-17
- Estimated Expiration
- 2045-06-04
AI Technical Summary
The existing BIM model is huge in size and complex in data during the construction process, making it difficult to formulate detailed construction plans. The traditional construction management model fails to effectively respond to emergencies, resulting in waste of resources and cost overruns.
By re-meshing the BIM model and merging and storing similar components, combined with artificial neural networks and particle swarm optimization algorithms, construction plans can be optimized to reduce total time and costs and improve plan stability.
It improves construction preparation efficiency, accurately predicts task completion time and cost, enhances the stability of construction plans, avoids resource waste, and ensures projects are completed on time.