Traffic exit quality evaluation method, device and equipment in data transmission

By using first and second scoring queues in the traffic egress quality assessment to smooth out score fluctuations, the problem of drastic fluctuations in traffic egress quality scores is solved, and the stability and robustness of scheduling are improved.

CN120880994APending Publication Date: 2025-10-31BIGO TECH PTE LTD
0 Cites 0 Cited by

Patent Information

Application Number
CN202511153155.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-08-18
Publication Date
2025-10-31

AI Technical Summary

Technical Problem

In existing technologies, the quality score of traffic exits fluctuates drastically, resulting in poor stability of traffic exit scheduling.

Method used

By adding the initial rating level of the traffic exit to be detected to the first rating queue of the first manager and the second rating queue of the second manager respectively, the target rating level is determined according to the rating level distribution under different time lengths. The rating fluctuations are smoothed by combining the different sensitivities of the first and second rating queues.

Benefits of technology

It effectively reduced the fluctuation of export quality scores, improved the stability of traffic export scheduling, and ensured the stability and robustness of traffic export scheduling.

✦ Generated by Eureka AI based on patent content.
Patent Text Reader

Abstract

The embodiment of the invention discloses a flow exit quality evaluation method, device and equipment in data transmission. According to the technical scheme provided by the embodiment of the invention, the initial score levels of the to-be-detected traffic exit are respectively added to the first score queue of the first manager and the second score queue of the second manager, and the first score level is determined according to the first number of initial score levels recorded in the first score queue; and determining a second score level according to a second number of initial score levels recorded in the second score queue, and determining a target score level of the to-be-detected traffic exit according to the first score level and the second score level. The technical problem is solved, the fluctuation of the outlet quality score is reduced, and the stability of the flow outlet scheduling is improved.
Need to check novelty before this filing date? Find Prior Art