A load simulation analysis method and system for tunnel blasting construction
By selecting reference blasting schemes and combining vibration monitoring data to invert equivalent loads, the problem of discrepancies between simulation results and actual conditions in tunnel blasting construction was solved, achieving accurate simulation and stability assessment of tunnel blasting loads and ensuring construction safety.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- CHINA TIESIJU CIVIL ENGINEERING GROUP CO LTD
- Filing Date
- 2026-05-11
- Publication Date
- 2026-07-24
AI Technical Summary
In existing technologies for tunnel blasting construction, the simulation results of blasting loads do not match the actual dynamic response, resulting in low accuracy in assessing surrounding rock damage and vibration response. This makes it impossible to assess blasting stability across the entire construction section, posing safety hazards.
By collecting geological parameters of the surrounding rock of the tunnel and comparing them with historical records, reference blasting schemes were selected. The equivalent blasting load time history distribution was determined by combining vibration monitoring data. The load was then applied to the tunnel geological space model, and the simulated vibration velocity time history waveform was compared and adjusted to evaluate the blasting stability.
It improves the accuracy and geological adaptability of blasting load simulation, enables refined stability assessment of the entire construction section, identifies the risk of excessive local vibration, and provides safe and reliable construction guidance.
Smart Images

Figure CN122154257B_ABST