Flexible production scheduling system simulation method, system and storage medium for multi-day vehicle common rail

By constructing a simulation method for a flexible production scheduling system with multiple overhead cranes sharing a common track, and by using modular modeling and obstacle avoidance logic to optimize overhead crane scheduling, the optimization problem of multiple overhead crane scheduling in complex production environments is solved, and the system is fully simulated and optimized.

CN122331332APending Publication Date: 2026-07-03CHINA ELECTRONICS SYST ENG NO 2 CONSTR
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202610348454.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-03-20
Publication Date
2026-07-03

Smart Images

  • Figure CN122331332A_ABST
    Figure CN122331332A_ABST
Patent Text Reader

Abstract

This invention discloses a simulation method, system, and storage medium for a flexible production scheduling system with multiple overhead cranes sharing a common track. The method includes: S1: Creating a simulation object model with coordinate positions based on a workshop layout diagram; S2: Constructing a production data stream to bind production scheduling plans and process flow data to products; S3: Constructing an overhead crane track task list to collect overhead crane handling tasks issued by various entities; S4: Constructing an overhead crane scheduling system to assign tasks from the overhead crane track task list to designated idle overhead cranes; S5: Constructing overhead crane execution operation logic, whereby the overhead crane executes operation tasks according to its current position, task start position, and task end position, while avoiding obstacles during the process; S6: Running the simulation model, performing data statistics and evaluation, and adjusting relevant parameters and returning to step S1 when production requirements are not met. This invention can intuitively simulate multi-overhead crane scheduling scenarios, predict various operating conditions, and optimize the entire production system accordingly.