Geomembrane with adhesive film and application thereof
By setting three layers of composite adhesive film in the geomembrane welding overlap area, the problems of positioning difficulties, interface debonding and welding failure during geomembrane welding are solved, achieving efficient and stable welding construction, which is suitable for environmental protection seepage prevention, water conservancy and hydropower and municipal engineering.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- SHANDONG JIANTONG GEOSYNTHETICS CO LTD
- Filing Date
- 2026-06-05
- Publication Date
- 2026-07-17
AI Technical Summary
Existing geomembrane welding methods suffer from problems such as difficulty in positioning, interface debonding, and welding failure, resulting in low construction efficiency and insufficient long-term stability.
Three layers of composite adhesive film are set in the welding overlap area, including an interface transition layer, a welding positioning layer, and a release protection layer. The interface transition layer strengthens the bond with the HDPE body, the welding positioning layer enables rapid positioning at room temperature and fusion at high temperature, and the release protection layer ensures storage and construction performance.
It achieves precise welding positioning, strengthens the bond between the geomembrane body and the adhesive membrane, improves seepage prevention performance, simplifies the construction process, increases construction efficiency, and ensures long-term stability. It is suitable for environmental protection seepage prevention, water conservancy and hydropower, and municipal engineering projects.
Smart Images

Figure SMS_1 
Figure SMS_3