Construction area visualized model construction method applied to engineering management

By constructing a multi-source heterogeneous database and a 3D visualization model, the problem of collaborative analysis of multi-source data in the construction area visualization system was solved, enabling real-time monitoring of construction status and risk warning, and improving the level of intelligent project management.

CN122415893APending Publication Date: 2026-07-17SUZHOU UNIV OF SCI & TECH

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
SUZHOU UNIV OF SCI & TECH
Filing Date
2026-05-28
Publication Date
2026-07-17

AI Technical Summary

Technical Problem

Existing construction area visualization systems cannot achieve efficient collaboration and in-depth correlation analysis of multi-source heterogeneous data, resulting in managers being unable to accurately and timely grasp the actual construction status on site. The phenomenon of data silos is serious and cannot meet the needs of modern large-scale and complex engineering projects for refined, real-time and intelligent engineering management.

Method used

A multi-source heterogeneous database is constructed, and a full set of parameters is generated through spatial coordinate transformation and data cleaning. An initial construction state mapping map is constructed and optimization nodes are set. A dynamic semantic label system is defined, a three-dimensional visualization model is generated, and the construction deviation risk is dynamically assessed based on the model, providing visual early warning and adjustment strategies.

Benefits of technology

It has achieved unified integration of data throughout the entire construction process and dynamic optimization of status maps, which has improved the intelligence level of construction quality monitoring and risk response efficiency, and reduced rework costs and safety hazards caused by construction deviations.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN122415893A_ABST
    Figure CN122415893A_ABST
Patent Text Reader

Abstract

本发明公开了应用于工程管理的施工区域可视化模型构建方法,涉及建筑工程管理技术领域,本发明通过构建多源异构数据库,通过空间坐标转换与数据清洗,生成施工区域全要素参数集;基于施工区域全要素参数集构建初始施工状态映射图谱,并设置优化节点,获得优化后的施工状态映射图谱;然后,定义施工区域的动态语义标签体系,根据动态语义标签体系以及优化施工状态映射图谱获得三维可视化模型;最后,依据三维可视化模型动态评估施工偏差风险,并决策是否生成可视化预警提示及推荐最优施工调整策略;本发明实现了施工全过程数据的统一集成与状态图谱的动态优化,提升了施工质量监控的智能化水平和风险响应效率。
Need to check novelty before this filing date? Find Prior Art