Super-long large-span gymnasium laminated slab roof structure alternate warehouse cooperative construction method
By dividing the roof structure of the ultra-long span stadium into independent compartments and using low-heat concrete and temperature-controlled curing, the problems of temperature shrinkage cracks and steel corrosion were solved, achieving a rapid sealing system and seamless structural forming, thus improving construction progress and durability.
Patent Information
- Application Number
- CN202610850987.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-06-12
- Publication Date
- 2026-07-24
AI Technical Summary
In existing technologies, the construction of ultra-long span stadium roof structures presents challenges in controlling temperature shrinkage cracks. Traditional post-cast strip methods affect construction progress and are prone to steel corrosion and leakage. Existing skip-casting methods are difficult to coordinate the tensioning sequence of prestressed beams and splice construction joints in complex roof systems.
The construction method of skip-construction collaborative construction of the composite slab roof structure of the ultra-long span stadium is adopted. By dividing the structure into multiple independent compartments, the length of a single compartment is controlled to not exceed 41.30m, and the pouring interval between any two adjacent compartments is not less than 7 days. Low heat of hydration concrete is used, combined with continuous pouring by truck pump, multi-point temperature measurement and temperature-controlled curing, to form a seamless overall structure.
It enables the rapid formation of a closed system, shortens the construction cycle, avoids steel corrosion and leakage, improves structural durability, solves the problems of joint leakage and uneven stress, and ensures seamless structural forming and safety.