Stamping production scheduling management system based on multi-dimensional constraint parameters
The stamping production scheduling management system with multi-dimensional constraint parameters solves the problems of non-real-time synchronization of equipment status and resource conflicts in traditional stamping production scheduling, realizes efficient work order delivery and production synchronization, and improves the executability of the production scheduling plan.
Patent Information
- Application Number
- CN202610367788.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-03-24
- Publication Date
- 2026-07-24
AI Technical Summary
The current stamping workshop relies on manual Excel spreadsheets or simple tools for production scheduling, without taking into account the actual condition of the equipment. This results in excessively long work order delivery times, frequent resource conflicts, and a disconnect between production scheduling plans and on-site production, leading to poor execution.
A stamping production scheduling management system based on multi-dimensional constraint parameters is adopted. Through work order screening, equipment pool matching, time trial calculation and actual simulation, theoretical and actual production scheduling tables are generated to achieve global real-time synchronization of equipment status and efficient matching of resources.
Shorten work order delivery time, avoid resource conflicts, improve the feasibility of production scheduling, ensure that production scheduling is highly consistent with actual production, and reduce production congestion and material shortages.