Pole tower construction method, device, equipment and medium for high-altitude area
By constructing 3D models and multimodal large models of high-altitude areas, the problems caused by the complexity of climate and terrain in the construction of poles in high-altitude areas were solved, and the accurate layout and display of pole construction were realized, improving the accuracy and efficiency of construction.
CN122818922APending Publication Date: 2026-09-25NINGBO ELECTRIC POWER DESIGN INST
0 Cites 0 Cited by
Patent Information
- Application Number
- CN202610961870.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-06-30
- Publication Date
- 2026-09-25
AI Technical Summary
Technical Problem
When constructing power poles in high-altitude areas, existing technologies cannot fully account for climate change and terrain complexity, leading to frequent pole failures.
Method used
By acquiring remote sensing and climate information of high-altitude areas, a three-dimensional model is constructed, the region is divided, and a multimodal large model is used to generate a distribution map of tower construction information for precise layout and display.
Benefits of technology
This enabled precise pole and tower construction based on the specific characteristics of high-altitude areas, reduced pole and tower failures, and improved construction accuracy and efficiency.
✦ Generated by Eureka AI based on patent content.
Abstract
Embodiments of the present disclosure disclose a tower construction method, device, equipment and medium for high-altitude areas. A specific embodiment of the method includes: in response to receiving power pole tower construction information, constructing a three-dimensional model according to obtained remote sensing information and climate information; in response to delineating a corresponding tower construction range, performing regional division on a corresponding high-altitude area according to the altitude change and climate change corresponding to the tower construction range to obtain a regional distribution map; generating first candidate tower construction information corresponding to each region; generating a tower construction information distribution map according to the first candidate tower construction information distribution map; and performing tower simulation display on the three-dimensional model with the tower construction information distribution map. This embodiment can perform accurate layout and construction of power line towers based on the terrain information and climate information of high-altitude areas to avoid tower failure problems caused by large climate changes and inappropriate selection of tower materials.
Need to check novelty before this filing date? Find Prior Art