Foundation structure of highway composite foundation and highway structure
By setting inclined tributary channels and slides inside the insert plate, the problem of poor fluidity of cement slurry is solved, and the efficiency of driving the plunger movement and the strength of the connection between the foundation and the soil are improved.
Patent Information
- Application Number
- CN202420564127.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-22
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2034-03-22
AI Technical Summary
In the prior art, poor viscosity and fluidity of cement slurry lead to difficulty in operating when pushing the plunger to move, affecting the strength of the connection between the road foundation and the soil.
The inclined tributary channels and slides are opened inside the insert plate. The cement mortar is affected by gravity during the flow process, which saves more effort to push the plunger to move. It also pushes the plunger into the soil through the inclined tributary channels and slides, increasing the foundation and soil Connection strength.
It effectively improves the efficiency of cement mortar in promoting the movement of the plunger and inserting into the soil, reduces the difficulty of operation, and enhances the strength of the foundation and soil connection.
Smart Images

Figure CN222024815U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of highways, in particular to a highway composite foundation structure and a highway structure. Background Art
[0002] During use, roads need to have a strong load-bearing capacity so that they can withstand the crushing of heavy vehicles. Therefore, during the process of paving roads, a solid foundation needs to be set at the bottom of the road structure to ensure that the road can withstand heavy pressure without sinking.
[0003] In order to avoid uneven road surface caused by road settlement, the existing technology strengthens the connection strength between the road foundation and the surrounding soil, making the foundation more stable, such as the highway composite foundation structure and highway structure with publication number CN219862161U.
[0004] The highway foundation in the prior art is provided with a plug plate which is longitudinally inserted into the soil, a transverse pipe is provided inside the plug plate and a plunger is provided inside the pipe, cement slurry is used to push the plunger to move so that it is inserted into the surrounding soil, and the cement slurry also penetrates into the surrounding soil, thereby increasing the connection strength between the plug plate and the surrounding soil and improving the stability of the highway foundation.
[0005] However, in the prior art, the pipeline where the plunger is located is arranged horizontally, and the cement slurry itself is relatively viscous and has poor fluidity. Therefore, during the operation, it will be very difficult for the cement slurry to push the plunger to move. Utility Model Content
[0006] In view of the deficiencies in the prior art, the utility model provides a highway composite foundation base structure and a highway structure. By opening inclined tributary channels and slideways inside the plug plate, the cement mortar is affected by gravity during the flow process, which saves more effort in the process of pushing the plunger to move and insert it into the soil, and can effectively solve the problems in the background technology.
[0007] To achieve the above object, the technical solution adopted by the utility model is: a highway composite foundation structure includes a plurality of pads connected end to end, a plurality of plugs are arranged at the bottom of the pads, a main channel is opened inside the plugs, and the top of the main channel extends to the top of the plug;
[0008] A cannula is provided inside the main channel, the top end of which passes through the pad and is fixedly connected to the pad, and downwardly inclined branch channels are provided on both sides of the main channel, and one end of the branch channel away from the main channel extends to the outer surface of the plug plate;
[0009] A slideway is provided on the inner wall of the branch channel, the inner diameter of the slideway is larger than the inner diameter of the branch channel, a plunger is provided inside the slideway, a flow channel passing through the plunger is provided on the plunger, and a closed ring in contact with the inner wall of the slideway is fixed on the outer end of the plunger.
[0010] Furthermore, a V-shaped groove is provided at the bottom end of the plug plate, which can increase resistance during the sedimentation process and play a role in hindering sedimentation. A plurality of connecting holes are provided at the top end of the pad, and a vertical pipe is provided inside the connecting hole. The top end of the vertical pipe extends to the top of the pad, and a plurality of through holes are provided at the outer end of the vertical pipe.
[0011] Furthermore, both ends of the pad are provided with connection grooves, and a connection plate is provided between two adjacent pads, and both ends of the connection plate are respectively clamped in the connection grooves of the pad on the corresponding side;
[0012] Two rows of inner grouting channels are provided on the connecting plate, and the inner grouting channels penetrate the connecting plate. The two rows of inner grouting channels correspond to two pads connected by the connecting plate respectively. An outer grouting channel communicating with the inner grouting channel is provided on the top of the inner grouting channel, and the outer grouting channel is provided on the pad corresponding to the inner grouting channel.
[0013] A highway structure includes a highway composite foundation structure, wherein a crushed stone layer is arranged on the top of the pad, an asphalt concrete layer is fixedly arranged on the top of the crushed stone layer, and the top of the riser penetrates the crushed stone layer and contacts the bottom of the asphalt concrete layer.
[0014] Furthermore, a plurality of steel bars are arranged inside the asphalt concrete layer, and both ends of the steel bars extend to the outside of the asphalt concrete layer, thereby increasing the connection strength between the highway structure and the soil.
[0015] Furthermore, a separation net is fixedly provided on the top of the asphalt concrete layer, and the separation net can block debris after the road cracks, so as to prevent the debris from falling into the deep gap and being difficult to clean up. A multi-layer asphalt surface layer is fixedly provided on the top of the separation net;
[0016] A colored sand layer is provided between the adjacent asphalt surfaces.
[0017] Compared with the prior art, the utility model provides a highway composite foundation structure and a highway structure, which have the following beneficial effects:
[0018] 1. By opening a branch channel and a slideway inside the plug plate, and both of them are inclined downward, the cement mortar is affected by gravity during the flow process, which will save more effort in the process of pushing the plunger to move and insert it into the soil.
[0019] 2. When laying the asphalt surface layer, sprinkle some colored sand layers on the top of each asphalt surface layer, and each layer of colored sand has a different color. In this way, if there is a colored sand layer exposed on the road surface during subsequent use, it means that the road surface is worn, and the degree of wear can be judged according to the color of the exposed colored sand layer so that it can be repaired evenly. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 It is a schematic diagram of the basic structure of the highway composite foundation of the utility model;
[0021] Figure 2 This is a cross-sectional view of the backing plate and the inserting plate of the utility model;
[0022] Figure 3 For the utility model Figure 2 Enlarged view of part A in the middle;
[0023] Figure 4 For the utility model Figure 2 Enlarged view of middle part B;
[0024] Figure 5 This is a cross-sectional view of the connection plate of the utility model;
[0025] Figure 6 It is a schematic diagram of the extension state of the steel bar of the utility model;
[0026] Figure 7 This is the internal structure diagram of the riser of the utility model;
[0027] Figure 8 It is a cross-sectional view of the highway structure of the utility model;
[0028] Fig. 9 This is a cross-sectional view of the asphalt surface layer of the utility model.
[0029] In the figure: 1. pad; 2. plug plate; 201. main channel; 202. tributary channel; 203. slideway; 3. external grouting channel; 4. connecting groove; 5. connecting plate; 6. riser; 601. through hole; 7. internal grouting channel; 8. V-shaped groove; 9. plug; 10. connecting hole; 11. plunger; 12. flow channel; 13. closing ring; 14. gravel layer; 15. asphalt concrete layer; 16. separation net; 17. asphalt surface layer; 18. steel bar; 19. colored sand layer. DETAILED DESCRIPTION
[0030] In order to make the technical means, creative features, objectives and effects of the present invention easy to understand, the present invention will be further described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0031] like Figure 1-Figure 9 As shown, the utility model provides a highway composite foundation structure, including a plurality of pads 1 connected end to end, a plurality of plugs 2 are arranged at the bottom of the pads 1, a main channel 201 is opened inside the plugs 2, and the top of the main channel 201 extends to the top of the plugs 2;
[0032] The main channel 201 is provided with an insert 9, the top of which passes through the pad 1 and is fixedly connected to the pad 1. Both sides of the main channel 201 are provided with downwardly inclined branch channels 202, and one end of the branch channel 202 away from the main channel 201 extends to the outer surface of the insert plate 2;
[0033] A slideway 203 is provided on the inner wall of the branch channel 202, and the inner diameter of the slideway 203 is larger than the inner diameter of the branch channel 202. A plunger 11 is provided inside the slideway 203, and a flow channel 12 penetrating the plunger 11 is provided on the plunger 11. A closed ring 13 in contact with the inner wall of the slideway 203 is fixed on the outer end of the plunger 11.
[0034] Before paving the road, first bury the plug plate 2 in the soil and tamp the soil around the plug plate 2, set the interval between the plug plates 2 according to the plug pipe 9 on the pad 1, then place the pad 1 on the top of the plug plate 2, insert the plug pipe 9 downward into the main channel 201 on the corresponding plug plate 2, and then pour cement mortar into the plug pipe 9. The cement mortar flows downward into the main channel 201 through the plug pipe 9 and then enters the tributary channel 202. When the cement mortar flows to the slide 203, it will push the plunger 11 to move until one end of the plunger 11 is inserted into the soil around the plug plate 2. At the same time, the cement mortar will also flow into the soil around the plug plate 2 through the flow channel 12. After it solidifies, it can increase the connection strength of the plug plate 2 with the surrounding soil. In this way, since the tributary channel 202 and the slide 203 are inclined downward, the cement mortar is affected by gravity during the flow process, and it will be more labor-saving in the process of pushing the plunger 11 to move and insert it into the soil.
[0035] In order to increase the connection strength between two adjacent pads 1, Figure 1 , Figure 5As shown, both ends of the pad 1 are provided with connecting grooves 4, and a connecting plate 5 is provided between two adjacent pads 1, and both ends of the connecting plate 5 are respectively clamped in the connecting grooves 4 on the pad 1 on the corresponding side;
[0036] Two rows of inner grouting channels 7 are provided on the connecting plate 5, and the inner grouting channels 7 penetrate the connecting plate 5. The two rows of inner grouting channels 7 correspond to the two pads 1 connected by the connecting plate 5 respectively. The top of the inner grouting channel 7 is provided with an outer grouting channel 3 communicating with the inner grouting channel 7, and the outer grouting channel 3 is opened on the pad 1 corresponding to the inner grouting channel 7.
[0037] After the two adjacent pads 1 are aligned end to end, the connecting plate 5 can be inserted into the connecting groove 4 at the butt joint of the two, and the inner grouting channel 7 on the connecting plate 5 can be aligned with the outer grouting channel 3 on the pad 1. After the two are aligned, cement mortar is poured into the outer grouting channel 3 and the inner grouting channel 7, and after it solidifies, it can play a connecting role, thereby increasing the connection strength between the two adjacent pads 1.
[0038] It is also necessary to increase the connection strength between the pad 1 and the road on top of it, such as Figure 1 , Figure 2 , Figure 4 , Figure 7 , Figure 8 As shown, a V-shaped groove 8 is provided at the bottom of the plug plate 2, and the V-shaped groove 8 can increase resistance during the sedimentation process and play a role in hindering sedimentation. A plurality of connecting holes 10 are provided at the top of the pad 1, and a vertical pipe 6 is provided inside the connecting hole 10. The top of the vertical pipe 6 extends to the top of the pad 1, and a plurality of through holes 601 are provided at the outer end of the vertical pipe 6;
[0039] A highway structure includes a highway composite foundation structure, wherein a crushed stone layer 14 is provided on the top of the base plate 1, an asphalt concrete layer 15 is fixedly provided on the top of the crushed stone layer 14, and the top of the riser 6 penetrates the crushed stone layer 14 and contacts the bottom of the asphalt concrete layer 15.
[0040] After the foundation structure under the highway is basically laid, first insert the riser 6 into the connecting groove 4 at the top of the pad 1, and then lay the gravel layer 14 on the top of the pad 1. After the gravel layer 14 is laid, the top of the riser 6 is flush with the top of the gravel layer 14, and then lay the asphalt concrete layer 15 on the top of the gravel layer 14. The asphalt concrete layer 15 can flow through the riser 6 to the inside of the connecting hole 10 on the pad 1. After the asphalt concrete layer 15 solidifies, it can be connected to the pad 1. In the process of passing through the inside of the riser 6, the asphalt concrete layer 15 penetrates into the gravel layer 14 through the through hole 601. Therefore, the connection strength among the asphalt concrete layer 15, the gravel layer 14 and the pad 1 is increased by setting the riser 6.
[0041] In order to improve the connection strength between the highway structure and the surrounding soil, such as Figure 6 , Figure 8 , Fig. 9 As shown, a plurality of steel bars 18 are provided inside the asphalt concrete layer 15 , and both ends of the steel bars 18 extend to the outside of the asphalt concrete layer 15 , thereby increasing the connection strength between the highway structure and the soil.
[0042] A separation net 16 is fixedly disposed on the top of the asphalt concrete layer 15. The separation net 16 can block debris after the road cracks to prevent the debris from falling into the deep gap and being difficult to clean. A multi-layer asphalt surface layer 17 is fixedly disposed on the top of the separation net 16.
[0043] A colored sand layer 19 is provided between the adjacent asphalt surface layers 17 on both sides.
[0044] During the laying process of the asphalt concrete layer 15, steel bars 18 are arranged inside the asphalt concrete layer 15, and both ends of the steel bars 18 extend to both sides of the highway and are inserted into the soil on both sides of the highway, thereby increasing the connection strength between the kilometer structure and the surrounding soil. Finally, when laying the asphalt surface layer 17, each time a layer of asphalt surface layer 17 is laid, some colored sand layers 19 are sprinkled on the top of the asphalt surface layer 17. The number of colored sand layers 19 does not need to be too many, as long as their existence can be clearly seen, and each layer of colored sand layer 19 has a different color. In this way, if the colored sand layer 19 is exposed on the road surface during the subsequent use of the highway, it means that the road surface is worn, and the degree of wear can be judged according to the color of the exposed colored sand layer 19 so that it can be repaired evenly.
[0045] The above shows and describes the basic principle and main features of the utility model and the advantages of the utility model. The technicians in this industry should understand that the utility model is not limited by the above embodiments, and the above embodiments and descriptions are only for explaining the principle of the utility model. Without departing from the spirit and scope of the utility model, the utility model will have various changes and improvements, and these changes and improvements fall within the scope of the utility model to be protected.
Claims
1. A composite foundation structure for a highway, comprising a plurality of pads (1) connected end to end, wherein a plurality of insert plates (2) are provided at the bottom of the pads (1), characterized in that: A main channel (201) is provided inside the plug board (2), and the top end of the main channel (201) extends to the top end of the plug board (2); An insert pipe (9) is provided inside the main channel (201), the top end of the insert pipe (9) passes through the backing plate (1) and is fixedly connected to the backing plate (1), downwardly inclined branch channels (202) are provided on both sides of the main channel (201), and one end of the branch channel (202) away from the main channel (201) extends to the outer surface of the insert plate (2); A slideway (203) is provided on the inner wall of the branch channel (202); the inner diameter of the slideway (203) is larger than the inner diameter of the branch channel (202); a plunger (11) is provided inside the slideway (203); a flow channel (12) penetrating the plunger (11) is provided on the plunger (11); and a closed ring (13) in contact with the inner wall of the slideway (203) is fixedly provided at the outer end of the plunger (11).
2. The highway composite foundation structure according to claim 1, characterized in that: The bottom end of the plug plate (2) is provided with a V-shaped groove (8), the top end of the pad plate (1) is provided with a plurality of connection holes (10), a vertical pipe (6) is provided inside the connection hole (10), the top end of the vertical pipe (6) extends to the top of the pad plate (1), and the outer end of the vertical pipe (6) is provided with a plurality of through holes (601).
3. The highway composite foundation structure according to claim 2 is characterized in that: Both ends of the pad (1) are provided with connection grooves (4), a connection plate (5) is provided between two adjacent pads (1), and both ends of the connection plate (5) are respectively clamped in the connection grooves (4) on the pad (1) on the corresponding side; Two rows of inner grouting channels (7) are provided on the connecting plate (5), the inner grouting channels (7) penetrate the connecting plate (5), the two rows of inner grouting channels (7) respectively correspond to the two pads (1) connected by the connecting plate (5), and outer grouting channels (3) communicating with the inner grouting channels (7) are provided on the tops of the inner grouting channels (7), the outer grouting channels (3) are provided on the pads (1) corresponding to the inner grouting channels (7).
4. A highway structure, comprising the highway composite foundation structure according to claim 3, characterized in that: A crushed stone layer (14) is provided at the top of the base plate (1), an asphalt concrete layer (15) is fixedly provided at the top of the crushed stone layer (14), and the top of the riser (6) penetrates the crushed stone layer (14) and contacts the bottom of the asphalt concrete layer (15).
5. The highway structure according to claim 4, characterized in that: A plurality of steel bars (18) are arranged inside the asphalt concrete layer (15), and both ends of the steel bars (18) extend to the outside of the asphalt concrete layer (15).
6. The highway structure according to claim 5, characterized in that: A separation net (16) is fixedly provided on the top of the asphalt concrete layer (15), and a multi-layer asphalt surface layer (17) is fixedly provided on the top of the separation net (16); A colored sand layer (19) is provided between the adjacent asphalt surface layers (17) on both sides.