Reference column structure for collimation point of particle accelerator

By designing the reference column for collimating points of the spacer structure, the combination of the inner cylinder, the first embedded plate, the outer cylinder and the second embedded plate is solved, and the particle accelerator is improved working accuracy.

CN222025246UActive Publication Date: 2024-11-19GUANGZHOU DESIGN INST
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323412567.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-13
Publication Date
2024-11-19
Estimated Expiration
2033-12-13

AI Technical Summary

Technical Problem

In particle therapy technology, transport vehicles in the treatment device area are prone to impacting the reference column, causing the reference column to be offset and affecting the working accuracy of the particle accelerator.

Method used

A reference column structure for collimating points including an inner cylinder, a first embedded plate, an outer cylinder and a second embedded plate is designed, and the inner cylinder is filled with concrete, and the first embedded plate and the second embedded plate are arranged at intervals. The anchor is directly fixed to the ground, and the spacer structure isolates the external collision and avoids the deviation of the reference column.

Benefits of technology

It effectively isolates collision interference from transport vehicles or pedestrians, prevents the reference column from being offset, and improves the working accuracy of the particle accelerator.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222025246U_ABST
    Figure CN222025246U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of particle treatment, and discloses a reference column structure for a collimation point of a particle accelerator, which comprises an inner cylinder filled with concrete, and the collimation point is arranged at the top of the inner cylinder; the first pre-embedded plate is fixedly arranged at the bottom of the inner cylinder, and a plurality of first anchoring parts inserted into the ground are mounted on the first pre-embedded plate; the outer cylinder is coaxially arranged outside the inner cylinder in a sleeving manner at an interval; the first pre-buried plate is arranged at the bottom of the outer cylinder, the second pre-buried plate is arranged at the upper part of the first pre-buried plate at intervals, concrete is poured in a gap between the first pre-buried plate and the second pre-buried plate, the second pre-buried plate is fixedly connected with the bottom of the outer cylinder, and a plurality of second anchoring parts inserted into the ground are mounted on the second pre-buried plate. According to the reference column structure for the collimation point of the particle accelerator, the influence on the working precision of the particle accelerator caused by the offset of the reference column can be avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of particle therapy, in particular to a reference column structure for an alignment point of a particle accelerator. Background Art

[0002] Particle therapy technology uses an ion source to generate a particle beam, which is accelerated by an accelerator and finally directed to the lesion to kill tumor cells. The particle beam needs to be accurately irradiated during the acceleration process, which requires the use of collimation points to debug and maintain the accelerator device to ensure the stability of the particle beam flow line, such as Figure 1 In the prior art, the alignment point of the center is to use a reference column to stand in the treatment device area. When the treatment device is repaired, there is a risk that the transport vehicle will hit the reference column. The reference column is easily offset after being hit, thereby causing the alignment point on the reference column to shift, thereby affecting the working accuracy of the particle accelerator. Utility Model Content

[0003] The utility model aims to provide a reference column structure for the alignment point of a particle accelerator, which is used to solve the technical problem that the transport vehicle used for the treatment device maintenance in the treatment device area is easy to hit the reference column, which is easy to cause the reference column to deviate and affect the working accuracy of the particle accelerator.

[0004] In order to achieve the above-mentioned object, the utility model provides a reference column structure for alignment points of a particle accelerator, comprising:

[0005] The inner cylinder is a round steel tube filled with concrete, and the alignment point is set at the top of the inner cylinder;

[0006] A first embedded plate, the first embedded plate is fixedly arranged at the bottom of the inner tube, and a plurality of first anchors inserted into the ground are installed on the first embedded plate;

[0007] The outer cylinder is a square steel tube, and is coaxially and spaced apart from the inner cylinder;

[0008] The second embedded plate is arranged at an interval on the upper part of the first embedded plate, concrete is poured in the interval between the first embedded plate and the second embedded plate, the second embedded plate is fixedly connected to the bottom of the outer tube, and the second embedded plate is installed with a plurality of second anchors inserted into the ground.

[0009] As a preferred solution, a space is reserved between the first embedded plate and the ground, and the space between the first embedded plate and the ground is filled with slightly expanded fine stone concrete.

[0010] As a preferred solution, the upper portion of at least one of the first anchors is simultaneously fixedly inserted into the concrete of the inner tube.

[0011] As a preferred solution, an inner tube column foot stiffening rib is fixedly provided on the bottom side of the inner tube, and the bottom of the inner tube column foot stiffening rib is also fixedly connected to the first embedded plate.

[0012] As a preferred solution, an outer tube column foot stiffening rib is fixedly provided on the bottom side of the outer tube, and the bottom of the outer tube column foot stiffening rib is also fixedly connected to the second embedded plate.

[0013] As a preferred solution, a concrete protection pier is cast around the bottom circumference of the outer cylinder.

[0014] As a preferred solution, the cross section of the outer cylinder is square.

[0015] Compared with the prior art, the reference column structure for alignment points of a particle accelerator in the embodiment of the utility model has the following beneficial effects:

[0016] The reference column structure for the alignment point of the particle accelerator of the embodiment of the utility model comprises an inner tube, a first embedded plate, an outer tube and a second embedded plate, the inner tube is filled with concrete, and the alignment point is set at the top of the inner tube; the first embedded plate is fixedly set at the bottom of the inner tube, and a plurality of first anchors inserted into the ground are installed on the first embedded plate, and the inner tube is fixed by the first embedded plate; the outer tube is coaxial and sleeved outside the inner tube at intervals; the second embedded plate is spaced at the upper part of the first embedded plate, and concrete is poured in the interval between the first embedded plate and the second embedded plate, the second embedded plate is fixedly connected to the bottom of the outer tube, and a plurality of second anchors inserted into the ground are installed on the second embedded plate, and the outer tube is fixed by the second embedded plate. Since there is a gap between the inner tube and the outer tube, and the outer tube is directly fixed on the ground, the collision interference of the outside world on the reference column can be isolated when a transport vehicle or pedestrian collides with it, so as to avoid the deviation of the reference column and affect the working accuracy of the particle accelerator. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 It is a schematic diagram of debugging an accelerator device by aligning points in the prior art;

[0018] Figure 2 It is a schematic diagram of a reference column structure for an alignment point of a particle accelerator according to an embodiment of the utility model;

[0019] Figure 3 yes Figure 1 1-1 is a cross-sectional view;

[0020] Figure 4 is a schematic diagram of an implementation method S1 of a reference column structure for an alignment point of a particle accelerator of the present application;

[0021] Figure 5 is a schematic diagram of an implementation method S2 of a reference column structure for an alignment point of a particle accelerator of the present application;

[0022] Figure 6 It is a schematic diagram of the implementation method S3 of the reference column structure for the alignment point of the particle accelerator of the present application.

[0023] In the figure, 1, inner tube, 2, outer tube, 3, first embedded plate, 4, second embedded plate, 5, first anchor, 6, second anchor, 7, ground, 8, inner tube column foot stiffening rib, 9, outer tube column foot stiffening rib, 10, lifting ear. DETAILED DESCRIPTION

[0024] The following is a further detailed description of the specific implementation of the present invention in conjunction with the accompanying drawings and examples. The following examples are used to illustrate the present invention, but are not intended to limit the scope of the present invention.

[0025] like Figures 2 to 6 As shown, a reference column structure for the alignment point of a particle accelerator in an optional embodiment of the utility model comprises an inner cylinder 1, a first embedded plate 3, an outer cylinder 2 and a second embedded plate 4, the inner cylinder 1 is filled with concrete, and the alignment point is set at the top of the inner cylinder 1; the first embedded plate 3 is fixedly arranged at the bottom of the inner cylinder 1, and a plurality of first anchors 5 inserted into the ground 7 are installed on the first embedded plate 3, and the inner cylinder 1 is fixed by the first embedded plate 3; the outer cylinder 2 is coaxial and sleeved outside the inner cylinder 1 at intervals; the second embedded plate 4 is arranged at intervals on the upper part of the first embedded plate 3, and concrete is poured in the interval between the first embedded plate 3 and the second embedded plate 4, the second embedded plate 4 is fixedly connected to the bottom of the outer cylinder 2, and a plurality of second anchors 6 inserted into the ground 7 are installed on the second embedded plate 4, and the outer cylinder 2 is fixed by the second embedded plate 4. Since there is a gap between the inner cylinder 1 and the outer cylinder 2, and the outer cylinder 2 is directly fixed on the ground 7, the collision interference of the outside world on the reference column can be isolated when a transport vehicle or pedestrian collides, so as to avoid the deviation of the reference column and affect the working accuracy of the particle accelerator.

[0026] The inner tube 1 is fixedly connected to the first embedded plate 3 by welding, and the outer tube 2 is fixedly connected to the second embedded plate 4 by welding.

[0027] In a specific embodiment of the present application, a gap is reserved between the first embedded plate 3 and the ground 7, and the gap between the first embedded plate 3 and the ground 7 is filled with slightly expanded fine stone concrete to fix the position of the first embedded plate 3 and further increase the stability of the inner tube 1.

[0028] In a specific embodiment of the present application, the upper portion of at least one first anchor 5 is simultaneously fixedly inserted into the concrete of the inner tube 1. Specifically, at least one first anchor 5 extends upward to the inside of the inner tube 1, and then the inner tube 1 is filled with concrete to simultaneously position and fix the inner tube 1 and the first anchor 5.

[0029] Specifically, the bottom side of the inner tube 1 in the embodiment of the present application is fixedly provided with the inner tube 1 column foot stiffening rib, and the bottom of the inner tube 1 column foot stiffening rib is also fixedly connected to the first embedded plate 3. The inner tube 1 column foot stiffening rib is welded and fixed to the first embedded plate 3 and the inner tube 1, and the inner tube 1 column foot stiffening rib is used to increase the strength and stability of the inner tube 1 and the first embedded plate 3.

[0030] Among them, the outer tube 2 column foot stiffening ribs are fixedly arranged on the bottom side of the outer tube 2, and the bottom of the outer tube 2 column foot stiffening ribs is fixedly connected to the second embedded plate 4 at the same time. The outer tube 2 column foot stiffening ribs are welded and fixed to the second embedded plate 4 and the outer tube 2, and the outer tube 2 column foot stiffening ribs are used to increase the strength and stability of the outer tube 2 and the second embedded plate 4.

[0031] In a further embodiment of the present application, a concrete protection pier is cast around the bottom circumference of the outer cylinder 2 to further protect the outer cylinder 2 and improve its stability.

[0032] In the specific embodiment of the present application, the cross section of the outer tube 2 is a square. The first anchor 5 and the second anchor 6 are both anchor bolts, and nuts are installed at the ends of the anchor bolts.

[0033] The specific implementation method of the reference column structure for the alignment point of the particle accelerator of the present application comprises the steps of: S1, as Figure 4 As shown, the first anchor 5 and the embedded plate of the inner tube 1 are positioned and embedded, concrete is poured once from the bottom plate to 50 mm below the first embedded plate, and the embedded plate of the column foot of the inner tube 1 is installed.

[0034] S2, such as Figure 5 As shown, weld the inner tube 1 and the stiffening ribs at the base of the inner tube 1 column, backfill the space between the first embedded plate 3 and the ground 7 with 50mm thick C35 slightly expanding fine stone concrete, fill the inner tube 1 with C30 non-shrinkage fine stone concrete, install the column top reference adjustment mechanism, and after completion, cut off the inner steel tube lifting ear 10.

[0035] S3, such as Figure 6 As shown, the second embedded plate 4 is installed, the outer tube 2 and the outer tube 2 column foot stiffening ribs are welded, and the bottom plate to the bottom of the second embedded plate of the outer tube is poured with concrete for the second time, and the outer steel tube lifting lug is removed after completion;

[0036] S4, such as Figure 1 As shown, a 200mm high C30 plain concrete protective pier is cast at the base of the outer tube 2, a protective cover of the reference adjustment mechanism is installed, and the anti-collision permanent reference column is installed.

[0037] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "illustrative embodiments", "examples", "specific examples", or "some examples" means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner.

[0038] Although the embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the claims and their equivalents.

[0039] The above is only an optional implementation mode of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and substitutions can be made without departing from the technical principles of the present invention. These improvements and substitutions should also be regarded as the protection scope of the present invention.

Claims

1. A reference column structure for alignment points of a particle accelerator, characterized in that: include: An inner cylinder, wherein the inner cylinder is filled with concrete, and the alignment point is arranged at the top of the inner cylinder; A first embedded plate, the first embedded plate is fixedly arranged at the bottom of the inner tube, and a plurality of first anchors inserted into the ground are installed on the first embedded plate; An outer cylinder, the outer cylinder is coaxially and sleeved outside the inner cylinder at intervals; The second embedded plate is arranged at an interval on the upper part of the first embedded plate, concrete is poured in the interval between the first embedded plate and the second embedded plate, the second embedded plate is fixedly connected to the bottom of the outer tube, and the second embedded plate is installed with a plurality of second anchors inserted into the ground.

2. The reference column structure for alignment points of a particle accelerator according to claim 1, characterized in that: A space is reserved between the first embedded plate and the ground, and the space between the first embedded plate and the ground is filled with slightly expanded fine stone concrete.

3. The reference column structure for alignment points of a particle accelerator according to claim 1, characterized in that: The upper portion of at least one of the first anchors is simultaneously fixedly inserted into the concrete of the inner tube.

4. The reference column structure for alignment points of a particle accelerator according to claim 1, characterized in that: An inner tube column foot stiffening rib is fixedly arranged on the bottom side of the inner tube, and the bottom of the inner tube column foot stiffening rib is fixedly connected to the first embedded plate at the same time.

5. The reference column structure for alignment points of a particle accelerator according to claim 1, characterized in that: An outer cylinder column foot stiffening rib is fixedly arranged on the bottom side of the outer cylinder, and the bottom of the outer cylinder column foot stiffening rib is fixedly connected to the second embedded plate at the same time.

6. The reference column structure for alignment points of a particle accelerator according to claim 1, characterized in that: A concrete protection pier is also cast around the bottom circumference of the outer cylinder.

7. The reference column structure for alignment points of a particle accelerator according to claim 1, characterized in that: The cross section of the outer cylinder is a square.