Drainage ditch suitable for underground road and having access road function
Through the assembly installation and sealing structure of prefabricated drainage ditch units, the problem of difficulty in setting up drainage ditches in underground roads is solved, efficient drainage and space utilization is achieved, and construction efficiency and safety are improved.
Patent Information
- Application Number
- CN202420459049.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-11
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2034-03-11
AI Technical Summary
In underground road projects, due to the limitation of lateral space, drainage ditches are difficult to set, which affects driving comfort and safety, and it is difficult to cast drainage ditches with maintenance functions on site in special-shaped spaces.
The prefabricated drainage unit is adopted, and the front and tail are installed, and the closure cover plate and water inlet hole are installed, and the bottom is formed with a right angle or chamfered assembly. The maintenance road space is used, and the rubber belt and the slot sealing structure are combined to ensure tight connections.
Effectively utilize the maintenance road space to avoid encroaching on vehicle roads, improve space utilization, simplify construction, and improve drainage safety and durability.
Smart Images

Figure CN222065067U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the field, and in particular relates to a drainage ditch which is suitable for underground roads and also has the function of an inspection road. Background Art
[0002] Article 3.5.1 of the "Design Code for Urban Underground Road Engineering" (CJJ 211-2015) stipulates: "The width of the inspection road in the construction limit of urban underground roads is W j The minimum value is 0.75m, the exposed height h is 25~40cm; the curb W mc The minimum value is 0.25m".
[0003] At present, due to the limited lateral space of underground roads in some projects, the curb strip W mc The minimum value is often taken, and drainage ditches need to be set up in underground roads. When the lateral space of the curb is insufficient, the drainage ditches will invade the carriageway, causing a certain impact on driving comfort and safety.
[0004] At the same time, since the underground main structure often has a lower chamfer, it is difficult to cast a drainage ditch on site in the special-shaped space that also serves as an inspection road. Therefore, the lateral space of the inspection road is sufficient but often cannot be effectively used for drainage.
[0005] The above factors together result in the current situation where it is difficult to install drainage ditches in some underground roads. Summary of the invention
[0006] The utility model is proposed to solve the problems existing in the prior art, and its purpose is to provide a drainage ditch suitable for underground roads and having the function of an inspection road.
[0007] The technical solution of the utility model is: a drainage ditch suitable for underground roads and also having the function of an inspection road, comprising a prefabricated drainage ditch unit, wherein the prefabricated drainage ditch units are installed end to end to form a drainage ditch, the top of the prefabricated drainage ditch unit is open, and a cover plate assembly for sealing is provided at the open part, a water inlet hole is provided in the prefabricated drainage ditch unit, and the bottom of the prefabricated drainage ditch unit forms an assembly portion adapted to the underground structure.
[0008] Furthermore, the assembly portion includes an outer wall of the trench body and a trench body bottom plate, the outer wall and the trench body bottom plate are right-angled, and the outer wall and the trench body bottom plate are installed at a right-angle position of the underground structure.
[0009] Furthermore, the assembly portion includes an outer wall of the trench body and a bottom plate of the trench body, a chamfered portion is formed between the outer wall and the bottom plate of the trench body, and the chamfered portion is installed at the chamfered position of the underground structure.
[0010] Furthermore, the lower edge of the water inlet hole is flush with the road surface, so that road surface water flows into the prefabricated drainage ditch unit.
[0011] Furthermore, the prefabricated drainage ditch unit is enclosed by the inner wall of the ditch body, the outer wall of the ditch body, and the bottom plate of the ditch body to form a drainage cavity with an open top.
[0012] Furthermore, a drainage ditch inner cover plate is arranged inside the drainage cavity, and the drainage ditch inner cover plate is higher than the water inlet hole.
[0013] Furthermore, a drainage ditch outer cover plate is also provided on the top of the drainage cavity, and the drainage ditch outer cover plate is flush with the inner wall of the ditch body and the top of the outer wall of the ditch body.
[0014] Furthermore, the prefabricated drainage ditch units are connected end to end by splicing components.
[0015] The beneficial effects of the utility model are as follows:
[0016] The utility model makes full use of the existing inspection road space and also serves as a drainage ditch, does not occupy the roadway space, solves the problem of difficult arrangement of drainage ditches in such projects, solves the problem of drainage safety hazards, and at the same time, makes full use of the vertical space of the drainage ditch and also serves as a pipeline ditch, greatly improving the space utilization rate.
[0017] The utility model adopts a prefabricated drainage ditch type. Two sections of drainage ditches are connected through a socket joint and sealed by a rubber belt and a slot. Fastening anchor bolts are arranged between the sections to ensure the tightness of the connection. The construction period is short and the operation is convenient.
[0018] The utility model adopts prefabricated reinforced concrete drainage ditch, which is standardized and produced in a prefabrication factory. It is easier to control the quality of the structure than the cast-in-place drainage ditch of civil construction, and has excellent durability. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 It is a structural schematic diagram of the utility model;
[0020] Figure 2 It is another structural schematic diagram of the utility model;
[0021] Figure 3 This is an installation schematic diagram of the utility model;
[0022] Figure 4 yes Figure 3 Schematic diagram of the location;
[0023] Figure 5 It is another installation schematic diagram of the utility model;
[0024] Figure 6 yes Figure 5 Schematic diagram of the location;
[0025] Figure 7It is a schematic diagram of a puzzle of the utility model;
[0026] Figure 8 This is another schematic diagram of the utility model;
[0027] in:
[0028] 1 Prefabricated gutter unit 2 Gutter inner cover
[0029] 3 Outer cover of drainage ditch 4 First step
[0030] 5 Second step 6 Mortar leveling layer
[0031] 7 Underground main structure bottom plate 8 Underground main structure side wall
[0032] 11 Inner wall of the groove 12 Outer wall of the groove
[0033] 13 Trench bottom plate 14 Water inlet
[0034] 15 Chamfer 16 End socket
[0035] 17 End socket 18 Rubber belt
[0036] 19 Card slots. DETAILED DESCRIPTION
[0037] Hereinafter, the present invention will be described in detail with reference to the accompanying drawings and embodiments:
[0038] like Figures 1 to 8 As shown, a drainage ditch suitable for underground roads and also serving as an inspection road comprises a prefabricated drainage ditch unit 1, wherein the prefabricated drainage ditch units 1 are assembled end to end to form a drainage ditch, the top of the prefabricated drainage ditch unit 1 is open, and a cover plate assembly for sealing is provided at the open portion, a water inlet hole 14 is provided in the prefabricated drainage ditch unit 1, and an assembly portion adapted to the underground structure is formed at the bottom of the prefabricated drainage ditch unit 1.
[0039] The assembly portion includes an outer side wall 12 of the trench body and a trench bottom plate 13 . The outer side wall 12 and the trench bottom plate 13 are in a right-angle shape and are installed at a right-angle position of the underground structure.
[0040] The assembly portion includes an outer wall 12 of the trench body and a trench bottom plate 13 . A chamfered portion 15 is formed between the outer wall 12 and the trench bottom plate 13 . The chamfered portion 15 is installed at the chamfered position of the underground structure.
[0041] The lower edge of the water inlet hole 14 is flush with the road surface, so that road surface water flows into the prefabricated drainage ditch unit 1 .
[0042] The prefabricated drainage ditch unit 1 is enclosed by a ditch body inner wall 11 , a ditch body outer wall 12 , and a ditch body bottom plate 13 to form a drainage cavity with an open top.
[0043] A drainage ditch inner cover plate 2 is arranged inside the drainage cavity, and the drainage ditch inner cover plate 2 is higher than the water inlet hole 14 .
[0044] A drainage ditch outer cover plate 3 is also provided on the top of the drainage cavity, and the drainage ditch outer cover plate 3 is flush with the top of the inner wall 11 and the outer wall 12 of the ditch body.
[0045] The prefabricated drainage ditch units 1 are connected end to end by splicing components.
[0046] The cover plate assembly comprises an inner cover plate 2 of the drainage ditch and an outer cover plate 3 of the drainage ditch.
[0047] Specifically, Figure 1 , Figure 3 , Figure 4 , Figure 8 As shown, the inner wall 11 and the outer wall 12 of the trench body are parallel, the inner wall 11 and the trench body bottom plate 13 are connected at right angles, the trench body bottom plate 13 and the outer wall 12 of the trench body are connected by a chamfered portion 15, and the chamfered portion 15 is adapted to the chamfer of the underground structure.
[0048] Specifically, the water inlet hole 14 is arranged in the inner wall 11 of the trench body.
[0049] Specifically, a stepped first step portion 4 is formed at the opposite side walls of the inner wall 11 of the ditch body and the outer wall 12 of the ditch body, and the inner cover plate 2 of the drainage ditch is buckled in the first step portion 4 .
[0050] Specifically, the tops of the inner wall 11 and the outer wall 12 of the ditch body form a stepped second step portion 5 , and the outer cover plate of the drainage ditch is buckled in the second step portion 5 .
[0051] Specifically, a mortar leveling layer 6 is provided between the chamfered portion 15 and the chamfer of the underground structure, and the mortar leveling layer 6 is used to ensure surface fixation.
[0052] Specifically, the trench body bottom plate 13 is connected to the underground main structure bottom plate 7, and the trench body outer side wall 12 is connected to the underground main structure side wall 8.
[0053] Specifically, Figure 2 , Figure 5 , Figure 6 , Figure 7 As shown, the inner wall 11 and the outer wall 12 of the trench body are parallel, the trench body bottom plate 13 is connected to the inner wall 11 and the outer wall 12 of the trench body at right angles, and the outer wall 12 and the trench body bottom plate 13 are adapted to the right angles of the underground structure.
[0054] Specifically, a stepped first step portion 4 is formed at the opposite side walls of the inner wall 11 of the ditch body and the outer wall 12 of the ditch body, and the inner cover plate 2 of the drainage ditch is buckled in the first step portion 4 .
[0055] Specifically, the trench body bottom plate 13 is connected to the underground main structure bottom plate 7, and the trench body outer side wall 12 is connected to the underground main structure side wall 8.
[0056] Specifically, in the utility model, the prefabricated drainage ditch unit 1 is fixed end to end, and the splicing structure includes an end socket 16 and an end socket 17. The end socket 16 is arranged at one end of the prefabricated drainage ditch unit 1, and the end socket 17 is arranged at the other end of the prefabricated drainage ditch unit 1. The end socket 16 can be inserted into the end socket 17, so as to connect adjacent prefabricated drainage ditch units 1.
[0057] Specifically, a sealing structure is provided between the end socket 16 and the end socket 17 .
[0058] More specifically, the sealing structure includes a rubber belt 18 arranged on the outer wall of the end socket 16, and a groove 19 for accommodating the rubber belt 18 is formed in the inner groove wall of the end socket 17. After the end socket 16 is inserted into the end socket 17, the rubber belt 18 is placed in the groove 19, thereby achieving sealing of the transition connection position.
[0059] Specifically, Figure 7 , Figure 8 As shown, when the prefabricated drainage ditch unit 1 includes a chamfered portion 15, chamfers are formed correspondingly in the end socket 17 and the end plug 16.
[0060] Specifically, a fixing structure is further provided between adjacent prefabricated drainage ditch units 1, and the fixing structure is an arc-shaped bolt. A first arc-shaped through hole is formed between the end socket 16 and the side wall, and correspondingly, a second arc-shaped through hole is formed between the end socket 17 and the side wall. After adjacent prefabricated drainage ditch units 1 are spliced together, the first arc-shaped through hole and the second arc-shaped through hole are connected, and the arc-shaped bolt passes through the first arc-shaped through hole and the second arc-shaped through hole and then is screwed with a nut for fixing.
[0061] Specifically, the outer cover plate 3 of the drainage ditch is made of reinforced concrete and is provided with water holes. The outer cover plate 3 of the drainage ditch also has the function of a maintenance road.
[0062] Specifically, the inner cover plate 2 of the drainage ditch is made of ductile iron and is provided with a water hole. The inner cover plate 2 of the drainage ditch is located above the water inlet hole 14. If there are municipal pipelines such as water and electricity along the road, they can be placed on the inner cover plate of the drainage ditch, making full use of the vertical space between the water inlet hole and the outer cover plate of the drainage ditch. The inner cover plate 2 of the drainage ditch is also used as a pipeline ditch.
[0063] The utility model makes full use of the existing inspection road space and also serves as a drainage ditch, does not occupy the roadway space, solves the problem of difficult arrangement of drainage ditches in such projects, solves the problem of drainage safety hazards, and at the same time, makes full use of the vertical space of the drainage ditch and also serves as a pipeline ditch, greatly improving the space utilization rate.
[0064] The utility model adopts a prefabricated drainage ditch type. Two sections of drainage ditches are connected through a socket joint and sealed by a rubber belt and a slot. Fastening anchor bolts are arranged between the sections to ensure the tightness of the connection. The construction period is short and the operation is convenient.
[0065] The utility model adopts prefabricated reinforced concrete drainage ditch, which is standardized and produced in a prefabrication factory. It is easier to control the quality of the structure than the cast-in-place drainage ditch of civil construction, and has excellent durability.
Claims
1. A drainage ditch for underground roads and having the function of an inspection road, comprising a prefabricated drainage ditch unit (1), characterized in that: The prefabricated drainage ditch units (1) are assembled end to end to form a drainage ditch. The top of the prefabricated drainage ditch unit (1) is open, and a cover plate assembly for sealing is provided at the open portion. A water inlet hole (14) is provided in the prefabricated drainage ditch unit (1). The bottom of the prefabricated drainage ditch unit (1) forms an assembly portion adapted to the underground structure.
2. A drainage ditch with the function of an inspection road for underground roads according to claim 1, characterized in that: The assembly portion comprises a trench body outer wall (12) and a trench body bottom plate (13); the outer wall (12) and the trench body bottom plate (13) are in a right-angle shape; the outer wall (12) and the trench body bottom plate (13) are installed at a right-angle position of the underground structure.
3. The drainage ditch with the function of an inspection road for underground roads according to claim 1, characterized in that: The assembly portion comprises an outer wall (12) of a trench body and a trench body bottom plate (13), wherein a chamfered portion (15) is formed between the outer wall (12) and the trench body bottom plate (13), and the chamfered portion (15) is installed at a chamfered position of the underground structure.
4. The drainage ditch with the function of an inspection road for underground roads according to claim 1, characterized in that: The lower edge of the water inlet hole (14) is flush with the road surface, so that road surface water flows into the prefabricated drainage ditch unit (1).
5. The drainage ditch with the function of an inspection road for underground roads according to claim 1, characterized in that: The prefabricated drainage ditch unit (1) is enclosed by a ditch body inner wall (11), a ditch body outer wall (12), and a ditch body bottom plate (13) to form a drainage cavity with an open top.
6. The drainage ditch with the function of an inspection road for underground roads according to claim 5, characterized in that: A drainage ditch inner cover plate (2) is arranged inside the drainage cavity, and the drainage ditch inner cover plate (2) is higher than the water inlet hole (14).
7. The drainage ditch with the function of an inspection road for underground roads according to claim 6, characterized in that: A drainage ditch outer cover plate (3) is also provided on the top of the drainage cavity, and the drainage ditch outer cover plate (3) is flush with the top of the inner wall (11) and the outer wall (12) of the ditch body.
8. The drainage ditch with the function of an inspection road for underground roads according to claim 1, characterized in that: The prefabricated drainage ditch units (1) are connected end to end by splicing components.