Through type assembly support system for large cantilever bent cap
Through the lower bearing assembly bracket system, including column components and main stress truss, the problem of excessive bending moment at confined space and cantilever root is solved, safe, rapid and economical construction of cantilever cover beams is achieved, and construction costs and technology are reduced. Difficulty.
Patent Information
- Application Number
- CN202420457617.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-09
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2034-03-09
AI Technical Summary
Under confined space conditions, it is difficult to achieve safe, fast and economical temporary support erection in traditional cantilever cover beam construction, especially when the bending moment at the root of the cantilever is too large, and the existing technology is difficult to effectively solve it.
The lower bearing assembly bracket system is adopted, including column components, main stress trusses and tension balance rods. Through sand boxes, steel pipe columns, distribution beams and connectors, an overall stress system is formed, and the modular design is used to achieve rapid assembly. and disassemble, and strengthen the connection through embedded steel plates and ribs to reduce the cost of foundation treatment and technical difficulty.
It realizes safe, rapid and economical construction in confined spaces, reduces construction costs, improves construction efficiency, solves the problem of excessive bending moment at the root of the cantilever, and avoids the complexity of foundation treatment under weak geological conditions.
Smart Images

Figure CN222065198U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of civil engineering, and in particular relates to a bottom-bearing assembly bracket system for a large cantilever cap beam. Background Art
[0002] The cantilever cap beam of urban bridge piers usually adopts the cast-in-place concrete construction method on the ground full-height bracket. As a traditional construction method, this method has a high safety factor and a relatively low cost, and is widely used. With the rapid development of urban construction, there are many types of pipelines and underground structures under municipal engineering bridges, which are criss-crossed and arranged, and the underground environment is complex. Therefore, the traditional method of casting concrete on the full-height bracket is not applicable under certain specific environmental conditions, and the cantilever bracket method is favored by engineering and technical personnel. However, when the cantilever bracket method is constructed, in order to offset the bending moment generated at the cantilever end during the construction process, it is generally necessary to set a support at the cantilever end to solve the above problem. When the site conditions are restricted, the above measures are not applicable. Correspondingly, under certain environmental conditions, first, the design of the pier position is limited by space, and second, the cantilever length of the designed cap beam is gradually increased. Therefore, the construction of the existing cantilever cap beam significantly increases the difficulty of designing its bracket.
[0003] To this end, technical personnel in this field began to seek an assembled bracket suitable for the erection of large cantilever cap beams, in order to achieve not only cantilever construction in a limited space, but also solve the pain point problem of excessive bending moment at the root of the cantilever of the large cantilever cap beam.
[0004] Therefore, it is particularly important to select an assembly bracket for large cantilever cap beams in order to ensure that temporary brackets are erected and concrete is poured in a high-quality, fast and economical manner under the premise of safety. Utility Model Content
[0005] In order to overcome the above-mentioned problems, the purpose of the utility model is to propose a bottom-supported assembly bracket system for large cantilever cap beams in confined space conditions, so as to solve one or more technical problems existing in the existing technical conditions and at least provide an effective solution selection or creative idea.
[0006] The utility model is achieved through the following technical solutions.
[0007] A bottom-supported assembly support system for a large cantilever cap beam, comprising a sand box, characterized in that it also includes:
[0008] A column assembly, wherein the column assembly comprises a plurality of steel pipe columns arranged around the pier, wherein the column foot of the steel pipe column is connected to a steel plate pre-buried in the cap, and the column head of the steel pipe column is connected to a lower steel plate of the sand box;
[0009] A main load-bearing truss, the main load-bearing truss comprising lower chords symmetrically arranged on both sides of the bottom of the cap beam and fixedly connected to the upper steel plate of the sand box, upper chords arranged on both sides of the top of the cap beam, web bars connected between the lower chord and the upper chord on the same side, upper chord support bars connected between the upper chords, lower chord support bars connected between the lower chords, and a plurality of distribution beams laid on the upper surface of the lower chord along the length direction of the lower chord;
[0010] The tension balance rod is symmetrically arranged on both sides of the pier column, and its upper end is connected to the lower chord rod, and the lower end is connected to the pedestal.
[0011] Preferably, the upper chord includes an upper chord middle section, an end plate, and an upper chord wing section symmetrically connected to the two ends of the upper chord middle section through the end plate; the lower chord includes a lower chord middle section, an end plate, and a lower chord wing section symmetrically connected to the two ends of the lower chord middle section through the end plate; the web includes a web middle section and a web end section connected between the web middle section and the upper chord or the lower chord; the upper chord wing section and the web end section connected thereto constitute an upper wing truss, the upper chord middle section and the web end section connected thereto constitute an upper truss, the lower chord wing section and the web end section connected thereto constitute a lower wing truss, and the lower chord middle section and the web end section connected thereto constitute a lower truss.
[0012] Preferably, the plurality of steel tube columns are arranged in two rows on both sides of the pier along the longitudinal direction of the bridge, and each row of steel tube columns is divided into three columns along the transverse direction of the bridge, the first and last columns are composed of two steel tube columns arranged side by side along the longitudinal direction of the bridge, and the middle column is a single steel tube column.
[0013] Preferably, the column assembly also includes longitudinal connectors, transverse connectors, and wall connectors; the steel tube columns in the middle rows of two rows and the two steel tube columns arranged side by side in the first and last rows are connected along the longitudinal bridge direction by longitudinal connectors, the adjacent columns arranged in the same row are connected along the transverse bridge direction by transverse connectors, and the steel tube columns adjacent to the first and last rows and the pier are connected to the embedded parts in the pier through wall connectors, so that the column assembly forms an overall force system.
[0014] Preferably, the longitudinal connector and the transverse connector are composed of double-jointed channel steels and steel plates, and the wall connecting member is a channel steel.
[0015] Preferably, the spacing between adjacent distribution beams is 40-60 cm, and the distribution beams are I-beams.
[0016] Preferably, the web members are connected to the lower chord member and the upper chord member by welding, and the lower chord support rod and the lower chord support rod, and the upper chord support rod and the upper chord support rod are connected by bolts.
[0017] Preferably, the capital of the steel tube column is a steel plate welded to the top of the steel tube column, and the capital of the steel tube column is connected to the steel plate under the sand box by bolts; the foot of the steel tube column is welded to the steel plate embedded in the pedestal, and the connection is reinforced by ribs.
[0018] Compared with the prior art, the utility model has the following advantages:
[0019] 1. The large cantilever, bottom-supported support system of the utility model is composed of column components, main load-bearing trusses and tension balance rods, which not only uses economical materials, but also has reasonable force, safety and reliability. Among them, the use of large cantilever supports solves the technical problem that the large cantilever cap beam cannot be equipped with a full-floor support under special circumstances. The large cantilever support adopts a bottom-supported structure, which solves the disadvantages of using an upper-supported large cantilever cap beam support when the clearance under the cap beam is limited under normal circumstances and the problem of excessive bending moment at the root of the cantilever of the large cantilever cap beam.
[0020] 2. The utility model decomposes the main load-bearing truss into modules such as the upper truss, the upper wing truss, the lower truss, and the lower wing truss, so that the modules can be assembled and processed in advance in the factory, which not only ensures the welding quality of the node positions in each module, but also the overall connection structure of the modules as "upper and lower connection in the middle and left and right symmetry at both ends" can ensure the safety and balance of the main load-bearing truss during modular assembly, so that the on-site modular rapid assembly and disassembly of the main load-bearing truss can be realized, thereby greatly saving the construction cost of the main load-bearing truss and effectively improving the construction efficiency.
[0021] 3. The utility model supports the foundation by means of steel pipe columns connected to the embedded steel plates in the foundation, which not only saves the cost of foundation treatment and reduces the steps of foundation preloading, but also avoids the problem of high difficulty of foundation treatment technology under soft geological conditions. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] Other features, objects and advantages of the present invention will become more apparent by reading the detailed description of non-limiting embodiments with reference to the following drawings:
[0023] Figure 1 It is a schematic diagram of the main structure of the bottom-supported assembly bracket system of the large cantilever cap beam of the utility model;
[0024] Figure 2 It is a structural schematic diagram of the modular assembly of the main load-bearing trusses in the utility model;
[0025] Figure 3 for Figure 1 Middle AA section;
[0026] Figure 4 for Figure 1 Middle BB section;
[0027] Figure 5 for Figure 1 Middle CC section;
[0028] Figure 6 for Figure 1 Middle DD section;
[0029] Figure 7 for Figure 1 Middle EE section;
[0030] The meanings of the symbols in the above figure are: main load-bearing truss 1, lower chord 2, lower chord middle section 201, lower chord side section 202, upper chord 3, upper chord middle section 301, upper chord side section 302, web member 4, web member middle section 401, web member end section 402, upper chord support rod 5, lower chord support rod 6, upper truss 7, upper wing truss 8, lower wing truss 9, lower truss 10, steel pipe column 11, longitudinal connector 12, transverse connector 13, sand box 14, column head 15, column foot 16, tension balance rod 17, abutment 18, pier 19, cap beam 20, column assembly 21, wall connection member 22, railing 23, distribution beam 24, end plate 25.
[0031] Specific construction method
[0032] The utility model is described in detail below in conjunction with specific embodiments. The following embodiments will help those skilled in the art to further understand the utility model, but do not limit the utility model in any form. It should be pointed out that for those of ordinary skill in the art, several variations and improvements can be made without departing from the concept of the utility model. These all fall within the scope of protection of the utility model.
[0033] Combine the following Figure 1-Figure 7 The utility model is further described with embodiments. Example
[0034] A bottom-supported assembly bracket system for large cantilever cap beams, see Figures 1 to 7 , including a sand box 14, a column assembly 21, a main load-bearing truss 1, and a tension balance rod 17; wherein:
[0035] The column assembly 21 includes a plurality of steel pipe columns 11 arranged around the pier 19, and the column foot 16 of the steel pipe column 11 is connected to the steel plate pre-buried in the cap 18, and the column head 15 of the steel pipe column 11 is connected to the lower steel plate of the sand box;
[0036] The main load-bearing truss 1 includes lower chords 2 symmetrically arranged on both sides of the bottom of the cap beam 20 and fixedly connected to the upper steel plate of the sand box, upper chords 3 arranged on both sides of the top of the cap beam 20, web members 4 connected between the lower chord 2 and the upper chord 3 on the same side, upper chord support rods 5 connected between the upper chords 2, lower chord support rods 6 connected between the lower chords 3, and multiple distribution beams 24 laid on the upper surface of the lower chord 2 along the length direction of the lower chord 2;
[0037] The tension balance rod 17 is symmetrically arranged on both sides of the pier 19 , and its upper end is connected to the lower chord 2 , and its lower end is connected to the base 18 .
[0038] In order to facilitate the on-site hoisting construction of the main load-bearing truss, further, in a preferred embodiment, please refer to Figure 1 , Figure 2 and Figure 3 The upper chord 3 includes an upper chord middle section 301, an end plate 25, and an upper chord side wing section 302 symmetrically connected to the two ends of the upper chord middle section 301 through the end plate 25; the lower chord 2 includes a lower chord middle section 201, an end plate 25, and a lower chord side wing section 202 symmetrically connected to the two ends of the lower chord middle section 201 through the end plate 25; the web 4 includes a web middle section 401, and a web end section 402 connected between the web middle section 401 and the upper chord 3 or the lower chord 2; the upper chord side wing section 302 and the web end section 402 connected thereto constitute an upper wing truss 8, the upper chord middle section 301 and the web end section 402 connected thereto constitute an upper truss 7, the lower chord side wing section 202 and the web end section 402 connected thereto constitute a lower wing truss 9, and the lower chord middle section 301 The section 201 and the web member end section 402 connected thereto constitute the lower truss 10, so that the upper wing truss 8, the upper truss 7, the lower wing truss 9 and the lower truss 10 can be modularly assembled into the main load-bearing truss 1 through the upper chord support rod 5, the lower chord support rod 6 and the web member middle section 401; preferably, in order to facilitate the assembly of the main load-bearing truss 1, the web member end section 402 and the web member middle section 401, the upper chord support rod 5 and the upper chord rod 3, and the lower chord support rod 6 and the lower chord rod 2 are all connected by high-strength spirals; in order to ensure the strength and overall stability of the main load-bearing truss 1, the lower chord rod side section 202 and the lower chord rod middle section 201 are welded and connected by the end plate 25, and the connection weld is not less than 14mm; the upper chord rod side section 302 and the upper chord rod middle section 301 are welded and connected by the end plate 25, and the connection weld is not less than 12mm;
[0039] Based on the above structural setting, the web member end section 402 can be welded to the upper chord side section 302 in the factory to assemble the upper wing truss 8, the web member end section 402 can be welded to the upper chord middle section 301 to assemble the upper truss 7, the web member end section 402 can be welded to the lower chord side section 202 to assemble the lower wing truss 9, the web member end section 402 can be welded to the lower chord middle section 201 to assemble the lower truss 10, and then the upper wing truss 8, the lower truss 7, the lower wing truss 9 and the lower truss 10 can be transported to the construction site for modular rapid assembly, thereby greatly saving the on-site assembly cost and accelerating the construction efficiency.
[0040] Furthermore, in a preferred embodiment, the upper chord 3 and the lower chord 2 are double-jointed narrow flange H-shaped steels, the web 4 is a wide flange H-shaped steel, and the upper chord support rod 5 and the lower chord support rod 6 are double-jointed channel steels welded with filler plates; specifically, the upper chord 3 is formed by two HN600×200 narrow flange H-shaped steels connected by upper and lower flange plate welds, and the weld height is not less than 12 mm; the lower chord 2 is formed by two HN800×300 narrow flange H-shaped steels connected by upper and lower flange plate welds, and the weld height is not less than 12 mm; the web 4 is a 400mm×400mm wide flange H-shaped steel; the double-jointed channel steels of the upper chord support rod 5 and the lower chord support rod 6 are welded with 12mm thick filler plates, and the spacing between the filler plates is 90 cm.
[0041] Furthermore, in a preferred embodiment, the spacing between adjacent distribution beams 24 is 40-60 cm, and the distribution beams 24 are I-beams.
[0042] In order to ensure the safety of construction workers when installing the cap beam bottom formwork, further, in a preferred embodiment, railings 23 are provided on both sides of the distribution beam 24.
[0043] Furthermore, in a preferred embodiment, a cap beam bottom formwork is laid on the distribution beam 24, and the cap beam bottom formwork is a customized steel formwork. The elevation of the cap beam bottom formwork can be adjusted during the processing of the bottom formwork, and during installation, it is only necessary to control the elevation of the bracket to remain in a horizontal plane.
[0044] Furthermore, in a preferred embodiment, the web member 4 is welded to the lower chord member 2 and the upper chord member 3, and the lower chord support rod 6 and the lower chord member 3, and the upper chord support rod 5 and the upper chord member 2 are connected by bolts.
[0045] Further, in a preferred embodiment, see Figure 1 The tension balance rod 17 is φ32 finely rolled threaded steel bar, and there are 4 of them, with 2 on each side of the pier.
[0046] Further, in a preferred embodiment, see Figure 1 , Figure 4 and Figure 6 The plurality of steel tube columns 11 are arranged in two rows on both sides of the pier 19 along the longitudinal direction of the bridge, and each row of steel tube columns 11 is divided into three columns along the transverse direction of the bridge. The first and last columns are composed of two steel tube columns 11 arranged side by side along the longitudinal direction of the bridge, and the middle column is a single steel tube column 11.
[0047] Further, in a preferred embodiment, see Figure 1 as well as Figures 4 to 7 The column assembly also includes a longitudinal connector 12, a transverse connector 13, and a wall connector 22; the steel pipe columns 11 in the middle rows of the two rows and the two steel pipe columns 11 arranged side by side in the first and last rows are connected along the longitudinal bridge direction through the longitudinal connector 12, the adjacent columns arranged in the same row are connected along the transverse bridge direction through the transverse connector 13, and the steel pipe columns 11 adjacent to the pier 19 in the first and last rows are connected to the embedded parts in the pier 19 through the wall connector 22, so that the column assembly forms an overall force system.
[0048] Furthermore, in a preferred embodiment, the longitudinal connector 12 and the transverse connector 13 are composed of double-jointed channel steels and steel plates, and the wall connecting member 22 is a channel steel.
[0049] Further, in a preferred embodiment, see Figure 1 , Figure 3 and Figure 7 The column head 15 of the steel pipe column 11 is a steel plate welded to the top of the steel pipe column 11, and the column head 15 of the steel pipe column 11 is connected to the lower steel plate of the sand box by bolts; the column foot 16 of the steel pipe column 11 is welded to the steel plate embedded in the base 18, and the connection is reinforced by ribs.
[0050] The construction method of this utility model, please refer to Figures 1 to 7 , which comprises the following steps:
[0051] S1. The upper wing truss 8, the upper truss 7, the lower wing truss 9, and the lower truss 10 are welded and other components are manufactured in the factory, and transported to the site after acceptance; when the cap 18 and the pier 19 are cast, the steel plates for connecting with the column foot 16 and the wall connecting member 22 are pre-buried respectively;
[0052] S2, connecting the column foot of the steel pipe column 11 with the steel plate embedded in the pedestal 18, and welding the longitudinal connector 12 or the transverse connector 13 between the steel pipe columns 11, and welding the wall connecting member 22 with the steel plate embedded in the pier 19, so that the column assembly 21 forms an integral force system;
[0053] S3, placing the sand box 14 on the column head of the steel pipe column 11, and adjusting the height of the sand box 14 according to the height of the cap beam 20 and the bottom mold;
[0054] S4, hoist the lower truss 10 and place it on the sand box 14. After it is in place, weld the lower chord intermediate section 201 of the lower truss 10 to the steel plate on the sand box 14. Then hoist the upper truss 7 and install the upper truss 7 on the lower truss 10 through the web intermediate section 401.
[0055] S5, install the lower chord support rod 6 between the lower chord intermediate sections 201 of the lower truss 10, install the upper chord support rod 5 between the upper chord intermediate sections 301 of the upper truss 7, then install the tension balance rod 17 between the lower chord intermediate section 201 and the pedestal 18 for anchoring, and control the initial tension load of the tension balance rod 17 to a suitable value to ensure the stability of the support system during installation and balanced casting;
[0056] S6, hoist the lower wing truss 9 to the two ends of the lower truss 10, then connect the lower chord side wing section 202 of the lower wing truss 9 with the lower chord middle section 201 of the lower truss 10, and connect the upper truss 7 and the lower wing truss 9 through the web middle section 401; then, hoist the upper wing truss 8 to the upper wing truss 9, connect the upper chord side wing section 302 of the upper wing truss 8 with the upper chord middle section 301 of the upper truss 7, and connect the upper wing truss 8 and the lower wing truss 9 through the web middle section 401;
[0057] S7, installing the lower chord support rod 6 between the lower chord side wing sections 202 of the lower wing truss 9, and installing the upper chord support rod 5 between the upper chord side wing sections 302 of the upper wing truss 8;
[0058] S8. Lay the distribution beam 24 on the lower chord 2, i.e., the lower chord side section 202 and the lower chord middle section 201, and fix it with a special clamp to prevent overturning; then lay the cap beam bottom formwork on the distribution beam 24, and the elevation of the cap beam bottom formwork can be adjusted during the bottom formwork processing. During installation, you only need to control the bracket elevation to maintain it in a horizontal plane; in subsequent construction, in order to minimize eccentric loads, the concrete should be poured as symmetrically and balanced as possible, and the height difference of unbalanced concrete pouring should not exceed 0.5m.
[0059] The above describes the specific embodiments of the present invention. It should be understood that the present invention is not limited to the above specific embodiments, and those skilled in the art can make various modifications or variations within the scope of the claims, which does not affect the essence of the present invention.
Claims
1. A bottom-supported assembly support system for a large cantilever cap beam, comprising a sand box, characterized in that Also includes: A column assembly, wherein the column assembly comprises a plurality of steel pipe columns arranged around the pier, wherein the column foot of the steel pipe column is connected to a steel plate pre-buried in the cap, and the column head of the steel pipe column is connected to a lower steel plate of the sand box; A main load-bearing truss, the main load-bearing truss comprising lower chords symmetrically arranged on both sides of the bottom of the cap beam and fixedly connected to the upper steel plate of the sand box, upper chords arranged on both sides of the top of the cap beam, web bars connected between the lower chord and the upper chord on the same side, upper chord support bars connected between the upper chords, lower chord support bars connected between the lower chords, and a plurality of distribution beams laid on the upper surface of the lower chord along the length direction of the lower chord; and, The tension balance rod is symmetrically arranged on both sides of the pier column, and its upper end is connected to the lower chord rod, and the lower end is connected to the pedestal.
2. A bottom-supported assembly support system for a large cantilever cap beam as claimed in claim 1, characterized in that: The upper chord includes an upper chord middle section, an end plate, and an upper chord wing section symmetrically connected to the two ends of the upper chord middle section through the end plate; the lower chord includes a lower chord middle section, an end plate, and a lower chord wing section symmetrically connected to the two ends of the lower chord middle section through the end plate; the web includes a web middle section and a web end section connected between the web middle section and the upper chord or the lower chord; the upper chord wing section and the web end section connected thereto constitute an upper wing truss, the upper chord middle section and the web end section connected thereto constitute an upper truss, the lower chord wing section and the web end section connected thereto constitute a lower wing truss, and the lower chord middle section and the web end section connected thereto constitute a lower truss.
3. A bottom-supported assembly support system for a large cantilever cap beam as claimed in claim 1, characterized in that: The web member is connected to the lower chord member and the upper chord member by welding, and the lower chord support rod is connected to the lower chord member, and the upper chord support rod is connected to the upper chord member by bolts.
4. A bottom-supported assembly support system for a large cantilever cap beam as claimed in claim 1, characterized in that: The plurality of steel tube columns are arranged in two rows on both sides of the pier along the longitudinal direction of the bridge, and each row of steel tube columns is divided into three columns along the transverse direction of the bridge, the first and last columns are composed of two steel tube columns arranged side by side along the longitudinal direction of the bridge, and the middle column is a single steel tube column.
5. A bottom-supported assembly support system for a large cantilever cap beam as claimed in claim 4, characterized in that: The column assembly also includes longitudinal connectors, transverse connectors, and wall connectors. The steel tube columns in the middle rows and the two steel tube columns arranged side by side in the first and last rows are connected along the longitudinal bridge direction through longitudinal connectors, and the adjacent columns arranged in the same row are connected along the transverse bridge direction through transverse connectors. The steel tube columns in the first and last rows adjacent to the pier are connected to the embedded parts in the pier through wall connectors, so that the column assembly forms an overall force-bearing system.
6. A bottom-supported assembly support system for a large cantilever cap beam as claimed in claim 5, characterized in that: The longitudinal connecting piece and the transverse connecting piece are composed of double-jointed channel steel and steel plates, and the wall connecting piece is a channel steel.
7. A bottom-supported assembly support system for a large cantilever cap beam as claimed in claim 1, characterized in that: The column head of the steel pipe column is a steel plate welded to the top of the steel pipe column, and the column head of the steel pipe column is connected to the steel plate under the sand box by bolts; the column foot of the steel pipe column is welded to the steel plate embedded in the pedestal, and the connection is reinforced by ribs.
Citation Information
Cited By
Through type assembly support system for large cantilever bent cap and construction method of through type assembly support system
CN118127949A