Wind power foundation concrete construction device
By designing the concrete construction device for wind power foundations and using the combination of robotic arms and lifting steel rings, the problem of inconvenient concrete pouring operation in wind power foundations is solved, efficient transfer pipe height adjustment and construction position flexibility are achieved, and work risks are reduced .
Patent Information
- Application Number
- CN202420234060.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-31
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2034-01-31
AI Technical Summary
During the construction of wind power foundations, due to equipment height limitations during concrete pouring, it is inconvenient to operate and high working risks, making it difficult to effectively increase the height of the poured pipeline.
A wind power foundation concrete construction device is designed, including a movable vehicle body, a robot arm, a lifting mechanism, a lifting steel ring, a clamping mechanism and a driving mechanism. The lifting and lifting steel of the robot arm is realized through hydraulic cylinders and electric motors. The movement of the ring can fix the conveying pipes of different pipe diameters and adjust the construction position.
It has achieved the improvement of the conveying height and construction flexibility of the conveying pipe, reduced operation risks, and enhanced the convenience and safety of construction.
Smart Images

Figure CN222100859U_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of wind power foundation concrete construction devices, and specifically to a wind power foundation concrete construction device. Background Art
[0002] Wind power, or wind power generation, refers to the conversion of wind kinetic energy into electrical energy. Wind energy is a clean, pollution-free renewable energy source that has been used by people for a long time, mainly through windmills to pump water and grind flour. People are interested in how to use wind to generate electricity. Using wind power to generate electricity is very environmentally friendly, and the wind energy reserves are huge, so it is increasingly valued by countries around the world. At present, during the construction of wind power foundations, since the foundation of the wind turbine is much higher than the ground, during manual pouring, the pouring equipment is limited by its own height and cannot be effectively operated. It is necessary to use tools such as ladders to increase the height of the pouring pipe, which poses a high risk of work. Summary of the invention
[0003] The embodiments of the present specification provide a wind power foundation concrete construction device, which is used to solve the problem of inconvenient operation during concrete pouring in the prior art.
[0004] The technical solutions provided by the embodiments of this specification are:
[0005] In a first aspect, an embodiment of the present application provides a wind power foundation concrete construction device, comprising:
[0006] Movable body;
[0007] A mechanical arm, one end of which is rotatably connected to the top of the movable vehicle body, and the other end of which is a free end capable of moving up and down;
[0008] A lifting mechanism is provided on the movable vehicle body, and the free end can be moved up and down by the lifting mechanism;
[0009] A lifting steel ring is movably connected to the top of the mechanical arm and can move along the length direction of the mechanical arm;
[0010] A clamping mechanism is arranged on the lifting steel ring, comprising a telescopic cylinder arranged on the outer ring of the lifting steel ring, the output end of the telescopic cylinder extends to the inside of the lifting steel ring, and the output end of the telescopic cylinder is connected to a clamping plate;
[0011] The driving mechanism is arranged on the mechanical arm and is used for driving the clamping mechanism to move.
[0012] Furthermore, the lifting mechanism includes a hydraulic cylinder, one end of which is hinged to the movable vehicle body, and the other end is hinged to the bottom of the mechanical arm, and the free end can move up and down through the hydraulic cylinder.
[0013] Furthermore, the hydraulic cylinder and the mechanical arm are at an angle.
[0014] Furthermore, the driving mechanism includes a slide groove arranged at the top of the robotic arm, a threaded rod is rotatably connected in the slide groove, a driving motor is provided at the end of the robotic arm, the output end of the driving motor extends into the slide groove and is connected to the threaded rod, a slider is threadedly connected on the threaded rod, the slider can move in the slide groove, and the lifting steel ring is detachably connected to the slider.
[0015] Furthermore, at least three clamping mechanisms are provided, and the three clamping mechanisms are arranged at equal intervals along the circumference of the lifting steel ring.
[0016] Furthermore, the movable vehicle body includes a detachable handlebar.
[0017] Furthermore, a controller is provided on the handlebar, and the controller is used to control the start and stop of the lifting mechanism and the clamping mechanism.
[0018] Furthermore, a clamping block is provided at the bottom of the lifting steel ring, and a clamping groove is provided at the top of the sliding block.
[0019] At least one of the above technical solutions adopted in the embodiments of the present application can achieve the following beneficial effects: By fixing the delivery pipe in the lifting steel ring and then fixing the delivery pipe through the clamping mechanism, it is possible to fix delivery pipes of different diameters, which is highly flexible. At the same time, the free end of the robot arm is raised by the lifting mechanism to increase the delivery height of the delivery pipe. And by driving the lifting steel ring to move on the robot arm through the driving device, the construction position of the robot arm can be further adjusted. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] The drawings described herein are used to provide a further understanding of the present application and constitute a part of the present application. The illustrative embodiments of the present application and their descriptions are used to explain the present application and do not constitute an improper limitation on the present application. In the drawings:
[0021] Figure 1 This is a side view schematic diagram of the structure provided in the embodiment of this specification.
[0022] Figure 2 This is a schematic diagram of a three-dimensional structure provided in an embodiment of this specification. DETAILED DESCRIPTION
[0023] In order to make the purpose, technical solution and advantages of the present application clearer, the technical solution of the present application will be clearly and completely described below in combination with the specific embodiments of the present application and the corresponding drawings. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present application.
[0024] The technical solutions provided by various embodiments of the present application are described in detail below in conjunction with the accompanying drawings.
[0025] This specification provides a wind power foundation concrete construction device. Figure 1 and Figure 2 As shown, it includes a movable body 1, a mechanical arm 2, a lifting mechanism 3, a lifting steel ring 4, a clamping mechanism and a driving mechanism.
[0026] Among them, the movable body 1 can be an ordinary electric flatbed truck. The movable body 1 provided in this embodiment includes a support plate 11 and a driving wheel 12 arranged at the bottom of the support plate 11. One end of the mechanical arm 2 is rotatably connected to the top of the movable body 1, specifically connected to one side of the top of the support plate 11, and the other end is a free end that can move up and down; the mechanical arm 2 is arranged along the width direction of the support plate, so that the slurry discharge direction of the transport pipe after installation is in a cross structure with the moving direction of the movable body. Therefore, the slurry discharge is not affected in the process of the movable body moving forward. The lifting mechanism 3 is arranged on the movable body 1, and the free end can move up and down through the lifting mechanism; in a possible implementation, the lifting mechanism 3 includes a hydraulic cylinder 31, one end of the hydraulic cylinder 31 is hinged to the movable body 1, specifically hinged to the top of the support plate 11, and the other end is hinged to the bottom of the mechanical arm 2, and the free end can move up and down through the hydraulic cylinder 31. It should be further explained that the hydraulic cylinder and the mechanical arm are in an angle structure. In the specific implementation, the angle is 20 degrees, which enables the hydraulic cylinder to smoothly prop up the free end of the mechanical arm. The lifting steel ring 4 is movably connected to the top of the mechanical arm 2 and can move along the length direction of the mechanical arm 2. The clamping mechanism is set on the lifting steel ring 4, please refer to Figure 2 As shown, the clamping mechanism includes a telescopic cylinder 5 arranged on the outer ring of the lifting steel ring 4, the output end of the telescopic cylinder 5 extends to the inside of the lifting steel ring 4, and the output end of the telescopic cylinder 5 is connected to a clamping plate 6; a driving mechanism is arranged on the mechanical arm, and is used to drive the clamping mechanism to move. The telescopic cylinder includes but is not limited to a hydraulic cylinder or an electric cylinder.
[0027] In this embodiment, when in use, first move the movable vehicle body 1 to a position convenient for construction, then insert the transport pipe into the lifting steel ring 4, and then start the telescopic cylinder 5 to press the clamping plate 6 against the transport pipe to fix the transport pipe. The operation is simple and convenient. It can fix transport pipes of different diameters and achieve the purpose of high flexibility. At the same time, the free end of the mechanical arm is raised by the lifting mechanism to increase the transport height of the transport pipe. And the driving device drives the lifting steel ring to move on the mechanical arm, and the construction position of the mechanical arm can be further adjusted.
[0028] In one possible implementation, see Figure 2 As shown, the driving mechanism includes a slide 71 arranged at the top of the mechanical arm 2, a threaded rod 72 is rotatably connected in the slide 71, a driving motor 73 is arranged at the end of the mechanical arm 2, the output end of the driving motor 73 extends into the slide 71 and is connected to the threaded rod 72, a slider 74 is threadedly connected to the threaded rod 72, the slider 74 can move in the slide 71, and the lifting steel ring 4 is detachably connected to the slider. When in use, by starting the driving motor, the threaded rod is controlled to rotate, so that the slider moves along the length direction of the slide, so as to adjust the construction position of the lifting steel ring.
[0029] Further preferably, at least three clamping mechanisms are provided, and the three clamping mechanisms are arranged at equal intervals along the circumference of the lifting steel ring.
[0030] In a possible implementation, the movable vehicle body includes a detachable handlebar. The handlebar is fixedly connected to the support plate by bolts and can be disassembled for easy transportation. The handlebar is provided with a controller for controlling the start and stop of the lifting mechanism and the clamping mechanism.
[0031] Further preferably, a card block is provided at the bottom of the lifting steel ring 4, and a card slot is provided at the top of the slider 74. The card block can be inserted into the card slot to be fixedly connected. After use, it can be disassembled to reduce space occupation and facilitate transportation. At the same time, by inserting the card block into the card slot in different directions, the pipe mouth of the transport pipe can face different directions, thereby improving the flexibility of use.
[0032] It should also be noted that the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, commodity or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, commodity or device. In the absence of more restrictions, the elements defined by the sentence "comprises a ..." do not exclude the existence of other identical elements in the process, method, commodity or device including the elements.
[0033] The above is only an embodiment of the present application and is not intended to limit the present application. For those skilled in the art, the present application may have various changes and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application should be included in the scope of the claims of the present application.
Claims
1. A wind power foundation concrete construction device, It is characterized in that include: Movable body; A mechanical arm, one end of which is rotatably connected to the top of the movable vehicle body, and the other end of which is a free end capable of moving up and down; A lifting mechanism is provided on the movable vehicle body, and the free end can be moved up and down by the lifting mechanism; A lifting steel ring is movably connected to the top of the mechanical arm and can move along the length direction of the mechanical arm; A clamping mechanism is arranged on the lifting steel ring, comprising a telescopic cylinder arranged on the outer ring of the lifting steel ring, the output end of the telescopic cylinder extends to the inside of the lifting steel ring, and the output end of the telescopic cylinder is connected to a clamping plate; The driving mechanism is arranged on the mechanical arm and is used for driving the clamping mechanism to move.
2. A wind power foundation concrete construction device according to claim 1, It is characterized in that The lifting mechanism comprises a hydraulic cylinder, one end of which is hinged to the movable vehicle body, and the other end of which is hinged to the bottom of the mechanical arm, and the free end can be moved up and down by the hydraulic cylinder.
3. A wind power foundation concrete construction device according to claim 2, It is characterized in that The hydraulic cylinder and the mechanical arm form an angle structure.
4. A wind power foundation concrete construction device according to claim 1, It is characterized in that The driving mechanism includes a slide groove arranged at the top of the mechanical arm, a threaded rod is rotatably connected in the slide groove, a driving motor is provided at the end of the mechanical arm, the output end of the driving motor extends into the slide groove and is connected to the threaded rod, a slider is threadedly connected on the threaded rod, the slider can move in the slide groove, and the lifting steel ring is detachably connected to the slider.
5. A wind power foundation concrete construction device according to claim 1, It is characterized in that At least three clamping mechanisms are provided, and the three clamping mechanisms are arranged at equal intervals along the circumference of the lifting steel ring.
6. A wind power foundation concrete construction device according to claim 1, It is characterized in that The movable vehicle body includes a detachable handlebar.
7. A wind power foundation concrete construction device according to claim 6, It is characterized in that The handlebar is provided with a controller, and the controller is used to control the start and stop of the lifting mechanism and the clamping mechanism.
8. A wind power foundation concrete construction device according to claim 4, It is characterized in that A clamping block is provided at the bottom of the lifting steel ring, and a clamping groove is provided at the top of the sliding block.