Leaking stoppage structure for pressure pipeline

By designing a leak plugging structure and using the synchronous compression bonding of sealed hard rubber and epoxy resin glue, the problems of limitations in the scope of leakage plugging methods and media impact in the existing technology are solved, and efficient pressure pipeline leakage plugging is achieved. Suitable for pipes of different specifications, and improves leakage plugging efficiency and flexibility.

CN222103115UActive Publication Date: 2024-12-03SHANGHAI YUYI CONSTR & INSTALLATION ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420879257.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-25
Publication Date
2024-12-03
Estimated Expiration
2034-04-25

AI Technical Summary

Technical Problem

The existing pressure pipeline leak plugging methods have limited scope of application of clamps and media impact when applying epoxy resin glue, which affects leakage plugging efficiency and applicability.

Method used

A leak-blocking structure including the first and second mounting plates, a leak-blocking extrusion mechanism, a screw, a linkage mechanism and an internal threaded pipe are designed. The leak-blocking structure includes a synchronous compression bonding of the sealed hard rubber and epoxy resin glue, and the The drive motor and sprocket system realizes automatic shading and leakage plugging, and is suitable for pressure pipes of different specifications.

Benefits of technology

It effectively avoids the situation where epoxy resin glue is flushed out by the medium, improves the leakage plugging effect and scope of application, does not need to stop the medium transportation, and is suitable for pressure pipes of different specifications, improving the flexibility of use.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222103115U_ABST
    Figure CN222103115U_ABST
Patent Text Reader

Abstract

The utility model discloses a leaking stoppage structure for a pressure pipeline, which comprises a leaking stoppage structure body matched with the pressure pipeline, the leaking stoppage structure body comprises a first mounting plate and a second mounting plate, and leaking stoppage extrusion mechanisms are fixedly mounted on the sides, close to each other, of the first mounting plate and the second mounting plate. The two leaking stoppage extrusion mechanisms are located above and below the pressure pipeline correspondingly. Through the arrangement of a series of structures, the sealing hard rubber sheet and the epoxy resin glue can be pressed and bonded to the leakage position of the pressure pipeline, the leakage position of the pressure pipeline is plugged synchronously through the sealing hard rubber sheet and the epoxy resin glue, the situation that the epoxy resin glue is flushed out by media can be effectively avoided, and the plugging effect is improved; and in addition, through the mode that the two extrusion blocks are adjustable, the pressure pipeline leakage stopping device can be suitable for conducting leakage stopping operation on pressure pipelines of different specifications, the application range is widened, and the use flexibility is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of pressure pipeline plugging, in particular to a pressure pipeline plugging structure. Background Art

[0002] Pressure pipe is a kind of pipeline, and it also plays the same transportation function as pipeline. As a carrier, pressure pipe usually leaks during long-term use, so it needs to be repaired by plugging structure in later maintenance. There are two common plugging methods: 1. Use clamps and sealing rubber to temporarily plug the leakage of pressure pipe; 2. Apply epoxy resin glue to plug the leakage;

[0003] The plugging methods in the prior art have the following shortcomings during use: 1. The plugging method of the clamp and the sealing rubber has a limited scope of application of the clamp, and the clamps of the same specification can only be used for pipes of the same specification; 2. In the process of applying epoxy resin glue to plug leaks, due to the lack of shielding restrictions, the medium will impact the undried glue during the application process. Therefore, it is necessary to stop the medium delivery when applying the glue. The long waiting time affects the efficiency of the medium transmission and cannot meet the use requirements. Based on the above situation, we propose a plugging structure for pressure pipes. Utility Model Content

[0004] The utility model aims to solve the shortcomings in the prior art and provides a leak-proof structure for a pressure pipeline.

[0005] In order to achieve the above purpose, the utility model adopts the following technical solutions:

[0006] A leak-proof structure for a pressure pipeline comprises a leak-proof structure body that cooperates with the pressure pipeline, and the leak-proof structure body comprises a first mounting plate and a second mounting plate, and a leak-proof extrusion mechanism is fixedly installed on the side of the first mounting plate and the second mounting plate close to each other, and the two leak-proof extrusion mechanisms are respectively located above and below the pressure pipeline, and the leak-proof extrusion mechanism is used to block and plug leaks at the leakage points of the pressure pipeline, and a clamping fixing mechanism is installed on the first mounting plate, and screws are fixedly connected to the top two sides of the clamping fixing mechanism, and the connection between the first mounting plate and the screw is realized by the clamping fixing mechanism, and internal threaded pipes are rotatably installed on the top two sides of the second mounting plate, and the internal threaded pipes are threadedly sleeved on the corresponding screws. The threaded connection between the internal threaded pipe and the screw can move vertically while the internal threaded pipe rotates, and the same linkage mechanism is fixedly sleeved on the two internal threaded pipes, and the linkage mechanism is used to drive the two internal threaded pipes to rotate synchronously, and a driving motor fixedly connected to the linkage mechanism with an output shaft is embedded and fixed on the top of the second mounting plate, and the driving motor is used to drive the linkage mechanism.

[0007] Preferably, the leak-plugging extrusion mechanism includes extrusion blocks, and the sides of the two extrusion blocks that are far away from each other are respectively fixedly connected to the sides of the first mounting plate and the second mounting plate that are close to each other, and the sides of the two extrusion blocks that are close to each other are both arranged as arc-shaped structures, and the sides of the two extrusion blocks that are close to each other are both bonded and fixed with sealing hard rubber, and the sides of the two sealing hard rubbers that are close to each other are both coated with epoxy resin glue, and the epoxy resin glue is sticky, and the bonding between the sealing hard rubber and the pressure pipe can be achieved by the epoxy resin glue, and the left side and the right side of the two sealing hard rubbers that are close to each other are fixedly connected with toggle blocks, and the sealing hard rubber can be fixed by the toggle blocks.

[0008] Preferably, the card-mounting fixing mechanism includes two card sleeves, the top of the card sleeves is fixedly connected to the bottom end of the corresponding screw rod, and positioning grooves are provided on both sides of the top of the first mounting plate. The inner wall of the positioning groove is in movably contact with the outer side of the corresponding card sleeve, and the same card rod is movably mounted in the two card sleeves. The connection between the first mounting plate and the two screw rods is achieved by cooperating between the card sleeves and the card rod. The left end of the card rod extends to the left side of the first mounting plate and is fixedly connected to a reciprocal handle. The right side of the reciprocal handle is magnetically fixed to the left side of the first mounting plate, and the card rod can be pulled by the reciprocal handle.

[0009] Preferably, the linkage mechanism includes two first sprockets, the first sprockets are fixedly sleeved on the corresponding internal threaded tubes, the second sprocket is fixedly connected to the top end of the output shaft of the driving motor, the two first sprockets and the second sprocket are transmission-connected with the same chain, and the two first sprockets and the second sprockets cooperate with each other to drive the two internal threaded tubes to rotate simultaneously, and the two first sprockets and the second sprockets are distributed in a triangle.

[0010] Preferably, a plurality of first grooves are provided on the sides of the two extrusion blocks that are close to each other, and a male Velcro is fixedly connected to the inner wall of the first groove on the side away from the opening thereof, and a plurality of female Velcro is fixedly connected to the sides of the two sealing hard rubbers that are away from each other, and the female Velcro is movably sleeved in the corresponding first grooves and bonded to the male Velcro, so that the connection between the sealing hard rubber and the extrusion block can be quickly achieved through the male Velcro and the female Velcro.

[0011] Preferably, two second grooves are provided on the left side of the first mounting plate, a first magnet is fixedly connected to the inner wall of the second groove away from its opening, and two second magnets are fixedly connected to the right side of the circular handle. The second magnets are movably mounted in the corresponding second grooves and adsorbed with the first magnets, and the circular handle can be quickly fixed by the first magnet and the second magnet.

[0012] Preferably, a battery is embedded and fixed on the top of the second mounting plate, the battery is electrically connected to the drive motor, and the battery supplies power to the drive motor.

[0013] Compared with the existing technology, the beneficial effects of the utility model are:

[0014] 1. The first mounting plate, the second mounting plate, the plugging extrusion mechanism, the screw, the linkage mechanism and the internal threaded pipe can be matched to press and bond the sealing hard rubber and the epoxy resin glue, and the two can be used to plug the leakage of the pressure pipe at the same time. The blocking and glue plugging can effectively prevent the epoxy resin glue from being washed out by the medium, improve the plugging effect, and do not require personnel to stop the medium delivery work, and will not delay the delivery of the medium. The two extrusion blocks can be adjusted to be applicable to the plugging operation of pressure pipes of different specifications, thereby improving the scope of application and flexibility of use;

[0015] 2. Through the setting of the clamping fixing mechanism, the first mounting plate can be removed for installation during installation, making it convenient for personnel to install the entire device on the pressure pipe;

[0016] The utility model can compress and bond the sealing hard rubber and epoxy resin glue to the leaking part of the pressure pipe through the arrangement of a series of structures, and use the two to simultaneously plug the leaking part of the pressure pipe, which can effectively prevent the epoxy resin glue from being washed out by the medium, improve the plugging effect, and do not require personnel to stop the conveying work of the medium. In addition, through the adjustable manner of the two extrusion blocks, it can be suitable for plugging leaks in pressure pipes of different specifications, thereby improving the scope of application and flexibility of use. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 This is a structural schematic diagram of a leak plugging structure for a pressure pipeline proposed by the utility model;

[0018] Figure 2 for Figure 1 A schematic cross-sectional structure diagram of ;

[0019] Figure 3 for Figure 2 Schematic diagram of the enlarged structure of part A.

[0020] In the figure: 100, pressure pipe; 1, first mounting plate; 2, second mounting plate; 3, extrusion block; 4, sealing hard rubber; 5, epoxy resin glue; 6, ferrule; 7, clamping rod; 8, circular handle; 9, internal threaded pipe; 10, screw; 11, first sprocket; 12, second sprocket; 13, chain; 14, driving motor; 15, male Velcro; 16, female Velcro; 17, toggle block. DETAILED DESCRIPTION

[0021] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments.

[0022] Reference Figure 1-3 A plugging structure for a pressure pipeline, comprising a plugging structure body matched with a pressure pipeline 100, the plugging structure body comprising a first mounting plate 1 and a second mounting plate 2, the first mounting plate 1 and the second mounting plate 2 are both fixedly mounted with a plugging extrusion mechanism on one side close to each other, the two plugging extrusion mechanisms are respectively located above and below the pressure pipeline 100, the plugging extrusion mechanism comprises an extrusion block 3, the two extrusion blocks 3 are respectively fixedly connected to the first mounting plate 1 and the second mounting plate 2 on one side close to each other on one side away from each other, the two extrusion blocks 3 are both arranged on one side close to each other as an arc structure, the two extrusion blocks 3 are both bonded and fixed with a sealing hard rubber 4 on one side close to each other, wherein the two extrusion blocks 3 are both provided with a plurality of first grooves on one side close to each other, the first grooves are away from each other A male Velcro 15 is fixedly connected to the inner wall of one side of the opening, and a plurality of female Velcros 16 are fixedly connected to the sides of the two sealing hard rubbers 4 that are away from each other. The female Velcros 16 are movably sleeved in the corresponding first groove and bonded to the male Velcro 15. The connection between the sealing hard rubber 4 and the extrusion block 3 is quickly achieved through the male Velcro 15 and the female Velcro 16. The sides of the two sealing hard rubbers 4 that are close to each other are coated with epoxy resin glue 5. The epoxy resin glue 5 is sticky and can be used to achieve the bonding between the sealing hard rubber 4 and the pressure pipe 100. The left side and the right side of the two sealing hard rubbers 4 that are close to each other are fixedly connected with a toggle block 17, and the sealing hard rubber 4 can be fixed by the toggle block 17;

[0023] A clamping and fixing mechanism is installed on the first mounting plate 1, and the clamping and fixing mechanism includes two clamping sleeves 6, and a screw 10 is fixedly connected to the top of the clamping sleeve 6. Positioning grooves are provided on both sides of the top of the first mounting plate 1. The inner wall of the positioning groove is in movably contact with the outer side of the corresponding clamping sleeve 6. The same clamping rod 7 is movably clamped in the two clamping sleeves 6. The connection between the first mounting plate 1 and the two screws 10 is achieved by matching the clamping sleeve 6 and the clamping rod 7. The left end of the clamping rod 7 extends to the left side of the first mounting plate 1 and is fixedly connected to a circular handle 8. A first rectangular through-hole is provided on the inner wall of the side where the two positioning grooves are close to each other, and a second rectangular through-hole is provided on the inner wall of the left side of the positioning groove on the left side , the inner wall of the first rectangular perforation and the inner wall of the second rectangular perforation are both in active contact with the outer side of the card rod 7, the first rectangular perforation and the second rectangular perforation are both used for the card rod 7 to pass through, the right side of the circular handle 8 is fixed to the left side of the first mounting plate 1 by magnetic attraction, wherein two second grooves are provided on the left side of the first mounting plate 1, and the first magnet is fixedly connected to the inner wall of the second groove away from the opening thereof, and two second magnets are fixedly connected to the right side of the circular handle 8, the second magnets are movably sleeved in the corresponding second grooves and adsorbed with the first magnets, the circular handle 8 can be quickly fixed by the first magnet and the second magnet, and the card rod 7 can be pulled by the circular handle 8;

[0024] Internally threaded tubes 9 are rotatably installed on both sides of the top of the second mounting plate 2, wherein circular holes are opened on both sides of the top of the second mounting plate 2, and bearings are fixedly sleeved in the circular holes, and the inner side of the inner ring of the bearing is fixedly connected to the outer side of the corresponding internally threaded tube 9, and the bearing serves to provide a rotatable installation for the corresponding internally threaded tube 9, and the internally threaded tube 9 is threadedly sleeved on the corresponding screw 10, and the internally threaded tube 9 is threadedly connected to the screw 10 in such a way that it can move vertically while the internally threaded tube 9 rotates, and the same linkage mechanism is fixedly sleeved on the two internally threaded tubes 9, and a driving motor 14 whose output shaft is fixedly connected to the linkage mechanism is embedded and fixed on the top of the second mounting plate 2, and a battery is embedded and fixed on the top of the second mounting plate 2, and the battery is electrically connected to the driving motor 14, and the battery supplies power to the driving motor 14, wherein the linkage mechanism includes two first sprocket wheels 11, and the first sprocket wheels 11 are fixedly sleeved on the corresponding internally threaded tubes On the tube 9, the top end of the output shaft of the driving motor 14 is fixedly connected with the second sprocket 12, and the two first sprockets 11 and the second sprocket 12 are transmission-connected with the same chain 13, and the two first sprockets 11 and the second sprocket 12 are arranged in a triangular distribution. The two first sprockets 11 and the second sprocket 12 cooperate with each other to drive the two internally threaded tubes 9 to rotate simultaneously. The utility model can press and bond the sealing hard rubber 4 and the epoxy resin glue 5 to the leakage of the pressure pipe 100 through a series of structural settings, and use the two to synchronously plug the leakage of the pressure pipe 100, which can effectively avoid the situation where the epoxy resin glue 5 is washed out by the medium, improve the plugging effect, and do not need personnel to stop the medium transportation work. In addition, through the adjustable manner of the two extrusion blocks 3, it can be suitable for plugging operations on pressure pipes 100 of different specifications, thereby improving the scope of application and flexibility of use.

[0025] Working principle: when in use, when the leaking pressure pipe 100 is plugged, the epoxy resin glue 5 is not applied on the sealing hard rubber 4. First, pull the reciprocating handle 8 to the left to drive the two second magnets to separate from the corresponding first magnets, and release the fixation of the clamping rod 7. The reciprocating handle 8 pulls the clamping rod 7 to move to the left and separates from the two clamping sleeves 6, and releases the fixation of the two clamping sleeves 6. At this time, the first mounting plate 1 can be pulled away from the screw rod 10, and the first mounting plate 1 is separated from the two clamping sleeves 6. Then the first mounting plate 1 can be moved to the bottom of the pressure pipe 100, and then the two clamping sleeves 6 are respectively sleeved in the corresponding positioning grooves, and the reciprocating handle 8 is moved to insert the clamping rod 7 into the two clamping sleeves 6. The reciprocating handle 8 is fixed to the left side of the first mounting plate 1 by magnetic suction, thereby realizing the connection between the screw rod 10 and the first mounting plate 1. At this time, the pressure pipe 100 is located between the two sealing hard rubbers 4;

[0026] Then, a layer of epoxy resin glue 5 is applied on the sealing hard rubber 4. If there is only one leakage hole, epoxy resin glue 5 is applied on one sealing hard rubber 4. If there are two symmetrical leakage holes, epoxy resin glue 5 is applied on both sealing hard rubbers 4. Slightly rotate the first mounting plate 1 and the second mounting plate 2. When the sealing hard rubber 4 is aligned with the corresponding leakage hole, push the first mounting plate 1 in the direction close to the pressure pipe 100. The first mounting plate 1 drives the corresponding extrusion block 3 to move in the direction close to the pressure pipe 100. When the extrusion block 3 drives the corresponding sealing hard rubber 4 and epoxy resin glue 5 to move to close contact with the outer side of the pressure pipe 100, stop moving the first mounting plate 1. Then, fix the first mounting plate 1 and keep it stationary. Turn on the driving motor 14 in the forward direction. The output shaft of the driving motor 14 drives the second sprocket 12 to rotate. The second sprocket 12 drives the two first sprockets 11 to rotate through the chain 13. The first sprocket 11 drives the corresponding internally threaded pipe 9 to rotate. The internally threaded pipe 9 is rotated in the opposite direction. When the corresponding screw 10 rotates and moves vertically, the two internal threaded tubes 9 simultaneously drive the second mounting plate 2 to move in the direction close to the pressure pipe 100, and the second mounting plate 2 drives the corresponding extrusion block 3 to move. When the upper extrusion block 3 drives the corresponding sealing hard rubber 4 and epoxy resin glue 5 to move to close contact with the outer side of the pressure pipe 100, the driving motor 14 is stopped. At this time, the sealing hard rubber 4 blocks the leakage of the pressure pipe 100 to prevent the continued leakage of the medium. At the same time, the epoxy resin glue 5 is used for bonding and sealing, and the leakage of the pressure pipe 100 can be further blocked. The method of pressing and blocking and glue blocking at the same time can effectively prevent the epoxy resin glue 5 from being washed out by the medium, improve the blocking effect, and do not need personnel to stop the medium transportation work, will not delay the medium transportation, in addition, through the adjustable method of the two extrusion blocks 3, it can be applied to the plugging operation of pressure pipes 100 of different specifications, improve the scope of application and flexibility of use;

[0027] After the epoxy resin glue 5 is completely dry, the drive motor 14 can be started in the reverse direction. Similarly, the movement process of starting the drive motor 14 in the forward direction is opposite to that of the drive motor 14, so that the upper extrusion block 3 is transformed to move in the direction away from the pressure pipe 100. In the process of driving the upper extrusion block 3 to move, the corresponding sealing hard rubber 4 is fixed by the toggle block 17. When the upper extrusion block 3 moves upward, the corresponding male Velcro 15 is separated from the female Velcro 16, so that the sealing hard rubber 4 is still fixed on the pressure pipe 100. Then the sealing hard rubber 4 below can be fixed, and the extrusion block 3 below can be moved to separate from the corresponding sealing hard rubber 4. Then, the circular handle 8 can be pulled to the left again to move the clamping rod 7 out of the two clamping sleeves 6, and the first mounting plate 1 can be removed and separated from the clamping sleeve 6. Then, the first mounting plate 1 can be pulled out from the bottom of the pressure pipe 100, and the plugging work is completed. After the first mounting plate 1 and the second mounting plate 2 are removed, the two sealing hard rubbers 4 always cover the leakage, thereby improving the stability of the plugging.

[0028] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes within the technical scope disclosed by the present invention according to the technical scheme and the utility model concept of the present invention, which should be covered by the protection scope of the present invention.

Claims

1. A leak-proof structure for a pressure pipeline, comprising a leak-proof structure body matched with the pressure pipeline (100), characterized in that: The plugging structure body comprises a first mounting plate (1) and a second mounting plate (2). A plugging extrusion mechanism is fixedly mounted on one side of the first mounting plate (1) and the second mounting plate (2) close to each other. The two plugging extrusion mechanisms are respectively located above and below the pressure pipe (100). A clamping fixing mechanism is mounted on the first mounting plate (1). Screw rods (10) are fixedly connected to both sides of the top of the clamping fixing mechanism. Internal threaded tubes (9) are rotatably mounted on both sides of the top of the second mounting plate (2). The internal threaded tubes (9) are threadedly sleeved on the corresponding screw rods (10). The two internal threaded tubes (9) are fixedly sleeved with the same linkage mechanism. A driving motor (14) whose output shaft is fixedly connected to the linkage mechanism is embedded and fixed on the top of the second mounting plate (2).

2. A leak-proof structure for a pressure pipeline according to claim 1, characterized in that: The leak-blocking extrusion mechanism comprises an extrusion block (3), the sides of the two extrusion blocks (3) being away from each other are respectively fixedly connected to the sides of the first mounting plate (1) and the second mounting plate (2) being close to each other, the sides of the two extrusion blocks (3) being close to each other are both arranged as an arc structure, the sides of the two extrusion blocks (3) being close to each other are both bonded and fixed with a sealing hard rubber (4), the sides of the two sealing hard rubbers (4) being close to each other are both smeared with epoxy resin glue (5), and the left side and the right side of the sides of the two sealing hard rubbers (4) being close to each other are both fixedly connected with a toggle block (17).

3. A leak-proof structure for a pressure pipeline according to claim 1, characterized in that: The clamping and fixing mechanism comprises two clamping sleeves (6), the top of the clamping sleeves (6) is fixedly connected to the bottom end of the corresponding screw rod (10), positioning grooves are provided on both sides of the top of the first mounting plate (1), the inner wall of the positioning groove is in movably contact with the outer side of the corresponding clamping sleeve (6), and the same clamping rod (7) is movably clamped in the two clamping sleeves (6), the left end of the clamping rod (7) extends to the left side of the first mounting plate (1) and is fixedly connected to a circular handle (8), and the right side of the circular handle (8) is fixed to the left side of the first mounting plate (1) by magnetic attraction.

4. A leak-proof structure for a pressure pipeline according to claim 1, characterized in that: The linkage mechanism comprises two first sprockets (11), the first sprockets (11) are fixedly sleeved on the corresponding internal threaded tubes (9), the top end of the output shaft of the driving motor (14) is fixedly connected to the second sprocket (12), the two first sprockets (11) and the second sprocket (12) are transmission-connected to the same chain (13), and the two first sprockets (11) and the second sprocket (12) are distributed in a triangular shape.

5. A leak-proof structure for a pressure pipeline according to claim 2, characterized in that: A plurality of first grooves are provided on the sides of the two extrusion blocks (3) close to each other, and a male Velcro (15) is fixedly connected to the inner wall of the first groove away from the opening thereof. A plurality of female Velcro (16) are fixedly connected to the sides of the two sealing hard rubbers (4) away from each other, and the female Velcro (16) is movably sleeved in the corresponding first grooves and bonded to the male Velcro (15).

6. A leak-proof structure for a pressure pipeline according to claim 3, characterized in that: The left side of the first mounting plate (1) is provided with two second grooves, and the inner wall of the second groove away from the opening thereof is fixedly connected with a first magnet, and the right side of the circular handle (8) is fixedly connected with two second magnets, and the second magnets are movably sleeved in the corresponding second grooves and adsorbed with the first magnets.

7. A leak-proof structure for a pressure pipeline according to claim 1, characterized in that: A storage battery is embedded and fixed on the top of the second mounting plate (2), and the storage battery is electrically connected to the drive motor (14).