Double-kettle AB glue processing device

The double-kettle AB glue processing device automates the loading and unloading of A and B glue through integrated systems, addressing manual operation inefficiencies and ensuring synchronized delivery.

CN222111715UActive Publication Date: 2024-12-06JIANGSU AISI AIXIN MATERIALS CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420777565.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-16
Publication Date
2024-12-06
Estimated Expiration
2034-04-16

AI Technical Summary

Technical Problem

Existing AB glue production processes require manual operation and unloading of separate kettles, leading to inefficiencies and difficulty in achieving synchronized unloading of components A and B.

Method used

A double-kettle AB glue processing device with integrated unloading and conveying systems, utilizing a conveying assembly, negative pressure assembly, and feeding assembly to automate the loading and unloading process, ensuring synchronized delivery of A and B glue.

Benefits of technology

Facilitates automated and synchronized unloading of A and B glue, reducing manual labor and ensuring consistent export amounts, enhancing operational efficiency and control over the unloading process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222111715U_ABST
    Figure CN222111715U_ABST
Patent Text Reader

Abstract

The utility model provides a double kettle type AB glue processing device which comprises a base, a glue A preparation kettle and a glue B preparation kettle are respectively arranged at the top of the base, a mounting groove is formed in the base below the glue A preparation kettle and the glue B preparation kettle, a conveying assembly is assembled in the mounting groove, and a glue outlet is formed in the conveying assembly. The bottom of the A glue preparation kettle and the bottom of the B glue preparation kettle are jointly provided with a conveying pipe set in a butt joint mode, the front end of the conveying pipe set is provided with an integrated discharging assembly in a butt joint mode, the top of the base is fixedly provided with a negative pressure assembly, the working end of the negative pressure assembly is connected with the integrated discharging assembly, and the rear side of the base is provided with a feeding assembly. According to the glue feeding device, the conveying pipe group is matched with the integrated blanking assembly, so that processed glue A and glue B can be synchronously guided, and the quantity of the guided glue A and the quantity of the guided glue B are equal, so that the glue A and the glue B can be simultaneously blanked and loaded by the device, and personnel can better control the discharging process of the device.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of AB glue processing equipment, in particular to a double-kettle type AB glue processing device. Background Art

[0002] AB glue is produced by mixing component A and component B. Component A is usually the main body of epoxy resin, while component B is the curing agent or hardener. These two parts need to be mixed together in a specific ratio, and after stirring evenly, a chemical reaction begins to form the final glue;

[0003] During the production of the existing AB glue, each of the production kettles is used for processing and production. This requires personnel to operate and observe each of the production kettles of the AB glue, which causes the overall production process to bring more inconvenience to the staff. In addition, when unloading, each of the production kettles of the AB glue needs to be loaded, and the unified synchronous operation of unloading the AB glue cannot be achieved.

[0004] Therefore, the present application proposes a double-kettle AB glue processing device. Utility Model Content

[0005] In view of the deficiencies in the prior art, the utility model provides a double-kettle type AB glue processing device, which solves the problems mentioned in the background technology.

[0006] In order to achieve the above objectives, the present invention is implemented through the following technical solutions:

[0007] A double-kettle AB glue processing device comprises a base, wherein an A glue preparation kettle and a B glue preparation kettle are respectively arranged on the top of the base, a mounting groove is arranged on the base below the A glue preparation kettle and the B glue preparation kettle, a conveying assembly is assembled in the mounting groove, a conveying pipe group is mounted on the bottoms of the A glue preparation kettle and the B glue preparation kettle, an integrated unloading assembly is mounted on the front end of the conveying pipe group, a negative pressure assembly is fixedly mounted on the top of the base, and the working end of the negative pressure assembly is mounted and connected with the integrated unloading assembly, and a feeding assembly is arranged on the rear side of the base; the integrated unloading assembly comprises a shell and an unloading component, the front end of the conveying pipe group is mounted and connected with the shell, two groups of unloading cavities are arranged inside the shell, and the unloading component is assembled inside the shell, a negative pressure pump is fixedly mounted on the front side of the top of the base, and a second exhaust pipe connected with the two groups of unloading cavities is mounted and connected on the front of the shell, and the exhaust end of the negative pressure pump is mounted and connected with the second exhaust pipe; the conveying assembly comprises a conveyor belt, and the conveyor belt is assembled in the mounting groove.

[0008] Furthermore, the discharge ports at the bottom of the A glue preparation kettle and the B glue preparation kettle are both fixedly installed with a discharge valve for use with them, and the A glue preparation kettle and the B glue preparation kettle are connected to each other through the discharge ports to install a feed pipe group, the feed pipe group includes a glue liquid delivery branch pipe and a glue liquid delivery main pipe, the A glue preparation kettle and the B glue preparation kettle are connected to each other through the discharge ports to install a glue liquid delivery branch pipe, the ends of the glue liquid delivery branch pipes are jointly connected to the glue liquid delivery main pipe, two groups of glue delivery channels are arranged in the glue liquid delivery main pipe, and the two groups of glue delivery channels are respectively connected to the glue liquid delivery branch pipes.

[0009] Furthermore, the material unloading component includes an electric push rod, a docking port, a material guide barrel, and a feed port. The electric push rod is fixedly installed on the top of the shell, and the output end of the electric push rod extends into the material unloading cavity. The output end of the electric push rod is docked with a material guide barrel, and the material guide barrel is provided with a feed port corresponding to the glue delivery channel. The bottom end of the material guide barrel extends out of the shell, and the bottom end of the material guide barrel is docked with a docking port.

[0010] Furthermore, the negative pressure component also includes an exhaust pipe 1 and a support seat. The exhaust end of the negative pressure pump is docked with the exhaust pipe 1, and the negative pressure pump is installed and connected to the exhaust pipe 2 through the exhaust pipe 1. The exhaust pipe 2 is equipped with a support seat fixedly connected to the base.

[0011] Furthermore, a double-cavity storage barrel is placed on the conveying surface of the conveyor belt, and two sets of independent storage chambers for storing glue A and glue B are respectively arranged inside the double-cavity storage barrel, and two sets of injection ports are installed on the top of the double-cavity storage barrel, and the injection ports are respectively connected to the storage chambers, and the material guide cylinder cooperates with the injection port through the docking port.

[0012] Furthermore, the feeding assembly includes a layered feeding barrel, a filling port, a material guide branch pipe, a material guide main pipe, a feed pump, and a feeding pipe. The layered feeding barrel is arranged on the rear side of the base, the feeding port is docked on one side of the layered feeding barrel, the material guide main pipe is docked on the front of the layered feeding barrel through the material guide branch pipe, and a feed pump is fixedly installed on the rear side of the top of the base. The input end of the feed pump is installed and connected to the bottom end of the material guide main pipe, and the output end of the feed pump is assembled and connected to the A glue preparation kettle and the B glue preparation kettle through the feeding pipe.

[0013] The utility model provides a double-kettle AB glue processing device. Compared with the prior art, it has the following beneficial effects:

[0014] 1. Through the cooperation between the feeding pipe group and the integrated unloading assembly, not only can the processed A glue and B glue be synchronously conveyed to ensure that the amount of A glue and B glue exported is the same, so that the device can realize the simultaneous unloading and loading of A glue and B glue, and the personnel can also better control the unloading process of the device;

[0015] 2. The conveying components in the installation slot are used to cooperate with the loading parts, so that the loading parts can be automatically conveyed. In this way, personnel do not need to manually switch the loading parts during the unloading of the device, thus ensuring the operation process of the device;

[0016] 3. The negative pressure component cooperates with the integrated unloading component to increase the unloading process of the device by means of negative pressure extraction. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0018] Figure 1 It shows a schematic structural diagram of the first assembly state of the double-kettle AB glue processing device of the utility model;

[0019] Figure 2 It shows a schematic structural diagram of the third assembly state of the double-kettle AB glue processing device of the utility model;

[0020] Figure 3 The schematic diagram of the front assembly state of the double-kettle AB glue processing device of the utility model is shown;

[0021] Figure 4 The schematic diagram of the structure of the assembly state of the material delivery pipe group and the integrated material discharge assembly of the utility model is shown;

[0022] Figure 5 The schematic diagram of the structure of the integrated blanking assembly of the utility model is shown;

[0023] Figure 6 The schematic diagram of the structure of the material conveying pipe group of the utility model is shown;

[0024] As shown in the figure: 1. Base; 11. Mounting slot; 2. A glue preparation kettle; 3. B glue preparation kettle; 4. Integrated unloading assembly; 41. Shell; 42. Unloading parts; 421. Electric push rod; 422. Docking port; 423. Material guide cylinder; 424. Feed inlet; 5. Conveying assembly; 51. Conveyor belt; 52. Motor; 53. Pulley; 6. Negative pressure assembly; 61. Negative pressure pump; 62. Exhaust pipe 1; 63. Exhaust pipe 2; 64. Support seat; 7. Double-cavity storage barrel; 8. Feeding assembly; 81. Layered feeding barrel; 82. Filling port; 83. Material guide branch pipe; 84. Material guide main pipe; 85. Material extraction pump; 86. Feeding pipe; 9. Delivery pipe group; 91. Glue liquid delivery branch pipe; 92. Glue liquid delivery main pipe. DETAILED DESCRIPTION

[0025] In order to make the purpose, technical solution and advantages of the embodiments of the utility model clearer, the technical solution in the embodiments of the utility model is described clearly and completely. Obviously, the described embodiments are part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model. Embodiment 1

[0026] In order to solve the technical problems in the background technology, a double-kettle AB glue processing device is provided as follows:

[0027] Combination Figure 1-Figure 6 As shown, the utility model provides a double-kettle type AB glue processing device, comprising a base 1, wherein an A glue preparation kettle 2 and a B glue preparation kettle 3 are respectively arranged on the top of the base 1, and a mounting groove 11 is arranged on the base 1 below the A glue preparation kettle 2 and the B glue preparation kettle 3, and a conveying assembly 5 is assembled in the mounting groove 11, and a conveying pipe group 9 is commonly butt-jointedly installed at the bottom of the A glue preparation kettle 2 and the B glue preparation kettle 3, and an integrated unloading assembly 4 is butt-jointedly installed at the front end of the conveying pipe group 9, a negative pressure assembly 6 is fixedly installed on the top of the base 1, and the working end of the negative pressure assembly 6 is installed and connected with the integrated unloading assembly 4, and a feeding assembly 8 is arranged on the rear side of the base 1;

[0028] The required A glue and B glue are prepared respectively by the A glue preparation kettle 2 and the B glue preparation kettle 3, and the prepared raw materials are respectively injected into the A glue preparation kettle 2 and the B glue preparation kettle 3 through the feeding component 8. In the general glue preparation operation, the conveying component 5 in the installation groove 11 cooperates with the loading part so that the loading part can be automatically conveyed, so that the personnel do not need to manually switch the loading part during the unloading of the device, thereby ensuring the operation progress of the device, and through the mutual cooperation between the conveying pipe group 9 and the integrated unloading component 4, not only can the processed A glue and B glue be synchronously guided to ensure that the amount of A glue and B glue exported is the same, so that the device can realize the simultaneous unloading and loading of A glue and B glue, and the personnel can also better control the unloading process of the device, and the negative pressure component 6 cooperates with the integrated unloading component 4 to increase the unloading process of the device by negative pressure suction.

[0029] The integrated material discharge assembly 4 includes a shell 41 and a material discharge component 42. The front end of the material delivery pipe group 9 is docked with the shell 41. Two groups of material discharge cavities are arranged inside the shell 41. Each group of material discharge cavities of the shell 41 is equipped with a group of independent material discharge components 42. A negative pressure pump 61 is fixedly installed on the front side of the top of the base 1. The front side of the shell 41 is docked with a second air extraction pipe 63 connected with the two groups of material discharge cavities, and the air extraction end of the negative pressure pump 61 is installed and connected with the second air extraction pipe 63; the conveying assembly 5 includes a conveyor belt 51, and the conveyor belt 51 is installed in the installation groove 11;

[0030] The device realizes the separate unloading operations of glue A and glue B through the unloading component 42 in the shell 41. When unloading, the negative pressure pump 61 evacuates the unloading chamber through the exhaust pipe 63, so that the glue liquid can quickly enter the unloading chamber and is discharged by the unloading component 42. During this period, personnel can place the loading parts side by side on the conveyor belt 51, and use the conveyor belt 51 to guide them to the unloading position, so that the device can be unloaded and loaded multiple times without being taken out. Embodiment 2

[0031] like Figure 1 and Figure 5 As shown, based on the above embodiment, this embodiment further provides the following contents:

[0032] In this embodiment, the discharge ports at the bottom of the A glue preparation kettle 2 and the B glue preparation kettle 3 are fixedly installed with a discharge valve for use with them. The A glue preparation kettle 2 and the B glue preparation kettle 3 are connected to each other through the discharge ports and a feed pipe group 9 is installed. The feed pipe group 9 includes a glue liquid delivery branch pipe 91 and a glue liquid delivery main pipe 92. The A glue preparation kettle 2 and the B glue preparation kettle 3 are connected to each other through the discharge ports and a glue liquid delivery branch pipe 91 is installed. The ends of the glue liquid delivery branch pipe 91 are connected to each other and a glue liquid delivery main pipe 92 is installed. Two groups of glue delivery channels are arranged in the glue liquid delivery main pipe 92, and the two groups of glue delivery channels are respectively connected to the glue liquid delivery branch pipe 91.

[0033] The discharge ports at the bottom of the A glue preparation kettle 2 and the B glue preparation kettle 3 enter the glue liquid delivery branch pipe 91 under the control of the discharge valve, and then enter the glue delivery channel inside the glue liquid delivery main pipe 92 through the glue liquid delivery branch pipe 91 for delivery;

[0034] Glue A and glue B enter corresponding glue delivery channels respectively, and enter the unloading component 42 through their respective channels for unloading.

[0035] In this embodiment, the unloading component 42 includes an electric push rod 421, a docking port 422, a material guide cylinder 423, and a feed port 424. The electric push rod 421 is fixedly installed on the top of the shell 41, and the output end of the electric push rod 421 extends into the unloading cavity. The output end of the electric push rod 421 is docked with a material guide cylinder 423, and the material guide cylinder 423 is provided with a feed port 424 corresponding to the glue delivery channel. The bottom end of the material guide cylinder 423 extends out of the shell 41, and the bottom end of the material guide cylinder 423 is docked with a docking port 422.

[0036] During this period, the electric push rod 421 is started, and the electric push rod 421 drives the guide barrel 423 at the bottom to perform lifting and lowering movements. At this time, the feed port 424 on the guide barrel 423 is exposed and corresponds to the glue delivery channel. At the same time, the docking port 422 at the bottom of the guide barrel 423 is docked with the loading part, and the glue enters the guide barrel 423 through the feed port 424, and finally the glue enters the inside of the loading part.

[0037] A double-chamber storage barrel 7 is placed on the conveying surface of the conveyor belt 51. The interior of the double-chamber storage barrel 7 is provided with two independent storage chambers for storing glue A and glue B, and two sets of injection ports are installed at the top of the double-chamber storage barrel 7. The injection ports are connected to the storage chambers respectively, and the material guide cylinder 423 cooperates with the injection port through the docking port 422.

[0038] The double-chamber storage barrel 7 is the loading part;

[0039] The storage chamber inside the double-chamber storage barrel 7 can store glue A and glue B respectively;

[0040] During this period, when the double-chamber storage barrel 7 reaches below the docking port 422, the docking port 422 will be driven to dock with the feed port on the double-chamber storage barrel 7, so that glue A and glue B can enter the corresponding AB storage chambers. Embodiment 3

[0041] like Figure 1-Figure 5 As shown, based on the above embodiment, this embodiment further provides the following contents:

[0042] In this embodiment, the negative pressure component 6 also includes an exhaust pipe 62 and a support seat 64. The exhaust end of the negative pressure pump 61 is docked with the exhaust pipe 62, and the negative pressure pump 61 is installed and connected to the exhaust pipe 63 through the exhaust pipe 62. The exhaust pipe 63 is mounted with a support seat 64 fixedly connected to the base 1.

[0043] During this period, the negative pressure pump 61 is started, and the negative pressure pump 61 performs a vacuum operation through the cooperation between the vacuum pipe 1 62 and the vacuum pipe 2 63, so that a negative pressure effect can be formed in the material discharge chamber, which promotes the negative pressure discharge of the derived glue.

[0044] In this embodiment, the feeding assembly 8 includes a layered feeding barrel 81, a feeding port 82, a material guide branch pipe 83, a material guide main pipe 84, a material extraction pump 85, and a feeding pipe 86. The layered feeding barrel 81 is arranged on the rear side of the base 1, and the feeding port 82 is docked and installed on one side of the layered feeding barrel 81. The material guide main pipe 84 is docked and installed on the front of the layered feeding barrel 81 through the material guide branch pipe 83. A material extraction pump 85 is fixedly installed on the rear side of the top of the base 1, and the input end of the material extraction pump 85 is installed and connected to the bottom end of the material guide main pipe 84, and the output end of the material extraction pump 85 is assembled and connected to the A glue preparation kettle 2 and the B glue preparation kettle 3 through the feeding pipe 86.

[0045] The layered feeding barrel 81 is provided with multiple layers of feeding space inside, which can store the required raw materials for preparing glue A and glue B; the guiding branch pipe 83 is equipped with a solenoid valve for use, which is convenient for personnel to control the guiding of materials;

[0046] During this period, the extraction pump 85 is started, and the extraction pump 85 extracts the raw materials through the cooperation between the material guide branch pipe 83 and the material guide main pipe 84, and then supplies the raw materials to the A glue preparation kettle 2 and the B glue preparation kettle 3 through the supply pipe 86 for preparation operation.

[0047] In this embodiment, the conveying assembly 5 also includes a motor 52 , a pulley 53 , and a conveyor belt 51 ; the motor 52 is fixedly mounted on the rear side of the top of the base 1 , and the output end of the motor 52 is transmission-connected to the conveyor belt 51 via the pulley 53 .

[0048] During this period, personnel first place multiple double-chamber storage barrels 7 side by side on the conveyor belt 51, and then start the motor 52, and the output end pulley 53 of 52 rotates to complete the conduction operation of the conveyor belt. When the double-chamber storage barrel 7 reaches the unloading position, docking and unloading can be carried out.

[0049] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the existence of other identical elements in the process, method, article or device including the elements.

[0050] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.

Claims

1. A double-kettle AB glue processing device, characterized in that: It comprises a base, wherein a glue preparation kettle A and a glue preparation kettle B are respectively arranged on the top of the base, a mounting groove is arranged on the base below the glue preparation kettle A and the glue preparation kettle B, a conveying assembly is assembled in the mounting groove, a conveying pipe group is docked and installed at the bottom of the glue preparation kettle A and the glue preparation kettle B, an integrated material discharge assembly is docked and installed at the front end of the material discharge pipe group, a negative pressure assembly is fixedly installed on the top of the base, and the working end of the negative pressure assembly is installed and connected with the integrated material discharge assembly, and a feeding assembly is arranged at the rear side of the base; The integrated unloading component includes a shell and a unloading component. The front end of the feeding pipe group is docked with the shell, and two groups of unloading cavities are arranged inside the shell. The unloading component is installed inside the shell. A negative pressure pump is fixedly installed on the front side of the top of the base. A second exhaust pipe connected to the two groups of unloading cavities is docked with the front of the shell, and the exhaust end of the negative pressure pump is installed and connected to the second exhaust pipe. The conveying component includes a conveyor belt, and the conveyor belt is installed in the installation groove.

2. A double-kettle AB glue processing device according to claim 1, characterized in that: The discharge ports at the bottom of the A glue preparation kettle and the B glue preparation kettle are both fixedly installed with a discharge valve for use with them. The A glue preparation kettle and the B glue preparation kettle are connected to each other through the discharge ports to install a feed pipe group, the feed pipe group includes a glue liquid delivery branch pipe and a glue liquid delivery main pipe. The A glue preparation kettle and the B glue preparation kettle are connected to each other through the discharge ports to install a glue liquid delivery branch pipe, the ends of the glue liquid delivery branch pipes are jointly connected to the glue liquid delivery main pipe, two groups of glue delivery channels are arranged in the glue liquid delivery main pipe, and the two groups of glue delivery channels are respectively connected to the glue liquid delivery branch pipes.

3. A double-kettle AB glue processing device according to claim 2, characterized in that: The material unloading component includes an electric push rod, a docking port, a material guide barrel, and a feed port. The electric push rod is fixedly installed on the top of the shell, and the output end of the electric push rod extends into the material unloading cavity. The output end of the electric push rod is docked with the material guide barrel, and the material guide barrel is provided with a feed port corresponding to the glue delivery channel. The bottom end of the material guide barrel extends out of the shell, and the bottom end of the material guide barrel is docked with the docking port.

4. A double-kettle AB glue processing device according to claim 3, characterized in that: The negative pressure component also includes an exhaust pipe 1 and a support seat. The exhaust end of the negative pressure pump is connected to the exhaust pipe 1, and the negative pressure pump is installed and connected to the exhaust pipe 2 through the exhaust pipe 1. The exhaust pipe 2 is equipped with a support seat fixedly connected to the base.

5. A double-kettle AB glue processing device according to claim 4, characterized in that: A double-cavity storage barrel is placed on the conveying surface of the conveyor belt. Two sets of independent storage chambers for storing glue A and glue B are respectively arranged inside the double-cavity storage barrel, and two sets of injection ports are installed at the top of the double-cavity storage barrel. The injection ports are connected to the storage chambers respectively, and the material guide cylinder cooperates with the injection port through the docking port.

6. A double-kettle AB glue processing device according to claim 5, characterized in that: The feeding assembly includes a stratified feeding barrel, a material injection port, a material guide branch pipe, a material guide main pipe, a material extraction pump, and a feeding pipe. The stratified feeding barrel is arranged on the rear side of the base, the material injection port is docked on one side of the stratified feeding barrel, the material guide main pipe is docked on the front of the stratified feeding barrel through the material guide branch pipe, and a material extraction pump is fixedly installed on the rear side of the top of the base. The input end of the material extraction pump is installed and connected to the bottom end of the material guide main pipe, and the output end of the material extraction pump is assembled and connected to the A glue preparation kettle and the B glue preparation kettle through the feeding pipe.