Container ground rail paint spraying room

By designing the container rail spray room and using sliding frames and multiple spray gun structures, the problem of uneven spraying in the existing technology is solved, and the rapid and all-round spraying of the container is achieved, and the spraying efficiency and uniformity are improved.

CN222112251UActive Publication Date: 2024-12-06HEBEI HANNA TECHNOLOGY CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420683240.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-03
Publication Date
2024-12-06
Estimated Expiration
2034-04-03

AI Technical Summary

Technical Problem

It is difficult to achieve rapid and comprehensive spraying when spraying containers in existing spray rooms, and due to the large volume and weight of the container, the use of container movement will lead to uneven spraying.

Method used

A container rail spray room was designed. By sliding the spray parts on the rack, the spray parts can move along the track, realizing all-round spraying on the top, side and even bottom of the container, avoiding the movement of the container itself. Multiple guns and linkage structures for improved spray efficiency and uniformity.

Benefits of technology

It realizes rapid and uniform spraying of containers, improves spraying efficiency, and ensures complete coverage of container surfaces.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222112251U_ABST
    Figure CN222112251U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of paint spraying, and provides a container ground rail paint spraying room which is used for spraying paint on the surface of a container. The frame body is arranged in the accommodating space in a sliding manner; one end of the spraying part is arranged on the frame body in a sliding manner, and the other end of the spraying part faces the container. According to the technical scheme, the problem that an existing paint spraying room in the related technology cannot quickly spray paint on the container in all directions is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of spray painting, and in particular to a container rail spray painting room. Background Art

[0002] The existing spray booths are divided into two categories, dry spray booths and wet spray booths. The container rail spray booth belongs to the dry spray booth. The current dry spray booths on the market generally use manual, robotic arms, reciprocating machines and other spraying methods, which are workpieces moving and the spraying position fixed.

[0003] When spraying paint in a traditional spray booth, it is difficult to quickly and comprehensively spray paint containers using a single robotic arm or reciprocating machine. In addition, due to the large size and weight of the container, it is difficult to control the speed by moving the container, resulting in uneven spraying. Utility Model Content

[0004] The utility model provides a container ground rail spray painting room, which solves the problem that the existing spray painting rooms in the related technology cannot spray paint on the container quickly and comprehensively.

[0005] The technical solution of the utility model is as follows:

[0006] A container rail spray painting room, used for spraying paint on the surface of a container, comprising:

[0007] The main body has a receiving space;

[0008] A frame body is slidably disposed in the accommodation space;

[0009] The spraying part has one end slidably arranged on the frame and the other end facing the container.

[0010] Preferably, it also includes:

[0011] A first track is arranged in the accommodation space, and the frame is slidably arranged on the first track;

[0012] A second track is arranged in the accommodation space;

[0013] A supporting plate is slidably arranged on the second track, and the container is used to be arranged on the supporting plate.

[0014] Preferably, the spray-coated part comprises:

[0015] A mounting frame, slidably disposed on the frame body;

[0016] There are a plurality of connecting rods, which are symmetrically arranged on the frame, and each of the connecting rods has a mounting end;

[0017] There are a plurality of first spray guns, each of the mounting ends is provided with one of the first spray guns;

[0018] The driving member is arranged on the frame, the mounting frame is arranged on the driving member, and the driving member is used for driving the mounting frame to slide along the frame.

[0019] Preferably, the connecting rod comprises:

[0020] A first rod body, arranged on the mounting frame;

[0021] A rotating shaft is arranged at one end of the first rod body away from the mounting frame, and the rotating shaft is arranged perpendicular to the first rod body;

[0022] The second rod body is arranged perpendicular to the rotating shaft, one end of the second rod body is rotatably sleeved on the rotating shaft, and the mounting end is arranged at the other end of the second rod body.

[0023] Preferably, it also includes:

[0024] A gear, disposed on the rotating shaft;

[0025] A rack, slidably disposed on the mounting frame, the rack meshing with the gear;

[0026] The driving part is arranged on the mounting frame, the rack is arranged on the driving part, and the driving part is used for driving the rack to move.

[0027] Preferably, the frame comprises:

[0028] A crossbeam, on which the mounting frame is slidably disposed;

[0029] A column, arranged at the end of the beam;

[0030] A sliding seat, slidably disposed on the column;

[0031] A second spray gun is disposed on the sliding seat, and the second spray gun faces the container.

[0032] Preferably, it also includes:

[0033] A bracket, arranged in the accommodation space;

[0034] The bearing member is arranged on the bracket along the height direction of the bracket.

[0035] Preferably, it also includes:

[0036] The ventilation windows are provided in a plurality and are arranged on the main body at intervals.

[0037] Preferably, the main body further has a tunnel, and the tunnel is located below the second track.

[0038] Preferably, it also includes:

[0039] There are a plurality of door panels, and the plurality of door panels are respectively arranged on the main body.

[0040] The working principle and beneficial effects of the utility model are:

[0041] In the utility model, the spraying parts are slidably arranged on the frame. When the container is sprayed with paint, the container does not need to be moved, and only the spraying parts need to be moved to complete the spraying operation. Moreover, by arranging multiple spraying parts, the top surface, side surface and even bottom surface of the container can be sprayed at the same time, thereby realizing fast and uniform all-round spraying of the container. BRIEF DESCRIPTION OF THE DRAWINGS

[0042] The preferred implementation modes will be described below in a clear and understandable manner with reference to the accompanying drawings to further illustrate the above-mentioned characteristics, technical features, advantages and implementation methods of the present utility model.

[0043] Figure 1 This is a schematic diagram of the interior of the paint spraying room of the utility model;

[0044] Figure 2 This is a schematic diagram of the external structure of the paint spraying room of the utility model;

[0045] Figure 3 for Figure 1 A partial enlarged schematic diagram in the middle;

[0046] Figure 4 This is a schematic diagram of the frame structure of the utility model;

[0047] Figure 5 This is a schematic diagram of the structure of the mounting frame of the utility model.

[0048] In the figure: 1. main body; 101. accommodating space; 2. ventilation window; 3. door panel; 4. second track; 5. container; 6. first track; 7. supporting plate; 8. bracket; 9. bearing member; 10. frame; 1001. beam; 1002. column; 11. tunnel; 12. spraying member; 1201. mounting frame; 1202. first spray gun; 1203. driving member; 13. sliding seat; 14. second spray gun; 15. connecting rod; 1501. first rod body; 1502. second rod body; 16. rotating shaft; 17. rack; 18. gear. DETAILED DESCRIPTION

[0049] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the specific implementation methods of the utility model will be described below with reference to the accompanying drawings. Obviously, the accompanying drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings and other implementation methods can be obtained based on these drawings without creative work.

[0050] In order to simplify the drawings, only the parts related to the utility model are schematically shown in each figure, and they do not represent the actual structure of the product. In addition, in order to simplify the drawings and facilitate understanding, in some figures, only one of the parts with the same structure or function is schematically shown, or only one of them is marked. In this article, "one" not only means "only one", but also means "more than one", and "several" includes "two" and "more than two".

[0051] In this article, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in this utility model can be understood according to specific circumstances.

[0052] In addition, in the description of the present application, the terms "first", "second", etc. are only used to distinguish the description and cannot be understood as indicating or implying relative importance.

[0053] Reference Figure 1~Figure 2 , which is an embodiment of the utility model, proposes a container 5 rail spray paint room for spraying paint on the surface of the container 5, including: a main body 1, having a accommodating space 101; a frame 10, slidably arranged in the accommodating space 101; a spraying member 12, one end of which is slidably arranged on the frame 10 and the other end faces the container 5.

[0054] In the above scheme, the main body 1 is made of a sturdy and durable steel structure to form a closed accommodation space 101, which is large enough to accommodate at least one standard container 5 to enter completely. The wall of the main body 1 structure adopts a double-layer structure, the outer layer is a rust-proof and weather-resistant steel plate, and the inner layer is a flame-retardant and sound-proof material, which ensures the structural strength, anti-corrosion performance and quietness of the internal working environment of the paint spraying room. The frame 10 is a frame structure spliced ​​by profiles, which is light and rigid. The bottom of the frame 10 is provided with rollers matching the track, so that the frame 10 can slide smoothly along the ground track. The spraying part 12 can slide on the frame 10, and the spray gun is connected to a paint supply system to stably supply the required paint for the painting operation. When working, the spraying part 12 is slidably set on the frame 10. During the painting process, the container 5 does not need to be moved. Only the spraying part 12 needs to be moved to complete the spraying operation. By setting multiple spraying parts 12, the top surface, side surface and even bottom surface of the container 5 can be sprayed at the same time, so as to achieve fast and uniform all-round spraying of the container 5.

[0055] Furthermore, it also includes: a first track 6, which is arranged in the accommodating space 101, and the frame 10 is slidably arranged on the first track 6; a second track 4, which is arranged in the accommodating space 101; a supporting plate 7, which is slidably arranged on the second track 4, and the container 5 is arranged on the supporting plate 7.

[0056] In the above scheme, the first track 6 is provided on the ground inside the main body 1, which is usually made of high-strength steel and has a rust-proof surface treatment to ensure durability under long-term use. The first track 6 is laid along the length direction of the main body 1 and is firmly connected to the structure of the main body 1 to ensure the stability and accuracy of the frame 10 when it slides on it. The frame 10 slides along the first track 6 and is erected outside the container 5. Inside the main body 1, a second track 4 is provided parallel to the first track 6, and the second track 4 is located inside the first track 6. The second track 4 is also made of high-strength steel and has a rust-proof surface treatment to ensure durability. The support plate 7 is slidably arranged on the second track 4, which is designed to bear the weight of the entire container 5 and slide smoothly. When the container 5 needs to be painted, it is placed on the support plate 7, and the support plate 7 is controlled by a driving device (such as an electric hoist, a hydraulic cylinder, etc.) to slide along the second track 4, so that the container 5 moves into the designated position in the spray booth and moves out of the spray booth smoothly after the spraying is completed.

[0057] Reference Figure 3~Figure 5Furthermore, the spraying member 12 includes: a mounting frame 1201, which is slidably arranged on the frame 10; a plurality of connecting rods 15, which are symmetrically arranged on the frame 10, and each connecting rod 15 has a mounting end; a plurality of first spray guns 1202, and each mounting end is provided with a first spray gun 1202; a driving member 1203, which is arranged on the frame 10, and the mounting frame 1201 is arranged on the driving member 1203, and the driving member 1203 is used to drive the mounting frame 1201 to slide along the frame 10.

[0058] In the above scheme, one end of the connecting rod 15 is connected to the mounting frame 1201 by welding or bolt connection, and the other end is suspended outside the mounting frame 1201. A first spray gun 1202 is provided on the mounting end of each connecting rod 15. The first spray gun 1202 is firmly connected to the connecting rod 15 by a special fixing member to ensure the stability of the spray gun during the painting process. The spray gun mouth faces the surface of the container 5 to be painted, and is connected to the external paint supply system through a pipeline to ensure the continuous and stable supply of paint during the painting process. The number, layout and spray angle of the first spray gun 1202 can be adjusted according to the actual painting requirements. The driving member 1203 adopts a motor, and the motor drives the chain to drive the mounting frame 1201 to reciprocate along the frame 10 by driving the sprocket. It should be noted that the end of the mounting frame 1201 away from the first spray gun 1202 is slidably connected to the frame 10 to ensure the stability of the movement of the mounting frame 1201.

[0059] Furthermore, the connecting rod 15 includes: a first rod body 1501, which is arranged on the mounting frame 1201; a rotating shaft 16, which is arranged at one end of the first rod body 1501 away from the mounting frame 1201, and the rotating shaft 16 is arranged perpendicular to the first rod body 1501; a second rod body 1502, which is arranged perpendicular to the rotating shaft 16, one end of the second rod body 1502 is rotatably sleeved on the rotating shaft 16, and the mounting end is arranged at the other end of the second rod body 1502.

[0060] In the above solution, the shaft of the rotating shaft 16 is rotatably matched with the first rod 1501 and the second rod 1502 through connectors such as bearings or sleeves. The existence of the rotating shaft 16 enables the second rod 1502 to rotate at a certain angle relative to the first rod 1501, thereby meeting the requirements of spraying paint on the surfaces of different containers 5. In particular, when spraying the corners of the container 5, by rotating the second rod 1502 along the rotating shaft 16, the multiple first spray guns 1202 can spray the container 5 in a manner of surrounding the corners of the container 5, so that the spraying effect is better.

[0061] Furthermore, it also includes: a gear 18, which is arranged on the rotating shaft 16; a rack 17, which is slidably arranged on the mounting frame 1201, and the rack 17 is meshed with the gear 18; a driving unit, which is arranged on the mounting frame 1201, and the rack 17 is arranged on the driving unit, and the driving unit is used to drive the rack 17 to move.

[0062] In the above scheme, the cooperation between the gear 18 and the rack 17 can adjust the angle of the second connecting rod 15 to meet the spraying requirements of different container 5 surfaces. The rack 17 and the mounting frame 1201 are slidably matched through connecting parts such as slide rails, sliders or ball screws to ensure that the rack 17 moves steadily and smoothly. The driving unit is arranged on the mounting frame 1201 and connected to the rack 17. The driving unit usually adopts an electric or hydraulic driving method, and drives the rack 17 to slide along the mounting frame 1201 through a precise transmission mechanism (such as a motor, a reducer, a hydraulic cylinder, etc.), thereby driving the gear 18 to rotate, and adjusting the angle of the second connecting rod 15. By setting the angle parameters of the connecting rod 15, the driving unit can accurately control the moving speed and position of the rack 17 according to the set value, so as to achieve precise control of the angle of the connecting rod 15.

[0063] Furthermore, the frame 10 includes: a beam 1001, a mounting frame 1201 is slidably disposed on the beam 1001; a column 1002 is disposed at the end of the beam 1001; a sliding seat 13 is slidably disposed on the column 1002; a second spray gun 14 is disposed on the sliding seat 13, and the second spray gun 14 faces the container 5.

[0064] In the above solution, the frame 10 is a gantry frame, and a movable spraying method is adopted, so that the top surface, side surface and even the bottom surface of the container 5 can be automatically sprayed, thereby improving the spraying efficiency.

[0065] Furthermore, it also includes: a bracket 8, which is arranged in the accommodation space 101; and a bearing member 9, which is arranged on the bracket 8 along the height direction of the bracket 8. The bearing member 9 can be a basket or other platform that is convenient for standing. The bracket 8 and the bearing member 9 together form a supplementary spraying platform. After the automatic spraying mode is completed, the operator can carry the bearing member 9 to supplement the unsprayed position and inspect the surface of the container 5 to improve the spraying effect of the container 5.

[0066] Furthermore, it also includes: ventilation windows 2, which have a plurality of them, and a plurality of ventilation windows 2 are arranged at intervals on the main body 1. A plurality of ventilation windows 2 are arranged at intervals on the main body 1, that is, on the walls on the same side or different sides of the main body 1, and are arranged according to a certain spacing and arrangement. The ventilation windows 2 arranged at intervals can form an effective ventilation path, so that the air inside the paint spraying room can flow quickly and evenly, effectively reducing the concentration of harmful gases generated during the painting operation and improving the working environment. The ventilation windows 2 are usually used in conjunction with ventilation equipment (such as fans, exhaust fans, air purifiers, etc.). The air inside the paint spraying room is extracted by the drive of the fan and other equipment, and fresh air from the outside is introduced to realize the circulation and renewal of the air inside the paint spraying room. The power, air volume and opening and closing time of the ventilation equipment can be adjusted according to the actual painting needs to optimize the ventilation effect inside the paint spraying room.

[0067] Furthermore, the main body 1 also has a tunnel 11, and the tunnel 11 is located below the second track 4. The bottom surface of the container 5 can be sprayed without lifting the container 5, which reduces the lifting steps of the container 5 in the traditional spray painting room and makes the painting work simpler and faster.

[0068] Furthermore, it also includes: a plurality of door panels 3, and the plurality of door panels 3 are respectively arranged on the main body 1. The plurality of door panels 3 are respectively arranged on the main body 1, that is, on the walls on the same side or different sides of the main body 1, and the arrangement of the door panels 3 should ensure effective isolation between the inside and outside of the spray paint room, and prevent harmful gases, paint mist and other substances generated during the spray paint operation from spreading to the outside of the spray paint room and polluting the environment.

[0069] Working process: Container 5 is the workpiece to be sprayed. The door panel 3 of the main body 1 is opened, and the container 5 enters the interior of the main body 1 through the second track 4, and then stops at the designated position. The frame 10 will move from left to right, and the mounting frame 1201 on the top of the frame 10 will also move forward and backward. The first spray gun 1202 starts to spray paint, and the sliding seat 13 on the side of the frame 10 moves up and down, driving the second spray gun 14 to spray paint, spraying the top surface and two sides of the container 5. After this action is completed, the bracket 8 moves from left to right, and the bearing member 9 of the bracket 8 moves up and down according to demand, and starts to spray the left and right sides of the container 5 and the defects of the previous process. After that, the operator inside the main body 1 starts to spray the bottom surface of the container 5. This spray paint room can realize the painting of all surfaces of the container 5.

[0070] It should be noted that the above embodiments are only used to illustrate the technical solution of the utility model rather than to limit it. Although the utility model has been described in detail with reference to the preferred embodiments, ordinary technicians in the field should understand that the technical solution of the utility model can be modified or replaced by equivalents without departing from the spirit and scope of the technical solution of the utility model, which should be included in the scope of the claims of the utility model.

Claims

1. A container rail spray painting room, used for spraying paint on the surface of a container (5), characterized in that: include: A main body (1) having a receiving space (101); A frame (10) is slidably disposed in the accommodation space (101); A spraying member (12), one end of which is slidably disposed on the frame (10) and the other end of which is used to face the container (5); A first track (6) is arranged in the accommodating space (101), and the frame (10) is slidably arranged on the first track (6); A second track (4) is arranged in the accommodation space (101); A supporting plate (7) is slidably arranged on the second track (4), and the container (5) is used to be arranged on the supporting plate (7); The spraying part (12) comprises: A mounting frame (1201) is slidably mounted on the frame body (10); There are a plurality of connecting rods (15), wherein the connecting rods (15) are symmetrically arranged on the frame (10), and each connecting rod (15) has a mounting end; A plurality of first spray guns (1202), each of the mounting ends being provided with a first spray gun (1202); The driving member (1203) is arranged on the frame (10), and the mounting frame (1201) is arranged on the driving member (1203). The driving member (1203) is used to drive the mounting frame (1201) to slide along the frame (10).

2. The container rail spray painting room according to claim 1 is characterized in that: The connecting rod (15) comprises: A first rod body (1501) is arranged on the mounting frame (1201); A rotating shaft (16) is arranged at an end of the first rod (1501) away from the mounting frame (1201), and the rotating shaft (16) is arranged perpendicular to the first rod (1501); The second rod body (1502) is arranged perpendicular to the rotating shaft (16), one end of the second rod body (1502) is rotatably sleeved on the rotating shaft (16), and the mounting end is arranged at the other end of the second rod body (1502).

3. The container rail spray painting room according to claim 2 is characterized in that: Also includes: a gear (18), arranged on the rotating shaft (16); A rack (17) is slidably disposed on the mounting frame (1201), and the rack (17) is meshed with the gear (18); The driving unit is arranged on the mounting frame (1201), the rack (17) is arranged on the driving unit, and the driving unit is used to drive the rack (17) to move.

4. The container rail spray booth according to claim 1, characterized in that: The frame (10) comprises: A crossbeam (1001), wherein the mounting frame (1201) is slidably disposed on the crossbeam (1001); A column (1002) is arranged at the end of the crossbeam (1001); and further comprises: A sliding seat (13) slidably disposed on the column (1002); A second spray gun (14) is arranged on the sliding seat (13), and the second spray gun (14) faces the container (5).

5. The container rail spray booth according to claim 1, characterized in that: Also includes: A bracket (8) is arranged in the accommodating space (101); A bearing member (9) is arranged on the bracket (8) along the height direction of the bracket (8).

6. The container rail spray booth according to claim 1, characterized in that: Also includes: The ventilation windows (2) are provided in a plurality, and the plurality of ventilation windows (2) are arranged on the main body (1) at intervals.

7. The container rail spray booth according to claim 2, characterized in that:The main body (1) also has a tunnel (11), and the tunnel (11) is located below the second track (4).

8. The container rail spray booth according to claim 1, characterized in that: Also includes: There are a plurality of door panels (3), and the plurality of door panels (3) are respectively arranged on the main body (1).