By combining the design of arc-shaped and linear gates in water conservancy projects, and using the coordination of rotating shafts and driving components, the problem of linear gates in arc-shaped or duck-billed weirs cannot block water, achieving efficient installation of water conservancy equipment and operation reduces costs.

CN222120128UActive Publication Date: 2024-12-06CHINA INST OF WATER RESOURCES & HYDROPOWER RES +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420854083.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-23
Publication Date
2024-12-06
Estimated Expiration
2034-04-23

AI Technical Summary

Technical Problem

Existing linear gates cannot effectively block water in arc-shaped or duck-billed weirs and cannot adapt to the needs of weirs of different shapes.

Method used

A water blocking device is designed, combining arc gates and linear gates, and through the cooperation of the rotating shaft and driving components, the arc gates and linear gates are realized stably installed and abutted, and the water stop baffle and positioner are used to lift it. Waterproofing effect, the driving equipment includes hydraulic cylinders and traction ropes, and the control components in the management room are used to control the opening and closing of the gates.

Benefits of technology

The water barrier effect is achieved to increase the water barrier height on weirs of different shapes, while reducing costs. The structure of arc gates and linear gates is simple, and can be installed and operated stably and continuously, improving the applicability of water conservancy engineering equipment. .

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222120128U_ABST
    Figure CN222120128U_ABST
Patent Text Reader

Abstract

The utility model relates to the field of hydraulic engineering equipment, in particular to a water blocking device which comprises a weir body, a water blocking plate, a water blocking plate and a water blocking plate. The first gate assembly comprises a radial gate and a first rotating shaft; the radial gate is provided with a first shaft hole, and the radial gate is installed on the first base through cooperation of the first shaft hole and the first rotating shaft, so that the radial gate can rotate around the first base through the first rotating shaft; the second gate assembly comprises a linear gate and a second rotating shaft; the linear gate is provided with a second shaft hole, and the linear gate is installed on the second base through cooperation of the second shaft hole and the second rotating shaft, so that the linear gate can rotate around the second base through the second rotating shaft. According to the water retaining device, through selection and cooperation of the arc-shaped gate and the linear gate, the water retaining height of the water retaining device is increased, and meanwhile the water retaining device can adapt to weir bodies of different shapes.
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present application relates to the field of water conservancy engineering equipment, and in particular to a water blocking device. [Background technology]

[0002] The gates on the weir are common facilities in water conservancy buildings used to increase the water retaining height, control and regulate water flow. By raising and lowering the gates, the water flow through the weir can be adjusted to meet different needs such as irrigation, power generation, water supply, and shipping. Existing gates such as steel plate gates, movable hinge gates, and flap gates are mostly linear structures, but due to the diverse terrain of the weir, for example, in the design of curved weirs and duckbill weirs, linear gates are not applicable and cannot effectively retain water. [Contents of the utility model]

[0003] In view of this, the present application provides a water retaining device, which can adapt to the use of weirs of different shapes while increasing the water retaining height of the water retaining device through the selection and coordination of an arc gate and a linear gate.

[0004] The present application provides a water blocking device, the water blocking device comprising:

[0005] The weir body comprises an arc segment and a straight segment, wherein a first base is arranged on the arc segment and a second base is arranged on the straight segment;

[0006] A first gate assembly includes a radial gate and a first rotating shaft; the radial gate is provided with a first shaft hole, and the radial gate is installed on the first base through the cooperation between the first shaft hole and the first rotating shaft, so that the radial gate can rotate around the first base through the first rotating shaft; and

[0007] The second gate assembly includes a linear gate and a second rotating shaft; the linear gate is provided with a second shaft hole, and the linear gate is installed on the second base through the cooperation between the second shaft hole and the second rotating shaft, so that the linear gate can rotate around the second base through the second rotating shaft.

[0008] In some embodiments, the water blocking device further includes a water stopping assembly, and the water stopping assembly includes a first water stopping baffle and a second water stopping baffle;

[0009] The first water-stopping baffle is installed on the arc segment to fill the gap between the bottom of the arc gate and the arc segment. When the water-blocking device is in a closed state, the arc gate abuts against the first water-stopping baffle, and the projections of the arc gate and the first water-stopping baffle on the arc segment overlap in the vertical direction.

[0010] The second water stop baffle is installed on the straight section to fill the gap between the bottom of the linear gate and the straight section. When the water blocking device is in a closed state, the linear gate abuts against the second water stop baffle, and the projections of the linear gate and the second water stop baffle on the straight section overlap in the vertical direction.

[0011] In some embodiments, the water blocking device further includes a positioning assembly, and the positioning assembly includes a first positioner and a second positioner;

[0012] The first positioner is installed on the arc segment, and when the water blocking device is in a closed state, the arc gate abuts against the first positioner;

[0013] The second positioner is installed on the straight segment, and when the water blocking device is in a closed state, the linear gate abuts against the second positioner.

[0014] In some embodiments, the water blocking device further includes a driving device, and the driving device includes a first driving component and a second driving component;

[0015] The first driving assembly is connected to the arc gate to drive the arc gate to rotate relative to the first base;

[0016] The second driving assembly is connected to the linear gate to drive the linear gate to rotate relative to the second base.

[0017] In some embodiments, the first driving assembly includes a first hydraulic cylinder, and the first hydraulic cylinder is connected to the first rotating shaft so that the first hydraulic cylinder drives the radial gate to rotate; and / or

[0018] The first driving component includes a first traction rope, a first commutator and a first wire take-up device, and the arc gate is provided with a first mounting member, one end of the first traction rope is connected to the first mounting member, and the other end of the first traction rope is connected to the first wire take-up device after bypassing the first commutator and changing the extension direction.

[0019] In some embodiments, when the first driving assembly includes the first traction rope, the first commutator and the first wire take-up device, the first rotating shaft is installed in the first shaft hole in an eccentric arrangement.

[0020] In some embodiments, the second driving assembly includes a second hydraulic cylinder, and the second hydraulic cylinder is connected to the second rotating shaft so that the second hydraulic cylinder drives the linear gate to catch; and / or

[0021] The second driving component includes a second traction rope, a second commutator and a second wire take-up device, and the linear gate is provided with a second mounting member, one end of the second traction rope is connected to the second mounting member, and the other end of the second traction rope is connected to the second wire take-up device after bypassing the second commutator to change the extension direction.

[0022] In some embodiments, when the second driving assembly includes the second traction rope, the second commutator and the second wire take-up device, the second rotating shaft is installed in the second shaft hole in an eccentric arrangement.

[0023] In some embodiments, the water blocking device further includes a management room, in which a control component is disposed, and the control component is connected to the first gate component and the second gate component.

[0024] In some embodiments, the control assembly includes a control cabinet, a hydraulic station, and an operating table, and the first wire take-up device and the second wire take-up device are installed on the operating table.

[0025] After adopting the technical solution of this application, at least the following beneficial effects are achieved:

[0026] The water retaining device provided in the present application can select arc gates and linear gates of different numbers and lengths according to different extended shapes of the weir body such as straight lines or arcs, so that the arc gates and linear gates can be stably and continuously installed on the weir body. That is, the arc gates and linear gates can be abutted and matched with each other to increase the water retaining height of the water retaining device to achieve the water retaining effect. At the same time, the structures of the arc gates and linear gates are simple, which reduces the water retaining cost.

Brief Description of the Drawings

[0027] Figure 1 A schematic structural diagram of a water blocking device provided in an embodiment of the present application;

[0028] Figure 2 A schematic diagram of the structure of a radial gate of a water retaining device provided in an embodiment of the present application;

[0029] Figure 3 A schematic diagram of the structure of a linear gate of a water retaining device provided in an embodiment of the present application;

[0030] Figure 4 A schematic structural diagram of another water blocking device provided in an embodiment of the present application.

[0031] Figure ID:

[0032] 1. Weir body; 11. First base; 12. Second base; 2. Radial gate; 21. First rotating shaft; 22. First mounting piece; 3. Linear gate; 31. Second rotating shaft; 32. Second mounting piece; 4. First water stop baffle; 5. Second water stop baffle; 6. First positioner; 7. Second positioner; 81. First hydraulic cylinder; 82. First traction rope; 83. First diverter; 91. Second hydraulic cylinder; 92. Second traction rope; 93. Second diverter; 10. Management room; 101. Control cabinet; 102. Hydraulic station; 103. Operating table. [Specific implementation method]

[0033] In order to better understand the technical solution of the present application, the embodiments of the present application are described in detail below with reference to the accompanying drawings.

[0034] It should be clear that the described embodiments are only part of the embodiments of the present application, rather than all the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in the field without creative work are within the scope of protection of the present application.

[0035] The terms used in the embodiments of the present application are only for the purpose of describing specific embodiments, and are not intended to limit the present application. The singular forms "a", "said" and "the" used in the embodiments of the present application and the appended claims are also intended to include plural forms, unless the context clearly indicates other meanings.

[0036] It should be understood that the term "and / or" used in this article is only a description of the association relationship of associated objects, indicating that there can be three relationships. For example, A and / or B can represent: A exists alone, A and B exist at the same time, and B exists alone. In addition, the character " / " in this article generally indicates that the associated objects before and after are in an "or" relationship.

[0037] It should be noted that the directional words such as "upper", "lower", "left", and "right" described in the embodiments of the present application are described at the angles shown in the accompanying drawings and should not be understood as limiting the embodiments of the present application. In addition, in the context, it is also necessary to understand that when it is mentioned that an element is connected to another element "upper" or "lower", it can not only be directly connected to another element "upper" or "lower", but also indirectly connected to another element "upper" or "lower" through an intermediate element.

[0038] The gates on the weir are common facilities in water conservancy buildings used to increase the water retaining height, control and regulate water flow. By raising and lowering the gates, the water flow through the weir can be adjusted to meet different needs such as irrigation, power generation, water supply, and shipping. Existing gates such as steel plate gates, movable hinge gates, and flap gates are mostly linear structures, but due to the diverse terrain of the weir, for example, in the design of curved weirs and duckbill weirs, linear gates are not applicable and cannot effectively retain water.

[0039] In view of this, the present application provides a water blocking device, please refer to Figure 1 to Figure 4 , the water blocking device includes:

[0040] The weir body 1 comprises an arc segment and a straight segment, a first base 11 is arranged on the arc segment, and a second base 12 is arranged on the straight segment;

[0041] The first gate assembly includes a radial gate 2 and a first rotating shaft 21; the radial gate 2 is provided with a first shaft hole, and the radial gate 2 is installed on the first base 11 through the cooperation between the first shaft hole and the first rotating shaft 21, so that the radial gate 2 can rotate around the first base 11 through the first rotating shaft 21; and

[0042] The second gate assembly includes a linear gate 3 and a second rotating shaft 31 ; the linear gate 3 is provided with a second shaft hole, and the linear gate 3 is installed on the second base 12 through the cooperation between the second shaft hole and the second rotating shaft 31 , so that the linear gate 3 can rotate around the second base 12 through the second rotating shaft 31 .

[0043] In the above scheme, the water retaining device can select different numbers and lengths of arc gates 2 and linear gates 3 according to different extension shapes such as straight lines or arcs of the weir body 1, so that the arc gates 2 and linear gates 3 can be stably and continuously installed on the weir body 1, that is, through the abutment and cooperation of the arc gates 2 and the linear gates 3, while the water retaining height of the water retaining device is increased to achieve the water retaining effect, the structures of the arc gates 2 and the linear gates 3 are simple, which reduces the water retaining cost.

[0044] In some embodiments, the weir body 1 is a concrete structure, including at least one arc segment and at least one straight segment. Specifically, when the terrain where the weir body 1 is located is diverse and causes the shape of the weir body 1 to be irregular, the part of the weir body 1 where the gate is installed can be divided into multiple small distance units, one part of the multiple small distance units is a straight line segment, and the other part is an arc segment. The extension length and angle of the divided straight line segments and arc segments, and the bending angle of the arc segment can be selected according to actual needs. When gates are installed on adjacent straight line segments and arc segments, adjacent gates can be closely abutted to achieve the purpose of water blocking, and no limitation is made here.

[0045] In some embodiments, a first base 11 is provided on the arc segment, and the first base 11 and the arc segment can be connected by fasteners such as screws or by concrete solidification, etc., which can be selected according to actual needs and are not limited here. The first base 11 is used to install the first gate assembly. It can be understood that when the first gate assembly is installed on the first base, the first gate assembly can play a role in blocking water and increasing the water blocking height. Specifically, the first gate assembly includes a curved gate 2 and a first rotating shaft 21, and the first rotating shaft 21 is installed on the first base 11 in a vertical direction. The curved gate 2 is provided with a first shaft hole, and then the curved gate 2 is installed on the first base 11 through the cooperation of the first shaft hole and the first rotating shaft 21, so that the curved gate 2 can rotate around the second base 12 through the second rotating shaft 31. It can be understood that after the arc gate 2 is set, when the drainage process needs to be carried out, the arc gate 2 rotates around the first base 11 toward the water storage surface through the first rotating shaft 21, and the adjacent gates are no longer abutted, and the drainage process can be carried out at this time.

[0046] In some embodiments, a second base 12 is provided on the straight segment, and the first base 11 and the arc segment can be connected by fasteners such as screws or by concrete solidification, etc., which can be selected according to actual needs and are not limited here. The second base 12 is used to install the second gate assembly. It can be understood that when the second gate assembly is installed on the second base, the second gate assembly can play a role in blocking water and increasing the water blocking height. Specifically, the second gate assembly includes a linear gate 3 and a second rotating shaft 31, and the second rotating shaft 31 is installed on the second base 12 along the vertical direction. The linear gate 3 is provided with a second shaft hole, and then the linear gate 3 is installed on the second base 12 through the second shaft hole and the second rotating shaft 31. The second shaft 31 is matched, so that the linear gate 3 can rotate around the second base 12 through the second rotating shaft 31. It can be understood that after the linear gate 3 is set, when the drainage process needs to be carried out, the linear gate 3 rotates around the second base 12 toward the water storage surface through the second rotating shaft 31, and the adjacent gates are no longer abutted, and the drainage process can be carried out at this time.

[0047] Furthermore, when the arc gate 2 and the linear gate 3 are installed and play a water-blocking role, there is a certain gap between the bottom of the arc gate 2 and the linear gate 3 and the surface of the arc segment due to the installation structure, and the gap needs to be sealed to prevent water from flowing out of the connection gap between the arc gate 2 and the base. In this regard, the first gate assembly also includes a water-stop assembly, which includes a first water-stop baffle 4 and a second water-stop baffle 5.

[0048] The first water stop baffle 4 is installed on the arc segment to fill the gap between the bottom of the arc gate 2 and the arc segment. When the water retaining device is in a closed state, the arc gate 2 abuts against the first water stop baffle 4, and the projections of the arc gate 2 and the first water stop baffle 4 on the arc segment overlap in the vertical direction.

[0049] The second water stop baffle 5 is installed on the straight section to fill the gap between the bottom of the linear gate 3 and the straight section. When the water retaining device is in a closed state, the linear gate 3 abuts against the second water stop baffle 5, and the projections of the linear gate 3 and the second water stop baffle 5 on the straight section overlap in the vertical direction.

[0050] It can be understood that after the first water stop baffle 4 and the second water stop baffle 5 are provided, the water blocking effect of the arc gate 2 and the linear gate 3 can be improved. In the present application, the first water stop baffle 4, the second water stop baffle 5 and the weir body 1 can be connected by fasteners such as screws or by concrete solidification, which can be selected according to actual needs and is not limited here.

[0051] Furthermore, when the radial gate 2 and the linear gate 3 need to be reset after drainage is completed, the rotation angle of the radial gate 2 and the linear gate 3 is 0 to 360 degrees due to the arrangement of the first rotating shaft 21 and the second rotating shaft 31, and it is difficult to reset to the correct position. Therefore, in order to ensure the accurate reset of the radial gate 2 and the linear gate 3, the water retaining device also includes a positioning assembly, which is installed on the weir body 1 and is located on the side of the radial gate 2 or the linear gate 3 away from the water storage surface.

[0052] Specifically, the positioning assembly includes a first positioner 6 and a second positioner 7. The first positioner 6 is installed on the arc segment. When the water retaining device is in the closed state, the arc gate 2 abuts against the first positioner 6; the second positioner 7 is installed on the straight segment. When the water retaining device is in the closed state, the linear gate 3 abuts against the second positioner 7. It can be understood that after the first positioner 6 and the second positioner 7 are set, when the water retaining device is changed from the drainage state to the water retaining state, the arc gate 2 rotates to abut against the first positioner 6, and the linear gate 3 rotates to abut against the second positioner 7. At this time, the arc gate 2 and the linear gate 3 can play an effective water retaining role, and the gate will not be opened in a direction away from the water storage surface due to the push of the water flow.

[0053] As an optional technical solution of the present application, in order to ensure the service life of the positioning assembly, a buffer structure can also be set between the abutting part of the first positioner 6 and the arc gate, and between the abutting part of the second positioner 7 and the linear gate to prevent the arc gate 2 and the linear gate 3 from colliding and damaging the structure of the positioning assembly when they are reset. The buffer structure used in the present application can be a spring or other elastic member, which can be selected according to actual needs and is not limited here.

[0054] In some embodiments, the rotation of the radial gate 2 and the linear gate 3 is achieved by the cooperation of the management room 10 and the driving device. The management room 10 is provided with a control component, and the driving device includes a first driving component and a second driving component. The first driving component is connected to the radial gate 2 to drive the radial gate 2 to rotate relative to the first base 11, and the second driving component is connected to the linear gate 3 to drive the linear gate 3 to rotate relative to the second base 12. The control component includes a control cabinet 101, a hydraulic station 102, and an operation station 103. The driving device can be connected to the control component in the management room 10 through a pipeline, and the pipeline trough can be arranged in the weir body 1, so that the control component can control the driving device to perform the working process.

[0055] In some embodiments, as an optional technical solution of the present application, the first driving assembly includes a first hydraulic cylinder 81, and the first hydraulic cylinder 81 is connected to the first rotating shaft 21, so that the first hydraulic cylinder 81 drives the radial gate 2 to rotate.

[0056] It should be noted that when the first hydraulic cylinder 81 is connected to the first rotating shaft 21, a connecting column is provided at the bottom of the first hydraulic cylinder 81, and at least a portion of the connecting column is embedded in the shaft hole of the first rotating shaft 21, or at least a portion of the first rotating shaft 21 is embedded in the shaft hole of the connecting column, so that the two are connected by interference fit, so that the first hydraulic cylinder 81 can drive the first rotating shaft 21 to rotate relative to the first base 11, so as to drive the rotation of the radial gate 2. It can be understood that after the first hydraulic cylinder 81 is provided, the opening and closing of the radial gate 2 can be driven by the first hydraulic cylinder 81.

[0057] As another optional technical solution of the present application, the first driving assembly includes a first traction rope 82, a first commutator 83 and a first wire take-up device. The radial gate 2 is provided with a first mounting member 22, the first commutator 83 is arranged at the lower part of the first positioner 6, and the first wire take-up device is installed in the management room 10 and connected to the operation station 103. At this time, after the first traction rope 82 is connected to the reversing wheel of the first commutator 83, the directions of the two ends of the first traction rope 82 are changed, one end passes through the first positioner 6 and is connected to the first mounting member 22 on the radial gate 2, and the other end bypasses the first commutator 83 to change the extension direction and is connected to the first wire take-up device. It can be understood that after the first traction assembly is set, when water blocking is required, the worker operates the first wire take-up device 103 to drive the radial gate 2 to reset.

[0058] It should be noted that the gate opening method is different from that of the first hydraulic cylinder 81. Specifically, when the first traction assembly is used for driving, the first rotating shaft 21 is installed in the first shaft hole in an eccentric arrangement, and the pressure difference caused by the unequal water pressure at both ends of the radial gate 2 can be used to drive the radial gate 2 to rotate, and the radial gate 2 is opened to release water.

[0059] As can be seen from the above, when the radial gate 2 of the present application rotates, it can be driven by the first hydraulic cylinder 81 alone, or it can be pulled by the first traction rope 82 alone, or it can be driven by the first hydraulic cylinder 81 and pulled by the first traction rope 82. The combination of the first hydraulic cylinder 81 and the first traction rope 82 can be used. The two driving modes can be used at the same time to open or reset the gate faster and shorten the operation time. The driving mode of the radial gate 2 can be selected according to actual needs, and is not limited here.

[0060] In some embodiments, as an optional technical solution of the present application, the second driving assembly includes a second hydraulic cylinder 91, and the second hydraulic cylinder 91 is connected to the second rotating shaft 31, so that the second hydraulic cylinder 91 drives the linear gate 3 to rotate.

[0061] It should be noted that when the second hydraulic cylinder 91 is connected to the second rotating shaft 31, a connecting column is provided at the bottom of the second hydraulic cylinder 91, and at least a portion of the connecting column is embedded in the shaft hole of the second rotating shaft 31, or at least a portion of the second rotating shaft 31 is embedded in the shaft hole of the connecting column, so that the two are connected by interference fit, so that the second hydraulic cylinder 91 can drive the second rotating shaft 31 to rotate relative to the second base 12, so as to drive the rotation of the linear gate 3. It can be understood that after the second hydraulic cylinder 91 is provided, the opening and closing of the linear gate 3 can be driven by the second hydraulic cylinder 91.

[0062] As another optional technical solution of the present application, the second driving assembly includes a second traction rope 92, a second commutator 93 and a second wire take-up device. The linear gate 3 is provided with a second mounting member 32, the second commutator 93 is arranged at the lower part of the second positioner 7, and the second wire take-up device is installed in the management room 10 and connected to the operation station 103. At this time, after the second traction rope 92 is connected to the reversing wheel of the second commutator 93, the directions of the two ends of the second traction rope 92 are changed, one end passes through the second positioner 7 and is connected to the second mounting member 32 on the linear gate 3, and the other end bypasses the second commutator 93 to change the extension direction and is connected to the second wire take-up device. It can be understood that after the second traction assembly is set, when water blocking is required, the worker operates the second wire take-up device 103 to drive the linear gate 3 to reset.

[0063] It should be noted that the gate opening method is different from that of the second hydraulic cylinder 91. Specifically, when the second traction assembly is used for driving, the second rotating shaft 31 is installed in the second shaft hole in an eccentric arrangement, and the linear gate 3 can be driven to rotate by utilizing the pressure difference generated by the unequal water pressure at both ends of the linear gate 3, and the linear gate 3 is opened to release water.

[0064] As can be seen from the above, when the arc gate 2 of the present application rotates, it can be driven by the second hydraulic cylinder 91 alone, or it can be pulled by the second traction rope 92 alone, or it can be driven by the second hydraulic cylinder 91 and pulled by the second traction rope 92. The combination of the two driving modes can open or reset the gate faster and shorten the operation time. The driving mode of the linear gate 3 can be selected according to actual needs, and is not limited here.

[0065] In actual application, according to the different shapes of the weir body 1, arc gates 2 and linear gates 3 of different lengths, shapes and bending angles are selected to increase the water retaining height of the water retaining device to achieve the water retaining effect while reducing the water retaining cost.

[0066] The above describes in detail the structure, features and effects of the present application based on the embodiments shown in the drawings. The above is only a preferred embodiment of the present application, but the present application does not limit the scope of implementation to what is shown in the drawings. Any changes made in accordance with the concept of the present application, or modifications to equivalent embodiments with equivalent changes, which still do not exceed the spirit covered by the description and drawings, should be within the protection scope of the present application.

Claims

1. A water blocking device, characterized in that: The water blocking device comprises: A weir body (1) comprises an arc segment and a straight segment, wherein a first base (11) is arranged on the arc segment, and a second base (12) is arranged on the straight segment; A first gate assembly comprises a radial gate (2) and a first rotating shaft (21); the radial gate (2) is provided with a first shaft hole, and the radial gate (2) is mounted on the first base (11) through the cooperation between the first shaft hole and the first rotating shaft (21), so that the radial gate (2) can rotate around the first base (11) through the first rotating shaft (21); and The second gate assembly comprises a linear gate (3) and a second rotating shaft (31); the linear gate (3) is provided with a second axial hole, and the linear gate (3) is installed on the second base (12) through the cooperation between the second axial hole and the second rotating shaft (31), so that the linear gate (3) can rotate around the second base (12) through the second rotating shaft (31).

2. The water blocking device according to claim 1, characterized in that: The water blocking device further comprises a water stopping assembly, wherein the water stopping assembly comprises a first water stopping baffle plate (4) and a second water stopping baffle plate (5); The first water-stop baffle (4) is installed on the arc segment to fill the gap between the bottom of the arc gate (2) and the arc segment. When the water-blocking device is in a closed state, the arc gate (2) abuts against the first water-stop baffle (4), and the projections of the arc gate (2) and the first water-stop baffle (4) on the arc segment in the vertical direction overlap. The second water stop baffle (5) is installed on the straight section to fill the gap between the bottom of the linear gate (3) and the linear section. When the water retaining device is in a closed state, the linear gate (3) abuts against the second water stop baffle (5), and the projections of the linear gate (3) and the second water stop baffle (5) on the linear section overlap in the vertical direction.

3. The water blocking device according to claim 1, characterized in that: The water-blocking device further comprises a positioning assembly, wherein the positioning assembly comprises a first positioner (6) and a second positioner (7); The first positioner (6) is installed on the arc segment, and when the water blocking device is in a closed state, the arc gate (2) abuts against the first positioner (6); The second positioner (7) is installed on the straight section, and when the water blocking device is in a closed state, the linear gate (3) abuts against the second positioner (7).

4. The water blocking device according to claim 1, characterized in that: The water blocking device further comprises a driving device, wherein the driving device comprises a first driving component and a second driving component; The first driving assembly is connected to the radial gate (2) to drive the radial gate (2) to rotate relative to the first base (11); The second driving assembly is connected to the linear gate (3) to drive the linear gate (3) to rotate relative to the second base (12).

5. The water blocking device according to claim 4, characterized in that: The first driving assembly comprises a first hydraulic cylinder (81), the first hydraulic cylinder (81) being connected to the first rotating shaft (21), so that the first hydraulic cylinder (81) drives the radial gate (2) to rotate; and / or The first driving assembly comprises a first traction rope (82), a first commutator (83) and a first wire take-up device, and a first mounting member (22) is provided on the arc gate (2), one end of the first traction rope (82) is connected to the first mounting member (22), and the other end of the first traction rope (82) is connected to the first wire take-up device after passing around the first commutator (83) and changing the extension direction.

6. The water blocking device according to claim 5, characterized in that: When the first driving assembly comprises the first traction rope (82), the first commutator (83) and the first wire take-up device, the first rotating shaft (21) is installed in the first shaft hole in an eccentric arrangement.

7. The water blocking device according to claim 5, characterized in that: The second driving assembly comprises a second hydraulic cylinder (91), the second hydraulic cylinder (91) being connected to the second rotating shaft (31), so that the second hydraulic cylinder (91) drives the linear gate (3) to catch; and / or The second driving component comprises a second traction rope (92), a second commutator (93) and a second wire take-up device, and a second mounting member (32) is provided on the linear gate (3), one end of the second traction rope (92) is connected to the second mounting member (32), and the other end of the second traction rope (92) is connected to the second wire take-up device after passing around the second commutator (93) and changing the extension direction.

8. The water blocking device according to claim 7, characterized in that: When the second driving assembly comprises the second traction rope (92), the second commutator (93) and the second wire take-up device, the second rotating shaft (31) is installed in the second shaft hole in an eccentric arrangement.

9. The water blocking device according to claim 8, characterized in that: The water intercepting device further comprises a management room (10), wherein a control component is arranged in the management room (10), and the control component is connected to the first gate component and the second gate component.

10. The water blocking device according to claim 9, characterized in that: The control assembly comprises a control cabinet (101), a hydraulic station (102) and an operating table (103), and the first wire take-up device and the second wire take-up device are installed on the operating table (103).