Water gushing stratum deslagging device and earth pressure balance shield machine
By designing the slag discharge device of the water inrush formation, and using the screening and circulation modes of the mud separation station and storage station to process the cement slurry, the problem of high construction cost and low efficiency of the soil-pressed shield structure in the water inrush formation is solved, and the rapid and effective Construction and reduce environmental impact.
Patent Information
- Application Number
- CN202420095028.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-15
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2034-01-15
AI Technical Summary
The existing soil-pressure shield structure has high construction cost, low efficiency and cannot continue to be excavated under the water inlet formation, which has problems such as environmental pollution and delayed construction period.
A water slag discharge device is designed, including a mud separation station, storage station and pipeline control mechanism. The cement slurry is processed through screening and circulation modes to achieve effective storage and reuse of mud, ensuring that the shield machine is under water swelling conditions. Can continue construction.
It realizes rapid and effective continuous excavation under the water influx formation, reduces construction costs, avoids environmental pollution and delays in construction periods, and replaces the traditional grouting method and freezing method.
Smart Images

Figure CN222121519U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of shield construction, in particular to a slag discharge device for water gushing strata and an earth pressure balance shield machine. Background Art
[0002] The application of shield construction method in tunnel construction projects is becoming increasingly mature. However, due to the high uncertainty of tunnel geology, shield construction still faces many difficulties and challenges.
[0003] In the prior art, the solution for earth pressure shield to deal with water gushing conditions is usually to drain the gushing water, or to treat the gushing stratum by freezing or grouting, which is expensive and time-consuming. For example, Publication No.: CN218953368U discloses a mud and water treatment device in tunnel construction, which can pre-treat the impurities in the gushing water and discharge the gushing water, but there are environmental pollution problems, and the equipment cannot continue to work during the gushing water discharge process, and there are uncontrollable drainage time, high drainage costs, obvious environmental impact, construction delays and other adverse effects, which cannot achieve the working condition of the earth pressure balance shield to quickly advance in the gushing stratum. Utility Model Content
[0004] The utility model provides a slag discharge device for water-gushing strata and an earth pressure balance shield machine, so as to solve the technical problems of high cost, low efficiency and inability to continue excavation construction in the existing earth pressure shield machine in coping with water-gushing conditions.
[0005] The technical solution adopted by the utility model is as follows:
[0006] A slag discharge device for a water-gushing stratum is applied to an earth pressure balance shield machine, the earth pressure balance shield machine includes an excavation chamber and a screw conveyor, and the slag discharge device for a water-gushing stratum includes:
[0007] The mud separation station is connected to the slag discharge end of the excavation bin and the slag discharge end of the screw conveyor through the slurry discharge pipeline, and is used to receive the mud slurry and screen the mud slurry into the first slurry and slag soil according to the size of the particles in the mud slurry;
[0008] A slurry storage station, used to receive the first slurry, the slurry storage station is also used to be connected to the slurry inlet of the excavation bin via a slurry inlet pipeline, the slurry storage station is provided with a first liquid level control mechanism, used to transport the first slurry to the slurry inlet of the excavation bin via the slurry inlet pipeline when the liquid level of the first slurry in the slurry storage station is higher than a preset liquid level;
[0009] The pipeline control mechanism is used to control the delivery pressure and on-off of the slurry inlet pipeline and the delivery pressure and on-off of the slurry discharge pipeline respectively.
[0010] As a further improvement of the above technical solution, the water-gushing stratum slag discharge device also includes a waste slurry station connected to the mud storage station, and the waste slurry station is also used to be connected to the tunnel sewage treatment system through a reverse slurry pipe.
[0011] As a further improvement of the above technical solution, the mud separation station is connected to the waste slurry station by setting an overflow pipe, which is used to control the mud slurry in the mud separation station to flow out to the waste slurry station when the liquid level of the mud slurry in the mud separation station is higher than the preset liquid level.
[0012] As a further improvement of the above technical solution, a second liquid level control mechanism is provided in the waste slurry station, which is used to control the mud slurry in the waste slurry station to flow out to the tunnel sewage treatment system when the liquid level of the mud slurry in the waste slurry station is higher than a preset liquid level.
[0013] As a further improvement of the above technical solution, the mud separation station is provided with a slag chute for guiding the slag discharged from the mud separation station to a conveyor belt.
[0014] As a further improvement of the above technical solution, the mud storage station is also used to be connected to the flushing port of the screw conveyor via a flushing pipeline, and the pipeline control mechanism is also used to control the on-off of the flushing pipeline.
[0015] As a further improvement of the above technical solution, the pipeline control mechanism includes a first slag discharge valve for being arranged at the slag discharge port of the screw conveyor, a second slag discharge valve for being arranged at the slag discharge port of the excavation bin, a slurry discharge valve arranged at the slurry discharge pipeline, and a slurry inlet valve arranged at the slurry inlet pipeline.
[0016] As a further improvement of the above technical solution, the slurry inlet pipeline is provided with a slurry inlet driving mechanism, and the slurry discharge pipeline is provided with a slurry discharge driving mechanism.
[0017] As a further improvement of the above technical solution, the slag discharge device for water-gushing formations also includes a bypass pipeline, one end of which is connected to the slurry feed pipeline and is located on one side of the output end of the slurry feed drive mechanism, and the other end of the bypass pipeline is connected to the slurry discharge pipeline and is located on one side of the input end of the slurry discharge drive mechanism.
[0018] On the other hand, an earth pressure balance shield machine is also provided, which is applied with any of the above-mentioned slag discharge devices for water-gushing formations.
[0019] The utility model has the following beneficial effects:
[0020] During the excavation of the earth pressure balance shield machine in the tunnel, all components in the device are in a shutdown state. If water gushing occurs during the excavation of the earth pressure balance shield machine, mud is discharged by opening the slag outlet of the excavation bin of the shield and the slag outlet of the screw conveyor, and the slag outlet door of the screw conveyor itself is closed. At the same time, the pipeline control mechanism controls the slurry discharge pipeline to open and control its conveying pressure, and the gushing water slurry enters the mud separation station through the slurry discharge pipeline. After screening and treatment at the mud separation station, the first slurry with smaller particles enters the mud storage station, while the slag with larger particles and relatively low water content is discharged. When the liquid level in the mud station is higher than the preset liquid level, the first liquid level control mechanism feeds back to the pipeline control mechanism, which controls the opening of the slurry feed pipeline and the conveying pressure of the pipeline control mechanism, so that the first slurry obtained after the gushing water slurry treatment enters the excavation bin through the slurry feed pipeline. In this state, the gushing water is discharged in the form of mud circulation. The slurry is then re-transported into the excavation chamber in the mode, and the effect of stopping water gushing with water is initially achieved. The water gushing from the excavation chamber is suppressed by the first slurry transported in, and the pipeline control mechanism further controls the delivery pressure of the slurry inlet pipeline, so that when the mud pressure transported into the excavation chamber is slightly greater than or equal to the water gushing pressure generated by the excavation chamber, the water gushing from the excavation chamber is blocked by the slurry. At this time, the mud circulation mode can be used to continue excavation, and after passing through the water-gushing stratum, the construction can be switched to the earth pressure mode to continue. The device achieves the mud circulation effect by setting up a mud separation station and a mud storage station in cooperation with the pipeline control mechanism to realize the storage and transportation of mud, and further blocks the water gushing by controlling the mud delivery pressure so that the slurry inlet pressure is greater than the water gushing pressure, thereby achieving the effect that the earth pressure shield can still be excavated in the case of water gushing, replacing the traditional grouting method and freezing method, and quickly and effectively solving the problem that the earth pressure shield machine cannot continue to excavate in the water-gushing stratum.
[0021] In addition to the above-described purposes, features and advantages, the present invention has other purposes, features and advantages. The present invention will be further described in detail below with reference to the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] The drawings constituting a part of this application are used to provide a further understanding of the present invention. The illustrative embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation on the present invention. In the drawings:
[0023] Figure 1 It is a structural diagram of a preferred embodiment of the utility model;
[0024] 1. Excavation bin 2. Slurry inlet valve 3. Flushing valve 4. Slurry inlet drive mechanism 5. Mud separation station 51. Slag chute 52. Overflow pipe 6. Waste slurry station 7. Conveyor belt 8. Slurry inversion pipe 9. Slurry discharge valve 10. Mud storage station 11. Slurry discharge valve 12. Slurry discharge drive mechanism 13. Bypass valve 14. Second slag discharge valve 15. Screw conveyor 16. First slag discharge valve 17. Tunnel sewage treatment system. DETAILED DESCRIPTION
[0025] It should be noted that, in the absence of conflict, the embodiments and features in the embodiments of the present application can be combined with each other. The present utility model will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.
[0026] Reference Figure 1 The preferred embodiment of the utility model provides a slag discharge device for water-gushing strata, which is applied to an earth pressure balance shield machine. The earth pressure balance shield machine includes an excavation chamber 1 and a screw conveyor 15. The slag discharge device for water-gushing strata includes:
[0027] The mud separation station 5 is connected to the slag discharge end of the excavation chamber 1 and the slag discharge end of the screw conveyor 15 through the slurry discharge pipeline, and is used to receive the mud slurry and screen the mud slurry into the first slurry and slag according to the size of the particles in the mud slurry;
[0028] The mud storage station 10 is used to receive the first slurry. The mud storage station 10 is also used to be connected to the slurry inlet of the excavation chamber 1 through the slurry inlet pipeline. The mud storage station 10 is provided with a first liquid level control mechanism, which is used to transport the first slurry to the slurry inlet of the excavation chamber 1 through the slurry inlet pipeline when the liquid level of the first slurry in the mud storage station 10 is higher than the preset liquid level;
[0029] The pipeline control mechanism is used to control the delivery pressure and on-off of the slurry inlet pipeline and the delivery pressure and on-off of the slurry discharge pipeline respectively.
[0030] Working principle of this device: During the excavation of the earth pressure balance shield machine in the tunnel, all components in this device are in a shutdown state. If water gushing occurs during the excavation of the earth pressure balance shield machine, the slurry is discharged by opening the slag outlet of the excavation chamber 1 of the shield and the slag outlet of the screw conveyor 15. The slag outlet door of the screw conveyor 15 itself is closed, and at the same time, the pipeline control mechanism controls the slurry discharge pipeline to open and control its conveying pressure, and the gushing water slurry enters the slurry separation station 5 through the slurry discharge pipeline. After screening and processing at the mud separation station 5, the first slurry with smaller particles enters the mud storage station 10, while the slag with larger particles and relatively low water content is discharged. When the liquid level in the mud station is higher than the preset liquid level, the first liquid level control mechanism feeds back to the pipeline control mechanism, and the pipeline control mechanism controls the opening of the slurry inlet pipeline and the conveying pressure, so that the first slurry obtained after the gushing water slurry treatment enters the excavation chamber 1 through the slurry inlet pipeline. In this state, the gushing water is The mud circulation mode is re-transported into the excavation chamber 1, and the effect of stopping water gushing with water is initially achieved. The water gushing from the excavation chamber 1 is suppressed by the first slurry transported in, and the pipeline control mechanism further controls the delivery pressure of the slurry inlet pipeline, so that when the mud pressure transported into the excavation chamber 1 is slightly greater than or equal to the water gushing pressure generated by the excavation chamber 1, the water gushing from the excavation chamber 1 is blocked by the mud. At this time, the mud circulation mode can be used to continue excavation, and after passing through the water-gushing stratum, the construction can be switched to the earth pressure mode to continue; the device achieves the mud circulation effect by setting up a mud separation station 5 and a mud storage station 10 in cooperation with the pipeline control mechanism to realize the storage and transportation of mud, and further blocks the water gushing by controlling the mud delivery pressure so that the slurry inlet pressure is greater than the water gushing pressure, so as to achieve the effect that the earth pressure shield can still be excavated in the case of water gushing, replacing the traditional grouting method and freezing method, and quickly and effectively solving the problem that the earth pressure shield machine cannot continue to excavate in the water-gushing stratum.
[0031] The mud separation station 5 of the device can be integrated on the shield machine to avoid the waste of manpower and material resources caused by connecting the mud pipeline to the ground mud field.
[0032] It can be understood that the pipeline control mechanism includes a slurry feed drive mechanism 4 arranged in the slurry feed pipeline, and a slurry discharge drive mechanism 12 arranged in the slurry discharge pipeline. The structure and working principle of the slurry feed drive mechanism 4 and the slurry discharge drive mechanism 12 are realized by referring to the pumping equipment in the prior art such as mud pumps, hydraulic diaphragm pumps, etc.
[0033] In this embodiment, the slag discharge device for water-gushing formations also includes a waste slurry station 6 connected to the mud storage station 10. The waste slurry station 6 is also used to be connected to the tunnel sewage treatment system 17 through the slurry backflow pipe 8. The pipeline control mechanism is also used to control the on-off of the slurry discharge pipeline between the mud storage station 10 and the waste slurry station 6. When the properties of the first slurry in the mud storage station 10 cannot meet the excavation requirements, such as excessive viscosity, the mud in the mud storage station 10 needs to be replaced, and the pipeline control mechanism controls the slurry discharge pipeline to be opened. The first slurry in the mud storage station 10 flows into the waste slurry station 6 by itself, and the waste slurry in the waste slurry station 6 is discharged to the tunnel sewage treatment system 17 through the slurry backflow pipe 8, wherein the tunnel sewage treatment system 17 is implemented with reference to the prior art;
[0034] Furthermore, the mud separation station 5 is connected to the waste slurry station 6 by setting an overflow pipe 52, which is used to control the mud slurry in the mud separation station 5 to flow out to the waste slurry station 6 when the liquid level of the mud slurry in the mud separation station 5 is higher than the preset liquid level, and automatically flow into the waste slurry station 6 when the liquid level in the mud separation station 5 is higher than the overflow pipe 52. Specifically, a second liquid level control mechanism is set in the waste slurry station 6, which is used to control the mud slurry in the waste slurry station 6 to flow out to the tunnel sewage treatment system 17 when the liquid level of the mud slurry in the waste slurry station 6 is higher than the preset liquid level, and the tunnel sewage treatment system 17 processes the excess mud;
[0035] It should be understood that the mud separation station 5 is provided with a slag plate 51 for guiding the slag discharged from the mud separation station 5 to the conveyor belt 7 located below the slag plate 51 , and the slag is transported out through the conveyor belt 7 .
[0036] In this embodiment, the mud storage station 10 is also used to connect to the flushing port of the screw conveyor 15 through a flushing pipeline, and the pipeline control mechanism is also used to control the on-off of the flushing pipeline. The two ends of the flushing pipeline are respectively connected to the slurry inlet pipeline and the flushing port. When the screw conveyor 15 is blocked by the gushing slurry and cannot be discharged through the slag outlet, the pipeline control mechanism controls the flushing pipeline to open, and uses the mud in the slurry inlet pipeline to flush the screw conveyor 15 under its conveying pressure until the screw conveyor 15 can smoothly discharge slag, ensuring that the gushing slurry can be used for excavation; the flushing pipeline is closed or kept open according to the actual excavation working conditions, thereby ensuring that the slurry flow rate continuously flushes the slag discharge channel of the screw conveyor 15;
[0037] Furthermore, the device also includes a bypass pipeline, one end of which is connected to the slurry feed pipeline and is located on one side of the output end of the slurry feed drive mechanism 4, and the other end of the bypass pipeline is connected to the slurry discharge pipeline and is located on one side of the input end of the slurry discharge drive mechanism 12. When the pipelines of the slag outlet of the excavation bin 1 and the slag outlet of the screw machine are blocked, the slurry discharge drive mechanism 12 is emptied, and the excavation bin 1 is in danger of roof collapse due to continuous entry of slurry and inability to discharge slurry. The bypass pipeline is controlled by the pipeline control mechanism to open and close the flushing pipeline and the slurry inlet of the excavation bin 1. The first slurry enters the slurry discharge pipeline through the slurry feed pipeline and the bypass pipeline, and then enters the mud separation station 5. This process is a circulating external bypass. After the bypass operates normally, the pipeline can be unblocked. After the blocked pipeline is unblocked, the bypass pipeline is closed, the slurry feed and the flushing pipeline are opened, and the circulation enters a normal excavation state.
[0038] It should be understood that the pipeline control mechanism includes a first slag discharge valve 16 for being arranged at the slag discharge port of the screw conveyor 15, a second slag discharge valve 14 for being arranged at the slag discharge port of the excavation chamber 1, a slurry discharge valve 11 arranged in the slurry discharge pipeline, a bypass valve 13 arranged in the bypass pipeline, a flushing valve 3 arranged in the flushing pipeline, a slurry discharge valve 9 arranged in the slurry discharge pipeline and a slurry inlet valve 2 arranged in the slurry inlet pipeline. Each control valve is an automatic control valve, and may also be a pneumatic control valve, an electric control valve, a hydraulic control valve, a manual valve or a mechanical logic valve, etc.; the automatic control valve is used to realize automatic control of the device, and personnel only need to operate through the system buttons to realize automation. Compared with the traditional water gushing treatment scheme, the gushing water has no external discharge. Through recycling, the gushing water is pumped back to the water gushing formation without disturbing the environment, avoiding environmental problems and waste of manpower and material resources caused by the discharge of gushing water.
[0039] The above description is only the preferred embodiment of the utility model, and is not intended to limit the utility model. For those skilled in the art, the utility model can have various modifications and changes. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the utility model shall be included in the protection scope of the utility model.
Claims
1. A slag discharge device for water-gushing strata, applied to an earth pressure balance shield machine, the earth pressure balance shield machine comprising an excavation chamber (1) and a screw conveyor (15), It is characterized in that The slag discharge device for water gushing formation comprises: A mud separation station (5) is connected to the slag discharge end of the excavation chamber (1) and the slag discharge end of the screw conveyor (15) through a slurry discharge pipeline, and is used to receive mud slurry and screen the mud slurry into a first slurry and slag soil according to the size of particles in the mud slurry; A slurry storage station (10) for receiving a first slurry, the slurry storage station (10) being further connected to a slurry inlet of an excavation chamber (1) via a slurry inlet pipeline, the slurry storage station (10) being provided with a first liquid level control mechanism for conveying the first slurry to the slurry inlet of the excavation chamber (1) via the slurry inlet pipeline when the liquid level of the first slurry in the slurry storage station (10) is higher than a preset liquid level; The pipeline control mechanism is used to control the delivery pressure and on-off of the slurry inlet pipeline and the delivery pressure and on-off of the slurry discharge pipeline respectively.
2. The slag discharge device for water-bearing formations according to claim 1, It is characterized in that The water-gushing stratum slag discharge device further comprises a waste slurry station (6) connected to the slurry storage station (10), and the waste slurry station (6) is also used to be connected to a tunnel sewage treatment system (17) via a reverse slurry pipe (8).
3. The slag discharge device for water-bearing formation according to claim 2, It is characterized in that The mud separation station (5) is connected to the waste slurry station (6) by providing an overflow pipe (52), which is used to control the mud slurry in the mud separation station (5) to flow out to the waste slurry station (6) when the liquid level of the mud slurry in the mud separation station (5) is higher than a preset liquid level.
4. The slag discharge device for water-bearing formations according to claim 2, It is characterized in that The waste slurry station (6) is provided with a second liquid level control mechanism for controlling the slurry in the waste slurry station (6) to flow out to the tunnel sewage treatment system (17) when the liquid level of the slurry in the waste slurry station (6) is higher than a preset liquid level.
5. The slag discharge device for water-bearing formation according to claim 1, It is characterized in that The mud separation station (5) is provided with a slag chute (51) for guiding the slag discharged from the mud separation station (5) to a conveyor belt (7).
6. The slag discharge device for water-bearing formations according to claim 1, It is characterized in that The mud storage station (10) is also used to be connected to the flushing port of the screw conveyor (15) via a flushing pipeline, and the pipeline control mechanism is also used to control the on-off of the flushing pipeline.
7. The slag discharge device for water-bearing formation according to any one of claims 1 to 6, It is characterized in that The pipeline control mechanism comprises a first slag discharge valve (16) for being arranged at the slag discharge port of the screw conveyor (15), a second slag discharge valve (14) for being arranged at the slag discharge port of the excavation chamber (1), a slurry discharge valve (11) arranged at the slurry discharge pipeline, and a slurry inlet valve (2) arranged at the slurry inlet pipeline.
8. The slag discharge device for water-bearing formation according to any one of claims 1 to 6, It is characterized in that The slurry inlet pipeline is provided with a slurry inlet drive mechanism (4), and the slurry discharge pipeline is provided with a slurry discharge drive mechanism (12).
9. The slag discharge device for water-bearing formations according to claim 8, It is characterized in that The water-gushing stratum slag discharge device also includes a bypass pipeline, one end of which is connected to the slurry feed pipeline and is located on one side of the output end of the slurry feed drive mechanism (4), and the other end of which is connected to the slurry discharge pipeline and is located on one side of the input end of the slurry discharge drive mechanism (12).
10. An earth pressure balance shield machine, It is characterized in that The invention relates to a slag discharge device for water-gushing formations according to any one of claims 1 to 9.