Fence structure for construction site

By designing a slidable isolation plate and adjustment box, combined with the structure of the rotating cylinder and threaded rod, the problem of the entire partition plate in the construction site being difficult to fit the slope is solved, and the safety and installation convenience of the fence are improved.

CN222162225UInactive Publication Date: 2024-12-13别勇
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420854905.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-24
Publication Date
2024-12-13
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

In construction sites, the entire partition is difficult to fit with the slope, resulting in inconvenient installation and a bottom gap, affecting safety.

Method used

A construction site fence structure is designed, including support columns, rotating feet, fixed anchor rods, side plates, isolation plates and adjustment boxes. The isolation plates can be inclined to fit the slope through sliding grooves and positioning mechanisms. , and improve stability by rotating the barrel and threaded rod.

Benefits of technology

It realizes convenient fit of partitions when installing slopes, solves the gap problem in the installation of traditional whole baffles, improves the safety of the fence, and reduces the time and labor demand for leveling the slopes.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222162225U_ABST
    Figure CN222162225U_ABST
Patent Text Reader

Abstract

The utility model provides a fence structure for a construction site. The construction site fence structure comprises two supporting columns and rotating bottom feet rotationally installed at the bottoms of the two supporting columns, the two rotating bottom feet are each movably provided with two ground fixing anchor rods, and the outer walls of the sides, close to each other, of the two supporting columns are each fixedly provided with a first side plate and a second side plate; a plurality of isolation plates are movably installed between the first side edge plate and the second side edge plate, embedded plates are fixedly installed on the outer walls of one sides of the first side edge plate and the multiple isolation plates, and sliding grooves are formed in the outer walls of the other sides of the second side edge plate and the multiple isolation plates; the multiple embedded plates are installed in the multiple sliding grooves in a sliding mode correspondingly. The fence structure for the construction site has the advantages of being convenient to operate, capable of being installed by being attached to a slope surface and capable of improving safety.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of construction safety, in particular to a construction site enclosure structure. Background Art

[0002] In construction sites where construction is ongoing, in order to distinguish the construction area, fences will be set up at the edge of the construction site to prevent non-staff from entering the construction area and causing safety accidents.

[0003] At present, the common construction fence is formed by fixing a whole piece of partition on the ground, but this method has certain disadvantages. The whole piece of partition is easily affected by the installation environment. For example, when digging the foundation of some houses, a large amount of earth will be generated. The accumulation of earth will cause the ground to slope, and the ground in the entire construction area is not flat, and ramps often appear. When fencing these areas, the whole piece of partition cannot be completely in line with the slope. If placed horizontally, there will be a triangular vacant area at the bottom between adjacent partitions. Although the inclined placement of the partition can fit with the ground, it makes it inconvenient to connect adjacent partitions. When encountering such a situation, most of them will level the fence position to form a certain step on the slope before installing the fence. However, this method has a gap between adjacent partitions, which is easy to climb over and has no warning effect.

[0004] Therefore, it is necessary to provide a new construction site enclosure structure to solve the above technical problems. Utility Model Content

[0005] The technical problem solved by the utility model is to provide a construction site enclosure structure which is convenient to operate, can be installed in accordance with the slope surface and has improved safety.

[0006] In order to solve the above technical problems, the construction site enclosure structure provided by the utility model includes: two support columns and rotating feet rotatably installed at the bottom of the two support columns, two ground anchor rods are movably installed on the two rotating feet, side panels 1 and 2 are fixedly installed on the outer walls on one side of the two support columns close to each other, a plurality of isolation panels are movably installed between the side panels 1 and 2, embedded panels are fixedly installed on the outer walls of one side of the side panel 1 and the plurality of isolation panels, sliding grooves are opened on the outer walls of the other side of the side panel 2 and the plurality of isolation panels, and the plurality of embedded panels are slidably installed in the plurality of sliding grooves respectively.

[0007] Preferably, side frames are fixedly installed on the outer walls of the two support columns on one side close to each other, the bottoms of the side panel one and the side panel two are respectively fixedly connected to the tops of the two side frames, and a stabilizing plate is movably installed between the two side frames.

[0008] Preferably, a plurality of the embedded plates are provided with retaining grooves, the second side plate and the tops of the plurality of the isolation plates are fixedly mounted with adjustment boxes, and a retaining mechanism is provided in the plurality of the adjustment boxes.

[0009] Preferably, the locking mechanism includes a sliding plate, which is slidably installed in the adjustment box, a positioning plate is fixedly installed on one side outer wall of the sliding plate, a pull rod is fixedly installed on one side outer wall of the sliding plate, one end of the pull rod extends to the outside of the adjustment box and is fixedly installed with a pull ring, and a spring is sleeved on the pull rod.

[0010] Preferably, a rotating cylinder is movably installed on the two support columns, a threaded rod is slidably installed in the two rotating cylinders, a connecting frame is fixedly installed on the bottom ends of the two threaded rods, an auxiliary base is rotatably installed on the bottoms of the two connecting frames, and anchor holes are opened on the two auxiliary bases.

[0011] Preferably, a threaded sleeve is rotatably mounted on the bottom end of any one of the rotating cylinders, and the bottom ends of the two threaded rods respectively penetrate the two threaded sleeves and are threadedly connected to the inner walls thereof.

[0012] Compared with the related art, the construction site enclosure structure provided by the utility model has the following beneficial effects:

[0013] The utility model provides a construction site enclosure structure. The device is provided with a plurality of isolation plates that can slide against each other, so that when the slope is installed, the plurality of isolation plates can be tilted to the inclined surface, so that the bottoms of the plurality of isolation plates can fully fit with the slope. Not only is the installation relatively convenient, but it also solves the problem that gaps exist in traditional integral baffles when they are installed on the slope, thereby improving the safety of the enclosure and reducing the time and manpower for leveling the slope. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] Figure 1 A structural schematic diagram of a preferred embodiment of the construction site enclosure structure provided by the utility model;

[0015] Figure 2 for Figure 1 The connection diagram and partial enlarged diagram of two adjacent isolation plates shown;

[0016] Figure 3 for Figure 1 A schematic diagram of a cross-sectional structure of a regulating box as shown;

[0017] Figure 4 for Figure 1 A schematic diagram of the connection state of the stabilizing plate and two side frames shown;

[0018] Figure 5 for Figure 1 The schematic diagram of the connection state of the side panel 1 and the side panel 2 shown;

[0019] Figure 6 for Figure 1 The connection state schematic diagram and partial enlarged diagram of the rotating cylinder are shown.

[0020] Numbers in the figure: 1. Support column; 2. Rotating foot; 3. Ground anchor rod; 4. Warning light; 5. Side panel one; 6. Side panel two; 7. Isolation plate; 8. Sliding groove; 9. Embedded plate; 10. Holding groove; 11. Adjustment box; 12. Sliding plate; 13. Positioning plate; 14. Pull rod; 15. Spring; 16. Side frame; 17. Hanging ring; 18. Stabilizing plate; 19. Hook; 20. Rotating cylinder; 21. Fixed pipe; 22. Threaded sleeve; 23. Threaded rod; 24. Connecting frame; 25. Auxiliary foot. DETAILED DESCRIPTION

[0021] The utility model is further described below in conjunction with the accompanying drawings and implementation modes.

[0022] Please refer to Figure 1-Figure 6 ,in, Figure 1 A structural schematic diagram of a preferred embodiment of the construction site enclosure structure provided by the utility model; Figure 2 for Figure 1 The connection diagram and partial enlarged diagram of two adjacent isolation plates shown; Figure 3 for Figure 1 A schematic diagram of a cross-sectional structure of a regulating box as shown; Figure 4 for Figure 1 A schematic diagram of the connection state of the stabilizing plate and two side frames shown; Figure 5 for Figure 1 The schematic diagram of the connection state of the side panel 1 and the side panel 2 shown;

[0023] Figure 6 for Figure 1 The construction site enclosure structure includes: two support columns 1 and a rotating foot 2 rotatably mounted at the bottom of the two support columns 1, and two ground anchor rods 3 are movably mounted on the two rotating foots 2. Figure 1 As shown, the two ground anchor rods 3 on any rotating foot 2 are located on both sides of the support column 1. Figure 4As shown, C-shaped frames are welded to the bottoms of both support columns 1. Both rotating feet 2 are rotatably installed on the inner walls of both sides of the C-shaped frame by means of rotating shafts. Side plates one 5 and side plates two 6 are fixedly installed on the outer walls of the two support columns 1 close to each other. A plurality of partition plates 7 are movably installed between the side plates one 5 and the side plates two 6. The plurality of partition plates 7 are distributed in a linear array. Warning lights 4 that can be disassembled are installed on the tops of both support columns 1. Embedded plates 9 are fixedly installed on the outer walls of one side of the side plates one 5 and the plurality of partition plates 7. Sliding grooves 8 are opened on the outer walls of the other side of the side plates two 6 and the plurality of partition plates 7. The plurality of embedded plates 9 are respectively slidably installed in the plurality of sliding grooves 8, combined with Figure 2 and Figure 5 As shown, both the top and bottom of the sliding groove 8 are open. In order to prevent the side plates one 5, the side plates two 6 and the plurality of partition plates 7 from separating from each other, both the sliding groove 8 and the embedded plate 9 adopt a T-shaped embedded design.

[0024] Side frames 16 are fixedly installed on the outer walls of the two support columns 1 close to each other. Both side frames 16 are in the shape of the letter "N". The bottoms of the side plates one 5 and the side plates two 6 are respectively fixedly connected to the tops of the two side frames 16. A stability plate 18 is movably installed between the two side frames 16, combined with Figure 4 As shown, hanging rings 17 are fixedly installed on the outer walls of the two side frames 16 close to each other. Hook members 19 are fixedly installed on the outer walls of both sides of the stability plate 18. The two hook members 19 respectively penetrate through the two hanging rings 17.

[0025] Clamping grooves 10 are opened on the plurality of embedded plates 9, combined with Figure 2 As shown, the clamping groove 10 is a rectangular groove body, which is opened on the outer wall of the embedded plate 9 when it is embedded in the sliding groove 8. Adjusting boxes 11 are fixedly installed on the tops of the side plates two 6 and the plurality of partition plates 7. Positioning mechanisms are arranged in the plurality of adjusting boxes 11.

[0026] The positioning mechanism includes a sliding plate 12. The sliding plate 12 is slidably installed in the adjusting box 11, combined with Figure 3As shown, two limit rods are fixedly installed on the horizontal line inside the adjusting box 11, and the two limit rods both penetrate the sliding plate 12 and are slidably connected thereto. A positioning plate 13 is fixedly installed on the outer wall of one side of the sliding plate 12, and the positioning plate 13 is a rectangular block that fits with the clamping groove 10. A rectangular opening is opened on the outer wall of one side of the adjusting box 11, and the positioning plate 13 extends to the outside of the adjusting box 11 through the rectangular opening. A pull rod 14 is fixedly installed on the outer wall of one side of the sliding plate 12, and one end of the pull rod 14 extends to the outside of the adjusting box 11 and is fixedly installed with a pull ring. A spring 15 is sleeved on the pull rod 14, and one end of the spring 15 is fixedly connected to the inner wall of one side of the adjusting box 11, and the other end of the spring 15 is fixedly connected to the sliding plate 12.

[0027] The two support columns 1 are both movably mounted with a rotating cylinder 20, Figure 4 and Figure 5 As shown, the two support columns 1 are provided with strip-shaped openings, and the two rotating cylinders 20 are respectively rotatably mounted on the inner walls of the two sides of the two strip-shaped openings, and the two rotating cylinders 20 are slidably mounted with threaded rods 23, and the bottom ends of the two threaded rods 23 are fixedly mounted with connecting frames 24, and the bottoms of the two connecting frames 24 are rotatably mounted with auxiliary feet 25, combined with Figure 6 As shown, the connecting frame 24 and the auxiliary base 25 are both U-shaped frames, and short shafts are fixedly installed on the outer walls of both sides of the auxiliary base 25. The two short shafts are rotatably connected to the inner walls of both sides of the two connecting frames 24 respectively, and anchor holes are opened on the two auxiliary bases 25.

[0028] The bottom end of any of the rotating cylinders 20 is rotatably mounted with a threaded sleeve 22, and the bottom ends of the two threaded rods 23 respectively penetrate the two threaded sleeves 22 and are threadedly connected to the inner wall thereof. Figure 5 As shown, a fixed tube 21 is fixedly installed at the bottom end of the rotating cylinder 20 , a bearing is fixedly sleeved on the outer wall of the fixed tube 21 , and the outer wall of the bearing is fixedly connected to the inner wall of the threaded sleeve 22 .

[0029] The working principle of the construction site enclosure structure provided by the utility model is as follows:

[0030] When installing a fence at a construction site on flat ground, the two rotating feet 2 can be directly fixed to the ground through the ground anchor rods 3, and then the two rotating cylinders 20 can be rotated out from the two strip-shaped openings respectively. After rotating the two threaded sleeves 22 respectively, the two threaded rods 23 can be moved out of the two rotating cylinders 20 respectively under the side effect of the thread, thereby extending the connecting frame 24. After extending to a certain length, the auxiliary foot 25 can be fitted with the ground after rotation, and then the fixing rod can be installed through the anchor hole for fixing. In this way, a triangle is formed between the rotating cylinder 20, the support column 1 and the ground, thereby improving the stability of the fence.

[0031] When it is necessary to install a fence on the slope, the staff can pull out the stabilizing plate 18 horizontally. After the stabilizing plate 18 is detached from the two side frames 16, the bottom supports of the multiple isolation plates 7 will disappear, so that the multiple isolation plates 7 can slide relative to each other, and after sliding, the two adjacent isolation plates 7 are fixed again by embedding the positioning plate 13 into the holding groove 10. After adjustment in sequence, the two support columns 1 no longer maintain the same height, and the multiple isolation plates 7 are stepped down, so that they can fully fit the slope. The device can be fixed on the slope with the help of the rotating base 2 and the auxiliary base 25. After use, it is only necessary to pull the pull rod 14 horizontally to move the positioning plate 13 out of the holding groove 10 to release the fixing effect between the two adjacent isolation plates 7, and then push the multiple isolation plates 7 to the same height and then insert the stabilizing plate 18.

[0032] Compared with the related art, the construction site enclosure structure provided by the utility model has the following beneficial effects:

[0033] The utility model provides a construction site enclosure structure. The device is provided with a plurality of isolation plates 7 that can slide against each other, so that when the slope is installed, the plurality of isolation plates 7 can be tilted to the slope, so that the bottoms of the plurality of isolation plates 7 can fully fit with the slope. Not only is the installation relatively convenient, but it also solves the problem of gaps in the traditional whole baffle plate when it is installed on the slope, thereby improving the safety of the enclosure and reducing the time and manpower for leveling the slope.

[0034] The above description is only an embodiment of the present invention, and does not limit the patent scope of the present invention. Any equivalent structure or equivalent process transformation made by using the contents of the specification and drawings of the present invention, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present invention.

Claims

1. A construction site enclosure structure, include: Two support columns and a rotating base rotatably installed at the bottom of the two support columns, characterized in that two ground anchor rods are movably installed on the two rotating bases, side panels 1 and 2 are fixedly installed on the outer walls on one side of the two support columns close to each other, multiple isolation panels are movably installed between the side panels 1 and 2, embedded panels are fixedly installed on the outer walls of one side of the side panel 1 and the multiple isolation panels, sliding grooves are opened on the outer walls of the other side of the side panel 2 and the multiple isolation panels, and the multiple embedded panels are slidably installed in the multiple sliding grooves respectively.

2. The construction site enclosure structure according to claim 1, It is characterized in that Side frames are fixedly installed on the outer walls of the two support columns on one side close to each other, the bottoms of the side panels 1 and 2 are fixedly connected to the tops of the two side frames respectively, and a stabilizing plate is movably installed between the two side frames.

3. The construction site enclosure structure according to claim 2, It is characterized in that A plurality of the embedded plates are provided with retaining grooves, the second side plate and the tops of the plurality of the isolation plates are fixedly mounted with adjustment boxes, and a retaining mechanism is provided inside the plurality of the adjustment boxes.

4. The construction site enclosure structure according to claim 3, It is characterized in that The locking mechanism includes a sliding plate, which is slidably installed in the adjustment box, a positioning plate is fixedly installed on one side outer wall of the sliding plate, a pull rod is fixedly installed on one side outer wall of the sliding plate, one end of the pull rod extends to the outside of the adjustment box and is fixedly installed with a pull ring, and a spring is sleeved on the pull rod.

5. The construction site enclosure structure according to claim 4, It is characterized in that A rotating cylinder is movably installed on the two support columns, and a threaded rod is slidably installed in the two rotating cylinders. A connecting frame is fixedly installed on the bottom ends of the two threaded rods, and auxiliary base feet are rotatably installed on the bottoms of the two connecting frames. Anchor holes are opened on the two auxiliary base feet.

6. The construction site enclosure structure according to claim 5, It is characterized in that A threaded sleeve is rotatably mounted on the bottom end of any one of the rotating cylinders, and the bottom ends of the two threaded rods respectively penetrate the two threaded sleeves and are threadedly connected to the inner walls thereof.